CN105179925A - LNG storage tank for liquefied natural gas filling pontoon - Google Patents

LNG storage tank for liquefied natural gas filling pontoon Download PDF

Info

Publication number
CN105179925A
CN105179925A CN201510622218.5A CN201510622218A CN105179925A CN 105179925 A CN105179925 A CN 105179925A CN 201510622218 A CN201510622218 A CN 201510622218A CN 105179925 A CN105179925 A CN 105179925A
Authority
CN
China
Prior art keywords
tank body
saddle
storage tank
natural gas
liquefied natural
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510622218.5A
Other languages
Chinese (zh)
Inventor
吴志龙
王超
任改红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhangjiagang Furui Special Equipment Co Ltd
Original Assignee
Zhangjiagang Furui Special Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhangjiagang Furui Special Equipment Co Ltd filed Critical Zhangjiagang Furui Special Equipment Co Ltd
Priority to CN201510622218.5A priority Critical patent/CN105179925A/en
Publication of CN105179925A publication Critical patent/CN105179925A/en
Pending legal-status Critical Current

Links

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The invention discloses an LNG storage tank for a liquefied natural gas filling pontoon. The LNG storage tank for the liquefied natural gas filling pontoon comprises saddles, a tank body supported by the saddles, and a lead-out pipeline of the tank body. The lead-out pipeline of the tank body is formed at one end of the tank body. The saddles comprise the first saddle and the second saddle which are arranged in a spaced manner in the axial direction of the tank body. The second saddle is close to the lead-out pipeline of the tank body. Six supporting points are formed between the first saddle and the tank body and between the second saddle and the tank body in the peripheral direction. The six supporting points are symmetrically distributed on the two sides of the tank body. The first saddle and the tank body can slide relative to each other in the axial direction. The second saddle and the tank body are fixed to each other. The supporting structure is reasonable in arrangement; a twelve-point supporting manner is adopted, the stress performance is good, and influences of loads, in the upward direction, the downward direction and the other directions, on the storage tank are avoided; and according to design, the left end is supported to slide, the right end is supported by a fixing device, and the problem that after an inner container is contracted because of coldness, the borne shearing force is supported is solved.

Description

Liquefied natural gas filling landing stage LNG storage tank
Technical field
The application belongs to natural gas transportation technical field, particularly relates to the filling wholesale storage tank for ship for storing LNG Liquefied natural gas and filled function.
Background technique
The industrial revolution achieves great achievement in 30 years, but environmental pollution also seriously have impact on the living environment of people, and the cry of society is very large.Development of inland waterway transportation LNG ship oceangoing ship industry has great importance for energy-saving and emission-reduction.Progressively ripe along with LNG fuel shipbuilding technology, carries out filling to boats and ships and becomes key issue, boats and ships LNG annotate facility construction and promote extremely urgent.
Summary of the invention
The object of the present invention is to provide a kind of liquefied natural gas filling landing stage LNG storage tank, to overcome deficiency of the prior art.
For achieving the above object, the invention provides following technological scheme:
The embodiment of the present application discloses a kind of liquefied natural gas filling landing stage LNG storage tank, comprise saddle, be supported in the tank body on described saddle, the tank body being formed at described tank body one end draws pipeline, saddle comprises the first saddle and the second saddle that arrange along described tank body axially spaced-apart, described second saddle draws pipeline installing near described tank body, described first saddle and the second saddle are respectively and circumferentially form 6 strong points between described tank body, symmetrical and the described tank body both sides of these 6 strong points, vertically can relative sliding between described first saddle and described tank body, described second saddle is relative fixing with between described tank body.
Preferably, in above-mentioned liquefied natural gas filling landing stage LNG storage tank, described tank body comprises outer container and is positioned at the inner container of described outer container, is filled with sandwich layer thermal insulating material between described outer container and inner container.
Preferably, in above-mentioned liquefied natural gas filling landing stage LNG storage tank, circumferentially bracing ring is formed with between described inner container and outer container, described bracing ring comprises spaced first bracing ring and the second bracing ring vertically, and described first saddle and the second saddle are supported on described first bracing ring and the second bracing ring respectively.
Preferably, in above-mentioned liquefied natural gas filling landing stage LNG storage tank, in described first bracing ring and the second bracing ring, circumferentially array is provided with multiple angle steel respectively.
Preferably, in above-mentioned liquefied natural gas filling landing stage LNG storage tank, the interlayer top between described inner container and outer container is filled with anti-settling thermal-protective material.
Preferably, in above-mentioned liquefied natural gas filling landing stage LNG storage tank, swash plate and anti-swirl baffle in described inner container, is provided with.
Preferably, in above-mentioned liquefied natural gas filling landing stage LNG storage tank, be provided with two in described inner container and overlap independently liquid level emasuring device.
Preferably, in above-mentioned liquefied natural gas filling landing stage LNG storage tank, the both sides of described tank body are symmetrically arranged with 2 hangers respectively.
Preferably, in above-mentioned liquefied natural gas filling landing stage LNG storage tank, the linear sealing of described tank body fairlead is in ice chest parts, and these ice chest parts have an intake grill and a suction opeing, and described ice chest parts are also provided with combustible gas detector and gas-tight door.
Preferably, in above-mentioned liquefied natural gas filling landing stage LNG storage tank, described storage tank also comprises flow-off and gas phase mouth, and this flow-off and gas phase interruption-forming are in the middle part of described tank body.
Compared with prior art, the invention has the advantages that:
1, reasonable in design of the present invention, compact appearance, overall appearance.
2, supporting structure of the present invention is rationally distributed, have employed within the scope of 90 °, storage tank top and 2 glass reinforced plastic supports are set, ten two supporting way of four glass reinforced plastic supports are set within the scope of 120 °, storage tank bottom, stress performance is good, the problem of the direction loading effect such as upper and lower solving that storage tank is subject on boats and ships; The left end support of design is slided, right-hand member supporting adn fixing device, solves inner container and is meeting the shearing problem suffered by cold events rear support; The high-quality glass fibre reinforced plastics simultaneously adopted can reduce this key issue of storage tank leaking heat.
3, ice chest parts of the present invention, all pipelines and valve instrument etc. that storage tank draws is contained in the inside, effectively prevents product in use, because valve instrument etc. leaks the potential safety hazard caused.
4, be provided with one layer of heat preservation at interlayer top cotton and be fixed on the anti-settling structure at top in the present invention, solve product in use sandwich layer thermal insulating material pearlife because Action of Gravity Field sedimentation causes top to occur, the problem of heat is leaked in local.
5,4 non-standard axial lifting lugs product adopted, are arranged in storage tank both sides, avoid in product hoisting process, the problems such as shackle structure localized stress is excessive.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present application or technological scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, the accompanying drawing that the following describes is only some embodiments recorded in the application, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Figure 1 shows that the front view of liquefied natural gas filling landing stage LNG storage tank in the specific embodiment of the invention;
Figure 2 shows that A in Fig. 1 to schematic diagram.
Embodiment
The embodiment of the present application discloses a kind of liquefied natural gas filling landing stage LNG storage tank, and storage tank integral installation, on the pedestal of wharf boat body, comprises the LNG storage tank be arranged on hull and the ice chest structure carried thereof.Liquefied natural gas (LNG) tank comprises the interior outer container of low temperature resistant steel matter, also comprises the discharge pipe line filling pipeline and use LNG filling LNG, also comprises vapor return line, measurement of correlation liquid level pipeline etc. simultaneously; Contain process pipelines and valve etc. inside all steel structure ice chest, also have inlets and putlets of ventilation simultaneously, once find natural gas leaking, induced draft fan just can drain into safety zone by rock gas.Whole device, as the capital equipment on liquefied natural gas filling landing stage, achieves the hidden danger of LNG storage tank district without natural gas leaking on landing stage.
Below in conjunction with the accompanying drawing in the embodiment of the present invention, be described in detail the technological scheme in the embodiment of the present invention, obviously, described embodiment is only the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, the every other embodiment that those of ordinary skill in the art obtain under the prerequisite not making creative work, belongs to the scope of protection of the invention.
Shown in ginseng Fig. 1 and Fig. 2, liquefied natural gas filling landing stage LNG storage tank comprises saddle 1, the tank body 2 be supported on saddle, be formed at tank body 2 one end tank body draw pipeline 3, saddle 1 comprises the first saddle and the second saddle that arrange along tank body axially spaced-apart, second saddle is drawn pipeline 3 near tank body 2 and is arranged, first saddle and the second saddle are respectively and circumferentially form 6 strong points 4 between tank body 2, these 6 strong points are symmetrical with tank body 2 both sides, vertically can relative sliding between first saddle 101 and tank body 2, relative fixing between the second saddle with tank body 2.
In this technological scheme, supporting structure is according to the feature of low-temperature (low temperature) vessel, ten two supporting way adopted, have employed between each saddle and tank body within the scope of 90 °, storage tank top and 2 glass reinforced plastic supports are set, four glass reinforced plastic supports are set within the scope of 120 °, storage tank bottom, the load such as be up and down subject on boats and ships according to storage tank affect rational deployment; Slide in the one end simultaneously designed, one end fixing device, solves inner container after chance cold events, the shearing problem suffered by support.The high-quality glass fibre reinforced plastics simultaneously adopted can reduce this key issue of storage tank leaking heat.
Tank body 2 comprises outer container 201 and is positioned at the inner container 202 of outer container, is filled with sandwich layer thermal insulating material 5 between outer container 201 and inner container 202.Bracing ring 6 is circumferentially formed between inner container 202 and outer container 201, bracing ring 6 comprises spaced first bracing ring 601 and the second bracing ring 602, first saddle and the second saddle vertically and is supported in respectively on the first bracing ring 601 and the second bracing ring 602.In first bracing ring 601 and the second bracing ring 602, circumferentially array is provided with multiple angle steel 7 respectively.Interlayer top between outer container 201 and inner container 202 is filled with anti-settling thermal-protective material 8.
In this technological scheme, outer container support zone arranges a circle intercostal angle 7, can strengthen the intensity of support zone; The anti-settling thermal-protective material 8 that interlayer top is arranged, the problem of heat is leaked in local because Action of Gravity Field sedimentation causes top to occur to solve in use sandwich layer thermal insulating material pearlife 5, and anti-settling thermal-protective material 8 is preferably adiabatic continuous.
Swash plate 9 and anti-swirl baffle 10 is provided with in inner container 202.
In this technological scheme, swash plate can effectively prevent the liquid of boats and ships in the process of rocking in storage tank to the impact of left and right sides end socket, reduces impulsive load, avoids end socket to destroy because fatigue produces; Anti-swirl baffle effectively prevents storage tank from filling with in return-air process, and liquid enters and exits in storage tank and produces vortex phenomenon.
Be provided with two in inner container 202 and overlap independently liquid level emasuring device 11.
In this technological scheme, overlap independently liquid level emasuring device by two, the using and the reserved function can be realized, level gauging and security coordinated signals function in tank can be realized again simultaneously.
The both sides of tank body 2 are symmetrically arranged with 2 hangers 12 respectively.
In this technological scheme, the non-standard axial lifting lug of employing, rational deployment, avoids in product hoisting process, the problems such as shackle structure localized stress is excessive.
Tank body is drawn pipeline 3 and is sealed in ice chest parts 13, and these ice chest parts 13 have an intake grill and a suction opeing, and ice chest parts 13 are also provided with combustible gas detector and gas-tight door.
In this technological scheme, all pipelines of drawing in ice chest parts accommodation tank and valve instrument etc., effectively prevent product in use, because valve instrument etc. leaks the potential safety hazard caused.Arrange intake grill, suction opeing simultaneously, be equiped with combustible gas detector, add air-tight door structure at ice chest top, easy access personnel enter and exit ice chest.
Storage tank also comprises flow-off and gas phase mouth 14, and this flow-off and gas phase mouth 14 are formed at the middle part of tank body.
In this technological scheme, inner container comprises inner barrel and interior end socket, adopts the low temperature material of Austenitic Stainless Steel, effectively can store LNG Liquefied natural gas.The process pipelines comprised, integrates and fills, return-air, with liquid, thermometry, overflow, level gauging etc., considers the impact of expanding with heat and contract with cold on pipeline in design process.Wherein flow-off and gas phase mouth are arranged in the middle part of storage tank, avoid the measurement that internal vessel liquid fills because storage tank rocks and produce error, prevent liquid from flowing out to outside from gas phase mouth simultaneously, freeze safety valve and cause potential safety hazard.
It should be noted that, in this article, the such as relational terms of first and second grades and so on is only used for an entity or operation to separate with another entity or control panel, and not necessarily requires or imply the relation that there is any this reality between these entities or operation or sequentially.And, term " comprises ", " comprising " or its any other variant are intended to contain comprising of nonexcludability, thus make to comprise the process of a series of key element, method, article or equipment and not only comprise those key elements, but also comprise other key elements clearly do not listed, or also comprise by the intrinsic key element of this process, method, article or equipment.When not more restrictions, the key element limited by statement " comprising ... ", and be not precluded within process, method, article or the equipment comprising described key element and also there is other identical element.
The above is only the embodiment of the application; it should be pointed out that for those skilled in the art, under the prerequisite not departing from the application's principle; can also make some improvements and modifications, these improvements and modifications also should be considered as the protection domain of the application.

