CN107119664A - The construction method of fillet Sand-fixation net sand-protecting barrier - Google Patents
The construction method of fillet Sand-fixation net sand-protecting barrier Download PDFInfo
- Publication number
- CN107119664A CN107119664A CN201710499730.4A CN201710499730A CN107119664A CN 107119664 A CN107119664 A CN 107119664A CN 201710499730 A CN201710499730 A CN 201710499730A CN 107119664 A CN107119664 A CN 107119664A
- Authority
- CN
- China
- Prior art keywords
- sand
- fillet
- fixation net
- desert
- protecting barrier
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/005—Soil-conditioning by mixing with fibrous materials, filaments, open mesh or the like
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Structural Engineering (AREA)
- Agronomy & Crop Science (AREA)
- Environmental & Geological Engineering (AREA)
- Soil Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
The present invention is intended to provide a kind of construction method of fillet Sand-fixation net sand-protecting barrier, belongs to sand control engineering technical field.In desert treatment, it is widely used net grid sand-protecting barrier, sandbag sand-protecting barrier, straw checkerboard barrier sand-protecting barrier and implements the fixation to flowing desert, above-mentioned sand-protecting barrier there are many weak points, it is difficult to reach that easy construction, cost are low and sand-fixing effect is good.The present invention is according to the excellent weather-proof function of fillet Sand-fixation net, a rule interval 40cm is marked on desert to the construction line between 120cm, the center line of the fillet Sand-fixation net shakeout, overlapping, interval 10cm to 12cm parallel with construction line spreads out and puts on a fillet Sand-fixation net, Sand-fixation net is taken to insert embedding device, along construction line, fillet Sand-fixation net is inserted on desert successively, so embedding fillet Sand-fixation net is inserted along rule construction line, construction fillet Sand-fixation net sand-protecting barrier, reaches the purpose that easy construction, cost are low and sand-fixing effect is good.
Description
Technical field
The present invention relates to sand control engineering technical field, specially a kind of construction method of fillet Sand-fixation net sand-protecting barrier.
Background technology
At present, in desert treatment, net grid sand-protecting barrier, sandbag sand-protecting barrier, straw checkerboard barrier sand-protecting barrier is widely used and implements convection current
The fixation in dynamic desert, then plants psammophytes on the desert secured.Due to setting the straw transportation cost of straw checkerboard barrier very
Height, construction cost is also very high, and stalk straw checkerboard barrier will lose function of fixing the sand in 3 years because of weathering corrosion, makes the plant weight planted
Newly face by the condition of dust storm erosion;Net grid and sandbag sand-protecting barrier unit area building cost are more much higher than straw checkerboard barrier sand-protecting barrier, are big faces
The financial burden that product sand control engineering can not be born.The method that a kind of husky ridge of U-shaped Sand-fixation net is fixed the sand, U-shaped are provided before applicant
Sand-fixation net sand ridge sand-fixing effect is good, and cost is also reduced than net grid sand-protecting barrier, but because the section of U-shaped Sand-fixation net takes the shape of the letter U,
Construction is cumbersome, there is also the phenomenon being turned in moving dunes windward slope by eroding.Therefore, a kind of fillet Sand-fixation net is invented
The construction method of sand-protecting barrier, to overcome the defect of above-mentioned sand-protecting barrier, the need for being control of desert.
The content of the invention
The technical problem to be solved in the present invention and the technical assignment proposed are to overcome the defect of prior art there is provided one kind is narrow
The construction method of bar Sand-fixation net sand-protecting barrier.The construction method of fillet Sand-fixation net sand-protecting barrier, is according to " sand-protecting barrier at the top of the landforms of desert with mutually tying
Sediment trappings are closed fix the sand function law " principle analysis show that " sand-protecting barrier is fixed with being combined sediment trappings function of fixing the sand at the top of the landforms of desert
Rule " character express be:" sand-protecting barrier at the top of desert landforms (moving dunes, longitudinal dune, Sha Geng) is put, desert is flowed with fixed
Function, the size of function, equal to 1.42 times, the height of desert landforms adds the flat of sand-protecting barrier height sum at the top of desert landforms
Side, is multiplied by the length of sand-protecting barrier on contour at the top of the landforms of desert." its formulation is:
V=1.42 (H1+H2)2L
V is amount of drift sand in formula, and H1 is the height of desert landforms (moving dunes, sand bar, Sha Geng), and H2 is at the top of the landforms of desert
The height of sand-protecting barrier, L is the length of sand-protecting barrier on contour at the top of the landforms of desert.
