CN105040905A - L-shaped concrete filled steel tubular special-shaped column being suitable for industrial production - Google Patents
L-shaped concrete filled steel tubular special-shaped column being suitable for industrial production Download PDFInfo
- Publication number
- CN105040905A CN105040905A CN201510232597.7A CN201510232597A CN105040905A CN 105040905 A CN105040905 A CN 105040905A CN 201510232597 A CN201510232597 A CN 201510232597A CN 105040905 A CN105040905 A CN 105040905A
- Authority
- CN
- China
- Prior art keywords
- steel plate
- concrete
- shaped
- lateral parts
- angle steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
The invention relates to an L-shaped concrete filled steel tubular special-shaped column being suitable for industrial production. The special-shaped column includes a steel plate, a penetrating long bolt and concrete. The steel plate includes an outer angle steel plate (5), an inner angle steel plate (6) and two edge channel steel plates (8). The outer angle steel plate (5) includes a corner part (5-1), two end parts (5-2) and two side parts (5-3). The inner angle steel plate (6) includes a corner part (6-1), two end parts (6-2) and two side parts (6-3). Through welding connection with the edge channel steel plates (8), the L-shaped special-shaped column is formed, wherein the corner and two end cross sections of the L-shaped special-shaped column are all square in shape. The two side parts (6-3) of the inner angle steel plate (6) and the two side parts (5-3) of the outer angle steel plate (5) are fixedly connected through the penetrating long bolt. Concrete is poured in the L-shaped special-shaped column. The special-shaped column is suitable for industrial production and can be quickly assembled in construction site.
Description
Art
The invention belongs to building structure technology field, relate to a kind of fabricated steel pipe concrete profiled pile.
Background technology
Encased structures is that fill concrete is formed in steel pipe, it utilizes steel pipe and the interaction of concrete bi-material in loading process, namely steel pipe is to the effect of contraction of core concrete, concrete is made to be in the state of three dimension stress, thus concrete strength is improved, ductility is improved; Meanwhile, due to concrete existence, can delay or avoid steel pipe too early cripling to occur, ensure giving full play to of steel performance.In the work progress of concrete filled steel tube, steel pipe as the formwork for placing of its core concrete, compared with steel concrete, can save formwork cost, accelerates speed of application.
It is little that the proposition of steel pipe concrete profiled pile has benefited from its sectional dimension, post and body of wall wide thus avoid and build bight and occur that salient angle affects the problem of house usable floor area and house fitting-up.In several years of past, steel pipe concrete profiled pile obtains certain development, also in some Practical Projects, obtains application.Widely used is at present the steel pipe concrete profiled pile that batten plate formula connects or lacing formula connects, the defect of these hetermorphiscal column is that factory process making is very loaded down with trivial details, be unfavorable for the suitability for industrialized production of batch, in addition in-site installation construction weld seam quantity is many, workload is large, and the quality of hetermorphiscal column can not be guaranteed.
Can not realize the problems such as industrialized mass production and in-site installation construction sequence be complicated to solve steel pipe concrete profiled pile, needing to seek one can realize industrialized mass production, on-the-spot again can the steel pipe concrete profiled pile form of Fast Installation construction.
Summary of the invention
The present invention aims to provide a kind of industrialized mass production that can be applicable to, assembly concrete-filled steel tube hetermorphiscal column that job site can be spliced fast.Technical scheme of the present invention is as follows:
Be applicable to a L shape steel pipe concrete profiled pile for suitability for industrialized production, this post comprises steel plate, through stay bolt, concrete; It is characterized in that, described steel plate comprises exterior angle steel plate (5), interior gusset (6) and two limits channel-section steel plate (8), exterior angle steel plate (5) comprises corner part (5-1), two ends (5-2) and two lateral parts (5-3), interior gusset (6) comprises corner part (6-1), two ends (6-2) and two lateral parts (6-3); Two lateral parts (6-3) consistent size of exterior angle steel plate (5) two lateral parts (5-3) and interior gusset (6), offer mutually corresponding bolt hole; Exterior angle steel plate (5) and the corresponding end of interior gusset (6) form L shape hetermorphiscal column afterwards by being welded to connect with limit channel-section steel plate (8), L shape hetermorphiscal column corner and two end cross-sectional are square, two lateral parts (6-3) of interior gusset are fixedly connected with by through stay bolt with two lateral parts (6-3) of exterior angle steel plate, in L shape hetermorphiscal column, be cast with concrete.
