CN105098777A - 农村配电网低电压辅助决策方法 - Google Patents
农村配电网低电压辅助决策方法 Download PDFInfo
- Publication number
- CN105098777A CN105098777A CN201510574484.5A CN201510574484A CN105098777A CN 105098777 A CN105098777 A CN 105098777A CN 201510574484 A CN201510574484 A CN 201510574484A CN 105098777 A CN105098777 A CN 105098777A
- Authority
- CN
- China
- Prior art keywords
- distribution network
- voltage
- low
- distribution
- power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 20
- 238000005259 measurement Methods 0.000 claims abstract description 14
- 230000005611 electricity Effects 0.000 claims description 14
- 238000004364 calculation method Methods 0.000 claims description 9
- 230000007935 neutral effect Effects 0.000 claims description 3
- 230000035945 sensitivity Effects 0.000 claims description 3
- 238000004519 manufacturing process Methods 0.000 abstract description 5
- 238000004458 analytical method Methods 0.000 description 4
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
本发明提供的一种农村配电网低电压辅助决策方法,包括如下步骤:S1.获取配电网的系统参数和实测参数;S2.根据配电网络拓扑结构和台区拓扑结构,建立配电网模型,并根据配电网模型、系统参数和实测参数通过潮流计算确定整个配电网络的潮流分布,其中,配电网模型划分为中压网络和台区网络;S3.根据整个配电网络的潮流分布,分析农村配电网的低压原因,根据低压原因作出消除农村低电压的辅助决策,能够对农村配电网中的低电压原因进行准确分析,从而针对于造成低电压的原因提出具有针对性的解决方案,保证治理后的电压质量满足农村居民的生产和生活要求。
Description
技术领域
本发明涉及一种决策方法,尤其涉及一种农村配电网低电压辅助决策方法。
背景技术
在农村配电网(10kV、380/220V)中,存在着低电压问题,会直接导致农村居民的生产和生活造成影响,现有技术中,由于农村配电网中的线路和台区众多,难以对造成低电压的原因进行准确的分析,从而不能做出针对于低电压问题提出准确的指导决策。
因此,需要提出一种农村配电网低电压辅助决策方法,能够对农村配电网中的低电压原因进行准确分析,从而针对于造成低电压的原因提出具有针对性的解决方案,保证治理后的电压质量满足农村居民的生产和生活要求。
发明内容
有鉴于此,本发明的目的是提供一种农村配电网低电压辅助决策方法,能够对农村配电网中的低电压原因进行准确分析,从而针对于造成低电压的原因提出具有针对性的解决方案,保证治理后的电压质量满足农村居民的生产和生活要求。
本发明提供的一种农村配电网低电压辅助决策方法,包括如下步骤:
S1.获取配电网的系统参数和实测参数;
S2.根据配电网络拓扑结构和台区拓扑结构,建立配电网模型,并根据配电网模型、系统参数和实测参数通过潮流计算确定整个配电网络的潮流分布,其中,配电网模型划分为中压网络和台区网络;
S3.根据整个配电网络的潮流分布,分析农村配电网的低压原因,根据低压原因作出消除农村低电压的辅助决策。
进一步,步骤S1中,配电网的系统参数包括:配电网拓扑结构、配电线路型号、配电线路长度、配电变压器型号以及配电变压器容量;
实测参数通过在配电网中测量点获得,具体包括:电压、电流、有功功率以及无功功率。
进一步,步骤S2中,潮流计算采用迭代回推计算法,其中,对于中压网络,采用单相潮流计算法,对于台区网络采用三相潮流计算法。
进一步,步骤S3中,辅助决策包括如下决策:
S31.中压配电线路的线径较小的导线导致农村电网低电压,更换线径较大的导线;
S32.配电线路过长且供电半径大,末端用户低电压,增加变电站的数量;
S33.无功容量配置不足,无功功率在配电线路上传输导致配电线路上压降大,在配电线路上无功补偿以及在配变低压侧无功补偿;
S34.配电变压器分接头分配位置不合理造成低电压,调整分接头档位;
S35.配电网中每相的负荷量接入不合理和/或每相的负荷不同时性造成三相负荷不平衡,中性点电压偏移,调整负荷接入相别。
进一步,步骤S33中,无功补偿包括:补偿点选取和补偿容量配置,其中,补偿点按照如下方式选取:按照配电网的网损灵敏度和无功裕度倒数由大到小的的原则,在容量大于100kVA配变低压侧选择补偿点,在主干线路上选取1或2个补偿点为无功补偿候选节点。
