CN105113608B - Molds for inspection wells and method for constructing inspection wells through same - Google Patents

Molds for inspection wells and method for constructing inspection wells through same Download PDF

Info

Publication number
CN105113608B
CN105113608B CN201510538550.3A CN201510538550A CN105113608B CN 105113608 B CN105113608 B CN 105113608B CN 201510538550 A CN201510538550 A CN 201510538550A CN 105113608 B CN105113608 B CN 105113608B
Authority
CN
China
Prior art keywords
well
mould
rectangular
circular
chute
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510538550.3A
Other languages
Chinese (zh)
Other versions
CN105113608A (en
Inventor
李雷
吴登超
张永亮
吴建亮
邹光发
张传印
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Urban Construction Group Co Ltd
Original Assignee
Jinan Urban Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Urban Construction Group Co Ltd filed Critical Jinan Urban Construction Group Co Ltd
Priority to CN201510538550.3A priority Critical patent/CN105113608B/en
Publication of CN105113608A publication Critical patent/CN105113608A/en
Application granted granted Critical
Publication of CN105113608B publication Critical patent/CN105113608B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

The invention belongs to the field of building engineering, and particularly relates to molds for inspection wells and a method for constructing the inspection wells through the same. The molds comprise the circular well mold, the rectangular well mold and the chute plastering mold. The circular well mold is used for construction of a circular well and is of a circular plate structure with a circular hollow interior, the outer diameter of the circular well mold is equal to the inner diameter of a well chamber, and the inner diameter of the circular well mold is equal to that of a shaft. The rectangular well mold is used for construction of a rectangular well and is of a rectangular plate structure with a rectangular hollow interior, the length and width of the outer side of the rectangular well mold are equal to those of the inner wall of a well chamber, and the length and width of the inner side of the rectangular well mold are equal to those of the inner wall of a shaft. The chute plastering mold is used for well bottom chute plastering and is a semicircular mold with the diameter equal to the inner diameter of a pipeline. In the constructing process of the inspection wells, the specially-made molds for the inspection wells are used for comparison control and used based on construction conditions for rectifying a deviation in time in the construction process, and error accumulation is avoided, so that the overall construction quality of the inspection wells is improved, and the working efficiency of workers is improved.

Description

A kind of method that inspection shaft carries out checking well construction with mould and using the mould
Technical field
The present invention relates to building engineering field, and in particular to a kind of inspection shaft carries out inspection shaft with mould and using the mould The method of construction.
Background technology
In conventional Municipal Drainage Engineering, inspection shaft generally has that borehole wall out of plumb, well head be round and smooth, chute is uneven The phenomenon such as suitable, in irregular shape, has had a strong impact on the presentation quality of inspection shaft and has used function.
The content of the invention
The present invention for exist under existing construction method borehole wall out of plumb, not round and smooth well head, chute irregularity, shape not Regular the problems such as, the method that have developed a kind of inspection shaft mould and carry out checking well construction using the mould.
The present invention is achieved through the following technical solutions:
A kind of inspection shaft mould, includes circular well mould, rectangular well mould and chute and wipes one's face mould.The circle Well mould is built by laying bricks or stones for circular well, and which is the Circular plate structure with circular hollow, and external diameter is identical with footpath in well room, internal diameter and well Cylinder internal diameter is identical;The rectangular well mould is built by laying bricks or stones for rectangular well, and which is the Rectangular Plate Structure with rectangle hollow, and outside Length and width size is equivalently-sized with the length and width of well chamber interior walls, and the length and width size of inner side is equivalently-sized with the length and width of shaft in wall; Chute mould of wiping one's face is wiped one's face for shaft bottom chute, and which is diameter with internal diameter of the pipeline identical circular dies.
Further, the circular well mould, rectangular well mould, chute wipe one's face mould using the making of wood glue plate.
It is a kind of to carry out checking that the method for well construction is as follows using above-mentioned inspection shaft mould:
In inspection shaft building process, often building a step by laying bricks or stones is carried out according to control using circular well mould or rectangular well mould, When error is found, correction in time is completed until building by laying bricks or stones by that analogy with avoiding the cumulative of error;During chute is wiped one's face, Operation of wiping one's face is carried out using chute mould of wiping one's face along chute direction, treat chute smooth-going, it is round and smooth till.
Wherein, when well room is built by laying bricks or stones, contrasted using cylindrical or rectangular well mould the outside rectangular of circular well mould Control;In masonry shaft, carried out according to control using the inner circle of circular well mould or the inner rectangular of rectangular well mould.
The beneficial effects of the present invention is:Which is carried out with mould using special inspection shaft in inspection shaft building process According to control, allow construction to have " tool " can be according to being rectified a deviation in work progress in time, it is to avoid error it is cumulative, so as to improve inspection shaft Overall masonry quality, improve work task efficiency.
Description of the drawings
The present invention is further illustrated below in conjunction with the accompanying drawings.
Structural representation of the accompanying drawing 1 for circular well mould.
Structural representation of the accompanying drawing 2 for rectangular well mould.
Accompanying drawing 3 is wiped one's face for chute the structural representation of mould.
In figure, 1 circular well mould, 2 rectangular well moulds, 3 chutes are wiped one's face mould.
Specific embodiment
Accompanying drawing is the specific embodiment of the present invention, and which includes circular well mould 1 as shown in Figure 1, square as shown in Figure 2 Shape well mould 2 and chute as shown in Figure 3 are wiped one's face mould 3.The circular well mould is built by laying bricks or stones for circular well, and which is with circle The hollow Circular plate structure of shape, and external diameter is identical with footpath in well room, internal diameter is identical with pit shaft internal diameter;The rectangular well mould is used for square Shape well is built by laying bricks or stones, and which is the Rectangular Plate Structure with rectangle hollow, and the length and width size of the length and width size in outside and well chamber interior walls Identical, the length and width size of inner side is equivalently-sized with the length and width of shaft in wall;Chute mould of wiping one's face is smeared for shaft bottom chute Face, which is diameter with internal diameter of the pipeline identical circular dies.
Further, the circular well mould, rectangular well mould, chute wipe one's face mould using the making of wood glue plate.
It is a kind of to carry out checking that the method for well construction is as follows using above-mentioned inspection shaft mould:
In inspection shaft building process, often building a step by laying bricks or stones is carried out according to control using circular well mould or rectangular well mould, When error is found, correction in time is completed until building by laying bricks or stones by that analogy with avoiding the cumulative of error;During chute is wiped one's face, Operation of wiping one's face is carried out using chute mould of wiping one's face along chute direction, treat chute smooth-going, it is round and smooth till.
Further, when well room is built by laying bricks or stones, using outside rectangular and the well room of the cylindrical or rectangular well mould of circular well mould Inwall is carried out according to control, and the borehole wall of, rectangular well room round and smooth with the well head for guaranteeing circular well room is vertical;In masonry shaft, make Carried out according to control with shaft in wall with the inner circle of circular well mould or the inner rectangular of rectangular well mould, to guarantee circular pit shaft Well head is round and smooth, the quadrant pit borehole wall is vertical.

Claims (1)

1. it is a kind of check well construction method, it is characterised in that:
Instrument is selected:Choose the circular well mould built by laying bricks or stones for circular well(1), the rectangular well mould built by laying bricks or stones for rectangular well(2) And the chute wiped one's face for shaft bottom chute is wiped one's face mould(3)Used as construction mould, wherein, the circular well mould is with circle The hollow Circular plate structure of shape, its external diameter are identical with footpath in well room, and internal diameter is identical with pit shaft internal diameter;The rectangular well mould is that have The Rectangular Plate Structure of rectangle hollow, the length and width size on the outside of which are equivalently-sized with the length and width of well chamber interior walls, the length and width chi of inner side It is very little equivalently-sized with the length and width of shaft in wall;Chute mould of wiping one's face is diameter with internal diameter of the pipeline identical circular dies;
Using institute's selection tool construction:When well room is built by laying bricks or stones, a step is often built by laying bricks or stones, using the cylindrical or rectangular well mould of circular well mould Outside rectangular and well chamber interior walls carry out according to control, when error is found, correction in time to avoid the cumulative of error, with such Push away until well room is built by laying bricks or stones and completed;Continue masonry shaft, often build inner circle or rectangular well mould that a step uses circular well mould by laying bricks or stones Inner rectangular is carried out according to control with shaft in wall, when error is found, is rectified a deviation in time to avoid the cumulative of error, by that analogy Until build by laying bricks or stones completing;During chute is wiped one's face, operation of wiping one's face is carried out using chute mould of wiping one's face along chute direction, treat chute Smooth-going, it is round and smooth till.
CN201510538550.3A 2015-08-28 2015-08-28 Molds for inspection wells and method for constructing inspection wells through same Active CN105113608B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510538550.3A CN105113608B (en) 2015-08-28 2015-08-28 Molds for inspection wells and method for constructing inspection wells through same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510538550.3A CN105113608B (en) 2015-08-28 2015-08-28 Molds for inspection wells and method for constructing inspection wells through same