Beneficial effect of the present invention is as follows:
(1) suitability for industrialized production is applicable to, convenient processing and manufacture.The L shape pillar of whole building only need process the steel plate of several cross-sectional shape, as long as and correspondingly adjust the size of steel plate according to the size in pillar cross section and floor height.So just can be implemented in bulk production in factory, drastically increase production efficiency.
(2) weld seam quantity is few, and on-the-spot welding workload is little, and speed of application is fast, and the overall performance of hetermorphiscal column is good.Compared with the steel pipe concrete profiled pile connected with batten plate formula conventional in the market or lacing formula, weld seam quantity reduces in a large number, only need in the welding of steel plate junction, welding difficulty also greatly reduces, the residual stress meanwhile brought due to a large amount of welding and the impact of permanent set also reduce a lot, thus the overall performance of hetermorphiscal column is guaranteed.
(3) convenient with wall connecting.Post limit can not be stretched out in the two ends of bolt, but inside post limit, would not affect the connection of post and body of wall like this, makes construction more convenient.
Accompanying drawing explanation
Fig. 1 a, 1b, 1c, 1d are the floor map of Four types steel plate, and Fig. 1 a is exterior angle steel plate 5, Fig. 1 b be interior gusset 6, Fig. 1 c be limit steel plate 7, Fig. 1 d is limit channel-section steel plate 8;
Fig. 2 is the organigram of through stay bolt;
Fig. 3 a, 3b, 3c, 3d are respectively the schematic three dimensional views of the Four types steel plate that the present invention adopts;
Fig. 4 a, 4b, 4c are respectively L shape of the present invention, the schematic three dimensional views of T-shaped and cross tube concrete profiled pile;
Fig. 5 a, 5b, 5c are respectively L shape of the present invention, the generalized section of T-shaped and cross tube concrete profiled pile;
Fig. 6 a, 6b, 6c, 6d is the work progress schematic diagram of cross tube concrete profiled pile of the present invention, Fig. 6 a is schematic diagram steel plate good for prefabrication being installed at the scene location, through stay bolt is arranged on steel plate and the schematic diagram tightened by Fig. 6 b, and Fig. 6 c is the schematic diagram after welding, and Fig. 6 d is the schematic diagram after concreting.
In figure: 1, bolt hole, 2, weld seam, 3, concrete, 4, through stay bolt; 5, exterior angle steel plate (comprising corner part 5-1, two end 5-2 and two lateral parts 5-3), 6, interior gusset (comprises corner part 6-1, two end 6-2 and two lateral parts 6-3), 7, limit steel plate (comprising mid portion 7-1, two end 7-2 and two lateral parts 7-3); 8, limit channel-section steel plate
Detailed description of the invention
Below in conjunction with drawings and Examples, the present invention will be described.
