CN202544241U - Irregular steel pipe concrete column with limiting pulling rod - Google Patents

Irregular steel pipe concrete column with limiting pulling rod Download PDF

Info

Publication number
CN202544241U
CN202544241U CN201220008976XU CN201220008976U CN202544241U CN 202544241 U CN202544241 U CN 202544241U CN 201220008976X U CN201220008976X U CN 201220008976XU CN 201220008976 U CN201220008976 U CN 201220008976U CN 202544241 U CN202544241 U CN 202544241U
Authority
CN
China
Prior art keywords
steel pipe
screw rod
concrete
irregular
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201220008976XU
Other languages
Chinese (zh)
Inventor
李俊华
唐跃锋
王国锋
邱栋梁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo University
Original Assignee
Ningbo University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo University filed Critical Ningbo University
Priority to CN201220008976XU priority Critical patent/CN202544241U/en
Application granted granted Critical
Publication of CN202544241U publication Critical patent/CN202544241U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The utility model provides an irregular steel pipe concrete column with a limiting pulling rod. The irregular steel pipe concrete column comprises an irregular steel pipe, wherein, concrete is filled in irregular steel pipe; a plurality of limiting pulling rods are arranged along the direction of the long side of the irregular steel pipe; and the irregular steel pipe concrete column is characterized in that the limiting pulling rods are the prestressed limiting pulling rods comprising high-strength bolt pairs with performance rating of 8.8 or 10.9; the bolt pairs comprise screws and caps; the irregular steel pipe is provided with screw holes, and the screws pass through the screw holes to be screwed with the caps; and gaskets are respectively arranged between the cap ends of the screws and the steel pipe wall of the irregular steel pipe as well as the caps and the steel pipe wall of the irregular steel pipe. The irregular steel pipe concrete column has the advantages that the prestressed limiting pulling rods are adopted and can be pre-pulled to generate a transverse pre-pressing force in the steel pipe wall and the core concrete before a component bears the load, thus the driven limitation can be transformed into the drive limitation to the steel pipe wall and the concrete, and the effects of the steel pipe and the concrete can be performed to the maximum, and as a result, the mechanical property of the steel pipe concrete column can be further improved.

Description

A kind of belt restraining pull bar special-shaped steel pipe concrete post
Technical field
The utility model relates to the Structural Engineering field in the civil engineering, especially relates to a kind of belt restraining pull bar special-shaped steel pipe concrete post.
Background technology
Steel core concrete column is because its good stress performance applied more and more in high level, super-high building structure.Compare with square steel tube concrete column with traditional circle; Odd-shaped cross section steel core concrete columns such as rectangle, L shaped, T shape, cross can satisfy the architectural plane arrangement requirement better; Effectively avoid the post angle to expose, increase the house and use headroom, therefore in the many engineerings of China, progressively obtained application.Yet in the special-shaped steel pipe concrete posts such as rectangle, L shaped, T shape, cross; Steel pipe walls is not so good as the round steel pipe concrete column to the effect of contraction that core concrete can provide; Profile iron pipe range limit under the load action is because flakiness ratio is relatively large; Cripling takes place more easily, so the bearing capacity of special-shaped steel pipe concrete post and ductility all are not so good as the round steel pipe concrete column.In order to improve the mechanical property of special-shaped steel pipe concrete post, there is the scholar to propose to form belt restraining pull bar steel core concrete column at the every layout constraints pull bar across a certain distance of member long side direction.Research shows, the layout of this binding bar can effectively delay the cripling of steel pipe walls, improves steel pipe walls to concrete effect of restraint, improves bearing of component and ductility, is the effective way of improving special-shaped steel pipe concrete post stress performance.
But common binding bar is a kind of passive bound to this effect of contraction of steel pipe walls and core concrete; Has only competence exertion effect after member produces certain expansion and lateral deformation; Can not bring into play steel pipe and concrete effect in maximum limit ground; Thereby make steel core concrete column at the stressed initial stage, be prone to deform, reduce its bearing capacity.
Summary of the invention
The utility model technical problem to be solved provides a kind of steel core concrete column avoided with the prestressing force binding bar at the stressed initial stage, deforms, and the stress performance that reduces its bearing capacity is good, the binding bar special-shaped steel pipe concrete post of easy construction.
The utility model solves the problems of the technologies described above the technical scheme that is adopted: a kind of belt restraining pull bar special-shaped steel pipe concrete post; Comprise chapped pipe; Be filled with concrete in the described chapped pipe; The long side direction of described chapped pipe is provided with several binding bars, and described binding bar is the prestressing force binding bar.
Described prestressing force binding bar do as one likes can grade be secondary composition of high-strength bolt of 8.8 grades or 10.9 grades; Described bolt pair comprises screw rod and nut; Described chapped pipe is provided with the screw rod duct, and described screw rod passes described screw rod duct and described nut bolt.
Be respectively arranged with pad between the cap end of described screw rod and the steel pipe walls of described chapped pipe and between the steel pipe walls of described nut and described chapped pipe, further increase bearing capacity.
The diameter in described screw rod duct is than the big 1-2 millimeter of diameter of described screw rod.
Described chapped pipe comprises rectangular steel pipe, L shaped steel pipe, teeprofile and cross steel pipe.
Compared with prior art, the advantage of the utility model is:
(1) improves bearing of component.The said prestressing force binding bar of the utility model at the stressed initial stage of special-shaped steel pipe concrete post, just can provide lateral support to steel pipe walls, can effectively prevent the cripling of steel pipe walls, thereby improves the bearing capacity of special-shaped steel pipe concrete post.
(2) improve the deformation of members ability.The said prestressing force binding bar of the utility model plays the prestressing force stirrup, at the stressed initial stage of special-shaped steel pipe concrete post, just to steel pipe inner core concrete initiatively constraint is provided, and effectively improves concrete intensity and ultimate deformation ability.
(3) reduce axial deformation under the member peak value load, improve the rigidity in early stage of member.The said prestressing force binding bar of the utility model, at the stressed initial stage of special-shaped steel pipe concrete post, the active constraint to steel pipe inner core concrete provides will reduce the axial deformation under the special-shaped steel pipe concrete post peak value load, improve the rigidity in early stage of member.
(4) easy construction.The said band prestressing force of the utility model binding bar special-shaped steel pipe concrete post; Its prestressing force binding bar is that high-strength bolt is secondary; Before the member load-bearing; In screw rod, produce pretension through tightening the secondary nut of high-strength bolt, by the pretension of screw rod steel pipe walls and core concrete are carried out precompressed, work progress makes things convenient for.
In sum; A kind of belt restraining pull bar of the utility model special-shaped steel pipe concrete post is drawn together different in nature steel core concrete column and prestressing force binding bar, adopts the prestressing force binding bar; Promptly before the member load-bearing; In steel pipe walls and core concrete, produce horizontal precompression thereby binding bar is carried out prestretching, then can this passive bound be changed into steel pipe walls and concrete active constraint, maximum limit ground performance steel pipe and concrete effect; Further improve the mechanical property of steel core concrete column, for the application of band prestressing force binding bar special-shaped steel pipe concrete post in building structure field provides technical support.
Description of drawings
Fig. 1 is the utility model band prestressing force binding bar rectangular steel-tube concrete column elevation;
Fig. 2 is the cross section cut-away view of Fig. 1;
Fig. 3 is the L shaped steel core concrete column elevation of the utility model band prestressing force binding bar;
Fig. 4 is the cross section cut-away view of Fig. 3;
Fig. 5 is the utility model band prestressing force binding bar teeprofile concrete column elevation;
Fig. 6 is the cross section cut-away view of Fig. 5;
Fig. 7 is the utility model band prestressing force binding bar cross steel core concrete column elevation;
Fig. 8 is the cross section cut-away view of Fig. 7.
Among the figure: 1, chapped pipe; 2, concrete; 3, screw rod; 4, nut; 5, pad.
The specific embodiment
Embodiment describes in further detail the utility model below in conjunction with accompanying drawing.
Specific embodiment
A kind of belt restraining pull bar of the utility model special-shaped steel pipe concrete post comprises chapped pipe 1, is filled with concrete 2 in the chapped pipe 1, and vertical long side direction of chapped pipe 1 is provided with 3 binding bars, and binding bar is the prestressing force binding bar.
In this specific embodiment, prestressing force binding bar do as one likes can grade be secondary composition of high-strength bolt of 8.8 grades or 10.9 grades, and the bolt pair comprises screw rod 3 and nut 4, and chapped pipe 1 is provided with the screw rod duct, and screw rod 3 passes screw rod duct and nut 4 bolts; Be respectively arranged with pad 5 between the cap end of screw rod 3 and the steel pipe walls of chapped pipe 1 and between the steel pipe walls of nut 4 and chapped pipe 1; The diameter in screw rod duct is than the big 1-2 millimeter of diameter of screw rod 3; Chapped pipe 1 comprises rectangular steel pipe (as shown in Figure 1), L shaped steel pipe (as shown in Figure 2), teeprofile (as shown in Figure 3) and cross steel pipe (as shown in Figure 4).Wherein the number of binding bar is except that 3, can also for 4,5,6 or the like several.
Preparation method
At first 4 block plates are welded into the chapped pipe 1 among Fig. 1, Fig. 2, Fig. 3 or Fig. 4, before the welding the local machine drilling of binding bar are being set, the aperture is looked screw rod 3 diameters and is decided, and than screw rod 3 big 1-2 millimeters, forms the screw rod duct; Fluid concrete 2 in the steel pipe walls of chapped pipe 1 then; With reference to Fig. 1, Fig. 2, Fig. 3, Fig. 4; Before fluid concrete 2; Earlier insert round steel or plastic round tube at place, screw rod duct, in the steel pipe walls of the diameter of round steel or plastic round tube and chapped pipe 1 diameter in screw rod duct about equally, then fluid concrete 2; After treating that concrete 2 intensity reach certain value, round steel or plastic round tube are extracted; Penetrate high-strength screw rod 3 from the screw rod duct and link to each other with nut 4, shimming 5 respectively between the steel pipe walls of the cap end of screw rod 3 and the steel pipe walls of chapped pipe 1 and nut 4 and chapped pipe 1 gets final product through special-purpose torque wrench tightening nuts 4.According to different force requests, the quantity of prestressing force binding bar and vertical, horizontal spacing scalable on the tube wall of chapped pipe 1.

Claims (5)

1. belt restraining pull bar special-shaped steel pipe concrete post; Comprise chapped pipe; Be filled with concrete in the described chapped pipe, the long side direction of described chapped pipe is provided with several binding bars, it is characterized in that: described binding bar is the prestressing force binding bar.
2. a kind of belt restraining pull bar special-shaped steel pipe concrete post according to claim 1; It is characterized in that: described prestressing force binding bar do as one likes can grade be secondary composition of high-strength bolt of 8.8 grades or 10.9 grades; Described bolt pair comprises screw rod and nut; Described chapped pipe is provided with the screw rod duct, and described screw rod passes described screw rod duct and described nut bolt.
3. a kind of belt restraining pull bar special-shaped steel pipe concrete post according to claim 2 is characterized in that: be respectively arranged with pad between the cap end of described screw rod and the steel pipe walls of described chapped pipe and between the steel pipe walls of described nut and described chapped pipe.
4. a kind of belt restraining pull bar special-shaped steel pipe concrete post according to claim 2 is characterized in that: the diameter in described screw rod duct is than the big 1-2 millimeter of diameter of described screw rod.
5. a kind of belt restraining pull bar special-shaped steel pipe concrete post according to claim 1, it is characterized in that: described chapped pipe comprises rectangular steel pipe, L shaped steel pipe, teeprofile and cross steel pipe.
CN201220008976XU 2012-01-10 2012-01-10 Irregular steel pipe concrete column with limiting pulling rod Expired - Fee Related CN202544241U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201220008976XU CN202544241U (en) 2012-01-10 2012-01-10 Irregular steel pipe concrete column with limiting pulling rod

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201220008976XU CN202544241U (en) 2012-01-10 2012-01-10 Irregular steel pipe concrete column with limiting pulling rod

Publications (1)

Publication Number Publication Date
CN202544241U true CN202544241U (en) 2012-11-21

Family

ID=47164894

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201220008976XU Expired - Fee Related CN202544241U (en) 2012-01-10 2012-01-10 Irregular steel pipe concrete column with limiting pulling rod

Country Status (1)

Country Link
CN (1) CN202544241U (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103541512A (en) * 2013-11-06 2014-01-29 安徽工业大学 Method for manufacturing fiber reinforce plastic (FRP) pipe and concrete special-shaped column with built-in steel pipe and high-strength concrete core column
CN103924740A (en) * 2014-04-10 2014-07-16 北京工业大学 H-shaped steel bone-confined concrete column with round steel draw bars and fabrication method of column
CN104847053A (en) * 2015-05-07 2015-08-19 天津大学 Concrete filled steel tube specially shaped column suitable for industrial production
CN104912206A (en) * 2015-05-29 2015-09-16 重庆大学 Special-shaped concrete filled steel tube column-I-shaped steal beam framework node
CN104947854A (en) * 2015-05-07 2015-09-30 天津大学 T-shaped concrete filled steel tube specially-shaped column applied to industrial production
CN105040905A (en) * 2015-05-07 2015-11-11 天津大学 L-shaped concrete filled steel tubular special-shaped column being suitable for industrial production
CN105350441A (en) * 2015-11-30 2016-02-24 广东工业大学 Concrete combined box beam internally provided with tie bar steel and box column
CN105507496A (en) * 2015-05-07 2016-04-20 天津大学 Special L-shaped concrete-filled steel tubular composite applicable to industrial production
CN105507495A (en) * 2015-05-07 2016-04-20 天津大学 Special T-shaped concrete-filled steel tubular composite column applicable to industrial production
CN105544869A (en) * 2015-05-07 2016-05-04 天津大学 Steel pipe and concrete combination special-shaped column suitable for industrial production
CN105714984A (en) * 2016-01-28 2016-06-29 广东工业大学 Square-and-special-shaped concrete filled steel tubular column with built-in circular tubes and tie bars and construction method thereof
CN106958322A (en) * 2017-04-24 2017-07-18 西安建筑科技大学 A kind of multi-cavity steel tube concrete post to wearing Flat-head internal hexagonal bolt
KR20200065983A (en) * 2018-11-30 2020-06-09 주식회사 포스코 steel plate concrete synthetic wall

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103541512B (en) * 2013-11-06 2015-12-09 安徽工业大学 A kind of preparation method of FRP pipe concrete hetermorphiscal column of built-in high strength concrete filled steel tube stem stem
CN103541512A (en) * 2013-11-06 2014-01-29 安徽工业大学 Method for manufacturing fiber reinforce plastic (FRP) pipe and concrete special-shaped column with built-in steel pipe and high-strength concrete core column
CN103924740A (en) * 2014-04-10 2014-07-16 北京工业大学 H-shaped steel bone-confined concrete column with round steel draw bars and fabrication method of column
CN105507496A (en) * 2015-05-07 2016-04-20 天津大学 Special L-shaped concrete-filled steel tubular composite applicable to industrial production
CN104947854A (en) * 2015-05-07 2015-09-30 天津大学 T-shaped concrete filled steel tube specially-shaped column applied to industrial production
CN105040905A (en) * 2015-05-07 2015-11-11 天津大学 L-shaped concrete filled steel tubular special-shaped column being suitable for industrial production
CN104847053A (en) * 2015-05-07 2015-08-19 天津大学 Concrete filled steel tube specially shaped column suitable for industrial production
CN105507495A (en) * 2015-05-07 2016-04-20 天津大学 Special T-shaped concrete-filled steel tubular composite column applicable to industrial production
CN105544869A (en) * 2015-05-07 2016-05-04 天津大学 Steel pipe and concrete combination special-shaped column suitable for industrial production
CN104912206A (en) * 2015-05-29 2015-09-16 重庆大学 Special-shaped concrete filled steel tube column-I-shaped steal beam framework node
CN105350441A (en) * 2015-11-30 2016-02-24 广东工业大学 Concrete combined box beam internally provided with tie bar steel and box column
CN105714984A (en) * 2016-01-28 2016-06-29 广东工业大学 Square-and-special-shaped concrete filled steel tubular column with built-in circular tubes and tie bars and construction method thereof
CN105714984B (en) * 2016-01-28 2020-05-19 广东工业大学 Square and special-shaped concrete-filled steel tube column with built-in round tube and tie bars and construction method thereof
CN106958322A (en) * 2017-04-24 2017-07-18 西安建筑科技大学 A kind of multi-cavity steel tube concrete post to wearing Flat-head internal hexagonal bolt
KR20200065983A (en) * 2018-11-30 2020-06-09 주식회사 포스코 steel plate concrete synthetic wall
KR102223273B1 (en) * 2018-11-30 2021-03-08 주식회사 포스코 steel plate concrete synthetic wall

Similar Documents

Publication Publication Date Title
CN202544241U (en) Irregular steel pipe concrete column with limiting pulling rod
CN102817422B (en) Prestressed concrete constraining buckling-restrained brace
CN109914244B (en) Weak bracket system suitable for high-tower reinforced concrete combined beam steel structure installation and bottom and top plate concrete pouring and operation method thereof
CN105672576A (en) Annual ring type reinforced high-strength concrete square column
CN202138969U (en) Tower crane wall-attaching device used in cast-in-place concrete structure
CN101550727A (en) Node of connection of column and beam
CN102864746A (en) Bearing frame for bridge construction
CN106869520B (en) Reinforced concrete beam reinforcing device and installation method thereof
DE102010031511A1 (en) Stump stump joint of highly loaded precast columns
CN100386157C (en) Closed type three poles framework for support
CN204898508U (en) Circular steel tube pier of bucking power consumption structure is prevented in root setting
CN201730197U (en) Two-layer brace structure between purlins
CN210439163U (en) Diagonal joist supporting structure applicable to assembly and disassembly of continuous beam
CN202913356U (en) Load-bearing frame for bridge construction
CN210817165U (en) Steel bar straightening device
CN108222261B (en) Full-bolt-connection steel structure node and assembly method thereof
CN201883704U (en) External prestressed tensile base
CN203795859U (en) Large formwork supporting structure for bare concrete shear wall
CN202745061U (en) Inner supporting connection piece capable of varying size and force transmission direction and used for protecting foundation pit
CN102444283A (en) Lateral bracing structure of building formwork
CN105672683A (en) Device and method for reinforcing pillar through external prestressing
CN110747994A (en) Ductile node structure of reinforced concrete frame
CN206800792U (en) A kind of multi-cavity steel tube concrete post to wearing Flat-head internal hexagonal bolt
CN216041885U (en) Assembly structure for building site
CN213766424U (en) Pretensioning prestressed concrete assembled prefabricated pedestal

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121121

Termination date: 20150110

EXPY Termination of patent right or utility model