Publications (2)

Publication Number Publication Date
CN105113608A CN105113608A (en) 2015-12-02
CN105113608B true CN105113608B (en) 2017-03-22

Family

ID=54661700

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510538550.3A Active CN105113608B (en) 2015-08-28 2015-08-28 Molds for inspection wells and method for constructing inspection wells through same

Country Status (1)

Country Link
CN (1) CN105113608B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109706970A (en) * 2018-12-12 2019-05-03 金华电力设计院有限公司 A kind of prefabricated square cable active well

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IT1314540B1 (en) * 2000-08-03 2002-12-18 Marco Marchiano MULTI-FUNCTIONAL PREFABRICATED CENTINA.
KR20110000790U (en) * 2009-07-17 2011-01-25 우신건축환경클리닉(주) Cast for constructing manhole
CN202599307U (en) * 2012-06-08 2012-12-12 济南黄河路桥工程公司 Detection ruler of circular inspection well
CN102706258A (en) * 2012-06-08 2012-10-03 济南黄河路桥工程公司 Inspection ruler for round inspection well
CN102818503B (en) * 2012-09-13 2014-12-31 上海瑞尔实业有限公司 External diameter measuring apparatus of annular object and measuring method thereof
CN104294850B (en) * 2014-10-27 2016-05-25 济南黄河路桥工程公司 A kind ofly build the aid that circular inspection well is used by laying bricks or stones
CN205062990U (en) * 2015-08-28 2016-03-02 济南城建集团有限公司 Mould for inspection shaft

Also Published As

Publication number Publication date
CN105113608A (en) 2015-12-02

Similar Documents

Publication Publication Date Title
CN104452753B (en) Major diameter SMW engineering method stake machine
CN103790382A (en) Rapid blocking method and structure of external wall screw hole of concrete structure
CN101864768A (en) Pile-forming drilling tool for screw pile and pile-forming construction method thereof
CN105113608B (en) Molds for inspection wells and method for constructing inspection wells through same
CN205062990U (en) Mould for inspection shaft
CN103706734A (en) Stirrup manufacturing device for steel reinforcement cage
CN206173983U (en) Building foundation water -blocking weir
CN205078090U (en) Windowsill structure of bearing down on one
CN108049640A (en) A kind of building block system building block construction technology
CN102877652A (en) Construction method for post-injection cement mortar masonry brickwork
CN206550296U (en) The general screeding device of the cylindrical SMIS of Foundry Works's moulding process
CN102535935A (en) Method for constructing template of chimney shaft wall
CN203066109U (en) Fan-shaped pitshaft building block and pitshaft enclosed by fan-shaped pitshaft building blocks
CN204510208U (en) A kind of long-spiral drilling machine casing device
CN202556558U (en) Precast concrete sewage inspection shaft steel die
CN103072201B (en) A kind of precast concrete pastes ceramic tile new technology
CN105442822A (en) Mortar putty powder wall trowelling machine
CN208717959U (en) One kind lay bricks circular inspection well build mold
CN202108251U (en) Cushion block of water stopping screw for impervious concretes
CN203635829U (en) Rebar cage stirrup manufacturing device
CN215907317U (en) Tool for one-time forming of flatness of leveling layer of coke oven top plate
CN204080589U (en) The prefabricated drain tank of a kind of new concrete
CN102116049A (en) Drainage channel and method for pouring same
CN217812363U (en) Civil engineering is with reserving hole template
CN202299444U (en) Cement mortar construction device for building construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant