CN105141475B - A kind of intelligent substation station level equipment assistant adjustment system - Google Patents

A kind of intelligent substation station level equipment assistant adjustment system Download PDF

Info

Publication number
CN105141475B
CN105141475B CN201510507898.6A CN201510507898A CN105141475B CN 105141475 B CN105141475 B CN 105141475B CN 201510507898 A CN201510507898 A CN 201510507898A CN 105141475 B CN105141475 B CN 105141475B
Authority
CN
China
Prior art keywords
module
station level
level equipment
message
debugging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510507898.6A
Other languages
Chinese (zh)
Other versions
CN105141475A (en
Inventor
黄琦
姜振超
刘明忠
井实
李坚
吴杰
腾云龙
杨勇波
陈云
朱超
任曼曼
江晨颖
黄卿
苏根
周瑜
姚亮
何宇航
尹文
石俊
连利波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University of Electronic Science and Technology of China
Electric Power Research Institute of State Grid Sichuan Electric Power Co Ltd
Original Assignee
University of Electronic Science and Technology of China
Electric Power Research Institute of State Grid Sichuan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University of Electronic Science and Technology of China, Electric Power Research Institute of State Grid Sichuan Electric Power Co Ltd filed Critical University of Electronic Science and Technology of China
Priority to CN201510507898.6A priority Critical patent/CN105141475B/en
Publication of CN105141475A publication Critical patent/CN105141475A/en
Application granted granted Critical
Publication of CN105141475B publication Critical patent/CN105141475B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of intelligent substation station level equipment assistant adjustment system, and by user interactive module, debug command is assigned to closed loop verification module.Automation debugging module control MMS simulation sending modules carry out station level equipment analog message input, meanwhile, control 101/104 main website analog module in station level equipment outgoing message receiving module, alert the outgoing message that the module that direct transfers obtains station level equipment;Call whether the input and output message of exception processing module verification station level equipment matches, and generate and report and back to automation debugging module, shown finally by user interactive module, so as to complete the verification of a task.The present invention can fast and automatically change whether ground Preliminary detection intelligent Power Station station level equipment configures correct and modify in advance, so that staff need to only carry out 1 to 2 physical experiments and can complete debugging efforts, so as to greatly reduce the workload of traditional debugging work, the work load of commissioning staff is alleviated.

Description

A kind of intelligent substation station level equipment assistant adjustment system
Technical field
The invention belongs to intelligent substation technical field, more specifically, is related to a kind of to intelligent substation station level Equipment carries out assistant adjustment system.
Background technology
The debugging efforts of traditional intelligent substation station level equipment, staff need truly to carry out Physical Experiment, As operate some physical switch or hot line job physical circuit could simulate some station level equipment message point, it is necessary to Whether manual telephone system verification message output is correct, and process is very cumbersome, and needs to test even tens of times for several times repeatedly, ability Complete configuration inspection and the modification of station level equipment.
The content of the invention
It is an object of the invention to overcome the deficiencies of the prior art and provide a kind of intelligent substation station level equipment auxiliary to adjust Test system, to reduce intelligent substation station level debugging work load, mitigates the work load of commissioning staff.
For achieving the above object, intelligent substation station level equipment assistant adjustment system of the present invention, it is characterised in that Including user interactive module, closed loop verification module, station level equipment incoming message analog module and station level equipment output report Literary receiving module;
Wherein, closed loop verification module includes automation debugging module and exception processing module, station level equipment incoming message Analog module includes MMS (Manufacturing Message Specification, that is, manufacture message specification) simulations and sends mould Block, SCD parsing modules and station level device configuration parsing module, station level equipment outgoing message receiving module include 101/ 104 main website analog modules and alarm direct transfer module;
During startup, by user interactive module, operation closed loop verification mould automation debugging module in the block, sets 101/ The parameter that 104 main website analog modules need, including device IP, port, plant stand numbering etc., after set-up is complete, these are joined Number passes to 101/104 main website analog module, orders it correctly to set up the connection with communication network shutdown, so as to receive and feed back The outgoing message of communication network shutdown;Meanwhile also by user interactive module, operation automation debugging module, sets alarm to direct transfer The parameter that module needs, including agreement, passage IP, port etc. selected by the plant stand, after set-up is complete, these parameters pass to Alarm direct transfers module, orders it correctly to set up the connection for the gateway machine that direct transfers with alarm, so that it is defeated to receive the alarm gateway machine that direct transfers Go out warning message;
Closed loop verification mould automation debugging module control station level equipment incoming message analog module in the block and station level Equipment sets up connection:
MMS simulation sending modules in station level equipment incoming message analog module are being received from automation debugging mould Block establish bind command after, SCD (substation configuration description, i.e. whole station system configuration text Part) parsing module parses the SCD file of intelligent substation, and the connection relation and communication logic for obtaining station level equipment are closed System, can normally establish connection for MMS sending modules with station level equipment and provide data support;Station level device configuration parses mould Block parses the configuration file of intelligent substation station level equipment, analysis object be communication network shutdown forwarding list file and The configuration file of all station level equipment, normally sets up basic TCP/IP communication for MMS simulation sending modules and provides parameter branch Hold, while accurately send MMS messages for MMS simulation sending modules and data support is provided, configured after parsing, so that station level Equipment incoming message analog module is set up with station level equipment and is connected;
During debugging, by user interactive module, debug command is assigned to closed loop verification module, closed loop verification mould is in the block certainly After dynamicization debugging module receives the debug command from user interactive module, debug command is converted into corresponding message and is simulated Incoming task, message output reception task and input and output message verification task, and form set of tasks queue;
Debugging module is automated according to message simulation input task, controls the MMS in station level incoming message analog module Sending module is simulated, the gateway machine that direct transfers to communication network shutdown, alarm carries out analog message input;Automate debugging module root at the same time Reception task is exported according to message, 101/104 main website analog module in station level equipment outgoing message receiving module is controlled, alerts The module that direct transfers obtains communication network shutdown, alerts the gateway machine outgoing message that direct transfers respectively;Then, debugging module is automated according to basis Input and output message checks task, calls the shutdown of exception processing module verification communication network, alerts the input and output for the gateway machine that direct transfers Whether message matches, and generates and report and back to automation debugging module, shown finally by user interactive module, so that complete Into the verification of a task, i.e., the execution of one debug command.
The object of the present invention is achieved like this
Intelligent substation station level equipment assistant adjustment system of the present invention, by user interactive module, mould is checked to closed loop Block assigns debug command, and it is defeated that control closed loop verification module produces message simulation input task, message output reception task and input Outgoing packet checks task.Automate debugging module and sending module is simulated to station level according to message simulation input task, control MMS Equipment carries out analog message input, meanwhile, reception task is exported according to message, controls station level equipment outgoing message receiving module In 101/104 main website analog module, alarm direct transfer module obtain station level equipment outgoing message;Then according to according to input Outgoing message checks task, calls whether the input and output message of exception processing module verification station level equipment matches, and generates Report and return to automation debugging module, shown finally by user interactive module, so as to complete the verification of a task, i.e., The execution of one debug command.The present invention can fast and automatically change whether ground Preliminary detection intelligent Power Station station level equipment configures Modifying correctly and in advance so that staff, which need to only carry out 1 to 2 physical experiments, can complete debugging efforts, so that The workload of traditional debugging work can be greatly reduced, alleviate the work load of commissioning staff.
Brief description of the drawings
Fig. 1 is a kind of embodiment functional block diagram of intelligent substation station level equipment assistant adjustment system of the present invention.
Embodiment
The embodiment of the present invention is described below in conjunction with the accompanying drawings, so as to those skilled in the art preferably Understand the present invention.Requiring particular attention is that in the following description, when known function and the detailed description of design perhaps When can desalinate the main contents of the present invention, these descriptions will be ignored herein.
Fig. 1 is a kind of embodiment functional block diagram of intelligent substation station level equipment assistant adjustment system of the present invention.
In the present embodiment, as shown in Figure 1, intelligent substation station level equipment assistant adjustment system of the present invention includes user Interactive module 1, closed loop verification module 2, station level equipment incoming message analog module 3 and station level equipment outgoing message receive Module 4.Each comprising modules is described in detail below.
1st, user interactive module
In specific implementation process, user interactive module 1 can be made of the software terminal on one or more computer. User can carry out auxiliary system by software terminal the configuration on basis, mainly receive mould to station level equipment outgoing message Block is configured.Specifically, the automation debugging module 201 in closed loop verification module 2 is operated, the output of station level equipment is set The parameter that 101/104 main website analog module 401 in message receiving module 4 needs, including device IP, port, plant stand numbering etc.; After set-up is complete, these parameters are passed to 101/104 main website analog module 401 by automation debugging module 201, order it The correct connection set up with communication network shutdown, so as to receive the outgoing message of simultaneously feedback communication gateway machine;Meanwhile also by using Family interactive module 1, operation automation debugging module 201, sets the alarm in station level equipment outgoing message receiving module 4 to direct transfer The parameter that module 402 needs, including agreement, passage IP, port etc. selected by the plant stand, after set-up is complete, automation debugging These parameters are passed to alarm and direct transferred module 402 by module 201, order it correctly to set up the company for the gateway machine that direct transfers with alarm Connect, direct transfer gateway machine outputting alarm message so as to receive alarm.In addition, in the present embodiment, station level equipment outgoing message connects Receive module 4 and further include remote browse module 403,1 operation automation debugging module 201 of user interactive module, sets remote browse The parameter that module 403 needs, including agreement, passage IP, port etc. selected by the plant stand, after set-up is complete, automation debugging These parameters are passed to remote browse module 403 by module 201, order it correctly to set up the connection with graph gateway machine, from And receive graph gateway machine and send figure message, so as to show the wiring diagram situation and wiring diagram change conditions of intelligent substation.
After configuration is complete, user can assign debug command, such as by user interactive module 1 to closed loop verification module 2 Check whether all position of the switch of some observing and controlling are normal in station level device configuration, and closed loop verification module 2 receives debugging Order, just starts to perform these debug commands.
After order to be debugged is finished, closed loop can be checked the report daily record that module 2 be returned by user interactive module 1 I.e. debugging result is shown on software terminal, and in debug command implementation procedure, the fortune of real-time display assistant adjustment system Row data, including real-time device message is shown and intelligent substation wiring diagram is shown.
2nd, closed loop verification module
As shown in Figure 1, closed loop verification module 2 includes automation debugging module 201 and exception processing module 202.
By user interactive module 1, operation closed loop checks the automation debugging module 201 in module 2, makes station level equipment Outgoing message receiving module 4 and station level equipment, that is, communication network shutdown, alarm direct transfer gateway machine and graph gateway machine is set up Connection.Specific connection above has been carried out describing in detail, and details are not described herein.
Automation debugging module 201 in closed loop verification module 2 controls station level equipment incoming message analog module 3 and station Control layer equipment sets up connection:
MMS simulation sending modules 301 in station level equipment incoming message analog module 3 are being received from automation tune Die trial block 201 establish bind command after, SCD (substation configuration description, i.e. whole station system Configuration file) parsing module 302 parses the SCD file of intelligent substation, obtain station level equipment connection relation and Communication logic relation, simulate sending module 301 for MMS normally can provide data support with the foundation connection of station level equipment; Before auxiliary system starts, file where SCD file is put into assistant adjustment system software, when assistant adjustment system starts, SCD Parsing module meeting automatic start, reads SCD file and simultaneously completes to parse;Station level device configuration parsing module 303 is to intelligent power transformation The configuration file for station level equipment of standing is parsed, and analysis object is that the forwarding list file of communication network shutdown and all station levels are set Standby configuration file, normally sets up basic TCP/IP communication for MMS simulation sending modules 301 and provides parameter support, be at the same time MMS simulation sending modules 301 accurately send MMS messages and provide data support, will be to intelligent substation before auxiliary system startup File where the configuration file of station level equipment is put into assistant adjustment system software is simultaneously named as specified file, assistant adjustment system When system starts, Command Line Parsing module meeting automatic start simultaneously reads configuration, so that station level equipment incoming message analog module 3 and station Control layer equipment sets up connection.
Then, in debugging, by user interactive module, debug command, closed loop verification mould are assigned to closed loop verification module 2 After automation debugging module 201 in block 2 receives the debug command from user interactive module 1, debug command is converted to Corresponding message simulation input task, message output reception task and input and output message verification task, and form set of tasks Queue;Debugging module 201 is such as automated by the station level equipment message point for it is expected to check by user, is closed as xxx switchs separating brake Lock, xxx pressing plate foldings, xxx phase currents numerical value are xxx amperes etc., are converted into set of tasks queue one by one.
Debugging module 201 is automated according to message simulation input task, is controlled in station level incoming message analog module 3 MMS simulates sending module 301, and the gateway machine that direct transfers to communication network shutdown, alarm carries out analog message input;Automate debugging at the same time Module 201 exports reception task according to message, controls 101/104 main website mould in station level equipment outgoing message receiving module 4 Intend module 401, the alarm module 402 that direct transfers obtains communication network shutdown, alerts and direct transfer gateway machine outgoing message respectively;Then, automatically Change debugging module 201 and task is checked according to input and output message, call exception processing module 202 to check communication network shutdown, alarm Whether the input and output message of gateway machine of direct transferring matches, and generates and report and back to automation debugging module, finally by with Family interactive module is shown, so that complete the verification of a task, i.e., the execution of one debug command.
In the present embodiment, for user interactive module according to report, split window is shown to the report of each station level equipment of user Text and checked result, and mark whether to check successfully according to as a result, tinting.
Repeat the above process, until all debug commands are completed;Then, back to user interactive module, overall knot is shown Fruit, prompts user institute that selection operation executed is completed;User can check whether station level equipment works normally by debugging result, If abnormal, user can be modified it, and be debugged again.Therefore by assistant adjustment system, tune is alleviated The burden that trial work is made.
In the present embodiment, closed loop verification module 2, control assistant adjustment system are connected to the control of intelligent substation station Layer network and station level equipment are set up after MMS communication is connected, and the MMS of control assistant adjustment system simulation station level equipment is defeated Enter;Meanwhile assistant adjustment system is connected to intelligent substation egress network, it is only to set up station level equipment with station level equipment Some export deals connect (including IEC60870-5-104, IEC60870-5-101 and DL476-92, DL/T476-2012), from And receive the output of station level equipment;The incoming message of simulation and the outgoing message received are compared again, judge that its is defeated Enter the correctness of output, so as to form a complete closed loop audit process, and report is formed, so as to fulfill to station level equipment Correctness debugging, be finally reached assistant adjustment personnel and judge whether station level equipment has been configured properly.
3rd, station level equipment incoming message analog module
Station level equipment incoming message analog module 3 include MMS simulation sending module 301, SCD parsing modules 302 and Station level device configuration parsing module 303, wherein MMS are manufacture message specification.
Station level network is linked into by station level equipment incoming message analog module 3, company is set up with station level equipment Connect, and analog message, that is, MMS analog messages are carried out according to task and are inputted.
MMS simulation sending modules 301 can complete two class orders, first, receiving building from closed loop verification module 2 After vertical bind command, the station level parsed is read from SCD parsing modules 302 and station level device configuration parsing module 303 and is set The standby and information of station level network, is the single passage of each device configuration, then sets up MMS connections;Second, receiving After MMS analog message orders are specified in transmission from closed loop verification module 2, it can be controlled on the passage established before to station Layer equipment sends the MMS analog messages specified.
4th, station level equipment outgoing message receiving module
Station level equipment outgoing message receiving module includes 101/104 main website analog module 401, alerts the module 402 that direct transfers With remote browse module 403.Intelligent substation egress network is connected to by them, establishes and connects with station level equipment, and connect Receive the outgoing message of station level equipment.
101/104 main website analog module 401 is responsible for receiving the communication network shutdown output in station level equipment The message of IEC60870-5-101 and IEC61870-5-104, and after useless dialogue message is filtered out, outgoing message is fed back Give automation debugging module 201.Its engineering process is that, when assistant adjustment system starts, user passes through user interactive module 1, operation automation debugging module 201, the parameter for setting 101/104 main website analog module 401 to need, including passage IP, port, Plant stand numbering etc..After set-up is complete, automating debugging module 201 is needing to call 101/104 main website analog module 401 When, these parameters are passed into 101/104 main website analog module 401, order it correctly to set up the company with communication network shutdown Connect, so as to receive the outgoing message of simultaneously feedback communication gateway machine.
Alarm direct transfers, and module 402 is responsible to be received from the DL476-92 or DL/T476- for alerting the gateway machine output that direct transfers The message of 2012 agreements, and be alarm text by packet parsing after useless dialogue message is filtered out, feed back to automation debugging Module 201, and 1 display alarm text of user interactive module is fed back to by automation debugging module 201.Its workflow is, When assistant adjustment system starts, for user by user interactive module 1, operation automation debugging module 201, sets alarm to direct transfer The parameter that module 402 needs, including agreement selected by the plant stand, passage IP, port etc..After being provided with again, automation debugging Module 201 need to call alarm direct transfer module 402 when, these parameters are passed into alarm and are direct transferred module 402, order it It is correct to set up the connection for the gateway machine that direct transfers with alarm, so as to receive and feeder alert direct transfers gateway machine outputting alarm text.
Remote browse module 403 is responsible for receiving DL476-92 or the DL/T476-2012 association from the output of graph gateway machine The message of view, and after useless dialogue message is filtered out, be G formatted files by packet parsing, feed back to automation debugging module 201, and user interactive module 1 is fed back to by automation debugging module 201, thus show intelligent substation wiring diagram situation and Wiring diagram change conditions.Its workflow and the alarm module 402 that direct transfers are similar, repeat no more.
Although the illustrative embodiment of the present invention is described above, in order to the technology of the art Personnel understand the present invention, it should be apparent that the invention is not restricted to the scope of embodiment, to the common skill of the art For art personnel, if various change appended claim limit and definite the spirit and scope of the present invention in, these Change is it will be apparent that all utilize the innovation and creation of present inventive concept in the row of protection.

Claims (3)

1. a kind of intelligent substation station level equipment assistant adjustment system, it is characterised in that including user interactive module, closed loop core To module, station level equipment incoming message analog module and station level equipment outgoing message receiving module;
Wherein, closed loop verification module includes automation debugging module and exception processing module, the simulation of station level equipment incoming message Module include MMS (Manufacturing Message Specification, that is, manufacture message specification) simulation sending module, SCD parsing modules and station level device configuration parsing module, station level equipment outgoing message receiving module include 101/104 master Stand analog module and alarm direct transfers module;
During startup, by user interactive module, operation closed loop verification mould automation debugging module in the block, sets 101/104 master The parameter that analog module of standing needs, including device IP, port, plant stand numbering, after set-up is complete, these parameters are passed to 101/104 main website analog module, orders it correctly to set up the connection with communication network shutdown, so as to receive simultaneously feedback communication gateway The outgoing message of machine;Meanwhile also by user interactive module, operation automation debugging module, sets alarm to direct transfer module needs Parameter, including agreement, passage IP, port selected by the plant stand, after set-up is complete, these parameters pass to alarm and direct transfer mould Block, orders it correctly to set up and direct transfers the connection of gateway machine with alarm, direct transfers gateway machine outputting alarm message so as to receive alarm;
Closed loop verification mould automation debugging module control station level equipment incoming message analog module in the block and station level equipment Set up connection:
MMS simulation sending modules in station level equipment incoming message analog module are being received from automation debugging module After establishing bind command, SCD (substation configuration description, i.e. whole station system configuration file) solutions Analysis module parses the SCD file of intelligent substation, obtains the connection relation and communication logic relation of station level equipment, is MMS sending modules can normally establish connection with station level equipment and provide data support;Station level device configuration parsing module pair The configuration file of intelligent substation station level equipment is parsed, and analysis object is the forwarding list file of communication network shutdown and owns The configuration file of station level equipment, normally sets up basic TCP/IP communication for MMS simulation sending modules and provides parameter support, together When for MMS simulate sending module accurately send MMS messages provides data support, configured after parsing, so that station level equipment Incoming message analog module is set up with station level equipment and is connected;
During debugging, by user interactive module, debug command, closed loop verification mould automation in the block are assigned to closed loop verification module After debugging module receives the debug command from user interactive module, debug command is converted into corresponding message simulation input Task, message output reception task and input and output message verification task, and form set of tasks queue;
Debugging module is automated according to message simulation input task, controls the MMS simulations in station level incoming message analog module Sending module, the gateway machine that direct transfers to communication network shutdown, alarm carry out analog message input;Debugging module is automated according to report at the same time Text output reception task, controls 101/104 main website analog module in station level equipment outgoing message receiving module, alarm to direct transfer Module obtains communication network shutdown, alerts the gateway machine outgoing message that direct transfers respectively;Then, debugging module is automated according to according to input Outgoing message checks task, calls the shutdown of exception processing module verification communication network, alerts the input and output message for the gateway machine that direct transfers Whether match, and generate and report and back to automation debugging module, shown finally by user interactive module, so as to complete one The verification of bar task, i.e., the execution of one debug command.
2. assistant adjustment system according to claim 1, it is characterised in that the station level equipment outgoing message receives Module further includes remote browse module, and user interactive module operation automation debugging module, sets what remote browse module needed Parameter, including agreement, passage IP, port selected by the plant stand, after set-up is complete, automation debugging module pass these parameters Remote browse module is passed, orders it correctly to set up the connection with graph gateway machine, so that receiving graph gateway machine sends figure Shape message, so as to show the wiring diagram situation and wiring diagram change conditions of intelligent substation.
3. assistant adjustment system according to claim 1, it is characterised in that the user interactive module is reported according to production Accuse, split window is shown to the message and checked result of each station level equipment of user, and marks whether to check according to as a result, tinting Success.
CN201510507898.6A 2015-08-18 2015-08-18 A kind of intelligent substation station level equipment assistant adjustment system Expired - Fee Related CN105141475B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510507898.6A CN105141475B (en) 2015-08-18 2015-08-18 A kind of intelligent substation station level equipment assistant adjustment system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510507898.6A CN105141475B (en) 2015-08-18 2015-08-18 A kind of intelligent substation station level equipment assistant adjustment system

Publications (2)

Publication Number Publication Date
CN105141475A CN105141475A (en) 2015-12-09
CN105141475B true CN105141475B (en) 2018-04-13

Family

ID=54726692

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510507898.6A Expired - Fee Related CN105141475B (en) 2015-08-18 2015-08-18 A kind of intelligent substation station level equipment assistant adjustment system

Country Status (1)

Country Link
CN (1) CN105141475B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105427402A (en) * 2015-12-18 2016-03-23 贵州南源电力科技股份有限公司 Inspection robot and method capable of monitoring maintenance and debugging process of substation equipment in real time
CN105610245B (en) * 2016-02-04 2018-09-21 国网山东省电力公司淄博供电公司 Intelligent substation simulates main website integrated test system
CN107094091B (en) * 2017-03-30 2019-12-03 国电南瑞科技股份有限公司 A kind of intelligent substation station level network configuration method of calibration and system
CN108256657A (en) * 2018-03-02 2018-07-06 国网福建省电力有限公司 Substation based on electronics debugging list becomes more meticulous adjustment method
CN108767818B (en) * 2018-06-07 2019-11-26 贵州电网有限责任公司 A kind of Commissioning of Relay Protection system and adjustment method based on virtual Prudential Master
CN109085808B (en) * 2018-08-14 2021-02-02 电子科技大学 Simulation device and test method for auxiliary control system sub-equipment of intelligent substation
CN116132343A (en) * 2023-02-13 2023-05-16 国网四川省电力公司电力科学研究院 Online monitoring terminal simulation test system and method for primary equipment of intelligent substation

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102768314A (en) * 2012-07-05 2012-11-07 四川电力科学研究院 Double-closed-loop testing device for intelligent substation and control method thereof
CN103200051A (en) * 2013-04-27 2013-07-10 国家电网公司 Intelligent substation message simulation testing and association message analysis system and method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102768314A (en) * 2012-07-05 2012-11-07 四川电力科学研究院 Double-closed-loop testing device for intelligent substation and control method thereof
CN103200051A (en) * 2013-04-27 2013-07-10 国家电网公司 Intelligent substation message simulation testing and association message analysis system and method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
智能变电站二次设备系统级调试方法探讨;姜振超等;《四川电力技术》;20120430;1-4页 *

Also Published As

Publication number Publication date
CN105141475A (en) 2015-12-09

Similar Documents

Publication Publication Date Title
CN105141475B (en) A kind of intelligent substation station level equipment assistant adjustment system
CN108400908B (en) Automatic checking and accepting method for monitoring information of transformer substation
CN107734042B (en) Low-cost remote debugging system and method
CN104052633B (en) Intelligent station 61850 and the stipulations integration test method of telemechanical 104
CN106374439B (en) Software definition implementation method based on intelligent substation Protection control system
CN103295163B (en) Chart-model integrated transformer substation and dispatch master station cooperation modeling method
CN105978152B (en) A kind of intelligent substation telemechanical apparatus and the method for regulating and controlling main website automated closed-loop joint debugging
CN108366067B (en) System and method for testing consistency of universal service protocol of power system
CN103823199B (en) Intelligent substation relay-protection tester automated detection system and detection method
CN109873497B (en) Power distribution main station and terminal automatic joint debugging acceptance method based on intelligent acceptance device
CN103532756B (en) Command line system and command line operation method based on webmaster system
CN105005280B (en) A kind of industrial equipment man-machine interactive system and its control method based on intelligent wireless terminal
CN108923953A (en) A kind of virtual main station system of power remote machine debugging
CN110112831A (en) A kind of supervisory control of substation information automation checks and accepts device and its acceptance method
CN106953918A (en) Boss's station programming control system and method based on generic service agreement
CN107276229A (en) A kind of intelligent substation remote control overall process check system and method
CN204291050U (en) A kind of dispatching and monitoring information check system
CN107749811A (en) A kind of distribution terminal based on distribution main website accesses adaptive Commissioning Analysis method
CN103730959A (en) Method for testing communication protocols of power distribution network equipment
CN108229833A (en) A kind of food medicine batch production method and software systems based on SCADA
CN107257304A (en) Telemechanical is exempted to a configuration testing system
CN106910143A (en) Power distribution network artwork multi-edition control method and system
CN111934429A (en) Method for controlling sequence of calling station end of regulation and control main station
CN103699760B (en) A kind of multilayer closed-loop main station detection data source simulation method
CN104714119B (en) A kind of detecting tool and detecting system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Huang Qi

Inventor after: Zhu Chao

Inventor after: Ren Manman

Inventor after: Jiang Chenying

Inventor after: Huang Qing

Inventor after: Su Gen

Inventor after: Zhou Yu

Inventor after: Yao Liang

Inventor after: He Yuhang

Inventor after: Yin Wen

Inventor after: Shi Jun

Inventor after: Jiang Zhenchao

Inventor after: Lian Libo

Inventor after: Liu Mingzhong

Inventor after: Jing Shi

Inventor after: Li Jian

Inventor after: Wu Jie

Inventor after: Teng Yunlong

Inventor after: Yang Yongbo

Inventor after: Chen Yun

Inventor before: Huang Qi

Inventor before: Su Gen

Inventor before: Zhou Yu

Inventor before: Yao Liang

Inventor before: He Yuhang

Inventor before: Yin Wen

Inventor before: Shi Jun

Inventor before: Lian Libo

Inventor before: Jing Shi

Inventor before: Li Jian

Inventor before: Teng Yunlong

Inventor before: Chen Yun

Inventor before: Zhu Chao

Inventor before: Ren Manman

Inventor before: Jiang Chenying

Inventor before: Huang Qing

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20160602

Address after: 611731 Chengdu province high tech Zone (West) West source Avenue, No. 2006

Applicant after: University of Electronic Science and Technology of China

Applicant after: Electric Power Sciences Research Institute of Sichuan Electric Power Corporation

Address before: 611731 Chengdu province high tech Zone (West) West source Avenue, No. 2006

Applicant before: University of Electronic Science and Technology of China

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180413

Termination date: 20180818

CF01 Termination of patent right due to non-payment of annual fee