1.42 data in formula, are to constitute flowing according to the gradient angle of repose (maximum angle of repose is 35 ° of angles) of moving dunes
What the area statistics of sand dune section triangle were drawn, when moving dunes are (including recessed in longitudinal dune, Sha Geng, Sha Kan, grid sand-protecting barrier
Face) domatic somewhere, angle exceed angle of repose when, sand will be collapsed downwards, collapse to the gradient be less than angle of repose place, just from
So stop collapsing.
Straw checkerboard barrier sand-protecting barrier and sandbag grid sand-protecting barrier on desert fix the sand building site, one can see that sand-protecting barrier grid one by one
It is interior, it is the sand pit being recessed down one by one.The size of straw checkerboard barrier sand-protecting barrier it is general in 1m × 1m between 1.5m × 1.5m, strong wind
My god, the desert that strong wind punching is washed in a pan away in the sand in straw checkerboard barrier, straw checkerboard barrier will be recessed down, when the domatic gradient in straw checkerboard barrier exceedes
Angle of repose, domatic to collapse, the sand under straw checkerboard barrier will be collapsed to the pit in straw checkerboard barrier sand-protecting barrier, in some dusts storm mouthful, when
The Desert Sand of straw checkerboard barrier inside recess, is washed in a pan away, the sand under straw checkerboard barrier sand-protecting barrier, just the pit constantly into straw checkerboard barrier sand-protecting barrier by continuous punching
Collapse, once the sand below straw checkerboard barrier sand-protecting barrier is by naughty sky, straw checkerboard barrier sand-protecting barrier just disintegrates.This phenomenon is being provided with straw checkerboard barrier sand
Hinder the dust storm mouthful in building site, be very common.Such phenomenon is fixed the sand building site in sandbag grid sand-protecting barrier, shows more prominent, former
It is bigger than straw checkerboard barrier because being the specification of sandbag grid sand-protecting barrier, typically in 1.5m × 1.5m between 2m × 2m, strong wind day sandbag grid
Pit in sand-protecting barrier, can firmly get many, the sandbag grid sand-protecting barrier on the windward slope of desert, strong wind than the pit in straw checkerboard barrier sand-protecting barrier
It is washed in a pan away due to husky constantly rushed by strong wind in sandbag grid, and the sand below sandbag sand-protecting barrier just constantly collapses to the pit of sandbag grid
Fall into, sandbag is fallen into hole therewith, and sandbag dune work just becomes in disorder.
, can according to " sand-protecting barrier be combined at the top of the landforms of desert sediment trappings fix the sand function law " and the angle number that stops on sand dune
To calculate:Pit in 2m × 2m grid sand-protecting barriers, depth about 60cm.Pit in 1m × 1m grid sand-protecting barriers, depth about 30cm,
Pit in 0.5m × 0.5m grid sand-protecting barriers, depth about 15cm.To desert fix the sand building-site detection, conclusion is also what is be consistent.
As can be seen here, the interval between sand-protecting barrier is smaller, by erosion into pit also Yue , the foundation of sand-protecting barrier is more firm.Therefore, U is worked as
The spacing on the shape Sand-fixation net sand ridge, during more than 1m, especially in windward slope, can equally be collapsed by erosion.If reducing U-shaped Sand-fixation net
The spacing on the husky ridge, must increase engineering cost, therefore, manufacture experimently miscellaneous new sand-protecting barrier, to reduce construction costs, improve engineering
Quality, is the routine work of applicant these years.
By month after month being contrasted on desert to various sand-protecting barrier repetition tests throughout the year, it has been found that wide cut 17cm, long 3m
Vertical insert of Sand-fixation net horizontal direction to 10m is embedded on the windward slope of moving dunes, and strong wind day, Sand-fixation net is rushed by strong wind soon
Wash in a pan out, included away by wind.Identical wide cut, long 12cm fillet Sand-fixation net, horizontal direction is vertically inserted and is embedded in meeting for moving dunes
On wind slope, strong wind, but see that fillet Sand-fixation net is safe and sound several times is undergone, the Desert Sand on fillet Sand-fixation net periphery is walked by strong wind erosion
, top of the top margin as a sand hill of fillet Sand-fixation net, this fillet Sand-fixation net not only ensure that inherently safe, also fixed
Desert Sand one small sand hill of formation around firmly.This is an of great value discovery, and this finds explanation potting on desert
Sand-fixation net, length is longer, is more subject to wind erosion and includes race by strong wind, the fillet Sand-fixation net for being about 12cm is just very safe.According to
This finds that people can be Sand-fixation net cutting into the fillet that length is 10cm to 12cm, the parallel direction interval 10cm on desert
An embedding fillet Sand-fixation net is inserted to 12cm, fillet Sand-fixation net sand-protecting barrier of constructing so not only may insure the safety of Sand-fixation net sand-protecting barrier,
The consumption of Sand-fixation net can also be greatly lowered, the cost of dune work is greatly lowered.
Followed by the safe spacing understood fully on desert between a rule fillet Sand-fixation net sand-protecting barrier, in moving dunes windward slope
On, the sand-protecting barrier of direction windward can form huge turbulent erosive force, it is therefore necessary to grasp forward and backward sand-protecting barrier to sand-protecting barrier below
Between safe spacing.By test, on the windward slope of moving dunes, according to gradient size, between fillet Sand-fixation net sand-protecting barrier
Spacing 40cm between 50cm selection be safe, on gentle desert, the spacing between fillet Sand-fixation net sand-protecting barrier exists
70cm is safe to being selected between 150cm.
Followed by be produced on desert insert embedding fillet Sand-fixation net special equipment --- fillet Sand-fixation net inserts embedding device and fillet
Sand-fixation net inserts embedding machine.Fillet Sand-fixation net inserts embedding device for manpower instrument, is made up of slugging, pedal, arch connector, handle,
Concrete structure division is illustrated.Fillet Sand-fixation net insert embedding machine by engine, support, fuselage, drive disk assembly, direction controlling part, insert
Embedding wheel, fillet Sand-fixation net conveyer composition, concrete structure division are illustrated.
A kind of construction method of fillet Sand-fixation net sand-protecting barrier, it is characterised in that:Fillet Sand-fixation net be wide cut in 20cm to 36cm,
Between, length in 10cm between 12cm, plastic wire of the porosity between 10% to 25%.
According to landforms on desert, the standardized rule is constructed line, and construction line can be interval 40cm to straight between 120cm
Line or curve, can be continuous or sectional;The center line of the fillet Sand-fixation net shakeout, with
Construct line it is parallel it is overlapping, interval 10cm to 12cm spread out a fillet Sand-fixation net, take Sand-fixation net to insert embedding device, along construction line, successively
Fillet Sand-fixation net is inserted and is embedded on desert, the top margin of fillet Sand-fixation net is flushed with desert, then slightly swings and inserts embedding instrument, promote
Fillet Sand-fixation net is combined closely with Desert Sand, make fillet Sand-fixation net is V-shaped to be embedded on desert, so constructed along a rule
Line inserts embedding fillet Sand-fixation net, fillet Sand-fixation net sand-protecting barrier of constructing.
Beneficial effect
Scientific discovery can drive scientific and technological progress, and the present invention is the fillet Sand-fixation net being embedded on desert is inserted, with powerful anti-
The phenomenon for function of eroding, with inserting on embedding fillet Sand-fixation net sand-protecting barrier, has not only saved the Sand-fixation net of fillet Sand-fixation net interval,
The Resistance to wind Erosion of Sand-fixation net sand-protecting barrier is also enhanced, the cost that engineering is fixed the sand can be both greatly lowered, can be increased substantially again solid
The weather-proof quality and sand-fixing effect of husky engineering.
Brief description of the drawings
Fig. 1 is the fillet Sand-fixation net schematic front view of present invention construction fillet Sand-fixation net sand-protecting barrier.
Fig. 2 inserts the fillet Sand-fixation net schematic front view being embedded on desert for the present invention.
Fig. 3 inserts the fillet Sand-fixation net schematic cross-section being embedded on desert for the present invention.
Fig. 4 is layout schematic top plan view of the fillet Sand-fixation net sand-protecting barrier of the present invention on desert.
In accompanying drawing:1st, fillet Sand-fixation net, 2, construction line, 3, Desert Sand, 4, fillet Sand-fixation net sand-protecting barrier.
Embodiment
Now according to Figure of description, the invention will be further described:
As illustrated, a kind of construction method of fillet Sand-fixation net sand-protecting barrier of the invention, it is characterised in that:Fillet Sand-fixation net 1 is
Wide cut in 20cm to 36cm, between, length in 10cm between 12cm, plastic wire of the porosity between 10% to 25%.
According to landforms on desert, the standardized rule is constructed line 2, and construction line 2 can be interval 40cm to straight between 120cm
Line or curve, can be continuous or sectional;The center line of the fillet Sand-fixation net 1 shakeout,
Overlapping, interval 10cm to 12cm parallel with construction line 2 spreads out a fillet Sand-fixation net, takes Sand-fixation net to insert embedding device, along construction line 2,
Fillet Sand-fixation net 1 is inserted successively and is embedded on desert, the top margin of fillet Sand-fixation net 1 is flushed with desert, then slightly swings and inserts embedding
Instrument, promotes fillet Sand-fixation net 1 to be combined closely with Desert Sand 3, makes fillet Sand-fixation net 1 is V-shaped to be embedded on desert, so along
One rule construction line 2 inserts embedding fillet Sand-fixation net 1, construction fillet Sand-fixation net sand-protecting barrier 4.
