CN105156272A - 一种风力发电机组喘流风况控制方法 - Google Patents

一种风力发电机组喘流风况控制方法 Download PDF

Info

Publication number
CN105156272A
CN105156272A CN201510589664.0A CN201510589664A CN105156272A CN 105156272 A CN105156272 A CN 105156272A CN 201510589664 A CN201510589664 A CN 201510589664A CN 105156272 A CN105156272 A CN 105156272A
Authority
CN
China
Prior art keywords
wind
speed
control system
heavily
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510589664.0A
Other languages
English (en)
Other versions
CN105156272B (zh
Inventor
王千
于迟
王冬冬
郭俊涛
刘昊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guodian United Power Technology Co Ltd
Original Assignee
Guodian United Power Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guodian United Power Technology Co Ltd filed Critical Guodian United Power Technology Co Ltd
Priority to CN201510589664.0A priority Critical patent/CN105156272B/zh
Publication of CN105156272A publication Critical patent/CN105156272A/zh
Application granted granted Critical
Publication of CN105156272B publication Critical patent/CN105156272B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Control Of Positive-Displacement Air Blowers (AREA)
  • Wind Motors (AREA)

Abstract

本发明公开了一种风力发电机组喘流风况控制方法,包括如下步骤:(1)通过监测获得机组的风机叶片前端一段距离内的风速分布信号,并将该信号传输给机组的风机主控系统;(2)主控系统对前端风速分布情况进行计算判断,如果判断前端有喘流风,则再结合喘流风距离风机的距离计算出变桨角度及变桨速度,并将上述参数发送至变桨系统。通过该控制方法可以降低风力发电机组在喘流风况的机组振动,一方面可以降低机组的载荷,提高机组疲劳强度,另一方面可以使机组平稳渡过喘流期、减少机组停机、提高机组发电时间。

Description

一种风力发电机组喘流风况控制方法
技术领域
本发明涉及风力发电机组控制技术领域,尤其涉及一种风力发电机组喘流风况控制方法。
背景技术
安装于山区或者地形复杂地区的风力发电机组经常受到喘流风况的影响。由于喘流风况时风速在短时间迅速增大然后又恢复正常,而风力发电机组在短时间内无法及时做出响应及时收桨,机组由于受力突然增加会发生以下两种故障:1.额定风速以下机组由于受到轴向力突然增加会给机舱一个轴向冲击导致机组振动幅值增加,触发振动报警。2.在额定风速以上机组扭矩和轴向力都突然增加,不但会引发机组振动报警,还可能导致机组发生超速故障。发生上述两种故障机组都会触发停机,维护人员需到达机位进行检查,确保无其他故障原因后才能复位重新启动。
据贵州某风场统计,由于喘流风况引起的振动和超速问题约占该类问题的12%,为了使风力发电机组在喘流风况的地区平稳运行,必须针对喘流风况设计新的控制方法。
发明内容
本发明要解决的技术问题在于提供一种风力发电机组喘流风况控制方法,以解决喘流风况下风力发电机组出现振动、超速报警问题,使机组可平稳渡过喘流风况,降低机组载荷、振动,减少机组停机。
为解决上述技术问题,本发明采用如下技术方案:
一种风力发电机组喘流风况控制方法,包括如下步骤:
(1)通过监测获得机组的风机叶片前端一段距离内的风速分布信号,并将该信号传输给机组的风机主控系统;
(2)主控系统对前端风速分布情况进行计算判断,如果判断前端有喘流风,则再结合喘流风距离风机的距离计算出变桨角度及变桨速度,并将上述参数发送至变桨系统。
进一步地,所述步骤(2)中的喘流风的判断标准为:喘流强度△V/△t≥1.33,其中△V表示风速的增长量,△t表示风速增长的时间。
进一步地,所述步骤(2)中,变桨角度及变桨速度的具体获得方法为:主控系统根据风速的增长量△V的大小,计算出变桨角度a,变桨角度a为△V/0.8°/m/s即风速每增大4m/s,桨叶调整5°,按照线性比例进行调节;主控系统再根据喘流风距离风机的距离S及喘流风前端风速V,计算喘流风到达风机的时间t=S/V,主控系统根据变桨角度a计算机组所需要的变桨速度ω=a/t,该变桨速度ω为最小变桨速度。
进一步地,所述步骤(2)中,如果所述最小变桨速度小于机组的正常变桨速度ω1,则将该正常变桨速度ω1作为发送给变桨系统的变桨速度;同时,主控系统计算出正常变桨延迟时间参数,具体计算方法为:主控系统根据上述确定的变桨角度a及正常变桨速度ω1,计算调整桨叶角度需要的时间t1=a/ω1,则正常变桨延迟时间等于t-t1。
进一步地,在进入喘流风况控制后,主控系统会不断计算风机振动幅值以及发电机转速与设定值的差值,当2个差值都小于等于零时,机组自动进入正常控制模式。
进一步地,所述步骤(1)中的风速由安装在机舱顶部或轮毂中心的激光雷达测风仪获得,或由地面式测风雷达获得。
进一步地,所述步骤(1)中,对机组的风机叶片正前方200m范围内的风速进行监控。
由于采用上述技术方案,本发明至少具有以下有益效果:
1、该控制方法通过提前监测喘流风,当喘流风到达机组时,机组已经提前收桨以减少机组所受的轴向力和扭矩冲击;降低了机组在喘流强度较大的风况时的机组振动及载荷,提高了机组疲劳强度,使机组可平稳渡过喘流期、减少机组停机、提高机组发电时间。
2、该控制方法中,主控系统会同时计算出变桨延迟时间参数,当遇见喘流不太强距离机组较远时,机组就会延长延迟变桨启动时间、以正常的变桨速度迅速使桨叶收到设定位置,减少喘流对风机的振动冲击和扭矩冲冲击,在保证机组平稳度过喘流期的同时提高机组发电时间。
下面通过附图和实施例,对本发明的技术方案做进一步的详细描述。
附图说明
为了更清楚地说明本发明实施例中的技术方案,下面将对实施描述中所需要使用的附图作简单地介绍,下面描述中的附图仅仅是本发明的一种实施方式。
图1为喘流风况控制方案示意图;
图2为控制逻辑示意图。
具体实施方式
下面结合附图并通过具体实施方式来进一步说明本发明的技术方案。
本发明的一种风力发电机组喘流风况控制方法,包括如下步骤:
(1)通过监测获得机组的风机叶片前端一段距离内的风速分布信号,并将该信号传输给机组的风机主控系统;
(2)主控系统对前端风速分布情况进行计算判断,如果判断前端有喘流风,则再结合喘流风距离风机的距离计算出变桨角度及变桨速度,并将上述参数发送至变桨系统。
具体实现方案如下:
如图1所示,通过在机舱4上部安装激光雷达测风仪3来进行监测,获得机组的风机叶片1前端一段距离内的风速分布信号,并将该风速分布信号发送给主控系统,该实施例中主控柜位于塔筒5内。
上述优选的监测距离是风机叶片1正前方的200m范围内。
当然,除通过上述方案以外,该发明还可以使用其他监测方法获得风机叶片1的前端风速,如使用地面式测风雷达或者还是使用激光雷达测风仪3,但是将其安装在轮毂2中心。
配合图2所示,激光雷达测风仪对机组前端风速进行监测,风机主控系统对风速分布信号进行处理计算,判断前端是否有喘流风,喘流风的判断标准为:喘流强度△V/△t≥1.33,其中△V表示风速的增长量,△t表示风速增长的时间。即当机组风速在3s内,风速变化大约≥4m/s时,主控系统认为机组即将遭遇喘流风,上述标准为经过大量试验验证的最优方案,在该方案的基础上进行的控制效果最好。
上述变桨角度及变桨速度的具体获得方法为:
主控系统根据风速的增长量△V的大小,计算出变桨角度a,变桨角度a为△V/0.8°/m/s即风速每增大4m/s,桨叶调整5°,按照线性比例进行调节。该变桨角度的确定方法也是经过大量试验验证的最优方案,在该方案的基础上进行的控制效果最好。
主控系统根据喘流风距离风机的距离S及喘流风前端风速V,计算喘流风到达风机的时间t=S/V,主控系统根据变桨角度a计算机组所需要的变桨速度ω=a/t,该变桨速度ω为最小变桨速度。
考虑到机组的发电效率,可将上述最小变桨速度与机组的正常变桨速度ω1进行对比,如果最小变桨速度小于机组的正常变桨速度ω1,则将该正常变桨速度ω1作为发送给变桨系统的变桨速度;同时,主控系统计算出正常变桨延迟时间参数,具体计算方法为:主控系统根据上述确定的变桨角度a及正常变桨速度ω1,计算调整桨叶角度需要的时间t1=a/ω1,则正常变桨延迟时间等于t-t1。当遇见喘流不太强距离机组较远时,机组就会延长延迟变桨启动时间、以正常的变桨速度迅速使桨叶收到设定位置。通过使机组变桨启动时间延时一定时间,再以正常变桨速度变桨,这样可以大大提高机组的发电效率,避免提早变桨带来的效率损失。
如果经过对比,上述最小变桨速度大于机组的正常变桨速度ω1,则将该最小变桨速度作为发送给变桨系统的变桨速度。此时,一般喘流较强,距离机组较近,不进行时间延迟,以较快的变桨速度迅速使桨叶收到设定位置。
在进入喘流风况控制后,主控系统会不断计算风机振动幅值以及发电机转速与设定值的差值,当2个差值都小于等于零时,机组自动进入正常控制模式。即当喘流风经过后,风机的振动幅值和发电机转速都恢复到设定的安全值以下后,机组进入正常控制模式。
综上,本发明可以提前监测喘流风,当喘流风到达机组时,机组已经提前收桨以减少机组所受的轴向力和扭矩冲击。同时,主控系统可对不同的喘流风速及喘流风距离风机的距离做出不同的反应,在喘流风到达机组前提前完成收桨动作,减少喘流对风机的振动冲击和扭矩冲冲击,有效保护风机渡过喘流期,且保证机组的发电效率。
以上所述,仅为本发明较佳的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉该技术的人在本发明所揭露的技术范围内,可轻易想到的变化或替换,都应涵盖在本发明的保护范围之内。因此,本发明的保护范围应该以权利要求的保护范围为准。

Claims (7)

1.一种风力发电机组喘流风况控制方法,其特征在于,包括如下步骤:
(1)通过监测获得机组的风机叶片前端一段距离内的风速分布信号,并将该信号传输给机组的风机主控系统;
(2)主控系统对前端风速分布情况进行计算判断,如果判断前端有喘流风,则再结合喘流风距离风机的距离计算出变桨角度及变桨速度,并将上述参数发送至变桨系统。
2.根据权利要求1所述的风力发电机组喘流风况控制方法,其特征在于,所述步骤(2)中的喘流风的判断标准为:喘流强度△V/△t≥1.33,其中△V表示风速的增长量,△t表示风速增长的时间。
3.根据权利要求1或2所述的风力发电机组喘流风况控制方法,其特征在于,所述步骤(2)中,变桨角度及变桨速度的具体获得方法为:
主控系统根据风速的增长量△V的大小,计算出变桨角度a,变桨角度a为△V/0.8°/m/s即风速每增大4m/s,桨叶调整5°,按照线性比例进行调节;
主控系统再根据喘流风距离风机的距离S及喘流风前端风速V,计算喘流风到达风机的时间t=S/V,主控系统根据变桨角度a计算机组所需要的变桨速度ω=a/t,该变桨速度ω为最小变桨速度。
4.根据权利要求3所述的风力发电机组喘流风况控制方法,其特征在于,所述步骤(2)中,如果所述最小变桨速度小于机组的正常变桨速度ω1,则将该正常变桨速度ω1作为发送给变桨系统的变桨速度;同时,主控系统计算出正常变桨延迟时间参数,具体计算方法为:主控系统根据上述确定的变桨角度a及正常变桨速度ω1,计算调整桨叶角度需要的时间t1=a/ω1,则正常变桨延迟时间等于t-t1。
5.根据权利要求1所述的风力发电机组喘流风况控制方法,其特征在于,在进入喘流风况控制后,主控系统会不断计算风机振动幅值以及发电机转速与设定值的差值,当2个差值都小于等于零时,机组自动进入正常控制模式。
6.根据权利要求1所述的风力发电机组喘流风况控制方法,其特征在于,所述步骤(1)中的风速由安装在机舱顶部或轮毂中心的激光雷达测风仪获得,或由地面式测风雷达获得。
7.根据权利要求1所述的风力发电机组喘流风况控制方法,其特征在于,所述步骤(1)中,对机组的风机叶片正前方200m范围内的风速进行监控。
CN201510589664.0A 2015-09-16 2015-09-16 一种风力发电机组湍流风况控制方法 Active CN105156272B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510589664.0A CN105156272B (zh) 2015-09-16 2015-09-16 一种风力发电机组湍流风况控制方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510589664.0A CN105156272B (zh) 2015-09-16 2015-09-16 一种风力发电机组湍流风况控制方法

Publications (2)

Publication Number Publication Date
CN105156272A true CN105156272A (zh) 2015-12-16
CN105156272B CN105156272B (zh) 2018-04-17

Family

ID=54797270

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510589664.0A Active CN105156272B (zh) 2015-09-16 2015-09-16 一种风力发电机组湍流风况控制方法

Country Status (1)

Country Link
CN (1) CN105156272B (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107781105A (zh) * 2016-08-31 2018-03-09 北京天诚同创电气有限公司 风力发电机的变桨控制方法及装置
CN108105027A (zh) * 2016-11-24 2018-06-01 北京金风科创风电设备有限公司 风力发电机组变桨控制方法及装置
CN108757312A (zh) * 2018-06-06 2018-11-06 湘电风能有限公司 一种风力发电机变桨控制方法
CN109296506A (zh) * 2018-10-26 2019-02-01 许昌许继风电科技有限公司 一种风电机组的振动检测方法、控制方法及装置
CN109944749A (zh) * 2017-12-21 2019-06-28 北京金风科创风电设备有限公司 极端湍流的识别方法、装置、设备及计算机可读存储介质
CN110067703A (zh) * 2019-05-28 2019-07-30 华北电力大学 蜗杆式同步变桨风电机组及控制方法
CN112610406A (zh) * 2020-12-16 2021-04-06 太原重工股份有限公司 风力发电机组控制方法

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1998042980A1 (en) * 1997-03-26 1998-10-01 Forskningscenter Risø A wind turbine with a wind velocity measurement system
CN101368541A (zh) * 2007-08-13 2009-02-18 通用电气公司 利用逆风信息降低水平轴风力涡轮机中负荷的系统和方法
CN102011692A (zh) * 2010-11-26 2011-04-13 浙江运达风电股份有限公司 一种在不同湍流地形下风电机组稳定运行的控制方法
CN102251926A (zh) * 2010-07-15 2011-11-23 大唐南京自动化有限公司 一种风力发电机湍流抑制方法
CN102312782A (zh) * 2010-07-09 2012-01-11 通用电气公司 风力涡轮、控制系统和用于优化风力涡轮功率生产的方法
CN102782315A (zh) * 2009-12-23 2012-11-14 维斯塔斯风力系统集团公司 用于保护风力涡轮机免受损坏的方法和装置
CN103541862A (zh) * 2012-07-09 2014-01-29 远景能源(江苏)有限公司 降低风力涡轮机极端负载的桨距调节方法和系统
CN103562709A (zh) * 2011-04-28 2014-02-05 维斯塔斯风力系统集团公司 用于保护风力涡轮机不受极端事件影响的方法和装置
CN103597206A (zh) * 2011-05-06 2014-02-19 维斯塔斯风力系统集团公司 用于保护风力涡轮机不受极端状况影响的方法和装置
CN103742357A (zh) * 2013-11-18 2014-04-23 沈阳工业大学 一种风力发电机组风轮非对称载荷控制方法
CN104411967A (zh) * 2012-06-06 2015-03-11 维斯塔斯风力系统集团公司 带有载荷控制器的风力涡轮机

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1998042980A1 (en) * 1997-03-26 1998-10-01 Forskningscenter Risø A wind turbine with a wind velocity measurement system
CN101368541A (zh) * 2007-08-13 2009-02-18 通用电气公司 利用逆风信息降低水平轴风力涡轮机中负荷的系统和方法
CN102782315A (zh) * 2009-12-23 2012-11-14 维斯塔斯风力系统集团公司 用于保护风力涡轮机免受损坏的方法和装置
CN102312782A (zh) * 2010-07-09 2012-01-11 通用电气公司 风力涡轮、控制系统和用于优化风力涡轮功率生产的方法
CN102251926A (zh) * 2010-07-15 2011-11-23 大唐南京自动化有限公司 一种风力发电机湍流抑制方法
CN102011692A (zh) * 2010-11-26 2011-04-13 浙江运达风电股份有限公司 一种在不同湍流地形下风电机组稳定运行的控制方法
CN103562709A (zh) * 2011-04-28 2014-02-05 维斯塔斯风力系统集团公司 用于保护风力涡轮机不受极端事件影响的方法和装置
CN103597206A (zh) * 2011-05-06 2014-02-19 维斯塔斯风力系统集团公司 用于保护风力涡轮机不受极端状况影响的方法和装置
CN104411967A (zh) * 2012-06-06 2015-03-11 维斯塔斯风力系统集团公司 带有载荷控制器的风力涡轮机
CN103541862A (zh) * 2012-07-09 2014-01-29 远景能源(江苏)有限公司 降低风力涡轮机极端负载的桨距调节方法和系统
CN103742357A (zh) * 2013-11-18 2014-04-23 沈阳工业大学 一种风力发电机组风轮非对称载荷控制方法

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107781105A (zh) * 2016-08-31 2018-03-09 北京天诚同创电气有限公司 风力发电机的变桨控制方法及装置
CN107781105B (zh) * 2016-08-31 2019-05-07 北京天诚同创电气有限公司 风力发电机的变桨控制方法及装置
CN108105027A (zh) * 2016-11-24 2018-06-01 北京金风科创风电设备有限公司 风力发电机组变桨控制方法及装置
CN109944749A (zh) * 2017-12-21 2019-06-28 北京金风科创风电设备有限公司 极端湍流的识别方法、装置、设备及计算机可读存储介质
CN109944749B (zh) * 2017-12-21 2020-10-09 北京金风科创风电设备有限公司 极端湍流的识别方法、装置、设备及计算机可读存储介质
CN108757312A (zh) * 2018-06-06 2018-11-06 湘电风能有限公司 一种风力发电机变桨控制方法
CN109296506A (zh) * 2018-10-26 2019-02-01 许昌许继风电科技有限公司 一种风电机组的振动检测方法、控制方法及装置
CN110067703A (zh) * 2019-05-28 2019-07-30 华北电力大学 蜗杆式同步变桨风电机组及控制方法
CN110067703B (zh) * 2019-05-28 2023-12-29 华北电力大学 蜗杆式同步变桨风电机组及控制方法
CN112610406A (zh) * 2020-12-16 2021-04-06 太原重工股份有限公司 风力发电机组控制方法
CN112610406B (zh) * 2020-12-16 2022-03-08 太原重工股份有限公司 风力发电机组控制方法

Also Published As

Publication number Publication date
CN105156272B (zh) 2018-04-17

Similar Documents

Publication Publication Date Title
CN105156272A (zh) 一种风力发电机组喘流风况控制方法
EP3500751B1 (en) Dynamic controlled wind turbine shutdown
US10711764B2 (en) Control system for wind turbine having multiple rotors arranged to control support arm orientation
EP2516852B1 (en) Method and apparatus for protecting wind turbines from damage
CN102493918A (zh) 风电场阵风载荷预警控制系统和方法
CN105545590B (zh) 一种风力发电机组的控制方法
AU2018386361B2 (en) Control method and device for avoiding run-away and wind turbine
CA2787441C (en) Wind energy plant having a blade heater
JP5627529B2 (ja) 風力発電装置の制御装置、風力発電装置、ウインドファーム、及び風力発電装置の制御方法
WO2019128047A1 (zh) 风力发电机组的控制方法、装置及系统
US20130307270A1 (en) Fire System for a Wind Turbine
CN102128133A (zh) 兆瓦级风力发电机组变桨控制装置
CN112796939B (zh) 一种风力发电机降载方法
CN112963304B (zh) 一种包含转矩控制的风电机组超速保护辅助控制方法
KR102234121B1 (ko) 풍력 발전 설비의 제어 방법
KR101475274B1 (ko) 풍력발전기의 피치 제어 시스템 및 그 방법
KR20150019463A (ko) 풍력발전 단지 제어 장치 및 시스템
CN107701372A (zh) 一种变桨执行器失效下的风力发电机组自我保护控制方法
CN114776522B (zh) 一种用于解决风电机组涡激振动的方法
WO2011131494A2 (en) An advanced warning system and method for a turbine
CN202031775U (zh) 兆瓦级风力发电机组变桨控制装置
CN102797630A (zh) 一种风力发电机组停机控制方法及装置
CN113236485B (zh) 一种风电机组提高风能利用率的控制方法及其控制系统
CN104265567A (zh) 带自动偏离风向保护的偏航系统及偏航方法
CN204200474U (zh) 兆瓦级风力发电机组轮毂安全链

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Chu Jingchun

Inventor after: Wang Qian

Inventor after: Yu Chi

Inventor after: Wang Dongdong

Inventor after: Guo Juntao

Inventor after: Liu Hao

Inventor before: Wang Qian

Inventor before: Yu Chi

Inventor before: Wang Dongdong

Inventor before: Guo Juntao

Inventor before: Liu Hao

GR01 Patent grant
GR01 Patent grant