CN105113477A - Construction method using suspension-bag-shaped high vertical sand retaining net to fix wandering dune - Google Patents
Construction method using suspension-bag-shaped high vertical sand retaining net to fix wandering dune Download PDFInfo
- Publication number
- CN105113477A CN105113477A CN201510413934.2A CN201510413934A CN105113477A CN 105113477 A CN105113477 A CN 105113477A CN 201510413934 A CN201510413934 A CN 201510413934A CN 105113477 A CN105113477 A CN 105113477A
- Authority
- CN
- China
- Prior art keywords
- sediment trapping
- trapping net
- sand
- ditch
- net
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Combined Means For Separation Of Solids (AREA)
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
The invention relates to the technical field of sand-control engineering, in particular to a construction method using a suspension-bag-shaped high vertical sand retaining net to fix a wandering dune. The construction method is characterized in that a sand ridge line of the wandering dune is pushed by 1m to 10m from one side of a leeward slope to a windward slope; a 20-50cm height sand barrier is piled up; a ditch is dug up in the sand barrier; a sand retaining net body is spread along the ditch; brackets are constructed in the ditch, where the sand retaining net body is spread, in a 1-2m spaced manner; nearby desert sand is taken to press the sand retaining net body to allow the ditch to be filled up; then sand retaining net parts on the two sides of the ditch are lifted upwards; the top edges of the sand retaining net parts incline to the tops of the brackets, and are connected with and fixed to the tops of the brackets; and the suspension-bag-shaped high vertical type sand retaining net is constructed at the top of the wandering dune.
Description
Technical field
The present invention relates to sand control engineering technical field, be specially the construction method that moving dunes fixed by outstanding bag shape high vertical sediment trapping net.
Background technology
At present, in desert treatment, widely use plastic wire construction high vertical sediment trapping net, enforcement is to the interception in flowing desert and fix, but above-mentioned high vertical sediment trapping net due to vertical wire side when the invasion and attack suffering strong wind not only wire side easily blown brokenly, the wind stopped changes over upper and lower vertical direction from horizontal direction, the sand of wind meeting erosion sediment trapping sieve bottom vertically downward, make sediment trapping sieve bottom unsettled, construct just very unstable at the top of moving dunes and check dam, therefore invent the construction method that a kind of outstanding bag shape high vertical sediment trapping net fixes moving dunes and fix the needs that moving dunes have been control of desert.
Applicant has delivered " the fixing and utilizations of moving dunes " in 2009.In article, set forth the principle on splayed net cage sand barrier fixed flow sand dune, illustrate simultaneously after moving dunes top arranges splayed net cage sand barrier, due to husky toward eminence properties of flow, tall and big moving dunes just become tall and big machinery and hinder less.Therefore the mechanical sand barrier on textbook is hindered husky effect formula V=4.5H
2sima (formula 1), is modified as V=4.5 [H+ [(H1+H2)/2]
2sima (formula 2), in (formula 1), V is the husky amount of resistance, and H is the height of mechanical sand barrier, and a is the angle of cut.In (formula 2), V is the husky amount of resistance, and H is the height of mechanical sand barrier, and H1 is the height of moving dunes windward slope, and H2 is the height of moving dunes leeward slope, and a is the angle of cut.The top of exposing moving dunes due to splayed net cage sand barrier is less than 15cm, if apply mechanically the formula on textbook, be placed in the splayed net cage sand barrier at moving dunes top, it is very little for hindering husky effect, but in fact expose the splayed net cage sand barrier that top of sand dune is less than 15cm, owing to there being the moving dunes under cylinder mould sand barrier to make liner, it hinders husky effect far away higher than being arranged on smooth desert, being highly greater than the high vertical sediment trapping net of 150cm.Therefore (formula 1) husky effect of resistance of arranging Eight characters cylinder mould sand barrier in moving dunes top to constructing is inapplicable, just can must describe the problem with (formula 2).After moving dunes top arranges splayed net cage sand barrier, top of sand dune is deposited in by the drift sand that splayed net cage sand barrier is tackled, by promoting splayed net cage sand barrier, make the upwards lifting of moving dunes top, moving dunes just no longer move forward, harmful moving dunes just become useful mechanical sand barrier, the mechanical sand barrier of height like this, cannot accomplish with the high vertical sediment trapping net that any method builds, thus show moving dunes efficient intercepting desert function, but the mechanical sand barrier be so efficiently easy to get on desert, also be not familiar with by people at present, so far fail to find correlation theory and experimental data in textbook.What textbook was introduced is waist high vertical sediment trapping net being arranged on moving dunes, and reach the object of scabbling moving dunes, people still process moving dunes as disaster so far.So applicant is managing by engineering practice, proving that moving dunes to be transformed into tall and big mechanical sand barrier.