The invention provides a series of assembly concrete-filled steel tube hetermorphiscal column form, adopt the steel plate of 4 kinds of different cross section types as shown in figures 1 and 3, form the steel pipe concrete profiled pile of different cross section type by the combination of the wherein steel plate of any several cross-sectional shape.4 block plates of 3 kinds of section forms being connected into steel pipe concrete profiled pile that cross sectional shape is L shape by the through stay bolt of butt weld and Fig. 2 or 6 block plates of 3 kinds of section forms are connected into steel pipe concrete profiled pile that cross sectional shape is T-shaped by butt weld and bolt or by butt weld and bolt, 8 block plates of 2 kinds of section forms are connected into cross sectional shape is criss-cross steel pipe concrete profiled pile, see Fig. 4 and Fig. 5, fluid concrete in the groove after steel plate has connected.Respectively the hetermorphiscal column of several form is described below:
Concrete filled steel tube L shape hetermorphiscal column, comprises steel plate, through stay bolt, concrete; Described steel plate comprises exterior angle steel plate 5, interior gusset 6 and 2 limit channel-section steel plates 8, and exterior angle steel plate 5 comprises corner part 5-1, two end 5-2 and two lateral parts 5-3, and interior gusset 6 comprises corner part 6-1, two end 6-2 and two lateral parts 6-3; Two lateral parts 6-3 consistent size of exterior angle steel plate 5 two lateral parts 5-3 and interior gusset 6, offer mutually corresponding bolt hole; Exterior angle steel plate 5 and the corresponding end of interior gusset 6 form L shape hetermorphiscal column afterwards by being welded to connect with limit channel-section steel plate 8, L shape hetermorphiscal column corner and two end cross-sectional are square, two lateral parts 6-3 of interior gusset are fixedly connected with by through stay bolt with two lateral parts 6-3 of exterior angle steel plate, in L shape hetermorphiscal column, be cast with concrete.
Concrete filled steel tube T-shaped hetermorphiscal column, this post comprises steel plate, through stay bolt, concrete; Described steel plate comprises the interior gusset 6 of limit steel plate 7, two and 3 limit channel-section steel plates 8, and limit steel plate 7 comprises mid portion 7-1, two end 7-2 and two lateral parts 7-3, and interior gusset 6 comprises corner part 6-1, two end 6-2 and two lateral parts 6-3; A lateral parts 6-3 consistent size of the interior gusset 6 of two lateral parts 7-3 respectively with two of limit steel plate 7, and offer mutually corresponding bolt hole; Another lateral parts 6-3 consistent size of two interior gussets 6, and offer mutually corresponding bolt hole, limit steel plate 7 and two interior gusset 6 sizes cooperatively interact, limit steel plate 7 and the corresponding end of interior gusset 6 are by being welded to connect rear formation T-shaped hetermorphiscal column with limit channel-section steel plate 8, T-shaped hetermorphiscal column is square at middle part and three end cross-sectional, between limit steel plate 7 and interior gusset 6 and interior gusset 6 corresponding lateral parts be each other fixedly connected with by through stay bolt, in T-shaped hetermorphiscal column, be cast with concrete.
Concrete filled steel tube cross hetermorphiscal column, this post comprises steel plate, through stay bolt, concrete; Described steel plate comprises 4 interior gussets 6 and 4 limit channel-section steel plates 8, and interior gusset 6 comprises corner part 6-1, two end 6-2 and two lateral parts 6-3; 4 interior gussets 6 and limit channel-section steel plate 8 size cooperatively interact, end and the limit channel-section steel plate 8 of adjacent interior gusset 6 are welded to connect and form cross hetermorphiscal column, be square at the center of cross hetermorphiscal column and 4 end cross-sectional, the lateral parts consistent size of corresponding interior gusset 6, offer bolt hole, and be fixedly connected with by through stay bolt, in cross hetermorphiscal column, be cast with concrete.
4 kinds of steel plate cross-sectional shape, wherein there is the steel plate of 3 kinds of cross-sectional shape on its two longer limit, have the bolt hole of two determining deviations side by side along the short transverse of steel plate, certain spacing should be left between steel plate when location installed at the scene by steel plate, thus can ensure that concrete is along the through cast of total cross-section, so just can make to be connected with enough torsional rigidities between each steel pipe.
Now for cross tube concrete profiled pile, site operation process is described.Due to the symmetry of star section, so only need the steel plate of two kinds of cross-sectional shape, the steel plate of two kinds of cross-sectional shape is respectively as shown in Fig. 1 b and Fig. 1 d.First, the steel plate that prefabrication is good installs location at the scene, as shown in Figure 6 a.After steel plate has been located, next through stay bolt is arranged on steel plate, has tightened, ensured the reliable connection between steel plate, as shown in Figure 6 b.Then, welder's welding, cross tube concrete profiled pile has 8 road weld seams, as fig. 6 c.Finally, concreting, as shown in fig 6d.Can find, whole installation process is very convenient and quick, drastically increases the speed of construction, has saved cost.
Claims (1)
1. be applicable to a L shape steel pipe concrete profiled pile for suitability for industrialized production, this post comprises steel plate, through stay bolt and concrete; It is characterized in that, described steel plate comprises exterior angle steel plate (5), interior gusset (6) and two limits channel-section steel plate (8), exterior angle steel plate (5) comprises corner part (5-1), two ends (5-2) and two lateral parts (5-3), interior gusset (6) comprises corner part (6-1), two ends (6-2) and two lateral parts (6-3); Two lateral parts (6-3) consistent size of exterior angle steel plate (5) two lateral parts (5-3) and interior gusset (6), offer mutually corresponding bolt hole; Exterior angle steel plate (5) and the corresponding end of interior gusset (6) form L shape hetermorphiscal column afterwards by being welded to connect with limit channel-section steel plate (8), L shape hetermorphiscal column corner and two end cross-sectional are square, two lateral parts (6-3) of interior gusset are fixedly connected with by through stay bolt with two lateral parts (6-3) of exterior angle steel plate, in L shape hetermorphiscal column, be cast with concrete.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510232597.7A CN105040905A (en) | 2015-05-07 | 2015-05-07 | L-shaped concrete filled steel tubular special-shaped column being suitable for industrial production |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510232597.7A CN105040905A (en) | 2015-05-07 | 2015-05-07 | L-shaped concrete filled steel tubular special-shaped column being suitable for industrial production |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105040905A true CN105040905A (en) | 2015-11-11 |
Family
ID=54447847
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510232597.7A Pending CN105040905A (en) | 2015-05-07 | 2015-05-07 | L-shaped concrete filled steel tubular special-shaped column being suitable for industrial production |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105040905A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105569269A (en) * | 2015-12-17 | 2016-05-11 | 中冶建筑研究总院有限公司 | Combined special-shaped column, structure system comprising combined special-shaped column and construction method of structure system |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE29702615U1 (en) * | 1997-02-14 | 1997-04-10 | Chen Chin Lung | Steel structure for civil engineering |
KR20080108880A (en) * | 2007-06-11 | 2008-12-16 | 이창남 | Trench forme method for the steel concrete column |
CN101565968A (en) * | 2009-05-27 | 2009-10-28 | 天津大学 | Direct assembly concrete-filled steel tube combined special-shaped column and production method thereof |
CN201433511Y (en) * | 2009-06-11 | 2010-03-31 | 中国京冶工程技术有限公司 | Lattice-type special-shaped steel pipe concrete column |
CN202544241U (en) * | 2012-01-10 | 2012-11-21 | 宁波大学 | Irregular steel pipe concrete column with limiting pulling rod |
CN103184782A (en) * | 2013-04-09 | 2013-07-03 | 广西大学 | L-shaped steel concrete special-shaped column of supporting angle steel framework |
CN103195212A (en) * | 2013-04-09 | 2013-07-10 | 广西大学 | T-shaped steel reinforced concrete special-shaped column of supporting steel frame |
CN104358357A (en) * | 2014-11-05 | 2015-02-18 | 沈阳建筑大学 | Star-section reinforced concrete combination column with reinforced with external angle steel |
CN204691073U (en) * | 2015-05-07 | 2015-10-07 | 天津大学 | L shape assembly concrete-filled steel tube hetermorphiscal column |
-
2015
- 2015-05-07 CN CN201510232597.7A patent/CN105040905A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE29702615U1 (en) * | 1997-02-14 | 1997-04-10 | Chen Chin Lung | Steel structure for civil engineering |
KR20080108880A (en) * | 2007-06-11 | 2008-12-16 | 이창남 | Trench forme method for the steel concrete column |
CN101565968A (en) * | 2009-05-27 | 2009-10-28 | 天津大学 | Direct assembly concrete-filled steel tube combined special-shaped column and production method thereof |
CN201433511Y (en) * | 2009-06-11 | 2010-03-31 | 中国京冶工程技术有限公司 | Lattice-type special-shaped steel pipe concrete column |
CN202544241U (en) * | 2012-01-10 | 2012-11-21 | 宁波大学 | Irregular steel pipe concrete column with limiting pulling rod |
CN103184782A (en) * | 2013-04-09 | 2013-07-03 | 广西大学 | L-shaped steel concrete special-shaped column of supporting angle steel framework |
CN103195212A (en) * | 2013-04-09 | 2013-07-10 | 广西大学 | T-shaped steel reinforced concrete special-shaped column of supporting steel frame |
CN104358357A (en) * | 2014-11-05 | 2015-02-18 | 沈阳建筑大学 | Star-section reinforced concrete combination column with reinforced with external angle steel |
CN204691073U (en) * | 2015-05-07 | 2015-10-07 | 天津大学 | L shape assembly concrete-filled steel tube hetermorphiscal column |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105569269A (en) * | 2015-12-17 | 2016-05-11 | 中冶建筑研究总院有限公司 | Combined special-shaped column, structure system comprising combined special-shaped column and construction method of structure system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2018214477A1 (en) | Prefabricated dual-steel-tube concrete shear wall, and assembly method therefor | |
CN102561717B (en) | Method for reinforcing brick-concrete structure by utilizing angle steel frame | |
CN107299683B (en) | Compound concrete-filled tubular column assembled docks node and connection method | |
WO2017177470A1 (en) | Assembly type steel pipe casing reinforced concrete combined joint and mounting method | |
CN106381925A (en) | Prefabricated reinforced concrete column and column splice joint with sleeves | |
CN204691076U (en) | L shape assembling combined special-shaped column | |
CN109339229B (en) | Prefabricated assembled concrete-filled steel tube frame structure of perforation thick liquid anchor | |
CN104847053A (en) | Concrete filled steel tube specially shaped column suitable for industrial production | |
CN103276795B (en) | Steel-concrete slab-column structure system | |
CN109372130A (en) | The novel full assembly concrete shaped section steel frame node of one kind and its construction method | |
CN110230370B (en) | Connecting structure, steel pipe concrete composite column and construction method | |
CN105544869A (en) | Steel pipe and concrete combination special-shaped column suitable for industrial production | |
CN206144032U (en) | Mosaic structure of assembled steel core concrete column and post | |
KR100951646B1 (en) | Manufacturing method of concrete filled double steel column | |
CN112112264A (en) | Prefabricated column connecting joint for dry connection and construction method | |
CN106437032A (en) | Assembled concrete filled steel tubular column splicing structure and method | |
CN103469902B (en) | Full rigid steel pipes concrete column connected node | |
CN204691074U (en) | T-shaped assembling combined special-shaped column | |
CN103104038A (en) | Rectangular tubular column jointing inner sleeve bolt connection node | |
CN208105477U (en) | Assembly concrete-filled steel tube column-isolated footing-concrete collar tie beam L shape connecting node | |
CN204691075U (en) | T-shaped assembly concrete-filled steel tube hetermorphiscal column | |
CN204691073U (en) | L shape assembly concrete-filled steel tube hetermorphiscal column | |
CN107237453B (en) | Steel pipe concrete composite column | |
CN111749346B (en) | Extension joint containing prefabricated concrete-filled steel tube core column component and construction method | |
CN108265823A (en) | Assembly concrete-filled steel tube column-isolated footing-concrete collar tie beam L-shaped connecting node |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20151111 |