Claims (10)

1. a liquefied natural gas filling landing stage LNG storage tank, it is characterized in that, comprise saddle, be supported in the tank body on described saddle, the tank body being formed at described tank body one end draws pipeline, described saddle comprises the first saddle and the second saddle that arrange along described tank body axially spaced-apart, described second saddle draws pipeline installing near described tank body, described first saddle and the second saddle are respectively and circumferentially form 6 strong points between described tank body, symmetrical and the described tank body both sides of these 6 strong points, vertically can relative sliding between described first saddle and described tank body, described second saddle is relative fixing with between described tank body.
2. liquefied natural gas filling landing stage according to claim 1 LNG storage tank, is characterized in that: described tank body comprises outer container and is positioned at the inner container of described outer container, is filled with sandwich layer thermal insulating material between described outer container and inner container.
3. liquefied natural gas filling landing stage according to claim 2 LNG storage tank, it is characterized in that: between described inner container and outer container, be circumferentially formed with bracing ring, described bracing ring comprises spaced first bracing ring and the second bracing ring vertically, and described first saddle and the second saddle are supported on described first bracing ring and the second bracing ring respectively.
4. liquefied natural gas filling landing stage according to claim 3 LNG storage tank, is characterized in that: in described first bracing ring and the second bracing ring, circumferentially array is provided with multiple angle steel respectively.
5. liquefied natural gas filling landing stage according to claim 2 LNG storage tank, is characterized in that: the interlayer top between described inner container and outer container is filled with anti-settling thermal-protective material.
6. liquefied natural gas filling landing stage according to claim 2 LNG storage tank, is characterized in that: be provided with swash plate and anti-swirl baffle in described inner container.
7. liquefied natural gas filling landing stage according to claim 2 LNG storage tank, is characterized in that: be provided with two in described inner container and overlap independently liquid level emasuring device.
8. liquefied natural gas filling landing stage according to claim 1 LNG storage tank, is characterized in that: the both sides of described tank body are symmetrically arranged with 2 hangers respectively.
9. liquefied natural gas filling landing stage according to claim 1 LNG storage tank, it is characterized in that: the linear sealing of described tank body fairlead is in ice chest parts, these ice chest parts have an intake grill and a suction opeing, and described ice chest parts are also provided with combustible gas detector and gas-tight door.
10. liquefied natural gas filling landing stage according to claim 1 LNG storage tank, is characterized in that: described storage tank also comprises flow-off and gas phase mouth, and this flow-off and gas phase interruption-forming are in the middle part of described tank body.
CN201510622218.5A 2015-09-25 2015-09-25 LNG storage tank for liquefied natural gas filling pontoon Pending CN105179925A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510622218.5A CN105179925A (en) 2015-09-25 2015-09-25 LNG storage tank for liquefied natural gas filling pontoon

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510622218.5A CN105179925A (en) 2015-09-25 2015-09-25 LNG storage tank for liquefied natural gas filling pontoon

Publications (1)

Publication Number Publication Date
CN105179925A true CN105179925A (en) 2015-12-23

Family

ID=54902207

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510622218.5A Pending CN105179925A (en) 2015-09-25 2015-09-25 LNG storage tank for liquefied natural gas filling pontoon

Country Status (1)

Country Link
CN (1) CN105179925A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107218508A (en) * 2017-07-05 2017-09-29 江西制氧机有限公司 A kind of new LNG fuel tank ice chest
CN108016570A (en) * 2016-10-28 2018-05-11 石家庄安瑞科气体机械有限公司 The sealing device and grouping unit of CNG cargo ships gas cylinder or bottle type container grouping unit
CN108167638A (en) * 2017-12-20 2018-06-15 查特深冷工程系统(常州)有限公司 Cryogenic liquid tank case peculiar to vessel and its operating method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2776776A (en) * 1952-07-11 1957-01-08 Gen Electric Liquefied gas container
GB814193A (en) * 1954-12-08 1959-06-03 Maschf Augsburg Nuernberg Ag An improved inking mechanism for rotary printing machines
DE10331102A1 (en) * 2003-07-04 2005-01-27 Cta Anlagenbau Gmbh Container for storing and delivery of deeply frozen or otherwise hazardous liquids such as liquid oxygen has internal and external tanks rigidly interconnected by retaining components laid pole-side on longitudinal axis
CN201539687U (en) * 2009-10-20 2010-08-04 渤海船舶重工有限责任公司 Shipping liquid cargo tank of LNG transport ship
CN201779441U (en) * 2010-08-13 2011-03-30 孙加成 LNG (Liquefied Natural Gas) storage tank for diesel oil-LNG hybrid power ship
CN102840441A (en) * 2012-09-27 2012-12-26 张家港韩中深冷科技有限公司 Storage tank for cooling superconducting cable
CN202992639U (en) * 2012-12-21 2013-06-12 山东宏达科技集团有限公司 Inner and outer container supporting structure of horizontal type deep cold container
CN204534121U (en) * 2015-04-20 2015-08-05 张杨 A kind of low-temperature double-case spherical storage tank
CN204943013U (en) * 2015-09-25 2016-01-06 张家港富瑞特种装备股份有限公司 Liquefied natural gas filling landing stage LNG storage tank