Claims (2)
1. a kind of construction method of fillet Sand-fixation net sand-protecting barrier, it is characterised in that:Fillet Sand-fixation net be wide cut in 20cm to 36cm, it
Between, length in 10cm between 12cm, plastic wire of the porosity between 10% to 25%.
2. according to landforms on desert, standardized rule construction line, construction line can be spaced 40cm to the straight line between 120cm,
It can also be curve, can be continuous or sectional;The center line of the fillet Sand-fixation net shakeout, with applying
Work line it is parallel it is overlapping, interval 10cm to 12cm spread out a fillet Sand-fixation net, take Sand-fixation net to insert embedding device, along construction line, successively
Fillet Sand-fixation net is inserted and is embedded on desert, the top margin of fillet Sand-fixation net is flushed with desert, is then slightly swung and is inserted embedding instrument, promotes
Fillet Sand-fixation net is combined closely with Desert Sand, makes fillet Sand-fixation net is V-shaped to be embedded on desert, so along rule construction line
Embedding fillet Sand-fixation net is inserted, fillet Sand-fixation net sand-protecting barrier of constructing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710499730.4A CN107119664A (en) | 2017-06-12 | 2017-06-12 | The construction method of fillet Sand-fixation net sand-protecting barrier |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710499730.4A CN107119664A (en) | 2017-06-12 | 2017-06-12 | The construction method of fillet Sand-fixation net sand-protecting barrier |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107119664A true CN107119664A (en) | 2017-09-01 |
Family
ID=59719964
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710499730.4A Pending CN107119664A (en) | 2017-06-12 | 2017-06-12 | The construction method of fillet Sand-fixation net sand-protecting barrier |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107119664A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110374081A (en) * | 2019-05-21 | 2019-10-25 | 中节能大地环境修复有限公司 | A kind of vegetative sand control net and its application method |
-
2017
- 2017-06-12 CN CN201710499730.4A patent/CN107119664A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110374081A (en) * | 2019-05-21 | 2019-10-25 | 中节能大地环境修复有限公司 | A kind of vegetative sand control net and its application method |
CN110374081B (en) * | 2019-05-21 | 2024-03-01 | 中节能大地环境修复有限公司 | Plant sand fixation net |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Nayak | Equilibrium profiles of model beaches | |
CN107119664A (en) | The construction method of fillet Sand-fixation net sand-protecting barrier | |
CN103696405B (en) | Herringbone mud-rock flow water and stone separating system designing method | |
CN106836205B (en) | The Macadam Pile Construction method suitable for saturated soft soil | |
CN208136890U (en) | A kind of constructing structure of fillet Sand-fixation net sand-protecting barrier | |
CN107119663A (en) | A kind of method for inserting embedding fillet Sand-fixation net construction camber line sand-protecting barrier | |
CN107119662A (en) | A kind of method for inserting embedding fillet Sand-fixation net construction splayed sand-protecting barrier | |
CN107268570A (en) | The constructing structure that outstanding bag sand-protecting barrier, grid sand-protecting barrier are combined with plantation | |
CN107326890A (en) | The method that embedding fillet Sand-fixation net construction Sand-fixation net grid is inserted at interval | |
CN104563086A (en) | 20cm high plastic net sand-protecting barrier device and arranging method | |
CN207003406U (en) | A kind of fillet Sand-fixation net | |
CN107190722A (en) | The method that embedding fillet Sand-fixation net construction segmentation sand-protecting barrier is inserted at interval | |
CN104596735B (en) | Optimal arrangement method of bridge group | |
CN107268571A (en) | The constructing structure that outstanding bag sand-protecting barrier, segmentation sand-protecting barrier are combined with plantation | |
CN208280140U (en) | A kind of T section support pile closing retaining design and its construction casing | |
CN108487219A (en) | A kind of width Sand-fixation net sand pier | |
CN203256752U (en) | Subway foundation ditch fender structure | |
CN203096686U (en) | Novel composite structure combining long piled wharf and shore-connecting structure | |
JP2018115492A (en) | Covering element | |
CN103835279B (en) | Outstanding pouch-shaped high vertical sediment trapping net fixes the construction method of moving dunes | |
CN209100054U (en) | It is a kind of backfill and consolidation grouting telescoping steel form pre-embedment grouting pipe structure | |
CN103556617B (en) | Outstanding bag shape high vertical sediment trapping net and construction method thereof | |
CN205296589U (en) | Steelframe for building and shear force wall | |
CN207176663U (en) | Fillet Sand-fixation net inserts embedding device | |
CN108396724A (en) | A kind of wide Sand-fixation net sand pier of arc |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20170901 |
|
WD01 | Invention patent application deemed withdrawn after publication |