CN105064387A - 群桩基础抗推刚度调节方法 - Google Patents

群桩基础抗推刚度调节方法 Download PDF

Info

Publication number
CN105064387A
CN105064387A CN201510503976.5A CN201510503976A CN105064387A CN 105064387 A CN105064387 A CN 105064387A CN 201510503976 A CN201510503976 A CN 201510503976A CN 105064387 A CN105064387 A CN 105064387A
Authority
CN
China
Prior art keywords
stake
pile
thrust
stub
district
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510503976.5A
Other languages
English (en)
Other versions
CN105064387B (zh
Inventor
张兴其
杨家法
张乾坤
代迎立
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HEFEI MUNICIPAL DESIGN INSTITUTE Co Ltd
Original Assignee
HEFEI MUNICIPAL DESIGN INSTITUTE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEFEI MUNICIPAL DESIGN INSTITUTE Co Ltd filed Critical HEFEI MUNICIPAL DESIGN INSTITUTE Co Ltd
Priority to CN201510503976.5A priority Critical patent/CN105064387B/zh
Publication of CN105064387A publication Critical patent/CN105064387A/zh
Application granted granted Critical
Publication of CN105064387B publication Critical patent/CN105064387B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明涉及桩基工程领域,尤其是一种桩长差异较大的群桩基础抗推刚度调节方法,在推力方向短桩后半圆区域径向0.3m~0.5m范围内破碎基岩,形成桩后约束释放区,充填具有一定颗粒强度的级配粒料,并夯实;桩后约束释放区长度借助数值分析方法确定,可以调节桩长差异大的群桩基础抗推刚度的效果,解决了对基岩面起伏较大的场地,桩长差异较大的群桩基础在承受水平推力时,因桩基自身刚度不均,造成水平力分配不均的问题。

Description

群桩基础抗推刚度调节方法
技术领域
本发明涉及桩基工程领域,尤其是一种桩长差异较大的群桩基础抗推刚度调节方法。
背景技术
某些复杂的场地,常遇到基岩面起伏大,基岩强度高的地基,且基岩表面有较厚土层覆盖,对基岩切削整平难度较大,又需采用承受较大水平推力的群桩基础时,因桩长差异过大,会造成长桩分配的水平力小,其承载能力未充分发挥;而短桩分配的水平力很大,先发生破坏,从而发生整个体系垮塌的事故。
发明内容
有鉴于现有技术的上述缺陷,本发明主要针对基岩面起伏较大的场地,桩长差异较大的群桩基础在承受水平推力时,因桩基自身刚度不均,造成水平力分配不均的问题,而目的是在于提供一种桩长差异较大的群桩基础抗推刚度调节方法。
为实现上述目的,本发明的一种群桩基础抗推刚度调节方法,其方法步骤如下:
步骤一:初步假定桩长为h0+h1+h2,桩后约束根据实际基岩或覆盖土条件输入,在承台施加水平推力,建立承受水平推力的群桩基础进行三维数值分析;
步骤二:根据输出短桩和长桩的桩身剪力,判断每根桩的水平荷载分担情况;
步骤三:对于分担总水平推力80%以上的若干短桩,采取桩后释放区措施;
步骤四:顺推力方向,短桩桩后沿径向半圆范围破碎基岩,形成桩后约束释放区;
步骤五:在桩后约束释放区的破碎基岩空隙内,填入具有一定颗粒强度的级配粒料,并采用夯实措施,确保充填粒料达到中密状态;
步骤六:根据短桩在桩后释放区形成的新约束条件,更新步骤一建立的约束边界,短桩分担的水平荷载是否满足自身水平承载能力的要求;
步骤七:如不满足,调节桩后释放区长度重新输入数值模型,直至满足,最终确定短桩的桩后释放区长度及总桩长。
进一步的,在步骤一中,h0为承台以下基岩面以上残积土厚度,h1为桩后释放区长度,h2为嵌固长度,其中桩后释放区长度取2~3m。
进一步的,所述嵌固长度为桩径的1.5倍。
进一步的,在步骤四中,半圆范围为短桩桩后沿径向0.3m~0.5m。
本发明的有益效果:
由于采用上述方法,本发明在推力方向短桩后半圆区域径向0.3m~0.5m范围内破碎基岩,形成桩后约束释放区,充填具有一定颗粒强度的级配粒料,并夯实;桩后约束释放区长度借助数值分析方法确定,可以调节桩长差异大的群桩基础抗推刚度的效果。
以下将结合附图对本发明的构思、具体结构及产生的技术效果作进一步说明,以充分地了解本发明的目的、特征和效果。
附图说明
图1是发明优选实施例的平面示意图;
图2是图1的A-A剖视图;
图3是图1的B-B剖视图。
图中附图标记:1-短桩;2-承台;3-桩后释放区;4-级配粒料;5-长桩;6-基岩;7-覆盖土。
具体实施方式
以下结合附图和具体实施例对本发明提出的桩长差异较大的群桩基础抗推刚度调节方法作进一步详细说明。根据下面说明和权利要求书,本发明的优点和特征将更清楚。需说明的是,附图均采用非常简化的形式且均使用非精准的比率,仅用以方便、明晰地辅助说明本发明实施例的目的。
如图1所示,并结合图2和图3所示,本发明的方法包括:
步骤一:初步假定桩长为h0+h1+h2,桩后约束根据实际基岩6或覆盖土7条件输入,在承台施加水平推力D,建立承受水平推力D的群桩基础进行三维数值分析;
步骤二:根据输出短桩1和长桩5的桩身剪力,判断每根桩的水平荷载分担情况;
步骤三:对于分担总水平推力80%以上的若干短桩1,采取桩后释放区3措施;
步骤四:顺推力方向,短桩1桩后沿径向半圆范围破碎基岩6,形成桩后约束释放区3;
步骤五:在桩后约束释放区3的破碎基岩空隙内,填入具有一定颗粒强度的级配粒料4,并采用夯实措施,确保充填粒料达到中密状态;
步骤六:根据短桩1在桩后释放区3形成的新约束条件,更新步骤一建立的约束边界,短桩1分担的水平荷载是否满足自身水平承载能力的要求;
步骤七:如不满足,调节桩后释放区3长度重新输入数值模型,直至满足,最终确定短桩1的桩后释放区3长度及总桩长。
进一步的,在步骤一中,h0为承台以下基岩面以上残积土厚度,h1为桩后释放区长度,h2为嵌固长度,其中桩后释放区3长度取2~3m,嵌固长度为桩径的1.5倍。
作为优先方案,在步骤四中,半圆范围为短桩1桩后沿径向0.3m~0.5m,在推力方向短桩1后半圆区域径向0.3m~0.5m范围内破碎基岩6,形成桩后约束释放区3,充填具有一定颗粒强度的级配粒料4,并夯实;桩后约束释放区3长度借助数值分析方法确定,可以调节桩长差异大的群桩基础抗推刚度的效果。
由于采用上述方法,本发明在推力方向短桩后半圆区域径向0.3m~0.5m范围内破碎基岩,形成桩后约束释放区,充填具有一定颗粒强度的级配粒料,并夯实;桩后约束释放区长度借助数值分析方法确定,可以调节桩长差异大的群桩基础抗推刚度的效果。
以上详细描述了本发明的较佳具体实施例。应当理解,本领域的普通技术人员无需创造性劳动就可以根据本发明的构思做出诸多修改和变化。因此,凡本技术领域中技术人员依本发明的构思在现有技术的基础上通过逻辑分析、推理或者有限的实验可以得到的技术方案,皆应在由权利要求书所确定的保护范围内。

Claims (3)

1.一种群桩基础抗推刚度调节方法,至少包括以下步骤:
步骤一:初步假定桩长为h0+h1+h2,桩后约束根据实际基岩或覆盖土条件输入,在承台施加水平推力,建立承受水平推力的群桩基础进行三维数值分析;h0为承台以下基岩面以上残积土厚度,h1为桩后释放区长度,h2为嵌固长度,其中桩后释放区长度取2~3m;三维数值分析过程中,桩按照梁单元建模,桩与承台按刚接处理,水平荷载作用于承台,桩的边界条件输入按如下原则:h2顶面处桩端按固定端处理,残积土中的桩周边(h0)采用土弹簧模拟,土弹簧刚度根据土体物理力学参数和地质勘探判定特性、结合经验取值,桩后释放区h1处桩周边根据岩石破碎程度,采用弹簧模拟,弹簧刚度可参照碎石密实状态综合取值;
步骤二:上述三维数值模型经有限元程序处理后,在后处理数据中输出短桩和长桩的桩身剪力,判断每根桩的水平荷载分担情况;
步骤三:对于分担总水平推力80%以上的若干短桩,采取桩后释放区措施;
步骤四:顺推力方向,短桩桩后沿径向半圆范围破碎基岩,形成桩后约束释放区:在桩后约束释放区的破碎基岩空隙内,填入具有一定颗粒强度的级配粒料,并采用夯实措施,确保充填粒料达到中密状态,中密状态的判定可采用静力触探或标准贯入试验综合确定;
步骤五:根据短桩在桩后释放区形成的新约束条件,更新步骤一建立的约束边界,短桩分担的水平荷载是否满足自身水平承载能力的要求;
步骤六:如不满足,调节桩后释放区长度重新输入数值模型,直至满足,最终确定短桩的桩后释放区长度及总桩长。
2.根据权利要求2所述的一种群桩基础抗推刚度调节方法,其特征在于:在步骤一中,所述嵌固长度为桩径的1.5倍。
3.根据权利要求1所述的一种群桩基础抗推刚度调节方法,其特征在于:在步骤四中,半圆范围为短桩桩后沿径向0.3m~0.5m。
CN201510503976.5A 2015-08-17 2015-08-17 群桩基础抗推刚度调节方法 Active CN105064387B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510503976.5A CN105064387B (zh) 2015-08-17 2015-08-17 群桩基础抗推刚度调节方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510503976.5A CN105064387B (zh) 2015-08-17 2015-08-17 群桩基础抗推刚度调节方法

Publications (2)

Publication Number Publication Date
CN105064387A true CN105064387A (zh) 2015-11-18
CN105064387B CN105064387B (zh) 2017-03-01

Family

ID=54493874

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510503976.5A Active CN105064387B (zh) 2015-08-17 2015-08-17 群桩基础抗推刚度调节方法

Country Status (1)

Country Link
CN (1) CN105064387B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105976695A (zh) * 2016-06-15 2016-09-28 中国地质大学(武汉) 一种实体深基础法计算群桩基础承载力的教具
CN108463594A (zh) * 2016-03-30 2018-08-28 日铁住金建材株式会社 地基结构

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60115724A (ja) * 1983-11-29 1985-06-22 Nippon Kokan Kk <Nkk> 杭基礎
CN1876970A (zh) * 2005-06-10 2006-12-13 李仁平 长短桩正方单元组合型复合桩基
CN101270580A (zh) * 2007-03-23 2008-09-24 上海勘测设计研究院 一种软土地基的建筑桩基结构
CN202202318U (zh) * 2011-07-04 2012-04-25 绍兴文理学院 软土地基lcsg桩与堆载预压联合处理装置
CN203346750U (zh) * 2013-07-09 2013-12-18 中铁第四勘察设计院集团有限公司 一种深厚层松软土地区的长短桩桩筏结构路基
CN204059332U (zh) * 2014-05-30 2014-12-31 海南通程建筑工程有限公司 一种混凝土预制管桩与堆载预压软土地基处理装置

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60115724A (ja) * 1983-11-29 1985-06-22 Nippon Kokan Kk <Nkk> 杭基礎
CN1876970A (zh) * 2005-06-10 2006-12-13 李仁平 长短桩正方单元组合型复合桩基
CN101270580A (zh) * 2007-03-23 2008-09-24 上海勘测设计研究院 一种软土地基的建筑桩基结构
CN202202318U (zh) * 2011-07-04 2012-04-25 绍兴文理学院 软土地基lcsg桩与堆载预压联合处理装置
CN203346750U (zh) * 2013-07-09 2013-12-18 中铁第四勘察设计院集团有限公司 一种深厚层松软土地区的长短桩桩筏结构路基
CN204059332U (zh) * 2014-05-30 2014-12-31 海南通程建筑工程有限公司 一种混凝土预制管桩与堆载预压软土地基处理装置

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108463594A (zh) * 2016-03-30 2018-08-28 日铁住金建材株式会社 地基结构
CN105976695A (zh) * 2016-06-15 2016-09-28 中国地质大学(武汉) 一种实体深基础法计算群桩基础承载力的教具
CN105976695B (zh) * 2016-06-15 2019-01-01 中国地质大学(武汉) 一种实体深基础法计算群桩基础承载力的教具

Also Published As

Publication number Publication date
CN105064387B (zh) 2017-03-01

Similar Documents

Publication Publication Date Title
Yang et al. Annual variation of landslide stability under the effect of water level fluctuation and rainfall in the Three Gorges Reservoir, China
Jamsawang et al. Parameters affecting the lateral movements of compound deep cement mixing walls by numerical simulations and parametric analyses
Lu et al. Analytical models for consolidation of combined composite ground improved by impervious columns and vertical drains
CN110608054B (zh) 一种全断面法开挖隧道支护结构变形预测方法及装置
Nagula et al. Numerical modelling and validation of geosynthetic encased columns in soft soils with installation effect
Estabragh et al. Consolidation behavior of an unsaturated silty soil during drying and wetting
CN105064387A (zh) 群桩基础抗推刚度调节方法
Majedi et al. Effect of Reinforcement on stability and Settlement of Embankment: A finite element analysis of different kinds of reinforcing and construction conditions
Wang et al. In-situ monitoring and 3D numerical analysis of reinforced face behaviour of tunnel in composite strata by considering randomly-distributed rigid cobble granules
Liu et al. Experimental study on disaster mechanism of completely weathered granite landslide induced by extreme rainfall
Amarasinghe et al. The effect of lateral confinement on the settlement characteristics of shallow foundations on sand
CN112282849A (zh) 一种测量深埋隧洞衬砌外水压力的监测装置及方法
Bamane et al. Dam safety instrumentation
Jia et al. Centrifuge modeling and numerical analysis of reservoir bank landslides triggered by a fast two-step drop in water level
Wu A study of landslide body control of black bovine cave copper ore mining and beneficiation project
Zhong et al. Numerical analysis and research of entrance slope of shallow buried karst tunnel
Tabrizi A Note on Variability and Simplification in Geotechnical Models and Methods
Stacho NUMERICAL ANALYSIS OF STONE COLUMNS CREATED USING DIFFERENT TYPES OF COARSE–GRAINED MATERIAL
Brašnjić STABILITY ANALYSIS OF SLOPES ON NORTHERN OUTDOOR LANDFILL “DUBRAVA” COAL MINE “BANOVIĆI” USING THE METHOD OF DEFINITIVE ELEMENTS (MKE).
Marcelino et al. 3D Analysis of Montesinho CFRD using code-aster FEM program
Van Eekelen et al. Inversed triangular load distribution in a piled embankment, 3D model experiments, field tests, numerical analysis and consequences
Yesa et al. Slope Reinforcement using X Type Block in Precipitation
Brocca et al. Internal and Global Analysis of a Gabion Wall Using 2D and 3D Limit Equilibrium Analysis: A Comparison of Multiple Methods
Rameesha et al. Stability Analysis of Retaining Wall using GEO5 in Kuranchery
Zhu et al. Physical Model Test on the Deformation Mechanism of Reservoir Bank Slopes With Sand Layers Under Coupled Hydro-Mechanical Conditions

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 230041 Anhui province Hefei City Yingshang Road West, Yi Jing Road South colorful 16 storey office building, 17 floor, 18 floor

Applicant after: Hefei municipal engineering design and Research Institute Co. Ltd.

Address before: 230041 Anqing Road, Anhui, China, No. 85, No.

Applicant before: HEFEI MUNICIPAL DESIGN INSTITUTE CO., LTD.

COR Change of bibliographic data
GR01 Patent grant
GR01 Patent grant