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2776776A (en) * 1952-07-11 1957-01-08 Gen Electric Liquefied gas container
GB814193A (en) * 1954-12-08 1959-06-03 Maschf Augsburg Nuernberg Ag An improved inking mechanism for rotary printing machines
DE10331102A1 (en) * 2003-07-04 2005-01-27 Cta Anlagenbau Gmbh Container for storing and delivery of deeply frozen or otherwise hazardous liquids such as liquid oxygen has internal and external tanks rigidly interconnected by retaining components laid pole-side on longitudinal axis
CN201539687U (en) * 2009-10-20 2010-08-04 渤海船舶重工有限责任公司 Shipping liquid cargo tank of LNG transport ship
CN201779441U (en) * 2010-08-13 2011-03-30 孙加成 LNG (Liquefied Natural Gas) storage tank for diesel oil-LNG hybrid power ship
CN102840441A (en) * 2012-09-27 2012-12-26 张家港韩中深冷科技有限公司 Storage tank for cooling superconducting cable
CN202992639U (en) * 2012-12-21 2013-06-12 山东宏达科技集团有限公司 Inner and outer container supporting structure of horizontal type deep cold container
CN204534121U (en) * 2015-04-20 2015-08-05 张杨 A kind of low-temperature double-case spherical storage tank
CN204943013U (en) * 2015-09-25 2016-01-06 张家港富瑞特种装备股份有限公司 Liquefied natural gas filling landing stage LNG storage tank

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108016570A (en) * 2016-10-28 2018-05-11 石家庄安瑞科气体机械有限公司 The sealing device and grouping unit of CNG cargo ships gas cylinder or bottle type container grouping unit
CN108016570B (en) * 2016-10-28 2024-02-27 石家庄安瑞科气体机械有限公司 Sealing device of CNG transport ship gas cylinder or cylinder container marshalling unit and marshalling unit
CN107218508A (en) * 2017-07-05 2017-09-29 江西制氧机有限公司 A kind of new LNG fuel tank ice chest
CN108167638A (en) * 2017-12-20 2018-06-15 查特深冷工程系统(常州)有限公司 Cryogenic liquid tank case peculiar to vessel and its operating method
CN108167638B (en) * 2017-12-20 2024-04-26 查特深冷工程系统(常州)有限公司 Marine cryogenic liquid tank and operation method thereof

Similar Documents

Publication Publication Date Title
AU2015245422B2 (en) Sealed, heat-insulated vessel housed in a buoyant structure
CN102770342A (en) Wo2011101081
CN204943013U (en) Liquefied natural gas filling landing stage LNG storage tank
JP2015013494A (en) Long sea floating facility
JP2015016861A (en) Floating structure with fuel tank for gas fuel
JP2015013494A5 (en)
CN105179925A (en) LNG storage tank for liquefied natural gas filling pontoon
CN205327337U (en) LNG gas holder system of arranging of two fuel -power transportation boats and ships in ocean
CN105546325A (en) Filling marine liquefied natural gas storage tank
CN104806873A (en) Bimetal wall fully covering low-temperature storage tank
CN106168328A (en) A kind of removable LNG ship fuel tank case
CN203428013U (en) LNG (liquefied natural gas) fuel storage tank structure and LNG ship
CN202320725U (en) Liquefied gas transportation ship
WO2013083160A1 (en) System for containing and transporting compressed natural gas in inspectable cylindrical containers, combined in modules
CN204240043U (en) A kind of filling liquefied natural gas (LNG) tank peculiar to vessel
CN104094036A (en) Type-4 tank for CNG containment
CN108194835A (en) LNG fuel air supply system peculiar to vessel
CN104094042A (en) Inspectable containers for the transport by sea of compressed natural gas, fitted with a manhole for internal access
CN205579143U (en) LNG filling system and LNG filling ship
CN202030721U (en) Offshore oil gas floating air liquefying apparatus applied in water area of South China Sea
Fan et al. LNG bunkering pontoons on inland waters in China
CN103101604A (en) Liquefied gas transport ship
CN207865031U (en) LNG fuel air supply system peculiar to vessel
KR20140057960A (en) Drawing in and out unit for gas detector of lng carrier
KR20160148309A (en) Collecting apparatus of leakage for liquid gas storage tank and marine structure including the same

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20151223