CN105089693A - Goaf-side-roadway-retaining wall roof-contact improving method - Google Patents

Goaf-side-roadway-retaining wall roof-contact improving method Download PDF

Info

Publication number
CN105089693A
CN105089693A CN201510572238.6A CN201510572238A CN105089693A CN 105089693 A CN105089693 A CN 105089693A CN 201510572238 A CN201510572238 A CN 201510572238A CN 105089693 A CN105089693 A CN 105089693A
Authority
CN
China
Prior art keywords
wall
roadway
side entry
coal
goaf
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510572238.6A
Other languages
Chinese (zh)
Other versions
CN105089693B (en
Inventor
郝胜鹏
陈勇
武立飞
白兰永
任茂林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201510572238.6A priority Critical patent/CN105089693B/en
Publication of CN105089693A publication Critical patent/CN105089693A/en
Application granted granted Critical
Publication of CN105089693B publication Critical patent/CN105089693B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a goaf-side-roadway-retaining wall roof-contact improving method, and belongs to the field of goaf-side-roadway-retaining roadway-side supporting. The method includes the steps that a floral tube or a hose with holes or two floral tubes or two hoses with holes is/are laid at the portion, behind a working face end support, of the middle of the upper portion of a roof of a preset filling body and fixed to the roof or coal, one end of each tube is plugged, and the other end of each tube is led out to an in-roadway roof; a goaf-side-roadway-retaining roadway-side wall is constructed through conventional high hydraulic material bag filling, conventional concrete pumping filling, masonry and the like, after the wall is completely constructed or solidified, high-concentration concrete or yellow mud or accelerated cement or the like is injected into the floral tubes or the hoses with the holes in a roadway, and gaps such as anchoring nets between the wall and the roofs are filled with slurry accordingly till slurry overflows from the portions between the filling body and the roofs/the coal. After being rapidly solidified, the slurry is compactly connected with the roofs, the supporting effect of the wall is achieved in time, the roadway retaining effect can be improved, and the goaf-side-roadway-retaining application range can be expanded. The method is simple in technology and convenient to operate; a goaf can be sealed in time, the in-roadway roof can be effectively supported, and the goaf-side roof can be cut off.