本发明的有益效果:本发明的农村配电网低电压辅助决策方法,能够对农村配电网中的低电压原因进行准确分析,从而针对于造成低电压的原因提出具有针对性的解决方案,保证治理后的电压质量满足农村居民的生产和生活要求。
附图说明
下面结合附图和实施例对本发明作进一步描述:
图1为本发明的流程图。
具体实施方式
图1为本发明的流程图,如图所示,本发明提供的一种农村配电网低电压辅助决策方法,包括如下步骤:
S1.获取配电网的系统参数和实测参数;
其中,配电网的系统参数包括:配电网拓扑结构、配电线路型号、配电线路长度、配电变压器型号以及配电变压器容量;
实测参数通过在配电网中测量点获得,具体包括:电压、电流、有功功率以及无功功率。
S2.根据配电网络拓扑结构和台区拓扑结构,建立配电网模型,并根据配电网模型、系统参数和实测参数通过潮流计算确定整个配电网络的潮流分布;其中,配电网模型划分为中压网络和台区网络;潮流计算采用迭代回推计算法,其中,对于中压网络,采用单相潮流计算法,由于台区网络采用三相四线制供电,造成三相负荷不平衡的现象比较明显,因此对于台区网络采用三相潮流计算法,通过这两部分的计算,即可得到整个配电网络的潮流分布,提高对低压原因分析以及决策的准确性,配电网模型可以采用现有的模型;
需要指出的是:中压网络是指从配电网中的变电站低压侧10kV母线至各配电变压器低压侧的网络,配电变压器作为负荷点;台区网络是指从配电变压器的低压侧至各末端用户,用户作为负荷点。
S3.根据整个配电网络的潮流分布,分析农村配电网的低压原因,根据低压原因作出消除农村低电压的辅助决策。
其中,辅助决策包括如下决策:
S31.中压配电线路的线径较小的导线导致农村电网低电压,更换线径较大的导线;
S32.配电线路过长且供电半径大,末端用户低电压,造成此种原因在于农村配电网受地形、负荷分散等因素的影响,常常需要长距离配电线路向负荷供电,供电半径较大;因此,可以通过增加变电站的数量改善低压问题,其中,变电站的设置位置选择在10kV主干线电压降落1/2处;
S33.无功容量配置不足,无功功率在配电线路上传输导致配电线路上压降大,在配电线路上无功补偿以及在配变低压侧无功补偿,无功补偿包括:补偿点选取和补偿容量配置,其中,补偿点按照如下方式选取:按照配电网的网损灵敏度和无功裕度倒数由大到小的的原则,在容量大于100kVA配变低压侧选择补偿点,在主干线路上选取1或2个补偿点为无功补偿候选节点;
S34.配电变压器分接头分配位置不合理造成低电压,调整分接头档位;
S35.配电网中每相的负荷量接入不合理和/或每相的负荷不同时性造成三相负荷不平衡,中性点电压偏移,调整负荷接入相别,其中,当负荷不平衡度小于15%,则通过调整负荷改善低电压,降低不平衡度;当负荷调整不能调整而且不平衡度大于25%,则通过调补方式进行补偿,改善三相不平衡。
最后说明的是,以上实施例仅用以说明本发明的技术方案而非限制,尽管参照较佳实施例对本发明进行了详细说明,本领域的普通技术人员应当理解,可以对本发明的技术方案进行修改或者等同替换,而不脱离本发明技术方案的宗旨和范围,其均应涵盖在本发明的权利要求范围当中。
Claims (5)
1.一种农村配电网低电压辅助决策方法,其特征在于:包括如下步骤:
S1.获取配电网的系统参数和实测参数;
S2.根据配电网络拓扑结构和台区拓扑结构,建立配电网模型,并根据配电网模型、系统参数和实测参数通过潮流计算确定整个配电网络的潮流分布,其中,配电网模型划分为中压网络和台区网络;
S3.根据整个配电网络的潮流分布,分析农村配电网的低压原因,根据低压原因作出消除农村低电压的辅助决策。
2.根据权利要求1所述农村配电网低压辅助决策方法,其特征在于:步骤S1中,配电网的系统参数包括:配电网拓扑结构、配电线路型号、配电线路长度、配电变压器型号以及配电变压器容量;
实测参数通过在配电网中测量点获得,具体包括:电压、电流、有功功率以及无功功率。
3.根据权利要求1所述农村配电网低压辅助决策方法,其特征在于:步骤S2中,潮流计算采用迭代回推计算法,其中,对于中压网络,采用单相潮流计算法,对于台区网络采用三相潮流计算法。
4.根据权利要求1所述农村配电网低压辅助决策方法,其特征在于:步骤S3中,辅助决策包括如下决策:
S31.中压配电线路的线径较小的导线导致农村电网低电压,更换线径较大的导线;
S32.配电线路过长且供电半径大,末端用户低电压,增加变电站的数量;
S33.无功容量配置不足,无功功率在配电线路上传输导致线路上压降大,在配电线路上无功补偿以及在配变低压侧无功补偿;
S34.配电变压器分接头分配位置不合理造成低电压,调整分接头档位;
S35.配电网中每相的负荷量接入不合理和/或每相的负荷不同时性造成三相负荷不平衡,中性点电压偏移,调整负荷接入相别。
5.根据权利要求4所述农村电网低压辅助决策方法,其特征在于:步骤S33中,无功补偿包括:补偿点选取和补偿容量配置,其中,补偿点按照如下方式选取:按照配电网的网损灵敏度和无功裕度倒数由大到小的的原则,在容量大于100kVA配变低压侧选择补偿点,在主干线路上选取1或2个补偿点为无功补偿候选节点。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510574484.5A CN105098777A (zh) | 2015-09-10 | 2015-09-10 | 农村配电网低电压辅助决策方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510574484.5A CN105098777A (zh) | 2015-09-10 | 2015-09-10 | 农村配电网低电压辅助决策方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105098777A true CN105098777A (zh) | 2015-11-25 |
Family
ID=54578645
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510574484.5A Pending CN105098777A (zh) | 2015-09-10 | 2015-09-10 | 农村配电网低电压辅助决策方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105098777A (zh) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105488621A (zh) * | 2015-11-29 | 2016-04-13 | 国家电网公司 | 电网实验室用降损节能分析和能效评测系统 |
CN105610169A (zh) * | 2016-03-15 | 2016-05-25 | 河南隆鑫电力设备有限公司 | 一种低压配电网电压控制系统及方法 |
CN106712051A (zh) * | 2017-01-17 | 2017-05-24 | 广东技术师范学院 | 低压配电台区分散无功补偿与扩大线径协调优化计算方法 |
CN106786633A (zh) * | 2017-03-24 | 2017-05-31 | 广东电网有限责任公司河源供电局 | 无功电压调节装置的配置方法和无功电压调节装置 |
CN109118124A (zh) * | 2018-09-26 | 2019-01-01 | 国网安徽省电力有限公司芜湖供电公司 | 一种基于特征识别的台区出口低电压原因诊断方法 |
CN110571702A (zh) * | 2019-10-17 | 2019-12-13 | 国网山西省电力公司阳泉供电公司 | 一种在农村小巷内配电网改造的方法 |
CN112003285A (zh) * | 2020-08-14 | 2020-11-27 | 贵州电网有限责任公司 | 一种电网电压优化调控方法 |
CN112383050A (zh) * | 2020-11-05 | 2021-02-19 | 国网山东省电力公司昌邑市供电公司 | 一种基于农村配变调档的辅助决策系统及方法 |
CN112396534A (zh) * | 2020-11-06 | 2021-02-23 | 国网山东省电力公司昌邑市供电公司 | 一种农村低电压用户诊断分析系统和方法 |
CN114336692A (zh) * | 2022-01-05 | 2022-04-12 | 国网浙江省电力有限公司永康市供电公司 | 一种基于仿真分析的台区电压优化系统及方法 |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102074954A (zh) * | 2010-12-20 | 2011-05-25 | 重庆电力科学试验研究院 | 一种城乡配电网综合节能评估与决策方法 |
-
2015
- 2015-09-10 CN CN201510574484.5A patent/CN105098777A/zh active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102074954A (zh) * | 2010-12-20 | 2011-05-25 | 重庆电力科学试验研究院 | 一种城乡配电网综合节能评估与决策方法 |
Non-Patent Citations (2)
Title |
---|
袁旭峰等: "基于前推回代三相潮流的低压台区理论线损计算研究", 《电测与仪表》 * |
黄芷定,邹玲玲: "如何解决农村配电网低电压问题的探讨", 《中国西部科技》 * |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105488621B (zh) * | 2015-11-29 | 2019-06-11 | 国家电网公司 | 电网实验室用降损节能分析和能效评测系统 |
CN105488621A (zh) * | 2015-11-29 | 2016-04-13 | 国家电网公司 | 电网实验室用降损节能分析和能效评测系统 |
CN105610169A (zh) * | 2016-03-15 | 2016-05-25 | 河南隆鑫电力设备有限公司 | 一种低压配电网电压控制系统及方法 |
CN105610169B (zh) * | 2016-03-15 | 2018-08-14 | 河南隆鑫电力设备有限公司 | 一种低压配电网电压控制系统及方法 |
CN106712051A (zh) * | 2017-01-17 | 2017-05-24 | 广东技术师范学院 | 低压配电台区分散无功补偿与扩大线径协调优化计算方法 |
CN106712051B (zh) * | 2017-01-17 | 2019-06-25 | 广东技术师范大学 | 低压配电台区分散无功补偿与扩大线径协调优化计算方法 |
CN106786633A (zh) * | 2017-03-24 | 2017-05-31 | 广东电网有限责任公司河源供电局 | 无功电压调节装置的配置方法和无功电压调节装置 |
CN109118124A (zh) * | 2018-09-26 | 2019-01-01 | 国网安徽省电力有限公司芜湖供电公司 | 一种基于特征识别的台区出口低电压原因诊断方法 |
CN109118124B (zh) * | 2018-09-26 | 2022-02-11 | 国网安徽省电力有限公司芜湖供电公司 | 一种基于特征识别的台区出口低电压原因诊断方法 |
CN110571702A (zh) * | 2019-10-17 | 2019-12-13 | 国网山西省电力公司阳泉供电公司 | 一种在农村小巷内配电网改造的方法 |
CN112003285A (zh) * | 2020-08-14 | 2020-11-27 | 贵州电网有限责任公司 | 一种电网电压优化调控方法 |
CN112383050A (zh) * | 2020-11-05 | 2021-02-19 | 国网山东省电力公司昌邑市供电公司 | 一种基于农村配变调档的辅助决策系统及方法 |
CN112396534A (zh) * | 2020-11-06 | 2021-02-23 | 国网山东省电力公司昌邑市供电公司 | 一种农村低电压用户诊断分析系统和方法 |
CN114336692A (zh) * | 2022-01-05 | 2022-04-12 | 国网浙江省电力有限公司永康市供电公司 | 一种基于仿真分析的台区电压优化系统及方法 |
CN114336692B (zh) * | 2022-01-05 | 2024-08-13 | 国网浙江省电力有限公司永康市供电公司 | 一种基于仿真分析的台区电压优化系统及方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105098777A (zh) | 农村配电网低电压辅助决策方法 | |
US11378994B2 (en) | Systems and methods for grid operating systems in electric power systems | |
CN104992009B (zh) | 基于多代理系统的主动配电网分布式电压控制方法 | |
CN104375035B (zh) | 一种节能设备能效测试方法 | |
Ali et al. | Wide area smart grid architectural model and control: A survey | |
CN103219727B (zh) | 基于pmu实测的分区电网结构动态调整方法 | |
CN111680084A (zh) | 一种基于多源数据融合的线损计算方法 | |
CN102882218B (zh) | 配电网无功/电压的静态集中与动态分布协调控制系统 | |
CN102244384A (zh) | 一种基于经济当量分析的主变压器优化运行方法 | |
CN101609989A (zh) | 一种城市电网供电充裕度计算系统 | |
CN103560497B (zh) | 一种基于电网拓扑调整的短路电流限制方法 | |
CN102118061A (zh) | 一种区域电网集中控制方法及系统 | |
CN102522742B (zh) | 基于单点量测信息的外网戴维南等值参数的估计方法 | |
CN113114497A (zh) | 一种低压台区拓扑自动识别方法 | |
CN103997035A (zh) | 电力变压器及线路经济运行闭环控制系统及方法 | |
Zhou et al. | An overview on distribution automation system | |
CN106487022A (zh) | 一种农村低电压治理方法 | |
CN105071429A (zh) | 基于电压偏差的分布式电源接入变电站的可行性分析方法 | |
CN105406465B (zh) | 一种基于负荷矩裕度的配电网台区状态分析方法 | |
CN110601176B (zh) | 一种电网联络线静态稳定极限提升和预警的方法及系统 | |
CN104319779A (zh) | 一种地区电网无功电压控制方法 | |
CN107767060B (zh) | 配网线路理论线损计算系统及方法 | |
Liu et al. | Modeling simulation technology research for distribution network planning | |
Wu et al. | Research on improvement of line loss algorithm based on three-phase unbalance degree | |
CN102868177B (zh) | 风电场并网点系统阻抗自动辨识及修正方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20151125 |