Outstanding bag shape high vertical sediment trapping net and construction method thereof, that applicant fixes from construction splayed net cage sand barrier the construction method exploring out moving dunes engineering practice, outstanding bag shape high vertical sediment trapping net construction is at moving dunes top, stablize than splayed net cage sand barrier, highly splayed net cage sand barrier can be exceeded, therefore sediment trapping, sand-fixing effect are better than splayed net cage sand barrier, because the bottom of outstanding bag shape high vertical sediment trapping net has been filled at the bottom of husky bag, weather-proof effective, can not be blown down by the base erosion of strong wind from net.
Summary of the invention
The technical assignment of the technical problem to be solved in the present invention and proposition is the defect overcoming prior art, the constructing structure of existing high vertical sediment trapping net, hang as curtain from single width, change over the outstanding bag shape high vertical sediment trapping net like being equipped with the mesh bag shape that Desert Sand hangs up at the bottom of bag, make sediment trapping netting gear have front wire side and rear wire side, can desert drift sand be tackled between two wire sides of outstanding bag shape high vertical sediment trapping net and the both sides, front and back of sediment trapping net.Outstanding bag shape high vertical sediment trapping net changes the structure of traditional high vertical sediment trapping net, sediment trapping netting gear is made to have two wire sides tilted, drift sand interception in desert can be fixed on the middle both sides, front and back with netting of two wire sides of outstanding bag shape high vertical sediment trapping net, bottom due to sediment trapping net has been filled at the bottom of husky mesh bag, strong wind can not produce erosion to the base of sediment trapping net, be applicable to very much the top of constructing at moving dunes and check dam, reach the object improving fixing moving dunes.
Sediment trapping net of the present invention be wide cut between 120cm to 350cm, the plastic wire of degree of porosity between 45% to 55%.The cross sectional shape of outstanding bag shape high vertical sediment trapping net is that the outstanding bag shape that Desert Sand hangs up is housed at the bottom of mesh bag bag, the position of sediment trapping net support is in the center of outstanding bag shape sediment trapping net, the bottom of sediment trapping net support is fixed in desert with passing the bottom vertical of outstanding bag shape sediment trapping net, interval 1m to 2m is equipped with a support, and connection is tightened by an iron wire in the top one by one between support; The top margin of cradle top and outstanding bag shape sediment trapping net is fixed, and the top margin interval 30cm to 50cm of sediment trapping net and iron wire connection are fixed.
The construction method that moving dunes fixed by outstanding bag shape high vertical sediment trapping net is: the dune ridge line of moving dunes from leeward slope side, 1m to 10m is passed to windward slope direction, the husky ridge that heap erects high 20cm to 50cm, the angle of windward slope is less than 32 ° of angles, top horizontal is made into wide 50cm to 200cm platform, husky ridge platform digs Yi Tiaogou, the width of ditch is between 30cm to 70cm, and the degree of depth is between 15cm to 50cm; According to width and the sediment trapping net of degree of depth selection wide cut between 100cm to 350cm of ditch, sediment trapping net is spread out and put on along ditch, the center line of sediment trapping net is corresponding with bottom of trench, get the batten of length between 70cm to 230cm by sediment trapping net press-in bottom of trench, batten inserts in the sand of bottom of trench after vertically piercing through sediment trapping net, the batten degree of depth in insertion sand, between 30cm to 70cm, is fixed on batten in ditch, becomes the support of outstanding bag shape high vertical sediment trapping net; In the ditch of having spread out and put on sediment trapping net, interval 1m to 2m constructs a support, and one by one between support, connection is tightened by an iron wire in top, to strengthen the stability of support left and right directions; Desert Sand near getting is pressed in sediment trapping and on the net ditch is filled up, then the top margin tendency cradle top sediment trapping net of ditch both sides is upwards propped up, tighten, netted and and cradle top connection fixing, interval 30cm to 50cm fixes the top margin of both sides sediment trapping net and iron wire connection again, outstanding bag shape high vertical sediment trapping net is built into, height unrestricted choice between 25cm to 150cm of outstanding bag shape high vertical sediment trapping net at the top of moving dunes.
Accompanying drawing explanation
Fig. 1 is that the present invention is hanged bag shape high vertical sediment trapping net and fixed that the construction of moving dunes is main looks schematic cross-section.
Fig. 2 is that the present invention is hanged the construction left side that bag shape high vertical sediment trapping net fixes moving dunes and looked schematic cross-section.
