CN105113423B - A kind of railway jacked frame bridge bridge tie changes construction method - Google Patents

A kind of railway jacked frame bridge bridge tie changes construction method Download PDF

Info

Publication number
CN105113423B
CN105113423B CN201510605778.XA CN201510605778A CN105113423B CN 105113423 B CN105113423 B CN 105113423B CN 201510605778 A CN201510605778 A CN 201510605778A CN 105113423 B CN105113423 B CN 105113423B
Authority
CN
China
Prior art keywords
bridge
tie
railway
bridge tie
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510605778.XA
Other languages
Chinese (zh)
Other versions
CN105113423A (en
Inventor
谷金明
李平
乔文禄
高荣峰
周俊保
谷剑
智凯毅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP
China Railway Sixth Group Co Ltd
Original Assignee
TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP
China Railway Sixth Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP, China Railway Sixth Group Co Ltd filed Critical TAIYUAN RAILWAY CONSTRUCTION Co Ltd ZHONGTIE 6-BUREAU GROUP
Priority to CN201510605778.XA priority Critical patent/CN105113423B/en
Publication of CN105113423A publication Critical patent/CN105113423A/en
Application granted granted Critical
Publication of CN105113423B publication Critical patent/CN105113423B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The present invention is specially a kind of railway jacked frame bridge bridge tie and changes construction method, in the presence of influence transport, labour intensity is big, operating efficiency is low and relatively costly when solving the problems, such as that existing bridge tie is changed.Before a, Framed underpass bridge, by railway ballast bottom Zha Pu to bridge floor, after the position that paves, thickness meet frame bridge condition in place, ram and clap closely knit;B, on the tiny fragments of stone, coal, etc. of bridge floor bottom by bridge tie by design requirement arranged for interval to specified location;After c, Framed underpass bridge are in place, a bridge tie is changed every six roots of sensation steel sleeper, often to change and go up railway ballast immediately after a bridge tie and make firm by ramming closely knit, after bridge tie stress is fully transmitted to bridge floor, then change next bridge tie;After the completion of d, the bridge tie of whole station track are all changed, after track stress is transformed into bridge tie and bridge floor completely, D beam girders are removed.The present invention need not block railway, and the influence to railway operation is minimized, and operation simplifies, easy to operate, improve efficiency of construction, while having prevented the phenomenon of easy generation potential safety hazard.

Description

A kind of railway jacked frame bridge bridge tie changes construction method
Technical field
The present invention relates to railway D type roof beam structure unoccupied orbital construction methods, specially a kind of railway jacked frame bridge bridge tie is changed Construction method.
Background technology
Because existing railway operation has not interruptibility, when frame-type bridges and culverts is built in Existing Railway Line increasing, jacking is commonly used Construction, i.e., in existing railway side prefabricated frame posture bridges and culverts, after bridge main body intensity reaches the 100% of design strength, to railroad track Reinforced, railway sleeper is removed simultaneously during reinforcing, shoveling jacking is started after reinforcing, finally reached frame bridge in place by design. After frame bridge is in place, removes track and reinforce, recover track circuit, while changing special bridge tie.
Traditional bridge tie changes construction method:Block railway 3 hours-take-off part -- dig railway ballast-take out steel sleeper-wear bridge Pillow-connection fastener -- backfill railway ballast-make railway ballast firm by ramming is closely knit.There is following weak point in the method:1st, block railway is needed to apply Work, it is larger on railways train operation transport influence;2nd, need to excavate railway ballast and backfill again, workload is big;3rd, block construction is general at night, Illumination is needed, construction inconvenience, work efficiency is low, high cost.
The content of the invention
The present invention in order to solve to exist when existing bridge tie is changed influence transport, labour intensity is big, operating efficiency is low and into This problem higher, there is provided a kind of railway jacked frame bridge bridge tie changes construction method.
The present invention adopts the following technical scheme that realization:A kind of railway jacked frame bridge bridge tie replacing construction method, a, Before Framed underpass bridge, by railway ballast bottom Zha Pu to bridge floor, after the position that paves, thickness meet frame bridge condition in place, ram and clap closely knit;b、 By bridge tie by design requirement arranged for interval to specified location on the tiny fragments of stone, coal, etc. of bridge floor bottom;After c, Framed underpass bridge are in place, every six roots of sensation steel Pillow change a bridge tie, often change a bridge tie after go up immediately railway ballast make firm by ramming it is closely knit, until bridge tie stress is fully transmitted to bridge floor Afterwards, then next bridge tie is changed;After the completion of d, the bridge tie of whole station track are all changed, track stress is transformed into bridge tie and bridge floor completely Afterwards, D beam girders are removed.
Traditional substitute mode is overturned using the processing step, it is not necessary to block railway, and operation simple and fast, overcome Existing bridge tie has that influence is transported, labour intensity is big, operating efficiency is low and relatively costly when changing.
Construction method of the present invention is rationally reliable, it is not necessary to block railway, the influence to railway operation is minimized, It is easy to operate and operation is greatly simplified, efficiency of construction is improve, while prevented night work easily pacifying The phenomenon of full hidden danger, construction cost is relatively low.
Specific embodiment
A kind of railway jacked frame bridge bridge tie changes construction method, before a, Framed underpass bridge, by railway ballast bottom Zha Pu to bridge Face, after the position that paves, thickness meet frame bridge condition in place, rams and claps closely knit;B, on the tiny fragments of stone, coal, etc. of bridge floor bottom by bridge tie press design requirement Arranged for interval is to specified location;After c, Framed underpass bridge are in place, a bridge tie is changed every six roots of sensation steel sleeper, often change a bridge tie Go up railway ballast immediately afterwards and make firm by ramming closely knit, after bridge tie stress is fully transmitted to bridge floor, then change next bridge tie;D, whole station track After the completion of bridge tie is all changed, after track stress is transformed into bridge tie and bridge floor completely, D beam girders are removed.

Claims (1)

1. a kind of railway jacked frame bridge bridge tie changes construction method, it is characterised in that:Using following steps:A, Framed underpass bridge Before, by railway ballast bottom Zha Pu to bridge floor, after the position that paves, thickness meet frame bridge condition in place, ram and clap closely knit;B, in the bridge floor bottom tiny fragments of stone, coal, etc. On by bridge tie by design requirement arranged for interval to specified location;After c, Framed underpass bridge are in place, one is changed every six roots of sensation steel sleeper Bridge tie, often to change and go up railway ballast immediately after a bridge tie and make firm by ramming closely knit, after bridge tie stress is fully transmitted to bridge floor, then changes down A piece bridge tie;After the completion of d, the bridge tie of whole station track are all changed, after track stress is transformed into bridge tie and bridge floor completely, D beams are removed Girder.
CN201510605778.XA 2015-09-22 2015-09-22 A kind of railway jacked frame bridge bridge tie changes construction method Expired - Fee Related CN105113423B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510605778.XA CN105113423B (en) 2015-09-22 2015-09-22 A kind of railway jacked frame bridge bridge tie changes construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510605778.XA CN105113423B (en) 2015-09-22 2015-09-22 A kind of railway jacked frame bridge bridge tie changes construction method

Publications (2)

Publication Number Publication Date
CN105113423A CN105113423A (en) 2015-12-02
CN105113423B true CN105113423B (en) 2017-06-09

Family

ID=54661517

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510605778.XA Expired - Fee Related CN105113423B (en) 2015-09-22 2015-09-22 A kind of railway jacked frame bridge bridge tie changes construction method

Country Status (1)

Country Link
CN (1) CN105113423B (en)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2701734B1 (en) * 1993-02-19 1995-04-07 Beauthier Jean Marie Process for the construction of works under an embankment to support a railway or the like.
CN102979041B (en) * 2012-12-26 2015-01-21 中铁七局集团郑州工程有限公司 Soft overhead reinforcing jacking method for construction of span box bridge of jacking block of underpass turnout group of railway
CN103437254B (en) * 2013-09-07 2016-04-06 中铁六局集团有限公司 Framed underpass bridge railway trouble district track strengthening device
CN103643640B (en) * 2013-12-19 2015-06-17 中铁六局集团天津铁路建设有限公司 Jacking-first and line-reinforcement-second jacking construction method for frame bridge
CN103726451B (en) * 2014-01-16 2015-10-07 中铁六局集团有限公司 A kind of existing railway tears the construction method of beam bridge original position jacking framed bridge open
CN104612056B (en) * 2014-12-10 2016-06-29 中铁第四勘察设计院集团有限公司 The overall quickly pushing tow method for traversing of a kind of frame bridge

Also Published As

Publication number Publication date
CN105113423A (en) 2015-12-02

Similar Documents

Publication Publication Date Title
CN103375170B (en) Underground excavation construction deformation control method for three-hole small clear distance tunnel underpass trunk railway
CN206538637U (en) A kind of track strengthening device for existing railway
CN203130108U (en) Primary support structure of reinforced tunnel
CN101864963A (en) Large-section loess tunnel construction method
CN204385634U (en) Railway is not stopped transport the overall jacking mechanism of cross-line box culvert
CN104481546B (en) A kind of soft rock tunnel inclined shaft enters the construction method of the double curvature arch in positive hole
WO2020125503A9 (en) Recess structure for reinforcing connection between railway sleeper and track bed, and construction method
CN103452018B (en) Track gauge correction method for double-block type ballastless track construction
CN106087757A (en) A high position in box beam erection falls beam construction method
CN103939110A (en) Strengthening system for slight cracking of existing tunnel arch portion lining
CN102200019A (en) Tunnel boring machine middle-plate stepping reinforcing support mechanism and construction method thereof
CN104295301B (en) The construction method in a kind of shallow buried covered excavation cracked rock mass subway tunnel crosspoint
CN103953362A (en) Clearance-free strengthening system for serious cracks of existing tunnel arch lining
CN204825533U (en) Adopt existing circuit reinforcerment system of D type roof beam
CN204703922U (en) A kind ofly process the construction corollary equipment that Tunnel invades limit
CN206219897U (en) Medium-and low-speed maglev two-wire excavation location pile foundation combined type support rail beam transition section structure
CN104989419A (en) Tunnel early-stage support clearance-intrusion processing method and construction ancillary equipment of tunnel early-stage support clearance-intrusion processing method
CN104099872A (en) Railway-underneath-passed long-span box culvert longitudinal-picking transverse-lifting jacking construction method
CN105113423B (en) A kind of railway jacked frame bridge bridge tie changes construction method
CN103790176A (en) Embedded short strut structure and construction method thereof
CN203835407U (en) Arch lining slight-cracking reinforcing system for existing tunnel
CN108385456A (en) A kind of board-like ballastless track bed board integral replacing method of cast-in-place railway roadbed
CN203559311U (en) Steel bar truss sleeper
CN105019366A (en) Strengthening construction method for railway switch area line
CN204457786U (en) The large diameter shield tunnel that digs after the dismounting of a kind of B section of jurisdiction builds subway station

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170609

CF01 Termination of patent right due to non-payment of annual fee