CN105158599B - A kind of method for judging scheduling system busbar power-off telegram in reply in time - Google Patents

A kind of method for judging scheduling system busbar power-off telegram in reply in time Download PDF

Info

Publication number
CN105158599B
CN105158599B CN201510508650.1A CN201510508650A CN105158599B CN 105158599 B CN105158599 B CN 105158599B CN 201510508650 A CN201510508650 A CN 201510508650A CN 105158599 B CN105158599 B CN 105158599B
Authority
CN
China
Prior art keywords
remote signalling
saltus step
signalling value
telegram
judge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510508650.1A
Other languages
Chinese (zh)
Other versions
CN105158599A (en
Inventor
赵二保
李瑞超
殷骏
谢芝东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ANHUI LEADZONE INTELLIGENT GRID TECHNOLOGY Co Ltd
State Grid Corp of China SGCC
State Grid Anhui Electric Power Co Ltd
Original Assignee
ANHUI LEADZONE INTELLIGENT GRID TECHNOLOGY Co Ltd
State Grid Corp of China SGCC
State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI LEADZONE INTELLIGENT GRID TECHNOLOGY Co Ltd, State Grid Corp of China SGCC, State Grid Anhui Electric Power Co Ltd filed Critical ANHUI LEADZONE INTELLIGENT GRID TECHNOLOGY Co Ltd
Priority to CN201510508650.1A priority Critical patent/CN105158599B/en
Publication of CN105158599A publication Critical patent/CN105158599A/en
Application granted granted Critical
Publication of CN105158599B publication Critical patent/CN105158599B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
    • Y04S10/52Outage or fault management, e.g. fault detection or location

Abstract

The invention discloses a kind of method for judging scheduling system busbar power-off telegram in reply in time, comprise the following steps:Predetermined voltage threshold and the wandering section of voltage;The remote signalling value of breaker on real-time monitoring objective bus, and judge remote signalling value saltus step information;According to remote signalling value saltus step information judged result, target bus three-phase voltage sum after target bus three-phase voltage sum before remote signalling value saltus step and remote signalling value saltus step is contrasted with voltage threshold and the wandering section of voltage respectively, and according to comparing result, judge bus power-off or telegram in reply state.The present invention synchronously judge breaker remote signalling value saltus step information on target bus and in the three-phase voltage sum situation of change before and after remote signalling value saltus step on target bus by way of judge that the power-off of target bus is sent a telegram in reply situation, it can be ensured that the accurate of telegram in reply situation judgement is powered off to target bus.

Description

A kind of method for judging scheduling system busbar power-off telegram in reply in time
Technical field
The present invention relates to power network monitoring technical field, more particularly to a kind of scheduling system busbar of judgement in time to power off telegram in reply Method.
Background technology
It is timely to judge that the power-off of scheduling system median generatrix reflect some region of operation of power networks situation, to searching event in time Barrier, accident analysis and Fault Isolation give sufficient support, can further improve electric network data quality.At present, each province adjust, Ground is adjusted is directly accessed State Grid Corporation of China's monitor supervision platform by 220kV voltage class bus states, but 110kV voltage class Bus state is not due to being directly accessed, therefore national grid public affairs will be sent in the power-off of bus and telegram in reply information active by needing ground to adjust Department.
Current ground key degree system reports before the power-off of 110kV voltage class buses, telegram in reply information, it is necessary to dispatch automatically Member by core for dispatching data or phone contact electric power first-aid department scene is confirmed whether to actually occur bus power-off or telegram in reply Phenomenon, if actually occurring, dispatcher confirm after, scheduling system status information is preserved after again on be sent to national grid public affairs Department.If actual without bus power-off or telegram in reply phenomenon occurs, this information just belongs to scheduling system wrong report information, and dispatcher can be right This information is ignored.In the process, can be caused if dispatcher's error in judgement wrong data on give, have a strong impact on The correctness of data;The delay sent on being caused if dispatcher does not confirm in time, have a strong impact on the promptness of data;Such as Fruit human intervention does not deliberately confirm that the power-off actually occurred or telegram in reply information can then cause data section, has a strong impact on the complete of data Whole property;And the quality of the quality of data is directly connected to safe and stable, the economical operation of overall grid.
The content of the invention
Based on technical problem existing for background technology, it is multiple that the present invention proposes a kind of scheduling of judgement in time system busbar power-off The method of electricity.
A kind of method for judging scheduling system busbar power-off telegram in reply in time proposed by the present invention, comprises the following steps:
Predetermined voltage threshold and the wandering section of voltage;
The remote signalling value of breaker on real-time monitoring objective bus, and judge remote signalling value saltus step information;
According to remote signalling value saltus step information judged result, by target bus three-phase voltage sum before remote signalling value saltus step and remote signalling value Target bus three-phase voltage sum contrasts with voltage threshold and the wandering section of voltage respectively after saltus step, and according to comparing result, sentences Disconnected bus power-off or telegram in reply state.
Preferably, when remote signalling value from high level saltus step is low level, then judge whether to meet simultaneously mesh before remote signalling value saltus step Mark bus three-phase voltage sum is more than voltage threshold, and to be located at voltage wandering for target bus three-phase voltage sum after remote signalling value saltus step In section, if it is, judging bus power-off;If it is not, then monitor again and judge remote signalling value saltus step information;
When remote signalling value from low transition is high level, then judge whether to meet simultaneously target bus three before remote signalling value saltus step Phase voltage sum is located in the wandering section of voltage, and target bus three-phase voltage sum is more than voltage threshold after remote signalling value saltus step, If it is, judge bus telegram in reply;If it is not, then monitor again and judge remote signalling value saltus step information.
Preferably, when detecting remote signalling value saltus step, first determine whether remote signalling value whether from high level saltus step be low level, if It is then to determine whether that target bus three-phase voltage sum changes;If it is not, then judge remote signalling value whether from low transition be High level.
Preferably, when detecting remote signalling value saltus step, first determine whether remote signalling value whether from low transition be high level, if It is then to determine whether that target bus three-phase voltage sum changes;If it is not, then judge remote signalling value whether from high level saltus step be Low level.
Preferably, when remote signalling value from high level saltus step is low level, target bus three-phase before remote signalling value saltus step is first determined whether Whether voltage sum is more than voltage threshold, if it is not, then monitoring again and judging remote signalling value saltus step information;If it is, continue Whether target bus three-phase voltage sum is in the wandering section of voltage after judging remote signalling value saltus step, if it is not, then monitoring again And judge remote signalling value saltus step information;If it is, judge bus power-off.
Preferably, when remote signalling value from low transition is high level, target bus three-phase before remote signalling value saltus step is first determined whether Whether voltage sum is in the wandering section of voltage, if it is not, then monitoring again and judging remote signalling value saltus step information;If it is, Whether target bus three-phase voltage sum is more than voltage threshold after then judging remote signalling value saltus step, if it is not, then monitoring and sentencing again Disconnected remote signalling value saltus step information;If it is, judge bus telegram in reply.
Preferably, voltage threshold can on section [40kV, 60kV] value.
Preferably, the wandering section of voltage is [- a, a], 0≤a≤1kV.
The present invention is by the synchronous breaker remote signalling value saltus step information judged on target bus and before and after remote signalling value saltus step The mode of three-phase voltage sum situation of change on target bus come judge the power-off of target bus send a telegram in reply situation.First to open circuit Device remote signalling value saltus step information is judged, target bus power-off telegram in reply situation is estimated, then passes through the three of target bus The change of phase voltage sum is verified to estimate of situation, it can be ensured that the accurate of telegram in reply situation judgement is powered off to target bus.
By the method provided by the invention for judging scheduling system busbar power-off telegram in reply in time, timely judgement can be realized automatically Scheduling system median generatrix powers off and telegram in reply information, and the power-off or telegram in reply information programme automatically generated data file to judgement first upload State's tune is uploaded to again to saving to adjust, and is avoided human intervention, is advantageously ensured that promptness, correctness and integrality that data upload, Strong guarantee is provided to establishing sturdy power grid, is advantageous to improve operation of power networks efficiency.And the present invention is applicable the tune of different manufacturers Degree system.
Brief description of the drawings
Fig. 1 is a kind of method flow diagram for judging scheduling system busbar power-off telegram in reply in time proposed by the present invention.
Embodiment
Reference picture 1, a kind of method for judging scheduling system busbar power-off telegram in reply in time proposed by the present invention, its feature exist In comprising the following steps:
The first step, predetermined voltage threshold and the wandering section of voltage.
Voltage threshold can as the criterion of the three-phase voltage sum of target bus, specifically can section [40kV, 60kV] on value.Described three-phase voltage sum is the total value of three-phase voltage sum in the present invention.In addition, because bus powers off Afterwards, may be wandering phenomenon with the magnitude of voltage of very little on bus, so judging whether magnitude of voltage is zero, actually judgement is It is no it is positive and negative it is wandering value section in.In present embodiment, the wandering section of voltage can be used as judging voltage whether the standard for being zero, For example, working as the wandering section value [- 1kV, 1kV] of voltage, then when magnitude of voltage is interior at [- 1kV, 1kV], voltage is all considered as zero.Tool Body, when the value in the wandering section of voltage can determine according to actual conditions, such as value [- a, a], a can appoint in 0≤a≤1kV Meaning value, but a had better not be more than 1kV, in order to avoid judge by accident.
The remote signalling value of second step, breaker on real-time monitoring objective bus, and judge remote signalling value saltus step information.
Remote signalling value is possible with two kinds of saltus steps, i.e. target bus shutdown transient, and remote signalling value should be low from high level saltus step Level;Target bus is sent a telegram in reply moment, and remote signalling value should be high level from low transition.So when detecting remote signalling value saltus step, Can determine whether first remote signalling value whether from high level saltus step be low level, if it is, determining whether target bus three-phase voltage Sum changes;If it is not, then judge remote signalling value whether from low transition for high level, if it is, determining whether target Bus three-phase voltage sum changes;If it is not, then monitor again and judge remote signalling value saltus step information.
When it is implemented, when detecting remote signalling value saltus step, it can also first determine whether remote signalling value is high from low transition Level, if it is, determining whether that target bus three-phase voltage sum changes;If it is not, then judge remote signalling value whether from height Level saltus step is low level, if it is, determining whether that target bus three-phase voltage sum changes;If it is not, then supervise again Survey and judge remote signalling value saltus step information.
3rd step, according to remote signalling value saltus step information judged result, by target bus three-phase voltage sum before remote signalling value saltus step Contrasted respectively with voltage threshold and the wandering section of voltage with target bus three-phase voltage sum after remote signalling value saltus step, and according to contrast As a result, bus power-off or telegram in reply state are judged.
In the case of target bus is powered off or sent a telegram in reply, not only breaker remote signalling value changes, under normal circumstances, target bus On magnitude of voltage before and after remote signalling value saltus step also should it is corresponding with remote signalling value saltus step generation change.For example, when target bus breaks Electricity, i.e. target bus are changed into power failure state from electricity condition is obtained, and now, remote signalling value is low level from high level saltus step, and remote signalling value is jumped Target bus three-phase voltage sum should be greater than voltage threshold before change, and target bus three-phase voltage sum should be after remote signalling value saltus step Zero, i.e., in the wandering section of voltage.When target bus is sent a telegram in reply, i.e., target bus is changed into obtaining electricity condition from power failure state, now, Remote signalling value is high level from low transition, and target bus three-phase voltage sum should be located at the wandering area of voltage before remote signalling value saltus step In, target bus three-phase voltage sum should be greater than voltage threshold after remote signalling value saltus step.
So the 3rd step of this method for judging scheduling system busbar power-off telegram in reply in time may be accomplished by.
When remote signalling value from high level saltus step is low level, then judge whether to meet simultaneously target bus three before remote signalling value saltus step Phase voltage sum is more than voltage threshold, and target bus three-phase voltage sum is located in the wandering section of voltage after remote signalling value saltus step, If it is, judge bus power-off;If it is not, then monitor again and judge remote signalling value saltus step information;When remote signalling value is jumped from low level It is changed into high level, then judges whether that target bus three-phase voltage sum is located at the wandering section of voltage before meeting remote signalling value saltus step simultaneously It is interior, and target bus three-phase voltage sum is more than voltage threshold after remote signalling value saltus step, if it is, judging bus telegram in reply;If not, Then monitor again and judge remote signalling value saltus step information.
Specifically, when remote signalling value from high level saltus step is low level, target bus three-phase before remote signalling value saltus step is first determined whether Whether voltage sum is more than voltage threshold, if it is not, then monitoring again and judging remote signalling value saltus step information;If it is, continue Whether target bus three-phase voltage sum is in the wandering section of voltage after judging remote signalling value saltus step, if it is not, then monitoring again And judge remote signalling value saltus step information;If it is, judge bus power-off.
When remote signalling value from low transition is high level, target bus three-phase voltage sum before remote signalling value saltus step is first determined whether Whether in the wandering section of voltage, if it is not, then monitoring again and judging remote signalling value saltus step information;If it is, judge distant Whether target bus three-phase voltage sum is more than voltage threshold after letter value saltus step, if it is not, then monitoring again and judging remote signalling value Saltus step information;If it is, judge bus telegram in reply.
The foregoing is only a preferred embodiment of the present invention, but protection scope of the present invention be not limited thereto, Any one skilled in the art the invention discloses technical scope in, technique according to the invention scheme and its Inventive concept is subject to equivalent substitution or change, should all be included within the scope of the present invention.

Claims (7)

  1. A kind of 1. method for judging scheduling system busbar power-off telegram in reply in time, it is characterised in that comprise the following steps:
    Predetermined voltage threshold and the wandering section of voltage;
    The remote signalling value of breaker on real-time monitoring objective bus, and judge remote signalling value saltus step information;
    According to remote signalling value saltus step information judged result, by target bus three-phase voltage sum before remote signalling value saltus step and remote signalling value saltus step Target bus three-phase voltage sum contrasts with voltage threshold and the wandering section of voltage respectively afterwards, and according to comparing result, judges mother Line powers off or telegram in reply state;
    When remote signalling value from high level saltus step is low level, then judge whether to meet simultaneously target bus three-phase electricity before remote signalling value saltus step Pressure sum is more than voltage threshold, and target bus three-phase voltage sum is located in the wandering section of voltage after remote signalling value saltus step, if It is to judge bus power-off;If it is not, then monitor again and judge remote signalling value saltus step information;
    When remote signalling value from low transition is high level, then judge whether to meet simultaneously target bus three-phase electricity before remote signalling value saltus step Pressure sum is located in the wandering section of voltage, and target bus three-phase voltage sum is more than voltage threshold after remote signalling value saltus step, if It is to judge bus telegram in reply;If it is not, then monitor again and judge remote signalling value saltus step information.
  2. 2. the as claimed in claim 1 method for judging scheduling system busbar power-off telegram in reply in time, it is characterised in that when detecting Remote signalling value saltus step, first determine whether remote signalling value whether from high level saltus step be low level, if it is, determining whether target bus Three-phase voltage sum changes;If it is not, then judge remote signalling value whether from low transition for high level.
  3. 3. the as claimed in claim 1 method for judging scheduling system busbar power-off telegram in reply in time, it is characterised in that when detecting Remote signalling value saltus step, first determine whether remote signalling value whether from low transition be high level, if it is, determining whether target bus Three-phase voltage sum changes;If it is not, then judge remote signalling value whether from high level saltus step for low level.
  4. 4. the method as claimed in claim 1 for judging scheduling system busbar power-off telegram in reply in time, it is characterised in that when remote signalling value It is low level from high level saltus step, whether target bus three-phase voltage sum is more than voltage threshold before first determining whether remote signalling value saltus step Value, if it is not, then monitoring again and judging remote signalling value saltus step information;If it is, it is female to continue target after judging remote signalling value saltus step Whether line three-phase voltage sum is in the wandering section of voltage, if it is not, then monitoring again and judging remote signalling value saltus step information;Such as Fruit is then to judge bus power-off.
  5. 5. the method as claimed in claim 1 for judging scheduling system busbar power-off telegram in reply in time, it is characterised in that when remote signalling value It is high level from low transition, whether target bus three-phase voltage sum is wandering positioned at voltage before first determining whether remote signalling value saltus step In section, if it is not, then monitoring again and judging remote signalling value saltus step information;If it is, judge that target is female after remote signalling value saltus step Whether line three-phase voltage sum is more than voltage threshold, if it is not, then monitoring again and judging remote signalling value saltus step information;If it is, Judge bus telegram in reply.
  6. 6. the method as claimed in claim 1 for judging scheduling system busbar power-off telegram in reply in time, it is characterised in that voltage threshold Can on section [40kV, 60kV] value.
  7. 7. the method as claimed in claim 1 for judging scheduling system busbar power-off telegram in reply in time, it is characterised in that voltage is wandering Section is [- a, a], 0≤a≤1kV.
CN201510508650.1A 2015-08-18 2015-08-18 A kind of method for judging scheduling system busbar power-off telegram in reply in time Active CN105158599B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510508650.1A CN105158599B (en) 2015-08-18 2015-08-18 A kind of method for judging scheduling system busbar power-off telegram in reply in time

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510508650.1A CN105158599B (en) 2015-08-18 2015-08-18 A kind of method for judging scheduling system busbar power-off telegram in reply in time

Publications (2)

Publication Number Publication Date
CN105158599A CN105158599A (en) 2015-12-16
CN105158599B true CN105158599B (en) 2018-01-12

Family

ID=54799519

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510508650.1A Active CN105158599B (en) 2015-08-18 2015-08-18 A kind of method for judging scheduling system busbar power-off telegram in reply in time

Country Status (1)

Country Link
CN (1) CN105158599B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109767108B (en) * 2018-12-31 2023-03-24 国网安徽省电力有限公司 Accurate analysis method for line state of power dispatching system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102236841A (en) * 2011-06-28 2011-11-09 中国电力科学研究院 Method for handling accidents of electric power system
CN103051057A (en) * 2012-12-04 2013-04-17 河南省电力公司驻马店供电公司 Transformer equipment state overhaul intelligent management monitoring system
KR20130049239A (en) * 2011-09-29 2013-05-14 한국전력공사 Apparatus and method for controlling a load of power system
CN103197168A (en) * 2013-02-21 2013-07-10 华东电网有限公司 Fault diagnosis control method in power system based on event set causal chain
CN103595492A (en) * 2013-10-09 2014-02-19 国家电网公司 CDT channel fault alarm system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102236841A (en) * 2011-06-28 2011-11-09 中国电力科学研究院 Method for handling accidents of electric power system
KR20130049239A (en) * 2011-09-29 2013-05-14 한국전력공사 Apparatus and method for controlling a load of power system
CN103051057A (en) * 2012-12-04 2013-04-17 河南省电力公司驻马店供电公司 Transformer equipment state overhaul intelligent management monitoring system
CN103197168A (en) * 2013-02-21 2013-07-10 华东电网有限公司 Fault diagnosis control method in power system based on event set causal chain
CN103595492A (en) * 2013-10-09 2014-02-19 国家电网公司 CDT channel fault alarm system

Also Published As

Publication number Publication date
CN105158599A (en) 2015-12-16

Similar Documents

Publication Publication Date Title
CN102270836B (en) Wide-area over-current protection method and system for power distribution network
CN101673965B (en) Automatic switching control method for wide-area emergency power source of electric power system
CN103607042B (en) The distribution network failure processing method of long fault indicator for overhead lines towards outskirts of a town
CN103248055B (en) A kind of solve regional power grid off-the-line after correct choosing cut the method for generator and load
CN101741137B (en) Network centralized emergency power supply automatic switching method
CN104518564A (en) Backup automatic switching apparatus with area automatic switching function, and backup automatic switching method
CN102324789A (en) Intelligent substation domain control system on basis of substation control layer GOOSE (Generic Object Oriented Substation Event) and implementing method
CN104242455B (en) 110 kV substation protection and control action cooperation strategy suitable for DG (distributed generation) accessing
CN106571620B (en) A kind of failure judgment method of both-end direct current line of flexible direct current power transmission ground short circuit
CN203368127U (en) Spare power automatic switching control equipment for transformer substation network
CN104795897A (en) Intelligent substation configurable relay protecting method and system
CN108469557B (en) High voltage direct current transmission device Fault Locating Method based on inverter differential protection
CN112421621B (en) Integrated intelligent distribution network operation monitoring cloud system based on 5G Internet of things
CN207440228U (en) A kind of feeder line fault on-line monitoring system
CN105158599B (en) A kind of method for judging scheduling system busbar power-off telegram in reply in time
CN103532221A (en) Spare-power automatic switching implementation method of lines under wiring and operating modes of self-adaptive 330kV substation
CN107066639B (en) Regional power grid fault loss consequence calculation method based on topology analysis
CN104135079A (en) Failure processing method for intelligent power distribution network comprising distributed power supply
CN106340954A (en) Method for identifying line breaking of power supply line and switching to standby power supply
CN101707397A (en) Auto-switch-on system on basis of power grid dispatching and implementation method thereof
CN105137337B (en) A kind of method for judging scheduling system line power-off telegram in reply in time
CN103023014A (en) Simulation method of integrated defense system for enhancing coal enterprise power system power supply reliability
CN105226666A (en) To the check method of reactive apparatus running status in transformer station's automatism voltage control
CN104101814A (en) Line fault accurate location method based on distribution automation system
CN104535894B (en) Earth fault line selection method and device under the double-bus method of operation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant