CN105143555A - Clearing chain of track cleaning machine with safety rope switch protecting against lateral breaking away - Google Patents

Clearing chain of track cleaning machine with safety rope switch protecting against lateral breaking away Download PDF

Info

Publication number
CN105143555A
CN105143555A CN201480020552.7A CN201480020552A CN105143555A CN 105143555 A CN105143555 A CN 105143555A CN 201480020552 A CN201480020552 A CN 201480020552A CN 105143555 A CN105143555 A CN 105143555A
Authority
CN
China
Prior art keywords
track
longitudinal chain
chain part
lifting unit
operating position
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201480020552.7A
Other languages
Chinese (zh)
Other versions
CN105143555B (en
Inventor
H·沃高特
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
RTPLASSER BAHNBAUMASCH FRANZ
Original Assignee
RTPLASSER BAHNBAUMASCH FRANZ
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by RTPLASSER BAHNBAUMASCH FRANZ filed Critical RTPLASSER BAHNBAUMASCH FRANZ
Publication of CN105143555A publication Critical patent/CN105143555A/en
Application granted granted Critical
Publication of CN105143555B publication Critical patent/CN105143555B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/06Renewing or cleaning the ballast in situ, with or without concurrent work on the track
    • E01B27/10Renewing or cleaning the ballast in situ, with or without concurrent work on the track without taking-up track
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B27/00Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
    • E01B27/06Renewing or cleaning the ballast in situ, with or without concurrent work on the track
    • E01B27/10Renewing or cleaning the ballast in situ, with or without concurrent work on the track without taking-up track
    • E01B27/105Renewing or cleaning the ballast in situ, with or without concurrent work on the track without taking-up track the track having been lifted
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01HELECTRIC SWITCHES; RELAYS; SELECTORS; EMERGENCY PROTECTIVE DEVICES
    • H01H3/00Mechanisms for operating contacts
    • H01H3/02Operating parts, i.e. for operating driving mechanism by a mechanical force external to the switch
    • H01H3/022Emergency operating parts, e.g. for stop-switch in dangerous conditions
    • H01H3/0226Emergency operating parts, e.g. for stop-switch in dangerous conditions operated by a pull cord

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The invention relates to a method for transferring a longitudinal chain section (10) of a clearing chain (5) for picking up ballast from a track (2) from a transfer position to a working position adjacent to the sleeper ends (14) wherein camber values determining a precise track set of the track to be cleaned are stored in a computing unit (15). The position of the track (2) is measured in the area of a rail lifter (6) determining current camber values, which are compared to the stored camber values and the track is moved to the stored precise track set by the rail lifter (6) in the event of any discrepancy. The movement of the longitudinal chain section (10) in the transverse direction of the track (13) for subsequent lowering into the working position is controlled by a mechanical linkage (19) between the rail lifter (6) and the longitudinal chain section (10) acting on a limit switch (17) and is halted when a clearance gauge (18) is surpassed.

Description

There is the cleaning chain of the track sweeping machine avoiding the safety rope switch that side direction is shaken off
Technical field
The present invention relates to a kind of method, it is for will to be arranged on machine frame and the longitudinal chain part being used for picking up the cleaning chain of ballast aggregate below track transfers to operating position from transporting position, and sleeper end is adjoined in the transverse direction of track in this operating position.
Background technology
From US4614238, US4014389 or DE3151652, Known designs is annular and the cleaning chain for picking up ballast aggregate rotated around track.These chains are substantially by the horizontal chain part contacted with railway roadbed and hinged (articulatedlyconnected) two longitudinal chain parts to the former.Transfer to the process of operating position from transporting position at longitudinal chain part especially, exceed the danger of clearance gauge because exist, in order to security reason, must close with construct in the adjacent orbit that adjoins of track.
Summary of the invention
The object of the present invention is to provide a kind of method starting described type, can by longitudinal chain part safe transfer to operating position by it.
According to the present invention, this object is realized by the feature described in characteristic of claim 1.
Under these steps of the method, even if when not closing adjacent adjacent track, also can carry out longitudinal chain tra nsfer to operating position.Owing to temporarily removing whole railway roadbed for clearing up ballast aggregate, so lose the home position of track completely, therefore with reference to the vector value stored possibility be very important.In the case, the maximum permission lateral distance between the outward flange of track lifting unit and longitudinal chain part is accurately known all the time, and described track lifting unit is located according to the storing value storing old track position.Due to mechanical fastener, so, even if when hydraulic component failure, also there is Additional Protection, make reliably to prevent from exceeding clearance gauge.
Accompanying drawing explanation
Other advantages of the present invention can obviously be found out from dependent claims and drawing and description.
Below with reference to the accompanying drawings the embodiment shown in describes the present invention in more detail, wherein: Fig. 1 is the partial side elevation view of the ballast cleaner device with cleaning chain; And
Fig. 2 is the view of part cleaning chain along the longitudinal direction of machine.
Fig. 3 is the top view of part cleaning chain along the longitudinal direction of machine
Detailed description of the invention
Fig. 1 illustrates the simplified partial schematic diagram of the machine 1 of the ballast aggregate for clearing up track 2, and this machine has and is supported on track 2 or movable machine framework 4 on track 2 via rail mounted chassis 3.Be arranged on machine frame 4 be cleaning chain 5 for picking up ballast aggregate, vertical and adjustable in a lateral direction track lifting unit 6, work chamber 7 and for transport the ballast aggregate that digs out and after bringing cleaning or the conveyer belt 8 of new ballast aggregate.Be arranged on machine frame 4 and be made up of two longitudinal chain parts 10 and horizontal chain part 11 for the cleaning chain 5 carrying out vertical and lateral adjustments via driver 9, and transporting position is shown herein, and the operating position clearing up chain 5 represents with chain-dotted line.
In the above-mentioned operating position for picking up ballast aggregate from track 2 (now, can more clearly find out in figs 2 and 3), the horizontal chain part 11 of cleaning chain 5 is arranged in below the sleeper 12 of track 2, wherein, each longitudinal chain part 10 be positioned in the transverse direction 13 of track adjoin sleeper end 14 position on.In order to cleaning chain 5 is transferred to operating position from transporting position, longitudinal chain part 10 must be moved by the transverse direction 13 of driver 9 along track and then be declined, and then horizontal chain part 11 can be mounted.In the process, track 2 remains on its position no longer supported by ballast aggregate now by track lifting unit 6.
Now, according to the present invention, in order to transfer cleaning chain 5 in the method process, first the vector value of the exact position of track 2 pending for definition is stored in the processing unit 15 (Fig. 1) be arranged on machine 1.This such as can be undertaken by measuring advancing of performing on pending track 2 in advance in the first job step, in the first job step, determines and stores the vector value of accurate track location and be then loaded in processing unit 15.
In addition, when track lifting unit 6 is fixed on track, the physical location of track 2 in this region is measured by the sensor (not shown) being connected to this track lifting unit, forms the current vector value of the horizontal range corresponded between lifting unit 6 and machine frame 4 thus.Now the vector value of current vector value and storage is compared.When such as exist be shifted caused by track 2 deviation due to machine 1, track 2 is displaced to the accurate track location of storage by track lifting unit 6.
As the safety measure in transfer process, the movement of longitudinal chain part 10 on the horizontal direction 13 of track is additionally checked by the mechanical fastener 16 be arranged between track lifting unit 6 and longitudinal chain part 10.For this reason, connector 16 (being such as the shape of chain fitting 19) act on such as can be arranged on longitudinal chain part 10 limit switch 17 on, by limit switch 17, the clearance gauge 18 of track 2 is once be in the danger be exceeded, and the transverse shifting towards adjacent orbit direction of longitudinal chain part 10 just stops.Therefore, even if in the transfer process of cleaning chain 5, the railway traffic on adjacent orbit can also be kept.
In addition, in order to improve safety or as an alternative, also can the cable connecting piece being connected to limit switch 17 be set between track lifting unit 6 and longitudinal chain part 10, it is for limiting its maximum transversal and move being transferred in the process of operating position by longitudinal chain part 10, and it became effective when described mechanical fastener 16 loses efficacy.

Claims (3)

1. a method, for will being arranged in that machine frame (4) is upper and longitudinal chain part (10) for the cleaning chain (5) picking up track (2) below ballast aggregate transfers to operating position from transporting position, sleeper end (14) is transversely adjoined at track in described operating position, it is characterized in that comprising the steps:
A) vector value of the accurate track location determining pending described track (2) is stored in processing unit (15);
B) position of the described track (2) in the region of track lifting unit (6) is measured, form current vector value, then itself and the vector value stored are compared, and when there is deviation, by described track lifting unit (6) by the accurate track location of the position transfer of described track (2) to storage;
C) by be positioned between described track lifting unit (6) and described longitudinal chain part (10) and to act on the mechanical fastener (16) of limit switch (17), check the movement of described longitudinal chain part (10) in the transverse direction (13) of described track, this moves and is reduced to described operating position for follow-up, and stops when exceeding clearance gauge (18).
2. method according to claim 1, is characterized in that, pending described track (2) is advanced in the first job step, and in the process, stores the described vector value being used for described accurate track location.
3. method according to claim 1, it is characterized in that, its maximum transversal for described longitudinal chain part (10) is transferred to described operating position moves, by be positioned between described track lifting unit (6) and described longitudinal chain part (10) and the chain fitting (19) with limit switch (17) limits.
CN201480020552.7A 2013-04-10 2014-03-14 The cleaning chain of track sweeping machine with the safe cord switch from laterally shaking off Active CN105143555B (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
ATA271/2013 2013-04-10
AT2712013A AT513749B1 (en) 2013-04-10 2013-04-10 Method for transferring a longitudinal chain section of a clearing chain
PCT/EP2014/000706 WO2014166576A1 (en) 2013-04-10 2014-03-14 Clearing chain of a track cleaning machine with safety rope switch protecting against lateral breaking away

Publications (2)

Publication Number Publication Date
CN105143555A true CN105143555A (en) 2015-12-09
CN105143555B CN105143555B (en) 2017-07-18

Family

ID=50343731

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201480020552.7A Active CN105143555B (en) 2013-04-10 2014-03-14 The cleaning chain of track sweeping machine with the safe cord switch from laterally shaking off

Country Status (7)

Country Link
EP (1) EP2984232B8 (en)
JP (1) JP6253762B2 (en)
CN (1) CN105143555B (en)
AT (1) AT513749B1 (en)
EA (1) EA032060B1 (en)
ES (1) ES2655471T3 (en)
WO (1) WO2014166576A1 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1213723A (en) * 1997-10-06 1999-04-14 弗兰茨普拉塞铁路机械工业股份有限公司 Track working machine having reference system for controlling working unit,a nd method
CN1184379C (en) * 2001-04-25 2005-01-12 弗兰茨普拉塞铁路机械工业股份有限公司 Operation method of screen scarifier and screened ballast
CN1752343A (en) * 2004-09-22 2006-03-29 弗兰茨普拉塞铁路机械工业股份有限公司 Method and machinery of tracking a track geometry
US20060071787A1 (en) * 2004-09-20 2006-04-06 K.A. Schmersal Holding Kg Position monitoring device
US20070213926A1 (en) * 2004-04-21 2007-09-13 J. Muller Ag Method For Measuring Tracks
CN202416096U (en) * 2011-12-19 2012-09-05 中铁二局股份有限公司 Sleeper even laying device of cluster sleeper type track laying machine groups

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT329107B (en) * 1974-07-05 1976-04-26 Plasser Bahnbaumasch Franz GRUB BED CLEANING MACHINE WITH LEVELING DEVICE
AT343714B (en) 1974-08-14 1978-06-12 Plasser Bahnbaumasch Franz CONVEYOR CHAIN FOR TRACK CONSTRUCTION MACHINES WITH CHAIN TENSIONER
AT370463B (en) 1981-04-22 1983-04-11 Plasser Bahnbaumasch Franz DEFLECTION AND GUIDE DEVICE FOR CONTINUOUS ROOM AND CONVEYOR CHAINS OF TRACK CONSTRUCTION MACHINES
AT377551B (en) 1983-01-10 1985-04-10 Plasser Bahnbaumasch Franz FOERDER- OR SPACE CHAIN ARRANGEMENT FOR TRACKING MACHINES
EP0806523A1 (en) * 1996-05-09 1997-11-12 J. Müller Ag Machine for obtaining a rated railway track
AT405425B (en) * 1997-08-20 1999-08-25 Plasser Bahnbaumasch Franz TRACK CONSTRUCTION MACHINE WITH A LASER REFERENCE SYSTEM AND METHOD

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1213723A (en) * 1997-10-06 1999-04-14 弗兰茨普拉塞铁路机械工业股份有限公司 Track working machine having reference system for controlling working unit,a nd method
CN1184379C (en) * 2001-04-25 2005-01-12 弗兰茨普拉塞铁路机械工业股份有限公司 Operation method of screen scarifier and screened ballast
US20070213926A1 (en) * 2004-04-21 2007-09-13 J. Muller Ag Method For Measuring Tracks
US20060071787A1 (en) * 2004-09-20 2006-04-06 K.A. Schmersal Holding Kg Position monitoring device
CN1752343A (en) * 2004-09-22 2006-03-29 弗兰茨普拉塞铁路机械工业股份有限公司 Method and machinery of tracking a track geometry
CN202416096U (en) * 2011-12-19 2012-09-05 中铁二局股份有限公司 Sleeper even laying device of cluster sleeper type track laying machine groups

Also Published As

Publication number Publication date
EA032060B1 (en) 2019-04-30
ES2655471T3 (en) 2018-02-20
AT513749A4 (en) 2014-07-15
AT513749B1 (en) 2014-07-15
WO2014166576A1 (en) 2014-10-16
CN105143555B (en) 2017-07-18
JP6253762B2 (en) 2017-12-27
EP2984232B8 (en) 2018-01-10
EP2984232A1 (en) 2016-02-17
EP2984232B1 (en) 2017-11-08
JP2016514780A (en) 2016-05-23
EA201500797A1 (en) 2016-02-29

Similar Documents

Publication Publication Date Title
JP5818880B2 (en) Linked vehicle for transporting rails
CN105200877A (en) Railway track calibration system
CN204450571U (en) Mechanical hand
AU2015220685B2 (en) Device for positioning and squaring railway sleepers and machine comprising this device
JP6619821B2 (en) Tamping machine for compressing ballast roadbed in orbit
US20090301340A1 (en) Machine for Unloading and Positioning Rails on Crossties in Railway Tracks
CA2968590A1 (en) A method and device for compacting the ballast bed of a track
BR112013028622A2 (en) process for detecting and monitoring the position of transfer device / mobile wheeled dredger or bucket dredger
EP2971356B1 (en) Rail vehicle
CN105143555A (en) Clearing chain of track cleaning machine with safety rope switch protecting against lateral breaking away
CN205772113U (en) A kind of guard bar device of vehicle turning platform
WO2015034570A1 (en) Roadway barrier transfer apparatus
CN106062279A (en) Method for detecting and securing a stable working position of a track-laying machine
CN103144552B (en) Movable production device for railway contact system
US20160265168A1 (en) Fall prevention device for a track-laying machine
US10822210B2 (en) Rail vehicle having crane rails for a gantry crane
CN207072653U (en) A kind of glass loader
CN205366919U (en) Double transport vechicle of electronic rail mounted
US1880338A (en) Carriage for spike drivers
CN204847832U (en) Novel crane end beam
CN216121754U (en) Tow chain cable protection device of travelling car
CN203567748U (en) Pneumatic oscillating single-cylinder car arrester
US1590145A (en) Tie-setting tool
KR20160077709A (en) Double jib crane
CN203333175U (en) Anti-skidding blank clamp safety device for plate blank

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant