CN105160981B - A kind of railway tunnel rescue station fire test system containing a plurality of evacuation transverse passage-way - Google Patents
A kind of railway tunnel rescue station fire test system containing a plurality of evacuation transverse passage-way Download PDFInfo
- Publication number
- CN105160981B CN105160981B CN201510656888.9A CN201510656888A CN105160981B CN 105160981 B CN105160981 B CN 105160981B CN 201510656888 A CN201510656888 A CN 201510656888A CN 105160981 B CN105160981 B CN 105160981B
- Authority
- CN
- China
- Prior art keywords
- fire
- tunnel
- evacuation
- transverse passage
- way
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- G—PHYSICS
- G09—EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
- G09B—EDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
- G09B25/00—Models for purposes not provided for in G09B23/00, e.g. full-sized devices for demonstration purposes
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Educational Administration (AREA)
- Educational Technology (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Aerodynamic Tests, Hydrodynamic Tests, Wind Tunnels, And Water Tanks (AREA)
Abstract
The present invention relates to one kind containing a plurality of evacuation transverse passage-way railway tunnel rescue station fire test system, including experiment tunnel main body and data measurin system, experiment tunnel main body includes fire tunnel, evacuation transverse passage-way, non-fire tunnel, train model, burning things which may cause a fire disaster and smoke evacuation system;Fire tunnel is connected by evacuating transverse passage-way with non-fire tunnel, train model, burning things which may cause a fire disaster and smoke evacuation system are arranged in fire tunnel, the fire test platform includes 9 evacuation transverse passage-ways, by the transverse passage-way for blocking varying number, it is possible to achieve the fire test research of the railway tunnel rescue station of the evacuation transverse passage-way containing different bar numbers;This experiment porch has wider application, the rescue station fire scenario of different transverse passage-way bar numbers, the fire scenario of different fire locations, the fire scenario of different fume exhausting types, the different fire scenarios for divulging information operating mode can be combined, so as to which the analysis and research work to the experiment of a variety of fire scenarios of railway tunnel rescue station under reality can be realized, have broad application prospects and important directive significance.
Description
Technical field
Invention is related to railway tunnel technical field of fire hazard safety, more particularly to one kind containing a plurality of evacuation transverse passage-way railway tunnel
Road rescue station fire test system, flue gas control effect during for resting in rescue station after train fire in extra-long railway tunnel
Simulated, can be achieved to temperature field, the measurement of velocity field.
Background technology
Railway is the important infrastructure of country, main artery, the popular vehicles as country, in comprehensive traffic
Be in key status in system, and one of the important component of tunnel as railway, in recent years its quantity be on the increase and
Single seat length of tunnel also constantly increases.Although compared to vcehicular tunnel, the probability that fire occurs for railway tunnel is smaller, by
In its buried underground, environment closing, all it is greatly limited in ventilation, passenger flow rapid evacuation etc., once fire occurs
Calamity, dense smoke and hot gas are difficult that nature excludes, if the intensity of a fire can not be controlled effectively, its consequence will be hardly imaginable.
In view of the randomness and harmfulness of tunnel fire hazard, in railway tunnel particularly extra-long railway tunnel, carry out tunnel
Fire prevention and Evacuation Design work are extremely important, and for extra-long railway tunnel, setting rescue station is preferentially examined in Fire prevention
The scheme of worry.The working mechanism of rescue station is:When in tunnel fire occurs for train, train is left for into rescue station in time, multiplied
Visitor and road man get off rapidly, are evacuated to another tunnel, waited for rescue by transverse passage-way.Therefore, train stop of catching fire is studied
After rescue station under different fume exhausting types the regularity of distribution in temperature field, Smoke Spread and flue gas control effect for railway of growing up
Tunnel rescue station Fire prevention has important directive significance.
Economy and facility is tested based on small-scale model, it has also become the conventional means of research railway tunnel fire test now,
Have some researchers both at home and abroad and carried out various forms of model fire tests.External aspect, Lee et al. (1979) are built
Found an a length of 13.7m, the small size test model that cross-sectional area is 0.27m2, and to suppressing tunnel fire disaster fume adverse current
Critical wind velocity is studied.Afterwards, Chaiken et al. (1979), Vantelon et al. (1990), Kwack et al. (1990),
Xue et al. (1993), Oka et al. (1996) establish a series of small size test model that scales differ in succession, go forward side by side
The correlative study of tunnel fire hazard is gone.Hwang and Wargo (1996) have studied influence of the tunnel top rake to flow of flue gas.
G.T.Atkinson and Y.Wu (1996) have studied influence of the top rake to critical air-supply wind speed, and proposes and consider tunnel longitudinal slope
The projected relationship formula of the critical air-supply wind speed of degree.Y.Wu and M.Z.A.Bakar (2000), Hitoshi Kurioka et al.
(2002) detailed grind has been carried out to tunnel fire plume inclination angle, ceiling highest flue-gas temperature and position to vertical wind speed respectively
Study carefully, and propose the rule-of-thumb relation of oneself.Vauquelin (2006) passes through 1:20 model test, have studied tunnel width
Influence to critical wind velocity.Jae Seongroh (2008) establish one 1:20 small size testing stand, and have studied ventilation
Influence of the wind speed to burning things which may cause a fire disaster burn rate.Domestic aspect, it is 1.8m that the Yan Zhiguo (2002) of Southwest Jiaotong University, which establishes internal diameter,
Wall thickness is 15cm, a length of 100m concrete reinforced pipe segment model tunnel, and by the fire test of tunnel model, fire is occurred
When tunnel in the distribution of temperature field and pressure field, the condition of smog studied.Wang Mingnian of Southwest Jiaotong University etc.
(2003) an a diameter of 2m is established, length 120m, the gradient is 1% model tunnel, during to fire occurring in tunnel
Temperature changing regularity is studied.Lee's winter (2010) of Central South University using lion ocean submerged tunnel to rely on, establishes ratio
For 1:9, length is 52.5m model tunnel, and the Disaster Prevention Design and Fire prevention of underwater shield tunnel are studied.
By being investigated to some data, at present for the research of tunnel fire hazard, focus mostly on and occur in fire in single tube
The situation in tunnel, as the B of Chinese invention patent document CN 102306459 also merely disclose single tube railway tunnel rescue station fire
Experimental system for simulating;Research for fire test in the rescue station provided with evacuation transverse passage-way connection double-hole tunnel is also almost empty
In vain.
The content of the invention
The technical problems to be solved by the invention be for speciality double-hole tunnel can not full simulation fire when flue gas control
Effect, and measurement of the realization to temperature field, velocity field is, and it is an object of the present invention to provide a kind of rescue containing a plurality of evacuation transverse passage-way railway tunnel
Station fire test system is helped, flue gas control effect during to resting in rescue station after train fire in extra-long railway tunnel is solved and carries out
Simulation, the problem of can be achieved to temperature field, velocity field measurement.
The present invention's is achieved through the following technical solutions:One kind is real containing a plurality of evacuation transverse passage-way railway tunnel rescue station fire
Check system, including experiment tunnel main body and data measurin system, the experiment tunnel main body include fire tunnel, evacuate horizontal lead to
Road, non-fire tunnel, train model, burning things which may cause a fire disaster and smoke evacuation system;Described fire tunnel is by evacuating transverse passage-way and non-fire tunnel
Road is connected, and described train model, burning things which may cause a fire disaster and smoke evacuation system be arranged in fire tunnel, can pass through during specific experiment block it is horizontal
The mode of passway is realized containing the fire scenario in different transverse passage-way number rescue stations.
Described smoke evacuation system includes smokejack, exhaust smoke valve, exhaust opening, centrifugal blower and axial flow blower, the smokejack
Be separated out by smokejack partition wall in fire tunnel away from passage side, the exhaust smoke valve be reserved in it is small on smokejack partition wall
Hole;The exhaust opening is arranged in the middle part of smokejack, and described centrifugal blower is arranged in exhaust opening and outwards smoked, and plays outside smoking
Effect, the axial flow blower is arranged in fire tunnel and non-four holes in fire tunnel, and that fresh low temperature is provided into tunnel is empty
Gas simultaneously guides plume, and in terms of fume exhausting type, this experiment porch can study half horizontal smoke evacuation side under independent lateral smokejack
The high-temperature area under longitudinal fume exhausting type in the case of formula and transverse passage-way closing controls and fire and smoke spread control effect.
The data measurin system includes data measurement unit, data acquisition unit and software analysis module, and the data are surveyed
Amount device includes temperature measuring equipment and wind speed measuring device, and data measurement unit (thermocouple, pressure sensor etc.) will gather
To temperature, pressure values be converted into corresponding analog voltage (mv levels) and export to data acquisition unit, by operation amplifier, through A/D
Digital analog converter is converted into the binary code that single-chip microcomputer can be handled, and hands over single-chip microcomputer processing, and then single-chip microcomputer is by temperature, pressure
The digital quantity of output port output is sent to host computer (PC) through network, through the temperature in software analysis module, flow relocity calculation journey
Sequence is converted into corresponding temperature value, velocity amplitude, and is stored in database server.
Further, described exhaust smoke valve is 10, and section where taking each exhaust smoke valve is test section, is tested for totally 10
Section, per vault bottom in each section, above evacuation platform, each cloth in evacuation platform center line human eye feature height (i.e. 0.16m) place
A wind speed measuring point is put, the wind speed measuring point is provided with the measuring wind speed for measuring diverse location wind speed size in fire tunnel
Device.The wind speed measuring device is made up of the Pitot tube and little differential pressure sensor being arranged in fire tunnel.
Further, the experiment tunnel main body uses 1 with actual tunnel main body:10 contracting scale model, tunnel length
60m, fire tunnel are connected with non-fire tunnel by 9 evacuation transverse passage-ways;Using 1:The design of 10 contracting scale model, complete
It can meet in the case of obtaining accurate experimental data, practice every conceivable frugality experiment porch construction cost.
Further, it is described experiment tunnel main body fire tunnel using fire prevention brick masonry, described non-fire tunnel and
Evacuation transverse passage-way uses common brick masonry;The inner surface cement sand plaster of the experiment tunnel main body, zone of origin is using resistance to
Fiery cement plaster, outer surface use cement sand plaster after laying layer of steel wire net, refractory material are used in zone of origin, in non-burning things which may cause a fire disaster
Area uses common material, can be with cost-effective in the case where meeting experimental performance.
Further, the train model is made by reinforcing bar as framework using iron sheet merogenesis, the length and width in a section compartment,
Height is respectively 255cm, 31cm, 44cm, and train model length is that 17 section car lengths add locomotive overall length, i.e. 2.03+2.55 × 17
=45.38m, fire location one are saved and do not arrange compartment model in car length, and train is positioned in the middle part of fire tunnel, completely simulation
Train basic structure, make experimental data more accurate.
Further, burning things which may cause a fire disaster is pond fire, apart from each burning things which may cause a fire disaster at arrangement one in fire tunnel both ends hole and middle part, totally three
Burning things which may cause a fire disaster zone position, need to select fire location at one to be tested according to operating mode, burning things which may cause a fire disaster fuel uses gasoline.
Further, described zone of origin arranges a temperature test section every 1m, and non-zone of origin arranges one every 2m
Individual temperature test section, totally 45 test sections, each keystone for testing section set a fire tunnel center line temperature
Measuring point, described fire tunnel center line temperature point are disposed with temperature measuring equipment, each evacuation platform center line for testing section
Position sets an evacuation platform center line temperature point, and described evacuation platform center line temperature point is disposed with temperature survey dress
Put.
Further, the temperature measuring equipment arranged on described fire tunnel center line temperature point is a thermocouple
Tree, the thermocouple tree includes two thermocouples, is respectively 0cm, 15cm away from vault vertical distance;Described evacuation platform center line temperature
The temperature measuring equipment arranged on degree measuring point is a thermocouple tree, and the thermocouple tree includes 3 thermocouples, away from main tunnel ground
Highly it is respectively the thermo parameters method that 16cm, 33cm, 50.4cm are used to test in fire tunnel.Different transverse passage-way bar numbers are rescued
Help station fire scenario, the fire scenario of different fire locations, the fire scenario of different fume exhausting types, the fire of different ventilation operating modes
Scene is combined, so as to realize the analysis and research to the experiment of a variety of fire scenarios of railway tunnel rescue station under reality
Work.
Further, the exhaust smoke valve is the rectangular apertures for being reserved in 20cm × 25cm on smokejack partition wall, is easy to study
The high-temperature region under longitudinal fume exhausting type in the case of half horizontal fume exhausting type and transverse passage-way closing under independent lateral smokejack
Domain controls and fire and smoke spread control effect.
Further, the axial flow blower and centrifugal blower realize the regulation of wind speed by Frequency Converter Control rotating speed.With
Realize different ventilation operating modes.
The present invention compared with prior art, has the following advantages and advantages:
(1) in terms of experiment porch, this experiment porch is current first and rescued specifically for the stop of double-hole tunnel fire train
When helping station progress evacuating personnel, temperature field, wind speed field and Smoke Spread etc. carry out system in extra-long railway tunnel rescue station
The reduced scale cun experiment porch of research, experiment can be provided and put down for the smoke evacuation scheme in rescue station under similar situation and evacuating personnel research
Platform is supported;
(2) in terms of fume exhausting type, this experiment porch can study half horizontal fume exhausting type under independent lateral smokejack
And the high-temperature area control under longitudinal fume exhausting type in the case of transverse passage-way closing and fire and smoke spread control effect;
(3) in terms of data acquisition, advanced temperature measuring equipment, wind speed measuring device, data acquisition unit and software point
Analysis module can be to fire data is acquired record and analysis and research everywhere in rescue station;
(4) in terms of scope of experiment, rescue station fire scenario, different fire that this experiment porch can be to different transverse passage-way bar numbers
The fire scenario of source position, the fire scenario of different fume exhausting types, the fire scenario of different ventilation operating modes are combined, so as to
Realize the analysis and research work to the experiment of a variety of fire scenarios of railway tunnel rescue station under reality.