In accompanying drawing, 1, outstanding bag shape high vertical sediment trapping net, 2, sediment trapping net, 3, support, 4, iron wire, 5, moving dunes, 6, Sha Geng, 7, Desert Sand.
Detailed description of the invention
Now in conjunction with Figure of description, the invention will be further described: sediment trapping net of the present invention be wide cut between 100cm to 350cm, the plastic wire of degree of porosity between 45% to 55%.
As shown in Figure 1 and Figure 2, the construction method that moving dunes fixed by outstanding bag shape high vertical sediment trapping net is: the dune ridge line of moving dunes 5 from leeward slope side, 1m to 10m is passed to windward slope direction, the husky ridge 6 that heap erects high 20cm to 50cm, the angle of windward slope is less than 32 ° of angles, top horizontal is made into wide 50cm to 200cm platform, husky ridge platform digs Yi Tiaogou, the width of ditch is between 30cm to 70cm, and the degree of depth is between 15cm to 50cm; According to width and the sediment trapping net 2 of degree of depth selection wide cut between 100cm to 350cm of ditch, sediment trapping net is spread out and put on along ditch, the center line of sediment trapping net is corresponding with bottom of trench, get the batten of length between 70cm to 230cm by sediment trapping net press-in bottom of trench, batten inserts in the sand of bottom of trench after vertically piercing through sediment trapping net, the batten degree of depth in insertion sand, between 30cm to 70cm, is fixed on batten in ditch, becomes the support 3 of outstanding bag shape high vertical sediment trapping net; In the ditch of having spread out and put on sediment trapping net, interval 1m to 2m constructs a support, and one by one between support, connection is tightened by an iron wire 4 in top, to strengthen the stability of support left and right directions; Desert Sand 7 near getting is pressed in sediment trapping and on the net ditch is filled up, then the top margin tendency cradle top sediment trapping net of ditch both sides is upwards propped up, tighten, netted and and cradle top connection fixing, interval 30cm to 50cm fixes the top margin of both sides sediment trapping net and iron wire connection again, is built into outstanding bag shape high vertical sediment trapping net 1 at the top of moving dunes.
Sediment trapping net available mechanicalization of the present invention is produced in enormous quantities, and the engineering of moving dunes fixed by outstanding bag shape high vertical sediment trapping net, and available mechanical is constructed at moving dunes top.
Claims (1)
1. the construction method of moving dunes fixed by an outstanding bag shape high vertical sediment trapping net, it is characterized in that: the dune ridge line of moving dunes from leeward slope side, 1m to 10m is passed to windward slope direction, the husky ridge that heap erects high 20cm to 50cm, the angle of windward slope is less than 32 ° of angles, top horizontal is made into wide 50cm to 200cm platform, husky ridge platform digs Yi Tiaogou, the width of ditch is between 30cm to 70cm, and the degree of depth is between 15cm to 50cm; According to width and the sediment trapping net of degree of depth selection wide cut between 100cm to 350cm of ditch, sediment trapping net is spread out and put on along ditch, the center line of sediment trapping net is corresponding with bottom of trench, get the batten of length between 70cm to 230cm by sediment trapping net press-in bottom of trench, batten inserts in the sand of bottom of trench after vertically piercing through sediment trapping net, the batten degree of depth in insertion sand, between 30cm to 70cm, is fixed on batten in ditch, becomes the support of outstanding bag shape high vertical sediment trapping net; In the ditch of having spread out and put on sediment trapping net, interval 1m to 2m constructs a support, and one by one between support, connection is tightened by an iron wire in top, to strengthen the stability of support left and right directions; Desert Sand near getting is pressed in sediment trapping and on the net ditch is filled up, then the top margin tendency cradle top sediment trapping net of ditch both sides is upwards propped up, tighten, netted and and cradle top connection fixing, interval 30cm to 50cm fixes the top margin of both sides sediment trapping net and iron wire connection again, outstanding bag shape high vertical sediment trapping net is built into, height unrestricted choice between 25cm to 150cm of outstanding bag shape high vertical sediment trapping net at the top of moving dunes.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310524933.6A CN103556617B (en) | 2013-10-20 | 2013-10-20 | Outstanding bag shape high vertical sediment trapping net and construction method thereof |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310524933.6A Division CN103556617B (en) | 2013-10-20 | 2013-10-20 | Outstanding bag shape high vertical sediment trapping net and construction method thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105113477A true CN105113477A (en) | 2015-12-02 |
Family
ID=50010954
Family Applications (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510413934.2A Pending CN105113477A (en) | 2013-10-20 | 2013-10-20 | Construction method using suspension-bag-shaped high vertical sand retaining net to fix wandering dune |
CN201310524933.6A Active CN103556617B (en) | 2013-10-20 | 2013-10-20 | Outstanding bag shape high vertical sediment trapping net and construction method thereof |
CN201510413935.7A Pending CN105133564A (en) | 2013-10-20 | 2013-10-20 | Construction method for building sediment storage dam through hung-bag-shaped high vertical type sediment retaining net |
Family Applications After (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310524933.6A Active CN103556617B (en) | 2013-10-20 | 2013-10-20 | Outstanding bag shape high vertical sediment trapping net and construction method thereof |
CN201510413935.7A Pending CN105133564A (en) | 2013-10-20 | 2013-10-20 | Construction method for building sediment storage dam through hung-bag-shaped high vertical type sediment retaining net |
Country Status (1)
Country | Link |
---|---|
CN (3) | CN105113477A (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104060600A (en) * | 2014-06-16 | 2014-09-24 | 娄志平 | Overlapped-splicing type sand-blocking net and construction method thereof |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101294372A (en) * | 2007-04-27 | 2008-10-29 | 东丽株式会社 | Sand drift prevention method and tubular knit fabric for columnar sandbag |
CN102373676A (en) * | 2009-05-12 | 2012-03-14 | 娄志平 | High vertical reverse Y-shaped net cage sand barrier and construction method thereof |
CN102031773A (en) * | 2009-11-24 | 2011-04-27 | 娄志平 | Shirt rim type cylinder mould sand barrier and sand blocking and fixing construction method thereof |
CN203129121U (en) * | 2013-03-29 | 2013-08-14 | 中国科学院寒区旱区环境与工程研究所 | Windproof sand resistance sand barrier |
-
2013
- 2013-10-20 CN CN201510413934.2A patent/CN105113477A/en active Pending
- 2013-10-20 CN CN201310524933.6A patent/CN103556617B/en active Active
- 2013-10-20 CN CN201510413935.7A patent/CN105133564A/en active Pending
Also Published As
Publication number | Publication date |
---|---|
CN105133564A (en) | 2015-12-09 |
CN103556617B (en) | 2016-01-20 |
CN103556617A (en) | 2014-02-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103556617B (en) | Outstanding bag shape high vertical sediment trapping net and construction method thereof | |
CN103835279B (en) | Outstanding pouch-shaped high vertical sediment trapping net fixes the construction method of moving dunes | |
CN203846476U (en) | Construction structure of suspended-bag-shaped highly-vertical type sand blocking net | |
CN201314030Y (en) | Series herringbone sand trapping cylinder mould | |
CN208235711U (en) | A kind of bean column node easy for construction | |
CN103821129A (en) | Construction method of suspended bag-shaped high vertical sand stopping net | |
CN103774635B (en) | The construction method of outstanding pouch-shaped high vertical sediment trapping net check dam | |
CN205399388U (en) | High wind district moving dunes fix sand structure | |
CN202323917U (en) | Cotton straw boom net splayed mesh cage sand barrier and sand blocking construction structure | |
CN107268571A (en) | The constructing structure that outstanding bag sand-protecting barrier, segmentation sand-protecting barrier are combined with plantation | |
CN107268570A (en) | The constructing structure that outstanding bag sand-protecting barrier, grid sand-protecting barrier are combined with plantation | |
CN207469270U (en) | High slope combined bearing structure | |
CN102926372A (en) | Embedded type sediment trapping net sediment storage dam and construction method thereof | |
CN201433390Y (en) | Cylinder mould sheet for constructing splayed cylinder mould sand barrier | |
CN203096711U (en) | S-shaped embedded sand blocking screen sand ridge and construction structure thereof | |
CN107090822A (en) | The implantation methods that outstanding pouch-shaped sand-protecting barrier is combined with the husky ridge of point type arc net | |
CN202899166U (en) | Stones fill structure frame | |
CN103821130A (en) | Suspended bag-shaped high vertical sand stopping net | |
CN204570654U (en) | A kind of bottom is that U-shaped fixes the sand the vertical sediment trapping net of bag | |
CN204570656U (en) | A kind of bottom is that hook-type fixes the sand the sediment trapping net of bag | |
CN203475405U (en) | Construction structure for furrow-type obliquely-embedded-sand-blocking-net sand ridges | |
CN102953368A (en) | Embedded sand blocking nets and beaches and construction method thereof | |
CN102162236A (en) | Herringbone splay meshed cage sand barrier and sand-blocking construction method thereof | |
CN107119664A (en) | The construction method of fillet Sand-fixation net sand-protecting barrier | |
CN201574388U (en) | Cylinder mould sheet for constructing splay cylinder mould sand barrier |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20151202 |
|
WD01 | Invention patent application deemed withdrawn after publication |