Description

A kind of gob side entry retaining body of wall that improves connects top method
Technical field
The present invention relates to a kind of gob side entry retaining body of wall that improves and connect top method, belong to gob side entry retaining roadside support field, be particularly useful for that gob side entry retaining body of wall that needs and goaf completely cut off is closely knit to be connect.
Background technology
Gob side entry retaining is that twice utilization is done in a tunnel, and it can improve resource recovery, and alleviate excavation replacement nervous, making rational use of resources, reduce costs, is a major reform of coal mining and layout of actual mining roadway technology.The other body of wall in current gob side entry retaining lane mainly adopts the methods such as the filling of high-water material pocket type, template concrete filling, soft mould concrete filling, spoil bag, building block.In order to increase the stability of the other wall body area top board in lane and ensure safety, usually above work plane front, support or work plane rear adopt roof bolting with bar and wire mesh body of wall top panel area, but the body of wall that employing aforesaid way is constructed is due to reasons such as top board net, anchor pole (rope) and constructions, normally be difficult to completely closely knitly connect top, the other body of wall in lane can not play immediate support lane inside ceiling panel and cut off the effect of goaf side top board, and gob side entry retaining maintenance effects is poor.Connect top effect for improving body of wall, scene adopts timber or spoil to stop for body of wall and top board space larger part and pushes up, and smaller part sprayed mortar or macromolecular material in lane connect top, but are difficult to body of wall to connect top completely.China Patent No. is: 201010282345.2 disclose " construction method that a kind of gob side entry retaining reinforces obturation structure ", adopt the filling of high-water material pocket type, the pressure of filling pump is utilized during filling, filling bag is heaved and fully touches top board coal and rock beds, although play certain effect, be still difficult to when there being bolting with wire mesh top board/coal connect real top board completely.Therefore how to improve gob side entry retaining body of wall connect top effect just become this domain engineering technician need solve problem.
Summary of the invention
Technical problem: the object of the invention is the weak point overcome in prior art, provide a kind of construct simple, labour intensity is little, immediate support lane inside ceiling panel and the gob side entry retaining body of wall that cuts off goaf side top board can connect top method.
Technical scheme: raising gob side entry retaining body of wall of the present invention connects top method, adopt anchor beam rete cord to above front, coal-face termination, support and work plane rear top board/coal carry out supporting; Comprise the following steps:
A. middle position above the space top board to be filled at coal-face face end support rear, lay 1 ~ 2 floral tube or pertusate flexible pipe, and being fixed on top board/coal, floral tube or pertusate flexible pipe one termination are blocked, another termination leads on the top board in gob side entry retaining tunnel;
B. the body of wall that the building method construction gob side entry retaining lane of high-water material filling is other is adopted;
C. after wall construction completes and solidifies, in gob side entry retaining tunnel, by draw floral tube or pertusate flexible pipe one end in space to be filled, inject concrete, yellow mud or accelerated cement slurries, the anchor beam rete cord space between body of wall and space top board to be filled is made to be filled with concrete slurry, top is connect and from till outwards overflowing between body of wall and top board/coal until concrete slurry, stop slip casting, what complete gob side entry retaining body of wall connects top operation.
The horizontal range in the lead distance wall outer side face of described floral tube or pertusate flexible pipe is not less than 300mm.
The described setting rate injecting concrete, yellow mud or accelerated cement in floral tube or pertusate flexible pipe is 15s ~ 120s.
Beneficial effect: owing to have employed technique scheme, the present invention is by middle position above the space top board to be filled at coal-face face end support rear, lay floral tube or pertusate flexible pipe, another termination of floral tube is led on the top board in gob side entry retaining tunnel, after gob side entry retaining body of wall completes, by the floral tube in gob side entry retaining that exposes or pertusate flexible pipe to gob side entry retaining wall internal injection, until slurries note connects the backward outer spilling in top; Compared with prior art: improve gob side entry retaining body of wall and connect top effect, and improve coal recovery rate, alleviate excavation replacement nervous, can make rational use of resources, reduce costs, have practicality widely in the art, major advantage has:
1, body of wall can be made and top board/coal is closely knit connects top, prevent roof delamination, support support in mine gateway in time and cut off goaf top plate;
2, simple, the highly versatile of technique, workman easily grasps; 3, security reliability is high.
Accompanying drawing explanation
Fig. 1 is example schematic of the present invention.
Fig. 2 is floral tube structural representation of the present invention.
In figure: 1-coal-face, 2-anchor beam rete cord, 3-space to be filled, 4-floral tube or pertusate flexible pipe, 5-body of wall, 6-concrete, yellow mud or accelerated cement slurries, 7-gob side entry retaining tunnel, 8-floral tube or flexible pipe hole.
Detailed description of the invention
Below in conjunction with accompanying drawing, one embodiment of the present of invention are further described:
Raising gob side entry retaining body of wall of the present invention connects top method, and concrete steps are as follows:
A. along with the propelling of coal-face 1, according to space to be filled 3 top boards/coal stable case, above front, coal-face 1 termination, support or work plane rear adopt 3 top boards/coal region, anchor beam rete cord 2 supporting space to be filled;
B. 1 ~ 2 floral tube or pertusate flexible pipe 4 are laid in space to be filled 3 top boards at coal-face 1 face end support rear/coal centre position, and be fixed on top board/coal, floral tube or pertusate flexible pipe 4 one termination are blocked, another termination leads on the top board in gob side entry retaining tunnel 7; The horizontal range of lead distance body of wall 5 lateral surface of floral tube or pertusate flexible pipe 4 is not less than 300mm;
The diameter of described floral tube or pertusate flexible pipe 4 is not more than 30mm, and hole diameter is not more than 8mm.Near the centre being close to preset obturation according to space to be filled 3 top boards/coal situation or appropriately adjust, be beneficial to better closely knitly connect top.
The other body of wall 5 in method construction gob side entry retaining lane such as c. adopt high-water material packed filling, concrete pumping filling, build by laying bricks or stones;
D. after the other body of wall 5 in lane has been constructed and solidified, in floral tube or pertusate flexible pipe 4, slurries or the coagulum 6 of concrete, yellow mud or accelerated cement is injected in gob side entry retaining tunnel 7, the material injected in floral tube or pertusate flexible pipe 4 is high concentration concrete, yellow mud, accelerated cement, there is the characteristic of rapid solidification, can in 15s ~ 120s rapid solidification.Made the spaces such as the anchor net between body of wall 5 and top board/coal be full of slurries by the floral tube on floral tube or pertusate flexible pipe 4 or flexible pipe hole 8; The closely knit effect connecing top, support lane inside ceiling panel and cut-out goaf side top board is played after slurries 6 solidify.

Claims (4)

1. improve gob side entry retaining body of wall and connect a top method, adopt anchor beam rete cord (2) to carry out supporting to above coal-face (1) front, termination, support or work plane rear; It is characterized in that comprising the following steps:
A. in space to be filled (3) top board/coal middle position at coal-face (1) face end support rear, lay 1 ~ 2 floral tube or pertusate flexible pipe (4), and be fixed on top board/coal, floral tube or pertusate flexible pipe (4) termination are blocked, another termination leads on the top board of gob side entry retaining tunnel (7);
B. the body of wall (5) that the building method construction gob side entry retaining lane of high-water material filling is other is adopted;
C. after body of wall (5) has been constructed and solidified, in gob side entry retaining tunnel (7), by floral tube or pertusate flexible pipe (4) one end injection concrete, yellow mud or the accelerated cement slurries (6) in space to be filled (3) of drawing, anchor beam rete cord (2) space between body of wall (5) and space to be filled (3) top board is made to be filled with concrete slurry, top is connect and from till outwards overflowing between body of wall (5) and top board/coal until concrete slurry, stop slip casting, what complete gob side entry retaining body of wall connects top operation.
2. one raising gob side entry retaining body of wall according to claim 1 connects top method, and it is characterized in that: the diameter of described floral tube or pertusate flexible pipe (4) is not more than 30mm, the diameter of floral tube or flexible pipe hole (8) is not more than 8mm.
3. one raising gob side entry retaining body of wall according to claim 1 connects top method, it is characterized in that: the horizontal range of lead distance body of wall (5) lateral surface of described floral tube or pertusate flexible pipe (4) is not less than 300mm.
4. one raising gob side entry retaining body of wall according to claim 1 connects top method, it is characterized in that: the described setting rate injecting concrete, yellow mud or accelerated cement in floral tube or pertusate flexible pipe (4) is 15s ~ 120s.
CN201510572238.6A 2015-09-09 2015-09-09 One kind improves gob side entry retaining wall and connects top method Expired - Fee Related CN105089693B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510572238.6A CN105089693B (en) 2015-09-09 2015-09-09 One kind improves gob side entry retaining wall and connects top method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510572238.6A CN105089693B (en) 2015-09-09 2015-09-09 One kind improves gob side entry retaining wall and connects top method

Publications (2)

Publication Number Publication Date
CN105089693A true CN105089693A (en) 2015-11-25
CN105089693B CN105089693B (en) 2017-07-04

Family

ID=54570924

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510572238.6A Expired - Fee Related CN105089693B (en) 2015-09-09 2015-09-09 One kind improves gob side entry retaining wall and connects top method

Country Status (1)

Country Link
CN (1) CN105089693B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105604552A (en) * 2015-12-21 2016-05-25 冀中能源集团有限责任公司 Solid material filling mining gob side entry retaining method
CN105909307A (en) * 2016-06-27 2016-08-31 六盘水师范学院 Low-coal-seam gob-side entry retaining method
CN108590655A (en) * 2018-03-27 2018-09-28 山东科技大学 Assemble the method that wall realizes gob side entry retaining
CN109184769A (en) * 2018-11-08 2019-01-11 陕西蓝山重工科技有限公司 A kind of soft mould filling mining bracket and its placement method
CN109944634A (en) * 2019-04-19 2019-06-28 中国矿业大学(北京) A kind of Seam Roof And Floor filling type goaf filling structure and its placement method
CN110700855A (en) * 2019-09-10 2020-01-17 太原理工大学 Method for preventing horizontal dislocation at high roof contact rate of gob-side entry retaining roadside support

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3300167A1 (en) * 1982-01-08 1983-07-21 Gewerkschaft Eisenhütte Westfalia, 4670 Lünen Arrangement for working steep deposits, in particular coal seams
CN101649744A (en) * 2009-08-27 2010-02-17 王晓利 Device and method for casting concrete continuous walls along gob-side entry retaining by mining working face
CN101929342A (en) * 2010-09-29 2010-12-29 西安科技大学 Gob-side entry retaining concrete partition wall construction mold bag and construction method thereof
CN102296987A (en) * 2011-09-02 2011-12-28 中国矿业大学 Roadside packing gob-side entry retaining soft medium top filling method
CN102587933A (en) * 2012-03-26 2012-07-18 兖州煤业股份有限公司 Gob-side entry retaining method using prefabricated walls

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3300167A1 (en) * 1982-01-08 1983-07-21 Gewerkschaft Eisenhütte Westfalia, 4670 Lünen Arrangement for working steep deposits, in particular coal seams
CN101649744A (en) * 2009-08-27 2010-02-17 王晓利 Device and method for casting concrete continuous walls along gob-side entry retaining by mining working face
CN101929342A (en) * 2010-09-29 2010-12-29 西安科技大学 Gob-side entry retaining concrete partition wall construction mold bag and construction method thereof
CN102296987A (en) * 2011-09-02 2011-12-28 中国矿业大学 Roadside packing gob-side entry retaining soft medium top filling method
CN102587933A (en) * 2012-03-26 2012-07-18 兖州煤业股份有限公司 Gob-side entry retaining method using prefabricated walls

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105604552A (en) * 2015-12-21 2016-05-25 冀中能源集团有限责任公司 Solid material filling mining gob side entry retaining method
CN105909307A (en) * 2016-06-27 2016-08-31 六盘水师范学院 Low-coal-seam gob-side entry retaining method
CN108590655A (en) * 2018-03-27 2018-09-28 山东科技大学 Assemble the method that wall realizes gob side entry retaining
CN108590655B (en) * 2018-03-27 2019-05-31 山东科技大学 Assemble the method that wall realizes gob side entry retaining
CN109184769A (en) * 2018-11-08 2019-01-11 陕西蓝山重工科技有限公司 A kind of soft mould filling mining bracket and its placement method
CN109944634A (en) * 2019-04-19 2019-06-28 中国矿业大学(北京) A kind of Seam Roof And Floor filling type goaf filling structure and its placement method
CN110700855A (en) * 2019-09-10 2020-01-17 太原理工大学 Method for preventing horizontal dislocation at high roof contact rate of gob-side entry retaining roadside support

Also Published As

Publication number Publication date
CN105089693B (en) 2017-07-04

Similar Documents

Publication Publication Date Title
CN105089693A (en) Goaf-side-roadway-retaining wall roof-contact improving method
WO2020192055A1 (en) Two-step grouting modified water-protective coal mining method for roof aquifers
CN103498696B (en) A kind of method from roadway in the roof grouting filling compacting goaf filling body
CN103161480B (en) Initiatively support the method for roadside packing gob side entry retaining
CN103899323B (en) A kind of construction method of shield crossing rail yard
CN107762533B (en) A kind of front pre-grouting method of high-pressure water-enriched weak surrounding rock mountain tunnel
CN109098733B (en) Rapid grouting reinforcement method for large-section tunnel in fracture zone rock stratum
CN103628911B (en) Work plane segmented gob-side entry retaining method is adopted/put to a kind of combining
CN106907177B (en) A kind of girdle gob side entry retaining roadside packing method for protecting support
CN104481568A (en) Fully mechanized caving face gob-side entry retaining process and ventilating method
CN203756230U (en) Mold bag type sealed retaining wall capable of being quickly formed
CN102966359A (en) Working face ventilation oxidization zone roof control method
CN104632220A (en) Mining method with adjustable and controllable structure size of gentle dip medium-thickness ore body strip column reconstructed stope
CN102619536B (en) Deep coal mine roadway grout body maintenance method
CN103321235A (en) Composite soil nailing wall slope support method
CN109538216A (en) Pass through mined out and subsidence area constructing tunnel technique
CN102619514B (en) Top-filled pillarless cornice end-wall sublevel caving method extraction technique
CN109538295A (en) Seal groundwater in mining area library system
CN104863588A (en) Advanced pier column pre-arranging gob-side entry retaining method
CN108797621A (en) A kind of water sealing structure and its construction method in rich water depth ovum gravel erratic boulder stratum front pre-grouting
CN205277446U (en) Colliery collecting space area roadway support device
CN102704950B (en) Support method used in passing water guide fracture structure in mine exploration
CN106988760A (en) Facility-sliding strata tunnel portal reinforcing construction and construction method
CN106401609A (en) Bottom plate pressure relief and reinforcement structure for controlling floor heave of deep roadway and construction method of bottom plate pressure relief and reinforcement structure
CN104295315A (en) Low coal seam gob-side entry retaining method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170704

Termination date: 20180909

CF01 Termination of patent right due to non-payment of annual fee