Brief description of the drawings
Accompanying drawing described herein is used for providing further understanding the embodiment of the present invention, forms one of the application
Point, do not form the restriction to the embodiment of the present invention.In the accompanying drawings:
Fig. 1 is a kind of containing a plurality of evacuation transverse passage-way railway tunnel rescue station fire test system global structure signal for the present invention
Figure;
Fig. 2 is the partial structurtes containing a plurality of evacuation transverse passage-way railway tunnel rescue station fire test system shown in Fig. 1
Schematic diagram;
Fig. 3 is the front view of wind speed point layout in the embodiment of the present invention;
Fig. 4 is the top view of temperature point layout in the embodiment of the present invention;
Fig. 5 is the front view of temperature point layout in the embodiment of the present invention;
Fig. 6 is data measurin system schematic diagram of the present invention;
Label in figure:1- fire tunnel;The non-fire tunnels of 2-;3- evacuates transverse passage-way;4- sides smokejack;5- exhaust openings;
6- exhaust smoke valves;7- smokejack partition walls;8- centrifugal blowers;9- axial flow blowers;10- train models;11- burning things which may cause a fire disaster;12- wind speed measuring points;
13- fire tunnel center line temperature point;14- evacuates platform center line temperature point;15- data measurement units;16- data acquisitions
Device;17- software analysis modules.
Embodiment
For the object, technical solutions and advantages of the present invention are more clearly understood, with reference to embodiment and accompanying drawing, to this
Invention is described in further detail, and exemplary embodiment of the invention and its explanation are only used for explaining the present invention, do not make
For limitation of the invention.
Embodiment 1
One kind as depicted in figs. 1 and 2 containing it is a plurality of evacuation transverse passage-way railway tunnel rescue station fire test system, for pair
When resting in rescue station in extra-long railway tunnel after train fire, flue gas control effect is carried out in rescue station under different fume exhausting types
Simulation;Including fire tunnel 1, non-fire tunnel 2, evacuation transverse passage-way 3, train model 10, burning things which may cause a fire disaster 11 and smoke evacuation system.Fire tunnel
Side smokejack partition wall 7 away from evacuation transverse passage-way 3 in road 1 is separated out a side smokejack 4.Present invention experiment tunnel main body
Containing 9 evacuation transverse passage-ways, it can be realized by way of blocking transverse passage-way mouth during specific experiment and be rescued containing different transverse passage-way numbers
Help the fire scenario in station.
Train model 10, as framework, is made, the length in a section compartment is respectively by reinforcing bar using iron sheet merogenesis
255cm, 31cm, 44cm, train model length are that 17 section car lengths add locomotive overall length, common 45.38m, and fire location one saves car
Compartment model is not arranged in the length of railway carriage or compartment, train is positioned in the middle part of fire tunnel.
Burning things which may cause a fire disaster 11 is pond fire, is respectively arranging burning things which may cause a fire disaster at one apart from fire tunnel both ends hole 10m and middle part, totally three burning things which may cause a fire disaster
Position, need to select fire location at one to be tested according to operating mode.Smoke evacuation system includes smokejack 4, exhaust opening 5, exhaust smoke valve 6
And centrifugal blower 8, axial flow blower 9;Exhaust smoke valve 6 is arranged on smokejack partition wall, and exhaust smoke valve is to be reserved on smokejack partition wall
20cm × 25cm rectangular apertures, 6m is spaced, totally 10, connects smokejack 4 and fire tunnel 1, flue gas can be through exhaust smoke valve 6
Drained by smokejack 4;1 centrifugal blower 8 is arranged at exhaust opening 5, plays a part of outwards smoking;4 axial flow blowers 9 are distinguished
4 ends in tunnel are arranged in, fresh Cryogenic air is provided into tunnel and plays a part of guiding plume;Pass through frequency converter
Control the rotating speed of blower fan to realize the regulation of wind speed, realize different ventilation operating modes.
One kind as shown in Figure 6 is containing a plurality of evacuation transverse passage-way railway tunnel rescue station fire test system, in above-mentioned simulation
On the basis of agent structure, in terms of data acquisition, advanced temperature measuring equipment, wind speed measuring device, data acquisition unit 16
And software analysis module 17 can be to fire data is acquired record and analysis and research everywhere in rescue station;Specifically use data
Measuring system, including data measurement unit 15, data acquisition unit 16 and software analysis module 17.Data measurement unit 15 includes temperature
Spend measurement apparatus and wind speed measuring device, specific deployment scenarios such as Fig. 3, Fig. 4 and Fig. 5.The operation principle of data measurin system is:
The temperature collected, pressure values are converted into corresponding analog voltage by data measurement unit 15 (thermocouple, pressure sensor etc.)
(mv levels) output is to data acquisition unit 16, by operation amplifier, be converted into that single-chip microcomputer can handle through A/D digital analog converters two
Carry system code, single-chip microcomputer processing is handed over, then single-chip microcomputer sends the digital quantity that temperature, pressure output port export through network supreme
Position machine (PC), is converted into corresponding temperature value, velocity amplitude, and stores up through the temperature in software analysis module 17, flow relocity calculation program
It is stored in database server.
This experimental system has wider application, rescue station fire scenario, different fire that can be to different transverse passage-way bar numbers
The fire scenario of source position, the fire scenario of different fume exhausting types, the fire scenario of different ventilation operating modes are combined, so as to
The analysis and research work to the experiment of a variety of fire scenarios of railway tunnel rescue station under reality is realized, before there is wide application
Scape and important directive significance.
Embodiment 2
One kind as shown in Figure 3 is containing a plurality of evacuation transverse passage-way railway tunnel rescue station fire test system, in embodiment 1
On the basis of, section where taking each exhaust smoke valve is test section, totally 10 test sections, vault bottom, evacuation in every each section
Platform top, evacuation platform center line human eye feature height (i.e. 0.16m) place respectively arrange a wind speed measuring point 12, for measuring fire
The wind speed size of diverse location in tunnel;The wind speed measuring point 12 is provided with big for measuring diverse location wind speed in fire tunnel
Small wind speed measuring device, the wind speed measuring device is by the Pitot tube and little differential pressure sensor group that are arranged in fire tunnel 1
Into.
Embodiment 3
One kind as shown in Figures 4 and 5 is containing a plurality of evacuation transverse passage-way railway tunnel rescue station fire test system, in embodiment
On the basis of 1, zone of origin arranges a temperature test section every 1m, and non-zone of origin arranges a test section every 2m, altogether
45 test sections, 225 thermocouples.The keystone of each test section sets a fire tunnel center line temperature point
13, described fire tunnel center line temperature point 13 is disposed with temperature measuring equipment, each evacuation platform center line for testing section
Position sets an evacuation platform center line temperature point 14, and described evacuation platform center line temperature point 14 is disposed with temperature survey
Device;Temperature measuring equipment as needed can be with;The thermocouple tree of varying number and structure is formed, for example, on each section,
One thermocouple tree of vault arranged beneath, the thermocouple tree include two thermocouples, away from vault vertical distance be respectively 0cm,
15cm.Evacuate platform center line and arrange a thermocouple tree, the thermocouple tree includes 3 thermocouples, highly divided away from main tunnel ground
Not Wei 16cm (i.e. the feature height of human eye), 33cm, 50.4cm, for the thermo parameters method accurately tested in fire tunnel.
Above-described embodiment, the purpose of the present invention, technical scheme and beneficial effect are carried out further
Describe in detail, should be understood that the embodiment that the foregoing is only the present invention, be not intended to limit the present invention
Protection domain, within the spirit and principles of the invention, any modification, equivalent substitution and improvements done etc., all should include
Within protection scope of the present invention.
Claims (10)
1. one kind is surveyed containing a plurality of evacuation transverse passage-way railway tunnel rescue station fire test system, including experiment tunnel main body and data
Amount system, it is characterised in that:The experiment tunnel main body includes fire tunnel (1), evacuation transverse passage-way (3), non-fire tunnel
(2), train model (10), burning things which may cause a fire disaster (11) and smoke evacuation system;Described fire tunnel (1) is by evacuating transverse passage-way (3) and not fire
Calamity tunnel (2) is connected, and described train model (10), burning things which may cause a fire disaster (11) and smoke evacuation system are arranged in fire tunnel;
Described smoke evacuation system includes smokejack (4), exhaust smoke valve (6), exhaust opening (5), centrifugal blower (8) and axial flow blower (9),
The smokejack (4) is separated out by smokejack partition wall (7) in fire tunnel (1) away from passage side, and the exhaust smoke valve (6) is pre-
The aperture stayed on smokejack partition wall (7);The exhaust opening (5) is arranged in the middle part of smokejack (4), described centrifugal blower (8)
It is arranged in exhaust opening (5) outwards to smoke, the axial flow blower (9) is arranged in fire tunnel (1) and non-(2) four holes in fire tunnel
Mouth provides fresh Cryogenic air into tunnel and guides plume;
The data measurin system includes data measurement unit (15), data acquisition unit (16) and software analysis module (17), institute
Stating data measurement unit (15) includes temperature measuring equipment and wind speed measuring device, and the data measurement unit (15) passes through temperature
The temperature collected, pressure values are converted into corresponding analog voltage and exported to data acquisition by measurement apparatus and wind speed measuring device
Data after conversion are sent to host computer PC, the host computer PC by device (16), the data acquisition unit (16) by single-chip microcomputer
Corresponding temperature value and velocity amplitude are converted into by the temperature in software analysis module (17) and flow relocity calculation program, and are stored in
In database server.
2. according to claim 1 a kind of containing a plurality of evacuation transverse passage-way railway tunnel rescue station fire test system, it is special
Sign is:Described exhaust smoke valve (6) is 10, and the section of fire tunnel (1) where taking each exhaust smoke valve (6) is test section,
Totally 10 test sections, at each section vault bottom, above evacuation platform at and the 16cm of evacuation platform center line height at
Respectively one wind speed measuring point (12) of arrangement, the wind speed measuring point (12) are provided with big for measuring diverse location wind speed in fire tunnel
Small wind speed measuring device, the wind speed measuring device is by the Pitot tube and little differential pressure sensor that are arranged in fire tunnel (1)
Composition.
3. one kind according to claim 1 or 2 evacuates transverse passage-way railway tunnel rescue station fire test system containing a plurality of, its
It is characterised by:The experiment tunnel main body uses 1 with actual tunnel main body:10 contracting scale model, experiment tunnel main body length
60m, fire tunnel (1) are connected with non-fire tunnel (2) by 9 evacuation transverse passage-ways (3).
4. according to claim 3 a kind of containing a plurality of evacuation transverse passage-way railway tunnel rescue station fire test system, it is special
Sign is:The fire tunnel (1) of the experiment tunnel main body is using fire prevention brick masonry, described non-fire tunnel (2) and evacuation
Transverse passage-way (3) uses common brick masonry;The inner surface cement sand plaster of the experiment tunnel main body, zone of origin use fire resisting
Cement sand plaster is used in cement plaster, outer surface after laying layer of steel wire net.
5. according to claim 3 a kind of containing a plurality of evacuation transverse passage-way railway tunnel rescue station fire test system, it is special
Sign is:The train model (10), as framework, is made, the length difference in a section compartment by reinforcing bar using iron sheet merogenesis
For 255cm, 31cm, 44cm, train model length is that 17 section car lengths add locomotive overall length, i.e. 2.03+2.55 × 17=
45.38m, the fire location one save in car length and do not arrange compartment model, and train model (10) is positioned over fire tunnel (1)
Middle part.
6. a kind of according to claim 1 or 5 evacuate transverse passage-way railway tunnel rescue station fire test system containing a plurality of, its
It is characterised by:Described burning things which may cause a fire disaster (11) is pond fire, at fire tunnel (1) both ends hole 10m and at each arrangement one in middle part
Burning things which may cause a fire disaster (11), totally three burning things which may cause a fire disaster zone positions, need to select fire location at one to be tested, burning things which may cause a fire disaster (11) fuel is adopted according to operating mode
Use gasoline.
7. according to claim 6 a kind of containing a plurality of evacuation transverse passage-way railway tunnel rescue station fire test system, it is special
Sign is:Described zone of origin arranges a temperature test section every 1m, and non-zone of origin arranges a temperature test every 2m
Section, totally 45 test sections, each keystone for testing section set a fire tunnel center line temperature point (13), institute
The fire tunnel center line temperature point (13) stated is disposed with temperature measuring equipment, each evacuation platform midline position for testing section
One evacuation platform center line temperature point (14) is set, and described evacuation platform center line temperature point (14) is disposed with temperature survey
Device.
8. according to claim 7 a kind of containing a plurality of evacuation transverse passage-way railway tunnel rescue station fire test system, it is special
Sign is:The temperature measuring equipment arranged on described fire tunnel center line temperature point (13) is a thermocouple tree, the heat
Galvanic couple tree includes two thermocouples, is respectively 0cm, 15cm away from vault vertical distance;Described evacuation platform center line temperature point
(14) temperature measuring equipment arranged on is a thermocouple tree, and the thermocouple tree includes 3 thermocouples, high away from main tunnel ground
Degree is respectively the thermo parameters method that 16cm, 33cm, 50.4cm are used to test in fire tunnel.
9. according to claim 1 a kind of containing a plurality of evacuation transverse passage-way railway tunnel rescue station fire test system, it is special
Sign is:The exhaust smoke valve (6) is the rectangular apertures for being reserved in 20cm × 25cm on smokejack partition wall (7).
10. according to claim 1 a kind of containing a plurality of evacuation transverse passage-way railway tunnel rescue station fire test system, it is special
Sign is:The centrifugal blower (8) and axial flow blower (9) realize the regulation of wind speed by Frequency Converter Control rotating speed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510656888.9A CN105160981B (en) | 2015-10-12 | 2015-10-12 | A kind of railway tunnel rescue station fire test system containing a plurality of evacuation transverse passage-way |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510656888.9A CN105160981B (en) | 2015-10-12 | 2015-10-12 | A kind of railway tunnel rescue station fire test system containing a plurality of evacuation transverse passage-way |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105160981A CN105160981A (en) | 2015-12-16 |
CN105160981B true CN105160981B (en) | 2018-01-09 |
Family
ID=54801816
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510656888.9A Active CN105160981B (en) | 2015-10-12 | 2015-10-12 | A kind of railway tunnel rescue station fire test system containing a plurality of evacuation transverse passage-way |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105160981B (en) |
Families Citing this family (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106205338A (en) * | 2016-09-05 | 2016-12-07 | 清华大学 | A kind of interval, underground tunnel fire test device and method containing service channel |
CN106128286B (en) * | 2016-09-05 | 2022-09-20 | 清华大学 | Fire test device and method for transfer passage of subway elevated station and underground station |
CN106327992A (en) * | 2016-09-05 | 2017-01-11 | 清华大学 | Fire test device and method for subway turn-back track |
CN106525377A (en) * | 2016-12-13 | 2017-03-22 | 西南交通大学 | Experimental facility and method for studying variation of piston wind during docking of train at tunnel rescue station |
CN106781978A (en) * | 2017-01-12 | 2017-05-31 | 天津大学 | A kind of modularization longitudinal direction smoke evacuation subway tunnel movable body fire test system |
CN106710419A (en) * | 2017-01-12 | 2017-05-24 | 天津大学 | Twin-tube tunnel multiple motion body fire size reduction experiment system with contact passage |
CN106652724A (en) * | 2017-01-12 | 2017-05-10 | 天津大学 | Modular subway tunnel moving object fire size-reduced experiment system |
CN106847042A (en) * | 2017-01-12 | 2017-06-13 | 天津大学 | A kind of single tunnel onboard power multiple movement bodies fire reduced scale cun experimental system |
CN107067930A (en) * | 2017-01-12 | 2017-08-18 | 天津大学 | A kind of changeable full transverse direction and half horizontal smoke evacuation tunnel movable body fire test system |
CN106781979A (en) * | 2017-01-12 | 2017-05-31 | 天津大学 | A kind of modular conveyor belt formula subway tunnel movable body fire reduced scale cun experimental system |
CN106920453B (en) * | 2017-01-12 | 2019-08-06 | 天津大学 | A kind of interior reduced scale cun experimental system on fire of list tunnel chain traction multiple movement bodies |
CN106920454A (en) * | 2017-01-12 | 2017-07-04 | 天津大学 | A kind of single tunnel chain traction multiple movement bodies fire reduced scale cun experimental system |
CN108039114A (en) * | 2018-01-16 | 2018-05-15 | 西南交通大学 | A kind of underground space fire analogue experiment installation |
CN108798743B (en) * | 2018-07-31 | 2023-11-17 | 中铁二院工程集团有限责任公司 | Smoke-preventing and ventilating system for emergency rescue station at railway tunnel portal |
CN110111635B (en) * | 2019-06-05 | 2024-03-29 | 中国科学技术大学 | Double-long-narrow space fire experiment platform for small-size subway tunnel/train carriage |
CN111027176B (en) * | 2019-11-07 | 2023-04-25 | 武汉科技大学 | Calculation method for smoke countercurrent length of tunnel lateral key smoke discharging fire |
CN111462606B (en) * | 2020-04-21 | 2022-04-26 | 合肥工业大学 | Traffic tunnel group smoke cross flow research and emergency rescue system |
CN112343642B (en) * | 2020-11-09 | 2022-02-25 | 西南交通大学 | Disaster-prevention ventilation test model for jet fan of emergency rescue station at railway tunnel portal |
CN112817261A (en) * | 2020-12-30 | 2021-05-18 | 千方捷通科技股份有限公司 | Multi-linkage personnel evacuation system and method in tunnel and storage medium |
CN112767812A (en) * | 2021-01-22 | 2021-05-07 | 武汉科技大学 | Transverse passage and flat-guide railway tunnel experimental device |
CN113360991B (en) * | 2021-06-29 | 2023-03-14 | 四川农业大学 | Design method of disaster prevention ventilation facility of tunnel portal emergency rescue station |
CN113530564B (en) * | 2021-07-21 | 2023-03-31 | 四川农业大学 | Design method and system for high-altitude railway tunnel portal emergency rescue station |
CN114530085A (en) * | 2022-02-25 | 2022-05-24 | 西南交通大学 | Snake-shaped curve highway tunnel fire simulation test platform system |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102400701A (en) * | 2010-09-10 | 2012-04-04 | 上海同岩土木工程科技有限公司 | Road tunnel intercommunication type longitudinal ventilation mode |
CN203685272U (en) * | 2013-12-13 | 2014-07-02 | 中铁二院工程集团有限责任公司 | Emergent rescue station for three extra-long railway tunnels |
CN203685273U (en) * | 2013-12-13 | 2014-07-02 | 中铁二院工程集团有限责任公司 | Emergent rescue station for double separately-constructed extra-long railway tunnel |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100557192C (en) * | 2008-04-16 | 2009-11-04 | 浙江省交通规划设计研究院 | Improved tunnel smoke exhaust method and with the tunnel smoke evacuation system of independent fume extractor |
CN102693672A (en) * | 2011-03-25 | 2012-09-26 | 上海日浦信息技术有限公司 | Subway station fire hazard simulation experiment platform |
CN102306459B (en) * | 2011-08-01 | 2013-01-30 | 中国科学技术大学 | Fire simulation experiment system for railway tunnel rescue station |
CN202690109U (en) * | 2012-05-28 | 2013-01-23 | 中交第一公路勘察设计研究院有限公司 | Fireproof fan system at cross aisle of tunnel |
CN103971576B (en) * | 2014-05-11 | 2016-06-08 | 中国科学技术大学 | A kind of subway station key binding sites Fire Smoke Control simulation experiment platform |
CN104533498A (en) * | 2014-12-18 | 2015-04-22 | 西南交通大学 | Point exhaust type subway tunnel fire ventilation and smoke exhaust system |
CN204990975U (en) * | 2015-10-12 | 2016-01-20 | 西南交通大学 | Railway tunnel rescue station conflagration experimental apparatus that contains many sparse transverse passage -ways |
-
2015
- 2015-10-12 CN CN201510656888.9A patent/CN105160981B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102400701A (en) * | 2010-09-10 | 2012-04-04 | 上海同岩土木工程科技有限公司 | Road tunnel intercommunication type longitudinal ventilation mode |
CN203685272U (en) * | 2013-12-13 | 2014-07-02 | 中铁二院工程集团有限责任公司 | Emergent rescue station for three extra-long railway tunnels |
CN203685273U (en) * | 2013-12-13 | 2014-07-02 | 中铁二院工程集团有限责任公司 | Emergent rescue station for double separately-constructed extra-long railway tunnel |
Also Published As
Publication number | Publication date |
---|---|
CN105160981A (en) | 2015-12-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105160981B (en) | A kind of railway tunnel rescue station fire test system containing a plurality of evacuation transverse passage-way | |
CN204990975U (en) | Railway tunnel rescue station conflagration experimental apparatus that contains many sparse transverse passage -ways | |
CN108154265B (en) | Cellular automaton optimization and guidance method for mine fire escape path | |
Meng et al. | Numerical study on the optimization of smoke ventilation mode at the conjunction area between tunnel track and platform in emergency of a train fire at subway station | |
CN106971666A (en) | A kind of multi-functional underground railway tunnel fire ventilation smoke exhaust pattern simulation research platform | |
CN105336258A (en) | Metro interchange station fire disaster smoke discharge simulation experiment device | |
CN107393405B (en) | A kind of subway is grown up section fire test system and method | |
CN105243950A (en) | Fire ventilation and smoke exhaust experimental simulation device based on urban underground traffic linkage tunnel system | |
CN111462609B (en) | Fire burning and ventilation control system of spiral tunnel group | |
CN101914904A (en) | Fire simulation experiment equipment for caverns in hydraulic and hydro-power engineering and simulation experiment method | |
CN104167118B (en) | Simulation experiment apparatus for ship fire disaster | |
CN102750848A (en) | Subway station fire experiment simulation device | |
CN101586467B (en) | Road tunnel ventilation testing device | |
Zhou et al. | Critical velocity in the transverse passages of a railway tunnel rescue station with semi-transverse ventilation | |
Zhang et al. | The effect of exhaust velocity on smoke exhaust in subway platform fire | |
CN106205338A (en) | A kind of interval, underground tunnel fire test device and method containing service channel | |
Liu et al. | Full-scale experimental study on fire-induced smoke propagation in large underground plant of hydropower station | |
CN204788893U (en) | Visual test device that digs dust migration law in tunnel is combined in research | |
KR101170641B1 (en) | Method for verification tests of longitudinal smoke control facilities in a tunnel and the apparatus of the same | |
Zhong et al. | Full-scale experimental research on fire fume refluence of sloped long and large curved tunnel | |
CN206609471U (en) | Piping shaft data collecting system during hoistway is shared applied to smoke evacuation and ventilation shaft | |
CN207068331U (en) | A kind of subway is grown up section fire test device | |
CN206960088U (en) | A kind of express elevator piston effect checking test system | |
CN110728895A (en) | Experimental device for can be used to half horizontal research of discharging fume in tunnel and subway station | |
CN210865332U (en) | Subway reduced scale tunnel fire smoke control experiment system that quasi-rectangle links to each other with circular |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |