CN105155535A CN201510504095.5A CN201510504095A CN105155535A CN 105155535 A CN105155535 A CN 105155535A CN 201510504095 A CN201510504095 A CN 201510504095A CN 105155535 A CN105155535 A CN 105155535A
Authority
CN
China
Prior art keywords
anchor
anchor hole
underground water
construction method
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510504095.5A
Other languages
Chinese (zh)
Inventor
韩娟
袁广祥
范兵
韩灵杰
鲁福利
王志洁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhengzhou University of Science and Technology
Original Assignee
Zhengzhou University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou University of Science and Technology filed Critical Zhengzhou University of Science and Technology
Priority to CN201510504095.5A priority Critical patent/CN105155535A/en
Publication of CN105155535A publication Critical patent/CN105155535A/en
Pending legal-status Critical Current

Links

Abstract

The invention provides a construction method for an anchor rod for civil engineering. The construction efficiency is high, mud and vibration are avoided, the stability performance of anchor holes is high, the strength of the anchor rod is high, and the anti-puling bearing capability of the anchor rod is high. The construction method comprises the following steps that an eye position is marked through paint; a drilling machine is moved to the preset position, and a drill bit is driven by a drill rod to drill into the eye position; when it is found that drilling is difficult for the drilling machine, the air pressure and the drilling speed are adjusted in time; in the rotating process of the drill rod, the perpendicularity of the drill rod is observed in real time; after the drill bit drills into the position by the preset depth, whether underground water exists in an anchor hole or not is observed, and when a large amount of underground water exists, clean water is injected in the anchor hole, and when no underground water or a small amount of underground water exists in the anchor hole, cleaning is carried out through an air compressor air pipe; quality detection is carried out on a steel bar, and the steel bar is placed into the bottom of the anchor hole in a manual stacking manner; and a grouting pipe is inserted into the anchor hole, grouting is carried out through a grouting pump and the grouting pipe communicated with the grouting pump, and when the grout reaches the designed height, the grouting pipe is pulled out, and the grout and the steel bar are solidified and form the anchor rod.

Description

A kind of civil engineering anchor rod construction method
Technical field
The present invention relates to anchor bolt construction field, particularly relate to a kind of civil engineering anchor rod construction method.
Background technology
All buildings related to are all to high level, deep layer, large area, heavy-duty future development, the application quantity of anchor pole in Rock And Soil stabilization works, support engineering also increasing, range of application is more and more extensive, has important engineering significance and economic worth to the innovation of this field of engineering technology and construction technical method or useful improvement.Present stage anchor rod construction method and operation comparatively loaded down with trivial details, efficiency of construction is lower, and in work progress, anchor pole easily vibrates, and affects the stability of anchor hole, and in addition, anchor rod strength is low, and anti-pulling ability is weak.The problems referred to above need solution badly.
Summary of the invention
Based on the technical problem that background technology exists, the present invention proposes a kind of civil engineering anchor rod construction method, to solve the problems of the technologies described above.
A kind of civil engineering anchor rod construction method that the present invention proposes, comprises the following steps:
S1: according to Soil Anchor Design spacing and country rock bedding, joint distribution actual conditions, paint and mark eye position;
S2: rig substructure to precalculated position, and is leveled up by transfer rig, adjustment drill pipe angle, drives drill bit to pierce above-mentioned eye position by drilling rod;
S3: stirred forward by drilling rod rotary drilling-head and creep into, when discovery rig creeps at need, drag for slag in time and sample, and differentiate slag specimen, adjustment air pressure and rate of penetration, guarantee that drill bit enters bearing stratum;
S4: in drilling rod rotary course, real-time monitored drilling rod verticality, adjusts in time when deviation appears in drilling rod;
S5: after drill bit pierces desired depth, with or without underground water in observation anchor hole, when underground water is more, injected clear water in anchor hole, flows out till clear water in anchor hole, when in anchor hole without underground water or underground water less time, adopt air compressor air pipe cleaning, take away the residue in anchor hole;
S6: carry out quality examination to reinforcing bar, guarantees that rebar surface is without after dirt or scar, adopts artificial mode of stacking to transfer to anchor hole by reinforcing bar;
S7: Grouting Pipe inserted in anchor hole, the Grouting Pipe be communicated with it by grouting pump carries out slip casting, when slurries reach design height, extracts Grouting Pipe, and slurries and reinforcing bar solidify, and form anchor pole.
Preferably, in drilling rod rotary course, compass is adopted to check drilling rod verticality.
Preferably, above-mentioned grouting pump is high-pressure grout injector.
Preferably, above-mentioned slip casting process without pause, and adopts plummet to calculate pulp level.
A kind of civil engineering anchor rod construction method that the present invention proposes, efficiency of construction is high, and without mud, friction, anchor hole stability is good, and anchor rod strength is high, and anchor pole anti-pulling capacity is high.
Accompanying drawing explanation
Fig. 1 is the structural representation of a kind of civil engineering anchor rod construction method that the present invention proposes.
Detailed description of the invention
As shown in Figure 1, Fig. 1 is the structural representation of a kind of civil engineering anchor rod construction method that the present invention proposes.
With reference to Fig. 1, a kind of civil engineering anchor rod construction method that the present invention proposes, comprises the following steps:
S1: according to Soil Anchor Design spacing and country rock bedding, joint distribution actual conditions, paint and mark eye position;
S2: rig substructure to precalculated position, and is leveled up by transfer rig, adjustment drill pipe angle, drives drill bit to pierce above-mentioned eye position by drilling rod;
S3: stirred forward by drilling rod rotary drilling-head and creep into, when discovery rig creeps at need, drag for slag in time and sample, and differentiate slag specimen, adjustment air pressure and rate of penetration, guarantee that drill bit enters bearing stratum;
S4: in drilling rod rotary course, real-time monitored drilling rod verticality, adjusts in time when deviation appears in drilling rod;
S5: after drill bit pierces desired depth, with or without underground water in observation anchor hole, when underground water is more, injected clear water in anchor hole, flows out till clear water in anchor hole, when in anchor hole without underground water or underground water less time, adopt air compressor air pipe cleaning, take away the residue in anchor hole;
S6: carry out quality examination to reinforcing bar, guarantees that rebar surface is without after dirt or scar, adopts artificial mode of stacking to transfer to anchor hole by reinforcing bar;
S7: Grouting Pipe inserted in anchor hole, the Grouting Pipe be communicated with it by grouting pump carries out slip casting, when slurries reach design height, extracts Grouting Pipe, and slurries and reinforcing bar solidify, and form anchor pole.
In such scheme, in drilling rod rotary course, compass is adopted to check drilling rod verticality.
When specific design, above-mentioned grouting pump is high-pressure grout injector.
When specific design, above-mentioned slip casting process without pause, and adopts plummet to calculate pulp level.
A kind of civil engineering anchor rod construction method that the present invention proposes, efficiency of construction is high, and without mud, friction, anchor hole stability is good, and anchor rod strength is high, and anchor pole anti-pulling capacity is high.
The above; be only the present invention's preferably detailed description of the invention; but protection scope of the present invention is not limited thereto; anyly be familiar with those skilled in the art in the technical scope that the present invention discloses; be equal to according to technical scheme of the present invention and inventive concept thereof and replace or change, all should be encompassed within protection scope of the present invention.

Claims (4)

1. a civil engineering anchor rod construction method, is characterized in that, comprises the following steps:
S1: according to Soil Anchor Design spacing and country rock bedding, joint distribution actual conditions, paint and mark eye position;
S2: rig substructure to precalculated position, and is leveled up by transfer rig, adjustment drill pipe angle, drives drill bit to pierce above-mentioned eye position by drilling rod;
S3: stirred forward by drilling rod rotary drilling-head and creep into, when discovery rig creeps at need, drag for slag in time and sample, and differentiate slag specimen, adjustment air pressure and rate of penetration, guarantee that drill bit enters bearing stratum;
S4: in drilling rod rotary course, real-time monitored drilling rod verticality, adjusts in time when deviation appears in drilling rod;
S5: after drill bit pierces desired depth, with or without underground water in observation anchor hole, when underground water is more, injected clear water in anchor hole, flows out till clear water in anchor hole, when anchor hole without underground water or underground water less time, adopt air compressor air pipe cleaning, take away the residue in anchor hole;
S6: carry out quality examination to reinforcing bar, guarantees that rebar surface is without after dirt or scar, adopts artificial mode of stacking to transfer to anchor hole by reinforcing bar;
S7: Grouting Pipe inserted in anchor hole, the Grouting Pipe be communicated with it by grouting pump carries out slip casting, when slurries reach design height, extracts Grouting Pipe, and slurries and reinforcing bar solidify, and form anchor pole.
2. civil engineering anchor rod construction method according to claim 1, is characterized in that, in drilling rod rotary course, adopts compass to check drilling rod verticality.
3. civil engineering anchor rod construction method according to claim 1, is characterized in that, above-mentioned grouting pump is high-pressure grout injector.
4. civil engineering anchor rod construction method according to claim 1, is characterized in that, above-mentioned slip casting process without pause, and adopts plummet to calculate pulp level.
CN201510504095.5A 2015-08-17 2015-08-17 Construction method for anchor rod for civil engineering Pending CN105155535A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510504095.5A CN105155535A (en) 2015-08-17 2015-08-17 Construction method for anchor rod for civil engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510504095.5A CN105155535A (en) 2015-08-17 2015-08-17 Construction method for anchor rod for civil engineering

Publications (1)

Publication Number Publication Date
CN105155535A true CN105155535A (en) 2015-12-16

Family

ID=54796554

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510504095.5A Pending CN105155535A (en) 2015-08-17 2015-08-17 Construction method for anchor rod for civil engineering

Country Status (1)

Country Link
CN (1) CN105155535A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106049492A (en) * 2016-06-01 2016-10-26 贵州师范大学 Anchor rod construction method for civil engineering
CN106368225A (en) * 2016-10-18 2017-02-01 中国电建集团成都勘测设计研究院有限公司 Geological condition distinguishing and position length adjusting method for anchorage section of anchor cable of rock slope
CN111676980A (en) * 2020-06-01 2020-09-18 重庆弘粟建筑科技有限公司 Foundation pit supporting construction method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李博恒: "探讨地下工程中抗浮锚杆技术的应用", 《建材与装饰(下旬刊)》 *
李启东等: "某工程预应力抗浮锚杆施工工艺改进", 《施工技术》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106049492A (en) * 2016-06-01 2016-10-26 贵州师范大学 Anchor rod construction method for civil engineering
CN106368225A (en) * 2016-10-18 2017-02-01 中国电建集团成都勘测设计研究院有限公司 Geological condition distinguishing and position length adjusting method for anchorage section of anchor cable of rock slope
CN111676980A (en) * 2020-06-01 2020-09-18 重庆弘粟建筑科技有限公司 Foundation pit supporting construction method

Similar Documents

Publication Publication Date Title
CN102943466B (en) Construction method for miniature steel pipe concrete pile to penetrate through roadbed layer for reinforcing soft foundation construction
CN100501011C (en) Hole drilling mudjack pile construction method
CN101736755B (en) Clean water hole pile foundation constructing method
CN106761474B (en) A kind of the full-sleeve engineering method steel sleeve and its construction method of the soil that can actively muck haulage
CN107794915A (en) It is adapted to the karst cave treatment method of pile foundation construction in karst area
CN104831708A (en) Foundation excavation retaining and protecting cast-in-situ bored pile construction method and equipment thereof
CN105780763A (en) Construction method of medium-hole vibrating casing wall protection type long spiral cast-in-situ bored pile
CN103290840A (en) Prestressed pipe pile construction method under boulder group geological conditions
CN203361143U (en) Combination structure of high-pressure jet grouting pile and prestressed pipe pile
CN105064336A (en) Hole forming construction method for three-section type pedestal pile
CN105155535A (en) Construction method for anchor rod for civil engineering
CN106677168A (en) Construction method of cast-in-place superfluid concrete pile
CN104711973A (en) Construction method for small-diameter pile composite foundation
CN105649010A (en) Grouting pile construction technology
CN106677166A (en) Flow construction method for forming cast-in-place bored pile for gravel-decomposed rock stratum in double-machine combined mode
CN203584301U (en) Hole guide equipment
CN108755671B (en) Construction method of triaxial mixing pile of water-rich gravel layer
CN110241836A (en) A kind of construction method of embedding rock water-stop curtain
CN107700508A (en) A kind of shaped steel stirs the construction method of water spray soil curtain support pile
CN205444192U (en) Bridge stake is towards pile driving construction system
CN102409978B (en) Rotary drilling hole forming method by using multi-stage alloy pilot roller bit in complex stratum cast-in-place pile construction
CN103643674B (en) Erect column pile construction method under geologic condition of pebble bed sandstone
CN103015435A (en) Long auger down hole hammer vibration rotary-jet steel reinforced cement-soil pile foundation pit water-resisting and supporting method
CN204252120U (en) The construction equipment of concrete pile
CN103821140B (en) A kind of construction method of reinforcing soft foundation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20151216