CN105114976A - Front-back water cooled wall reverse carrying hoisting method for dry bottom hopper section - Google Patents

Front-back water cooled wall reverse carrying hoisting method for dry bottom hopper section Download PDF

Info

Publication number
CN105114976A
CN105114976A CN201510509288.XA CN201510509288A CN105114976A CN 105114976 A CN105114976 A CN 105114976A CN 201510509288 A CN201510509288 A CN 201510509288A CN 105114976 A CN105114976 A CN 105114976A
Authority
CN
China
Prior art keywords
hoist engine
lifting
water cooled
rear side
cooled wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510509288.XA
Other languages
Chinese (zh)
Other versions
CN105114976B (en
Inventor
刘少军
付修军
李义
吕慧军
戴海涛
温顺利
樊友田
程铭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Engineering Group Tianjin Electric Power Construction Co Ltd
Original Assignee
China Energy Engineering Group Tianjin Electric Power Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Energy Engineering Group Tianjin Electric Power Construction Co Ltd filed Critical China Energy Engineering Group Tianjin Electric Power Construction Co Ltd
Priority to CN201510509288.XA priority Critical patent/CN105114976B/en
Publication of CN105114976A publication Critical patent/CN105114976A/en
Application granted granted Critical
Publication of CN105114976B publication Critical patent/CN105114976B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)
  • Tunnel Furnaces (AREA)

Abstract

The invention discloses a front-back water cooled wall reverse carrying hoisting method for a dry bottom hopper section. The method comprises the following steps that a water cooled wall is reversely laid on a boiler zero-meter combined platform, equipment and the size are inspected, and a ball passing test and a spectrum test are carried out; combining and opening joining, welding and edge jointing are carried out, seal welding is completed, and secondary ball passing and pipe opening blocking are carried out after welding is completed; a dry bottom hopper section rear side rigid beam, an upper aligned horizontal beam and a connecting piece are mounted on a completed water cooled wall assembly, and a leveling beam and a sling pin shaft are perfected; and winch pulley sets are arranged at the left-most position and the right-most position of a rear side water cooled wall combustor hole respectively at certain height. According to the method, the problem that hoisting control is hard due to midair rotation of a lifting appliance and pulley overturn in hoisting work when a hole is reserved in a ceiling is solved, and frame erecting and dismounting work, brought by ceiling hole reserving or forming, for later restoration is solved; and the high altitude danger coefficient of mounting and welding work, ultrasonic grinding and other procedures is lowered, and process arrangement is more reasonable and economical.

Description

Before and after furnace hopper section, water-cooling wall has oppositely removed hanging method
Technical field
The present invention relates to power plant's component devices hoisting technology field, before and after particularly relating to furnace hopper section, water-cooling wall has oppositely removed hanging method.
Background technology
On-the-spot boiler furnace hopper lifting machine and steel wire rope walking can require to be reserved with suspending hole, before and after furnace hopper section of the present invention, water-cooling wall has oppositely removed hanging method, break through traditional approach boiler body furnace hopper section and needs are installed, avoid this problem, thus reach boiler roof tube and accessory device installs in advance, meet the construction safety of individual works schedule requirement and ceiling area, and the header of more than roof tube, liaison tube can be made to go into operation in advance and carry out smoothly.
Summary of the invention
The present invention reserves problem in order to avoid lifting machine and the steel wire rope suspending hole of bringing of walking, and before and after providing furnace hopper section, water-cooling wall has oppositely removed hanging method.
For achieving the above object, before and after providing furnace hopper section, water-cooling wall has oppositely removed hanging method, comprises the steps: in the present invention
Oppositely water-cooling wall is laid at boiler zero meter of combined platform, checkout facility and size, carry out through ball test and spectral test, combination counterpart, welding, piece complete seal welding, carry out secondary after having welded to lead to ball and to go forward side by side the shutoff of line pipe mouth, buckstay on rear side of furnace hopper section installed by the water-cooling wall assembly completed, upper neat horizontal beam and connector, improve smoothing beam and suspender belt bearing pin;
Winch pulley block is arranged in a rear side water-cooling wall burner Kongzui left side and the rightest two positions at certain altitude, each a set of; In water-cooling wall identical absolute altitude boiler center, front side arranges that a set of hoist engine is as auxiliary adjustment lifting measure;
Rear side master hangs every platform winch pulley block and uses steel wire rope and assembly pulley to lift by crane;
The adjustment of one, front side coordinates hoist engine and assembly pulley to adopt ten equally, and one is stressed;
At equipment and earth surface place cushioning flitch before lifting, tighten three hoist engines, check each assembly pulley, leading block, steel wire rope, in lifting process, two masters hang hoist engine and hoist, and hoist engine coordinates lifting;
Along with hanging thing component variations, front side coordinates hoist engine to carry out folding and unfolding adjustment in time, when arriving rear side assembly absolute altitude in place about 2 meters, is hung up properly by the 10 tons of jacks in six, outside hung up properly in advance and adjusts.
The invention has the beneficial effects as follows: improve being advanced by more than one month for more than ceiling and ceiling all equipment to be installed installations, late if any furnace hopper section equipment arrival, this scheme manifests benefit effect more, reduce the demand of renting large-scale more than 10 tons hoist engines (hold rope and measure 1000 meters), the spinning in the air of suspender in lifting operation when avoiding ceiling preformed hole, pulley overturns the lifting brought and controls difficulty, avoid shelf that ceiling is reserved or perforate brings later stage recovers to take and tear operation open, reduce installation and weld job, the high-altitude danger coefficient of the operations such as ultrasonic polishing, processing arrangement is more reasonable and economical.
Detailed description of the invention
Be described in detail below with reference to embodiments of the invention.
Before and after furnace hopper section, water-cooling wall has oppositely removed hanging method, comprises the steps:
Oppositely water-cooling wall is laid at boiler zero meter of combined platform, checkout facility and size, carry out through ball test and spectral test, combination counterpart, welding, piece complete seal welding, carry out secondary after having welded to lead to ball and to go forward side by side the shutoff of line pipe mouth, buckstay on rear side of furnace hopper section installed by the water-cooling wall assembly completed, upper neat horizontal beam and connector, improve smoothing beam and suspender belt bearing pin;
Winch pulley block is arranged in a rear side water-cooling wall burner Kongzui left side and the rightest two positions at certain altitude, each a set of; In water-cooling wall identical absolute altitude boiler center, front side arranges that a set of hoist engine is as auxiliary adjustment lifting measure;
Rear side master hangs every platform winch pulley block and uses steel wire rope and assembly pulley to lift by crane;
The adjustment of one, front side coordinates hoist engine and assembly pulley to adopt ten equally, and one is stressed;
At equipment and earth surface place cushioning flitch before lifting, tighten three hoist engines, check each assembly pulley, leading block, steel wire rope, in lifting process, two masters hang hoist engine and hoist, and hoist engine coordinates lifting;
Along with hanging thing component variations, front side coordinates hoist engine to carry out folding and unfolding adjustment in time, when arriving rear side assembly absolute altitude in place about 2 meters, is hung up properly by the 10 tons of jacks in six, outside hung up properly in advance and adjusts.

Claims (1)

1. before and after furnace hopper section, water-cooling wall has oppositely removed hanging method, it is characterized in that, comprises the steps:
Oppositely water-cooling wall is laid at boiler zero meter of combined platform, carry out conscientious equipment inspection and inspection size, complete through ball test and spectral test, by technical standard requirement combination counterpart, welding, piece complete seal welding, carry out secondary after having welded and lead to ball and carry out mouth of pipe close measure, then again buckstay on rear side of furnace hopper section is installed on the water-cooling wall assembly completed, horizontal beam and connector are all gone up together, smoothing beam is perfect, and suspender belt bearing pin is not omitted, and acceptance(check) is waited to hang;
Winch pulley block is arranged in a rear side water-cooling wall burner Kongzui left side and the rightest two positions at certain altitude, each a set of; In water-cooling wall identical absolute altitude boiler center, front side arranges that a set of hoist engine is as auxiliary adjustment lifting measure;
Rear side master hangs every platform winch pulley block and uses steel wire rope and assembly pulley to lift by crane;
The adjustment of one, front side coordinate hoist engine and assembly pulley to adopt ten equally one is stressed, single assembly pulley can meet and hangs thing lifting regulating power needs and the unpredictable stressed parameter eliminated in lifting process;
Before lifting, three hoist engines are all tightened check each assembly pulley, leading block, steel wire rope whether smooth and easy, with or without scratching, in lifting process, two masters hang hoist engine and slowly hoist, hoist engine is coordinated closely to follow, again check hoist engine, assembly pulley steel wire rope etc., confirm that errorless rear lifting continues, will at equipment and earth surface place cushioning flitch before lifting;
Along with ground and the change of aerial angle of hanging thing assembly, front side coordinates hoist engine to carry out folding and unfolding adjustment in time, basic arrival rear side assembly absolute altitude in place, during distance about 2 meters, the 10 tons of jacks in six, outside hung up properly in advance are hung up properly and adjusts, now hoist engine still can with hoisting, until reach predetermined on-station position.
CN201510509288.XA 2015-08-19 2015-08-19 Water-cooling wall has reversely removed hanging method before and after furnace hopper section Expired - Fee Related CN105114976B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510509288.XA CN105114976B (en) 2015-08-19 2015-08-19 Water-cooling wall has reversely removed hanging method before and after furnace hopper section

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510509288.XA CN105114976B (en) 2015-08-19 2015-08-19 Water-cooling wall has reversely removed hanging method before and after furnace hopper section

Publications (2)

Publication Number Publication Date
CN105114976A true CN105114976A (en) 2015-12-02
CN105114976B CN105114976B (en) 2017-08-29

Family

ID=54663024

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510509288.XA Expired - Fee Related CN105114976B (en) 2015-08-19 2015-08-19 Water-cooling wall has reversely removed hanging method before and after furnace hopper section

Country Status (1)

Country Link
CN (1) CN105114976B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105627353A (en) * 2015-12-30 2016-06-01 青岛安装建设股份有限公司 Scribing installation technology for boiler film water-cooled walls
CN106322347A (en) * 2016-08-22 2017-01-11 上海二十冶建设有限公司 Construction method for enabling water-cooling walls of refuse incineration power generation waste heat boiler to integrally penetrate from top
CN106322345A (en) * 2016-08-17 2017-01-11 中国能源建设集团天津电力建设有限公司 Installation technology of Pi-type boiler economizer pipe panels
CN107487713A (en) * 2017-08-01 2017-12-19 中国能源建设集团天津电力建设有限公司 Portion's entire combination waterborne lifts by crane technique in place after a kind of π types boiler
CN107620949A (en) * 2017-08-01 2018-01-23 中国能源建设集团天津电力建设有限公司 A kind of boiler furnace hopper bottling technique for making rotating shaft by oneself
CN113564289A (en) * 2021-06-21 2021-10-29 中国三冶集团有限公司 Installation method of large bulk boiler water-cooled wall
CN113721302A (en) * 2021-08-12 2021-11-30 芜湖福记恒机械有限公司 Steel ball detection device is led to copper water jacket

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5007501A (en) * 1989-09-01 1991-04-16 Baston Peter J Apparatus for facilitating the internal inspection and repair of large pressure vessels
CN101830415A (en) * 2010-05-28 2010-09-15 江苏能建机电实业集团有限公司 Multifunctional boiler hearth overhauling platform
CN202371880U (en) * 2011-12-19 2012-08-08 浙江先创新能源技术开发有限公司 Novel water coal slurry-fired organic heat transfer material heater

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5007501A (en) * 1989-09-01 1991-04-16 Baston Peter J Apparatus for facilitating the internal inspection and repair of large pressure vessels
CN101830415A (en) * 2010-05-28 2010-09-15 江苏能建机电实业集团有限公司 Multifunctional boiler hearth overhauling platform
CN202371880U (en) * 2011-12-19 2012-08-08 浙江先创新能源技术开发有限公司 Novel water coal slurry-fired organic heat transfer material heater

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
朱丹萍: "《锅炉斜炉底安装工艺》", 《价值工程》 *
汪公河: "660MW超超临界燃煤发电机组锅炉水冷壁冷灰斗采用卷扬机整体吊装方案研究与应用", 《科技与企业》 *
黄天佑: "《国产百万机组超超临界机组锅炉冷灰斗螺旋水冷壁吊装方案》", 《科技信息》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105627353A (en) * 2015-12-30 2016-06-01 青岛安装建设股份有限公司 Scribing installation technology for boiler film water-cooled walls
CN106322345A (en) * 2016-08-17 2017-01-11 中国能源建设集团天津电力建设有限公司 Installation technology of Pi-type boiler economizer pipe panels
CN106322347A (en) * 2016-08-22 2017-01-11 上海二十冶建设有限公司 Construction method for enabling water-cooling walls of refuse incineration power generation waste heat boiler to integrally penetrate from top
CN106322347B (en) * 2016-08-22 2019-01-15 上海二十冶建设有限公司 The construction method of waste incineration and generating electricity waste heat boiler water-cooling wall integral head injection
CN107487713A (en) * 2017-08-01 2017-12-19 中国能源建设集团天津电力建设有限公司 Portion's entire combination waterborne lifts by crane technique in place after a kind of π types boiler
CN107620949A (en) * 2017-08-01 2018-01-23 中国能源建设集团天津电力建设有限公司 A kind of boiler furnace hopper bottling technique for making rotating shaft by oneself
CN113564289A (en) * 2021-06-21 2021-10-29 中国三冶集团有限公司 Installation method of large bulk boiler water-cooled wall
CN113721302A (en) * 2021-08-12 2021-11-30 芜湖福记恒机械有限公司 Steel ball detection device is led to copper water jacket
CN113721302B (en) * 2021-08-12 2024-02-23 芜湖福记恒机械有限公司 Copper water jacket leads to steel ball detection device

Also Published As

Publication number Publication date
CN105114976B (en) 2017-08-29

Similar Documents

Publication Publication Date Title
CN105114976A (en) Front-back water cooled wall reverse carrying hoisting method for dry bottom hopper section
CN105443871B (en) A kind of new suspension and support and construction technology for the connection of horizontal multi-pipeline counterpart
CN105000462B (en) Split type hoisting method for 5MW land type wind generating set
CN101829470A (en) Construction technique of electric bag compound type dust remover
CN205348733U (en) Furred ceiling operation platform
CN103510816A (en) Nuclear power door
CN106276601A (en) A kind of technique in place for fired power generating unit π formula boiler furnace arch, furnace nose integral lifting
CN108532964A (en) A kind of cladding panel lifting installation method
CN106150518A (en) A kind of simulation assembling method of duct pieces of shield tunnel
CN106351454B (en) A kind of steel-making workshop steel structural roof combined installation method
CN106119454A (en) Installation method of blast furnace hot air surrounding pipe
CN105834272B (en) A kind of large aluminium-board stretching-machine equipment installation method under restricted clearance
CN205806703U (en) A kind of novel suspension and support connected for horizontal multi-pipeline boil on the nape opposite the mouth
CN106834589B (en) Converter Maintenance method
CN105502180B (en) Boom hoisting and hook and ladder
CN101721862A (en) Meta-synthesis construction method of 600MW unit bag-type dust remover
CN204850516U (en) A horizontal lifeline system for steel construction factory building
CN107487713B (en) integral combination hoisting and positioning process for upper part of water behind pi-shaped boiler
CN106223622A (en) A kind of tower concrete spreader
CN102062538A (en) Method for mounting head sprocket wheel of belt sintering machine
CN103204220A (en) Mounting process for cargo oil deep-well pump
CN103912089B (en) A kind of construction method of the lifting furred ceiling of auditorium
CN105953599A (en) Construction method of condenser
CN209009995U (en) Water-cooling wall lifts positioning device
CN206570361U (en) Device is built by laying on a kind of mammoth conveter furnace lining

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170829

CF01 Termination of patent right due to non-payment of annual fee