CN105155658A - 一种成品排水沟的简易结构检查井 - Google Patents
一种成品排水沟的简易结构检查井 Download PDFInfo
- Publication number
- CN105155658A CN105155658A CN201510623979.2A CN201510623979A CN105155658A CN 105155658 A CN105155658 A CN 105155658A CN 201510623979 A CN201510623979 A CN 201510623979A CN 105155658 A CN105155658 A CN 105155658A
- Authority
- CN
- China
- Prior art keywords
- pipe
- carrying basket
- ditch body
- material carrying
- sleeve pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Sewage (AREA)
Abstract
本发明涉及排水沟技术领域,特别涉及一种成品排水沟的简易结构检查井,该简易结构检查井包括带支管出水口的沟体和套管,所述带支管出水口的沟体的侧部和底部均设有管接头;所述套管套设于带支管出水口的沟体底部的管接头上;所述套管内置有带网孔的载物篮;所述套管的侧部设有管道接头。本发明以带支管出水口的沟体为基础,在其底部的管接头处安装一个内置有载物篮的套管,载物篮的圆柱面上设置有网孔,载物篮用于存放流入到排水沟内的杂物。套管的侧部设有管道接头,可以与其他管路进行连接。大大降低了生产厂家模具投入费用。另外,套管可以用带堵头的三通管取代,进一步降低了排水沟铺设的费用。
Description
技术领域
本发明涉及排水沟技术领域,特别涉及一种成品排水沟的简易结构检查井。
背景技术
现有的市政工程用地下网管检查井多为砖砌混凝土检查井,其主要存在如下缺点:首先强度低,砖砌结构的支撑强度低,尤其是靠近路面的砖砌结构变径缩口部分因作用力冲击易塌陷;其次井体施工周期长,施工复杂,由于必须手工现场堆砌,对土建要求高,标准化、通用化、系列化程度差,手工和用料的多少是影响质量的重要因素;此外还存在不能更换、易破裂和渗漏而造成污染等缺陷,需频繁维修,而且,对于传统的检查井中的淤泥或者其他杂物的捞取比较麻烦,主要是通过环卫工人用专门的工件进行操作,给环卫工人的工作造成了不便。
随着HDPE材料在成品排水沟应用的不断推广,成品排水沟逐渐取代传统排水沟,成品排水沟根据排水系统的设计包括有无支管出水口的沟体、带支管出水口的沟体和检查井组成。无支管出水口的沟体和带支管出水口的沟体均为直线型排水沟,从结构基本相同。不同的是带支管出水口的沟体在侧部和底部均设置有管接头,用于连接其他管路。而检查井从结构上与无支管出水口的沟体和带支管出水口的沟体明显不同,在铺设排水沟时需要根据排水情况每隔几米或十几米设置一个。
发明内容
本发明的目的在于针对现有技术的不足,提供一种成品排水沟的简易结构检查井,该简易结构检查井以带支管出水口的沟体为基础,在其底部的管接头处安装一个内置有载物篮的套管,载物篮的圆柱面上设置有网孔,载物篮用于存放流入到排水沟内的杂物。套管的侧部设有管道接头,可以与其他管路进行连接。
为解决上述问题,本发明提供以下技术方案:
一种成品排水沟的简易结构检查井,该简易结构检查井包括带支管出水口的沟体和套管,所述带支管出水口的沟体的侧部和底部均设有管接头;所述套管套设于带支管出水口的沟体底部的管接头上;所述套管内置有带网孔的载物篮;所述套管的侧部设有管道接头。
进一步地,所述管接头由两个同轴线的管道接头组成;所述套管的顶部敞开并设有管道对接头,其底部封闭;所述套管通过管道对接头与一个管道接头密封连接。
进一步地,所述管道对接头内设有限位台阶。
进一步地,所述管道对接头与管道接头通过密封胶连接。
进一步地,所述载物篮为圆柱形结构;所述网孔设置于载物篮的圆柱面上。
进一步地,所述载物篮的顶部敞开,其底部封闭;所述载物篮的顶部内侧边缘处设有挂钩。
有益效果:本发明的一种成品排水沟的简易结构检查井,该简易结构检查井以带支管出水口的沟体为基础,在其底部的管接头处安装一个内置有载物篮的套管,载物篮的圆柱面上设置有网孔,载物篮用于存放流入到排水沟内的杂物。套管的侧部设有管道接头,可以与其他管路进行连接。该简易结构检查井结构简单,不需要专门设计这个检查井的模具进行制造,只需针对载物篮和套管设计独立的模具,大大降低了生产厂家模具投入费用。另外,套管可以用带堵头的三通管取代,进一步降低了排水沟铺设的费用。
附图说明
图1为本发明分解结构示意图;
图2为本发明中带支管出水口的沟体的立体结构示意图一;
图3为本发明中带支管出水口的沟体的立体结构示意图二;
图4为本发明中载物篮安装于套管内的立体结构示意图;
图5为本发明中套管的立体结构示意图;
图6为本发明中载物篮的立体结构示意图;
附图标记说明:带支管出水口的沟体1,管接头1a,套管2,管道对接头2a,管道接头2b,限位台阶2c,载物篮3,网孔3a,挂钩3b。
具体实施方式
下面结合说明书附图和实施例,对本发明的具体实施例做进一步详细描述:
参照图1至图6所示的一种成品排水沟的简易结构检查井,该简易结构检查井包括带支管出水口的沟体1和套管2,所述带支管出水口的沟体1的侧部和底部均设有管接头1a;所述套管2套设于带支管出水口的沟体1底部的管接头1a上;所述套管2内置有带网孔3a的载物篮3;所述套管2的侧部设有管道接头2b。
所述管接头1a由两个同轴线的管道接头2b组成;所述套管2的顶部敞开并设有管道对接头2a,其底部封闭;所述套管2通过管道对接头2a与一个管道接头2b密封连接。
所述管道对接头2a内设有限位台阶2c。
所述管道对接头2a与管道接头2b通过密封胶连接。
其中,由于管道对接头2a与管道接头2b之间采用密封胶连接,为保证连接强度,管道接头2b应该插入管道对接头2a内足够的深度。而限位台阶2c的作用就是在安装套管2时作为安装基准,只有当限位台阶2c顶住管道接头2b,即管道接头2b与管道对接头2a之间充分接触时,才能确认为套管2安装到位。
所述载物篮3为圆柱形结构;所述网孔3a设置于载物篮3的圆柱面上。
所述载物篮3的顶部敞开,其底部封闭;所述载物篮3的顶部内侧边缘处设有挂钩3b。
需要说明的是,挂钩3b主要是为了方便环卫工人从检查井中取出载物篮3,具体操作方法是用铁丝钩或者专门的钩具勾住载物篮3内的挂钩3b向上提拉。带支管出口的沟体上的管接头1a主要是为了方便与其他分支管路连接,并且管接头1a设计有两个同轴心线的管道接头2b,方便通过不同直径的管道进行连接,在管道接头2b与带支管出口的沟体交接处槽璧的壁厚设计为U型槽体壁厚的三分之一,这样不需要特殊工具,只需榔头或者砖块轻敲便可实现开孔工作。当需要安装套管2和载物篮3时将该区域的槽璧敲除即可。
该简易结构检查井以带支管出水口的沟体1为基础,在其底部的管接头1a处安装一个内置有载物篮3的套管2,载物篮3的圆柱面上设置有网孔3a,载物篮3用于存放流入到排水沟内的杂物。套管2的侧部设有管道接头2b,可以与其他管路进行连接。该简易结构检查井结构简单,不需要专门设计这个检查井的模具进行制造,只需针对载物篮3和套管2设计独立的模具,大大降低了生产厂家模具投入费用。另外,套管2可以用带堵头的三通管取代,进一步降低了排水沟铺设的费用。
以上所述,仅是本发明的较佳实施例而已,并非对本发明的技术范围作出任何限制,故凡是依据本发明的技术实质对以上实施例所作的任何细微修改、等同变化与修饰,均仍属于本发明的技术方案的范围内。
Claims (6)
1.一种成品排水沟的简易结构检查井,其特征在于:该简易结构检查井包括带支管出水口的沟体(1)和套管(2),所述带支管出水口的沟体(1)的侧部和底部均设有管接头(1a);所述套管(2)套设于带支管出水口的沟体(1)底部的管接头(1a)上;所述套管(2)内置有带网孔(3a)的载物篮(3);所述套管(2)的侧部设有管道接头(2b)。
2.根据权利要求1所述的一种成品排水沟的简易结构检查井,其特征在于:所述管接头(1a)由两个同轴线的管道接头(2b)组成;所述套管(2)的顶部敞开并设有管道对接头(2a),其底部封闭;所述套管(2)通过管道对接头(2a)与一个管道接头(2b)密封连接。
3.根据权利要求2所述的一种成品排水沟的简易结构检查井,其特征在于:所述管道对接头(2a)内设有限位台阶(2c)。
4.根据权利要求2所述的一种成品排水沟的简易结构检查井,其特征在于:所述管道对接头(2a)与管道接头(2b)通过密封胶连接。
5.根据权利要求1所述的一种成品排水沟的简易结构检查井,其特征在于:所述载物篮(3)为圆柱形结构;所述网孔(3a)设置于载物篮(3)的圆柱面上。
6.根据权利要求5所述的一种成品排水沟的简易结构检查井,其特征在于:所述载物篮(3)的顶部敞开,其底部封闭;所述载物篮(3)的顶部内侧边缘处设有挂钩(3b)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510623979.2A CN105155658A (zh) | 2015-09-25 | 2015-09-25 | 一种成品排水沟的简易结构检查井 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510623979.2A CN105155658A (zh) | 2015-09-25 | 2015-09-25 | 一种成品排水沟的简易结构检查井 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105155658A true CN105155658A (zh) | 2015-12-16 |
Family
ID=54796669
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510623979.2A Pending CN105155658A (zh) | 2015-09-25 | 2015-09-25 | 一种成品排水沟的简易结构检查井 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105155658A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112663765A (zh) * | 2020-06-30 | 2021-04-16 | 陈超 | 一种市政排水结构 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4483643A (en) * | 1981-03-11 | 1984-11-20 | Horst Guggemos | Canal bed shell |
JPH0953273A (ja) * | 1995-08-14 | 1997-02-25 | Masaya Nagashima | U字溝 |
CN1299909A (zh) * | 1999-12-10 | 2001-06-20 | 罗锦秀 | 沟渠涵箱 |
DE102007033824A1 (de) * | 2007-07-18 | 2009-01-22 | Trauthwein Entwässerungs- und Abscheidetechnik Industrievertretungen GmbH | Straßen- und Brückenentwässerungssystem, Vorrichtung und Verfahren zum Einbau des Systems |
CN202064435U (zh) * | 2011-04-01 | 2011-12-07 | 辽宁衍水集团辽阳水工水泥制品有限责任公司 | 柔性接口检查井及使用该检查井的管道系统 |
WO2012073123A1 (en) * | 2010-12-03 | 2012-06-07 | Anand Belhe | An innovative method for making frp-polymer concrete drain channels |
CN204940484U (zh) * | 2015-09-25 | 2016-01-06 | 芜湖弛科排水材料贸易有限公司 | 一种成品排水沟的简易结构检查井 |
-
2015
- 2015-09-25 CN CN201510623979.2A patent/CN105155658A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4483643A (en) * | 1981-03-11 | 1984-11-20 | Horst Guggemos | Canal bed shell |
JPH0953273A (ja) * | 1995-08-14 | 1997-02-25 | Masaya Nagashima | U字溝 |
CN1299909A (zh) * | 1999-12-10 | 2001-06-20 | 罗锦秀 | 沟渠涵箱 |
DE102007033824A1 (de) * | 2007-07-18 | 2009-01-22 | Trauthwein Entwässerungs- und Abscheidetechnik Industrievertretungen GmbH | Straßen- und Brückenentwässerungssystem, Vorrichtung und Verfahren zum Einbau des Systems |
WO2012073123A1 (en) * | 2010-12-03 | 2012-06-07 | Anand Belhe | An innovative method for making frp-polymer concrete drain channels |
CN202064435U (zh) * | 2011-04-01 | 2011-12-07 | 辽宁衍水集团辽阳水工水泥制品有限责任公司 | 柔性接口检查井及使用该检查井的管道系统 |
CN204940484U (zh) * | 2015-09-25 | 2016-01-06 | 芜湖弛科排水材料贸易有限公司 | 一种成品排水沟的简易结构检查井 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112663765A (zh) * | 2020-06-30 | 2021-04-16 | 陈超 | 一种市政排水结构 |
CN112681484A (zh) * | 2020-06-30 | 2021-04-20 | 陈超 | 一种市政工程用分体排水结构 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103806470B (zh) | 钢筋混凝土检查井生产安装方法 | |
CN104711999A (zh) | 地下室底板渗水的疏导处理方法 | |
CN103939669B (zh) | 一种软土基质中防渗漏地下管道结构及其施工工艺 | |
CN204940484U (zh) | 一种成品排水沟的简易结构检查井 | |
CN109025899B (zh) | 一种封井装置 | |
CN205190987U (zh) | 一种聚丙烯波纹管 | |
CN104653902B (zh) | 节水灌溉管道及其施工方法 | |
CN105155658A (zh) | 一种成品排水沟的简易结构检查井 | |
CN206973068U (zh) | 一种穿楼板预埋用柔性接口可调心预埋接管 | |
CN202401561U (zh) | 多功能环保型可移动水槽 | |
CN107830291B (zh) | 一种汇流连接箱及其安装应用工艺 | |
CN205653873U (zh) | 一种便于安装的塑料检查井 | |
CN202500153U (zh) | 整体带肋塑料检查井 | |
CN205369322U (zh) | 一种用于处理底板涌水孔的堵漏装置 | |
CN209958395U (zh) | 一种隐蔽式检查井 | |
CN209874098U (zh) | 带外挂楼梯的建筑墙体防水结构 | |
CN207998913U (zh) | 预制污水检查井 | |
CN210369258U (zh) | 一种污水管网的雨污交汇井 | |
CN203668912U (zh) | 一种混凝土内排水管的埋设结构 | |
CN201738429U (zh) | 排水检查井 | |
CN206428549U (zh) | 透水性园林路面 | |
CN208074294U (zh) | 侧排式直埋件 | |
CN112628477A (zh) | 一种带伸缩及防排水功能的排水管预埋装置及安装方法 | |
CN205314128U (zh) | 一体式全塑电力通信井 | |
CN112113029A (zh) | 一种粉土地质条件下的顶管施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20151216 |
|
RJ01 | Rejection of invention patent application after publication |