CN105113608A - Molds for inspection wells and method for constructing inspection wells through same - Google Patents
Molds for inspection wells and method for constructing inspection wells through same Download PDFInfo
- Publication number
- CN105113608A CN105113608A CN201510538550.3A CN201510538550A CN105113608A CN 105113608 A CN105113608 A CN 105113608A CN 201510538550 A CN201510538550 A CN 201510538550A CN 105113608 A CN105113608 A CN 105113608A
- Authority
- CN
- China
- Prior art keywords
- well
- mould
- rectangular
- circular
- chute
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Furnace Housings, Linings, Walls, And Ceilings (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The invention belongs to the field of building engineering, and particularly relates to molds for inspection wells and a method for constructing the inspection wells through the same. The molds comprise the circular well mold, the rectangular well mold and the chute plastering mold. The circular well mold is used for construction of a circular well and is of a circular plate structure with a circular hollow interior, the outer diameter of the circular well mold is equal to the inner diameter of a well chamber, and the inner diameter of the circular well mold is equal to that of a shaft. The rectangular well mold is used for construction of a rectangular well and is of a rectangular plate structure with a rectangular hollow interior, the length and width of the outer side of the rectangular well mold are equal to those of the inner wall of a well chamber, and the length and width of the inner side of the rectangular well mold are equal to those of the inner wall of a shaft. The chute plastering mold is used for well bottom chute plastering and is a semicircular mold with the diameter equal to the inner diameter of a pipeline. In the constructing process of the inspection wells, the specially-made molds for the inspection wells are used for comparison control and used based on construction conditions for rectifying a deviation in time in the construction process, and error accumulation is avoided, so that the overall construction quality of the inspection wells is improved, and the working efficiency of workers is improved.
Description
Technical field
The present invention relates to building engineering field, be specifically related to a kind of manhole mould and utilize this mould to carry out the method for manhole construction.
Background technology
In Municipal Drainage Engineering in the past, there is the phenomenons such as borehole wall out of plumb, well head are not round and smooth, chute irregularity, out-of-shape in manhole, has had a strong impact on presentation quality and the using function of manhole usually.
Summary of the invention
The problems such as the borehole wall out of plumb existed under the present invention is directed to existing construction method, well head are not round and smooth, chute irregularity, out-of-shape, have developed a kind of manhole mould and utilize this mould to carry out the method for manhole construction.
The present invention is achieved through the following technical solutions:
A kind of manhole mould, includes circular well mould, rectangular well mould and chute and to wipe one's face mould.Described circular well mould is used for circular well and builds by laying bricks or stones, and it is the Circular plate structure with circular hollow, and external diameter is identical with the indoor footpath of well, and internal diameter is identical with pit shaft internal diameter; Described rectangular well mould be used for rectangular well build by laying bricks or stones, it is the Rectangular Plate Structure with rectangle hollow, and the length and width of the length and width size in outside and well chamber interior walls is measure-alike, the length and width size of inner side and the length and width of shaft in wall measure-alike; Described chute mould of wiping one's face is wiped one's face for shaft bottom chute, and it is diameter with the identical circular dies of internal diameter of the pipeline.
Further, described circular well mould, rectangular well mould, chute mould of wiping one's face adopts wood glue plate to make.
A kind of method utilizing above-mentioned manhole mould to carry out manhole construction is as follows:
In manhole building process, often build a step by laying bricks or stones and adopt circular well mould or rectangular well mould to carry out according to controlling, when finding error, correction in time to avoid the cumulative of error, by that analogy until built by laying bricks or stones; Wipe one's face in process at chute, use chute mould of wiping one's face to carry out along chute direction operation of wiping one's face, till treating that chute is smooth-going, round and smooth.
Wherein, when building well room by laying bricks or stones, the cylindrical of circular well mould or the outside rectangular of rectangular well mould is used to carry out according to controlling; When masonry shaft, the inner circle of circular well mould or the inner rectangular of rectangular well mould is used to carry out according to controlling.
Beneficial effect of the present invention is: it is in manhole building process, special manhole mould is adopted to carry out according to controlling, construction is allowed to have " tool " to comply with, rectify a deviation in time in work progress, avoid the cumulative of error, thus improve the overall masonry quality of manhole, improve work task efficiency.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the present invention is further illustrated.
Accompanying drawing 1 is the structural representation of circular well mould.
Accompanying drawing 2 is the structural representation of rectangular well mould.
Accompanying drawing 3 to be wiped one's face the structural representation of mould for chute.
In figure, 1 circular well mould, 2 rectangular well moulds, 3 chutes are wiped one's face mould.
Detailed description of the invention
Accompanying drawing is specific embodiments of the invention, and it includes circular well mould 1 as shown in Figure 1, rectangular well mould 2 as shown in Figure 2 and chute as shown in Figure 3 and to wipe one's face mould 3.Described circular well mould is used for circular well and builds by laying bricks or stones, and it is the Circular plate structure with circular hollow, and external diameter is identical with the indoor footpath of well, and internal diameter is identical with pit shaft internal diameter; Described rectangular well mould be used for rectangular well build by laying bricks or stones, it is the Rectangular Plate Structure with rectangle hollow, and the length and width of the length and width size in outside and well chamber interior walls is measure-alike, the length and width size of inner side and the length and width of shaft in wall measure-alike; Described chute mould of wiping one's face is wiped one's face for shaft bottom chute, and it is diameter with the identical circular dies of internal diameter of the pipeline.
Further, described circular well mould, rectangular well mould, chute mould of wiping one's face adopts wood glue plate to make.
A kind of method utilizing above-mentioned manhole mould to carry out manhole construction is as follows:
In manhole building process, often build a step by laying bricks or stones and adopt circular well mould or rectangular well mould to carry out according to controlling, when finding error, correction in time to avoid the cumulative of error, by that analogy until built by laying bricks or stones; Wipe one's face in process at chute, use chute mould of wiping one's face to carry out along chute direction operation of wiping one's face, till treating that chute is smooth-going, round and smooth.
Further, when building well room by laying bricks or stones, the cylindrical of circular well mould or the outside rectangular of rectangular well mould and well chamber interior walls is used to carry out according to controlling, to guarantee that the well head of circular well room is round and smooth, the borehole wall of rectangular well room is vertical; When masonry shaft, the inner circle of circular well mould or the inner rectangular of rectangular well mould and shaft in wall is used to carry out according to controlling, to guarantee that the well head of circular pit shaft is round and smooth, the borehole wall of quadrant pit is vertical.
Claims (4)
1. a manhole mould, is characterized in that: include the circular well mould (1) of building by laying bricks or stones for circular well, the rectangular well mould (2) of building by laying bricks or stones for rectangular well and to wipe one's face mould (3) for the chute that shaft bottom chute is wiped one's face; Described circular well mould is the Circular plate structure with circular hollow, and its external diameter is identical with the indoor footpath of well, and internal diameter is identical with pit shaft internal diameter; Described rectangular well mould is the Rectangular Plate Structure with rectangle hollow, the length and width size outside it and the length and width of well chamber interior walls measure-alike, the length and width size of inner side and the length and width of shaft in wall measure-alike; Described chute mould of wiping one's face is diameter with the identical circular dies of internal diameter of the pipeline.
2. manhole mould according to claim 1, is characterized in that: described circular well mould, rectangular well mould, chute mould of wiping one's face adopts wood glue plate to make.
3. one kind utilizes manhole mould described in claim 1 to carry out the method for manhole construction, it is characterized in that: in manhole building process, often building a step by laying bricks or stones adopts circular well mould or rectangular well mould to carry out according to controlling, when finding error, timely correction to avoid the cumulative of error, by that analogy until built by laying bricks or stones; Wipe one's face in process at chute, use chute mould of wiping one's face to carry out along chute direction operation of wiping one's face, till treating that chute is smooth-going, round and smooth.
4. utilizing manhole mould to carry out the method for manhole construction according to claim 3, it is characterized in that: when building well room by laying bricks or stones, using the cylindrical of circular well mould or the outside rectangular of rectangular well mould and well chamber interior walls to carry out according to controlling; When masonry shaft, the inner circle of circular well mould or the inner rectangular of rectangular well mould and shaft in wall is used to carry out according to controlling.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510538550.3A CN105113608B (en) | 2015-08-28 | 2015-08-28 | Molds for inspection wells and method for constructing inspection wells through same |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510538550.3A CN105113608B (en) | 2015-08-28 | 2015-08-28 | Molds for inspection wells and method for constructing inspection wells through same |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105113608A true CN105113608A (en) | 2015-12-02 |
CN105113608B CN105113608B (en) | 2017-03-22 |
Family
ID=54661700
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510538550.3A Active CN105113608B (en) | 2015-08-28 | 2015-08-28 | Molds for inspection wells and method for constructing inspection wells through same |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105113608B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109706970A (en) * | 2018-12-12 | 2019-05-03 | 金华电力设计院有限公司 | A kind of prefabricated square cable active well |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1178166A1 (en) * | 2000-08-03 | 2002-02-06 | Marco Marchiano | Multi-purpose prefabricated centering |
KR20110000790U (en) * | 2009-07-17 | 2011-01-25 | 우신건축환경클리닉(주) | Cast for constructing manhole |
CN102706258A (en) * | 2012-06-08 | 2012-10-03 | 济南黄河路桥工程公司 | Inspection ruler for round inspection well |
CN102818503A (en) * | 2012-09-13 | 2012-12-12 | 上海瑞尔实业有限公司 | External diameter measuring apparatus of annular object and measuring method thereof |
CN202599307U (en) * | 2012-06-08 | 2012-12-12 | 济南黄河路桥工程公司 | Detection ruler of circular inspection well |
CN104294850A (en) * | 2014-10-27 | 2015-01-21 | 济南黄河路桥工程公司 | Auxiliary tool for masonry of round inspection well |
CN205062990U (en) * | 2015-08-28 | 2016-03-02 | 济南城建集团有限公司 | Mould for inspection shaft |
-
2015
- 2015-08-28 CN CN201510538550.3A patent/CN105113608B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1178166A1 (en) * | 2000-08-03 | 2002-02-06 | Marco Marchiano | Multi-purpose prefabricated centering |
KR20110000790U (en) * | 2009-07-17 | 2011-01-25 | 우신건축환경클리닉(주) | Cast for constructing manhole |
CN102706258A (en) * | 2012-06-08 | 2012-10-03 | 济南黄河路桥工程公司 | Inspection ruler for round inspection well |
CN202599307U (en) * | 2012-06-08 | 2012-12-12 | 济南黄河路桥工程公司 | Detection ruler of circular inspection well |
CN102818503A (en) * | 2012-09-13 | 2012-12-12 | 上海瑞尔实业有限公司 | External diameter measuring apparatus of annular object and measuring method thereof |
CN104294850A (en) * | 2014-10-27 | 2015-01-21 | 济南黄河路桥工程公司 | Auxiliary tool for masonry of round inspection well |
CN205062990U (en) * | 2015-08-28 | 2016-03-02 | 济南城建集团有限公司 | Mould for inspection shaft |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109706970A (en) * | 2018-12-12 | 2019-05-03 | 金华电力设计院有限公司 | A kind of prefabricated square cable active well |
Also Published As
Publication number | Publication date |
---|---|
CN105113608B (en) | 2017-03-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104552576A (en) | Horizontal side-turning adjustable precast stair mold | |
CN102865087B (en) | Embedded grout pipe device in lining concrete of chamber and construction method | |
CN205062990U (en) | Mould for inspection shaft | |
CN105113608A (en) | Molds for inspection wells and method for constructing inspection wells through same | |
CN204487770U (en) | Horizontal rollover is adjustable precast stair mould | |
CN206173983U (en) | Building foundation water -blocking weir | |
CN108049640A (en) | A kind of building block system building block construction technology | |
CN103706734A (en) | Stirrup manufacturing device for steel reinforcement cage | |
CN204899034U (en) | Prefabricated wall post | |
CN102535935A (en) | Method for constructing template of chimney shaft wall | |
CN203821787U (en) | Reserved pipeline mold in brick wall | |
CN204326307U (en) | The module wall that a kind of building construction uses | |
CN204080589U (en) | The prefabricated drain tank of a kind of new concrete | |
CN105464242A (en) | Building method of plastering-free high-precision infilled wall | |
CN104389414A (en) | Building plasterer | |
CN104908150A (en) | Piping shaft manufacturing formwork and industrialized piping shaft production method | |
CN203066109U (en) | Fan-shaped pitshaft building block and pitshaft enclosed by fan-shaped pitshaft building blocks | |
CN205259430U (en) | Install special building block | |
CN204414282U (en) | A kind of smoke flue machine | |
CN204295848U (en) | A kind of architectural prefab particular manufacturing craft | |
CN202299444U (en) | Cement mortar construction device for building construction | |
CN210002926U (en) | plug-in type hard protection structure for stair ground | |
CN204225340U (en) | A kind of concavo-convex R-joining porous brick | |
CN204252337U (en) | Assembled architecture wall body construction | |
CN209798961U (en) | Trapezoidal corner concrete drainage inspection shaft |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |