CN105040681A - 一种大直径超长试验桩制造施工方法 - Google Patents

一种大直径超长试验桩制造施工方法 Download PDF

Info

Publication number
CN105040681A
CN105040681A CN201510428747.1A CN201510428747A CN105040681A CN 105040681 A CN105040681 A CN 105040681A CN 201510428747 A CN201510428747 A CN 201510428747A CN 105040681 A CN105040681 A CN 105040681A
Authority
CN
China
Prior art keywords
sleeve
inner sleeve
hole
pile
outer sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510428747.1A
Other languages
English (en)
Other versions
CN105040681B (zh
Inventor
于全胜
赵胜
崔喆鑫
杜建华
沈红云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group No5 Construction Co ltd
China Railway Tunnel Group Co Ltd CRTG
Shijiazhuang Institute of Railway Technology
Original Assignee
Shijiazhuang Railway Professional Career Technical College
China Railway Tunnel Group Co Ltd CRTG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shijiazhuang Railway Professional Career Technical College, China Railway Tunnel Group Co Ltd CRTG filed Critical Shijiazhuang Railway Professional Career Technical College
Priority to CN201510428747.1A priority Critical patent/CN105040681B/zh
Publication of CN105040681A publication Critical patent/CN105040681A/zh
Application granted granted Critical
Publication of CN105040681B publication Critical patent/CN105040681B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本发明公开了一种大直径超长试验桩制造施工方法,包括内套筒、外套筒的制作,依据施工步骤完成内、外筒的组合,并在浇筑完成后,分离内、外筒。本发明试验桩制造施工中,在工程桩桩顶标高以上部分采用外套筒与土层接触,采用内套筒与试验灌注桩接触,内、外套筒之间不接触,实现内套筒与无效段(工程桩桩顶标高以上部分土层段)土层隔离,直接消除该段的摩阻力,使试验桩在加载试验中与实际工程桩所受摩阻力相符,从而直接反映工程桩的实际摩阻力及沉降值;内套筒外壁上设置限位消阻轮,可以防止施工中内、外套筒因不可控外力而发生较大的偏移,即使限位消阻轮接触到外套筒内壁,摩阻力也可以忽略不计,同时保证试验桩垂直度。

Description

一种大直径超长试验桩制造施工方法
技术领域
本发明属于建筑基础开挖前试验桩施工领域,具体涉及一种大直径超长试验桩制造施工方法。
背景技术
试验桩是一种用于建筑施工前的试验测试装置,其目的在于检测桩基的承载力以及沉降量是否与设计相符,以保证建筑施工质量。
试验桩一般都是在建筑基坑开挖前或者开挖到槽底标高之前进行,这样就会出现工程桩设计顶标高与实际施工中的试验桩标高之间存在一段土层,该土层对试验桩的承载力和沉降量都有一定的影响,使试验桩的实验数据与实际工程桩的承载力和沉降量不一致,影响设计参数的调整,因此,研究一种能够消除该段土层阻力的试验桩,是我们研究的对象。
现有技术中有多种消除土层摩阻力的装置和方法,但是对于大直径大深度的超长的试验桩来说,普遍存在施工难度大,甚至不能施工的问题。
发明内容
本发明需要解决的技术问题是提供一种消除土层摩阻力,制作简单,施工方便的大直径超长试验桩制造施工方法。
为解决上述技术问题,本发明所采用的技术方案是:
一种大直径超长试验桩制造施工方法,该方法包括以下工艺步骤:
1)内套筒、外套筒制备,内套筒内径D4,壁厚T4,外壁上均布多组限位消阻轮,外套筒内径D3,壁厚T3,下端口焊接内环板;
2)钻孔φ1,钻孔直径D1,深度H1,H1为地面到工程桩顶标高;
3)将步骤1)制备好的外套筒吊装入步骤2)钻好的孔φ1中,外套筒底端放至孔φ1底;
4)在步骤3)基础上继续钻孔φ2,钻孔直径D2,深度H2;
5)在步骤4)的基础上将制备好的内套筒吊装入外套筒内,内套筒底端放至孔φ2底,内套筒顶端伸出外套筒,调整内、外套筒同心度并将外套筒上端口与内套筒之间固定;
6)将内、外套筒整体吊出,在内套筒2外壁上固定外环板5,外环板5下方粘贴环形泡沫板4,外环板5与内套筒2下端口的内环板7之间填充密封条5并调整同心度,同时继续钻孔φ,钻孔直径D,深度H,D是工程桩直径,H=工程桩长度-H2;
7)将内、外套筒整体再次吊入孔φ1、孔φ2,内套筒底端放至孔φ2底,清孔,吊放钢筋笼,浇筑混凝土,并按规定进行养护;
8)养护期满,将外套筒上端口与内套筒之间进行分离,试验桩加载测试,内、外套筒分离,采集测试数据。
上述步骤中:D1=D3+2T3+0~100mm,D2=D+0~30mm,D3=D4+2T4+200mm,D4=D2+0~30mm,H≥500mm,内环板径向宽度是80mm;钻孔φ2以及钻孔φ时,保证孔φ2、孔φ与孔φ1同心。
进一步的,所述限位消阻轮包括滚轮、轮轴、滚轮支架,其中滚轮通过轮轴固定在滚轮支架上,滚轮支架固定在内套筒外壁上。所述限位消阻轮与外套筒内筒壁之间的间隙≤5mm。
上述步骤5)中外套筒上端口与内套筒之间固定时,采用多个固定件均匀间隔固定,或者采用整体环状固定件固定,当采用多个固定件均匀间隔固定时,步骤6)中将内套筒底端放至孔φ2底后,还需要对外套筒上端口加装防护板,防止地面杂物落入内、外套筒之间的空隙中;固定件的固定方式为焊接固定或者螺栓固定,当采用焊接固定时,分离需要采用气割的方法。
由于采用了上述技术方案,本发明取得的技术进步是:
本发明试验桩制造施工中,工程桩桩顶标高以上部分采用外套筒与土层接触,采用内套筒与试验灌注桩接触,内、外套筒之间不接触,实现内套筒与无效段(工程桩桩顶标高以上部分土层段)土层隔离,直接消除该段的摩阻力,使试验桩在加载试验中与实际工程桩所受摩阻力情况相同,从而真实反映工程桩的实际摩阻力及沉降值;内套筒外壁上设置限位消阻轮,可以防止施工中内、外套筒因不可控外力而发生较大的偏移,即使限位消阻轮接触到外套筒内壁,摩阻力也可以忽略不计,同时保证试验桩的垂直度。
附图说明
图1是本发明外套筒结构示意图;
图2时本发明内套筒结构示意图;
图3是本发明内、外套筒组合后的结构示意图;
图4是本发明图3的局部放大图;
图5是本发明图3的截面结构示意图;
图6是本发明钻孔φ1放入外套筒后的结构示意图;
图7是本发明钻孔φ1放入外套筒后再钻孔φ2后的结构示意图;
图8是本发明钻孔完成且吊装到位浇筑前的结构示意图;
图9是本发明试验桩浇筑完成后的结构示意图
图10是本发明试验桩内、外套筒分离后结构示意图;
图11是本发明图10局部放大结构示意图;
其中:1、外套筒,2、内套筒,3、限位消阻轮,4、环形泡沫板,5、外环板,6、密封条,7、内环板,8、固定件。
具体实施方式
下面结合实施例对本发明做进一步详细说明:
本发明是一种大直径超长试验桩制造施工方法,该方法通过设计特殊的试验桩结构,采用合理的施工工艺,完成试验桩浇筑,实现无效土层摩阻力彻底消除,结构简单,施工方便,测试结果准确反映工程桩的实际摩阻力及沉降值,为工程设计提供可靠数据。
本发明方法包括以下工艺步骤:
1)内套筒2、外套筒1制备,内套筒2内径D4,壁厚T4,外壁上均布多组限位消阻轮3,外套筒1内径D3,壁厚T3,下端口焊接内环板7;
2)钻孔φ1,钻孔直径D1,深度H1,H1为地面到工程桩顶标高;
3)将步骤1)制备好的外套筒1吊入步骤2)钻好的孔φ1中,外套筒1底端放至孔φ1底;
4)在步骤3)基础上继续钻孔φ2,钻孔直径D2,深度H2;
5)在步骤3)的基础上将制备好的内套筒2吊入外套筒1内,内套筒2底端放至孔φ2底,内套筒2顶端伸出外套筒1,调整内、外套筒同心度并将外套筒上端口与内套筒固定;
6)将内、外套筒整体吊出,在内套筒2外壁上固定外环板5,外环板5下方粘贴环形泡沫板4,外环板5与内套筒2下端口的内环板7之间填充密封条5并调整同心度,同时继续钻孔φ,钻孔直径D,深度H,D是工程桩直径,H=工程桩长度-H2;
7)将内、外套筒整体再次吊入孔φ1、孔φ2,内套筒底端放至孔φ2底,清孔,吊放钢筋笼,浇筑混凝土,并按规定进行养护;
8)养护期满,将外套筒上端口与内套筒之间进行分离,试验桩加载测试,内、外套筒分离,采集测试数据。
为方便内、外筒套的制作施工,方便钻孔,上述步骤中:D1=D3+2T3+0~100mm,D2=D+0~30mm,D3=D4+2T4+200mm,D4=D2+0~30mm,H≥500mm,内环板径向宽度是80mm,外环板径向宽度80mm,环形泡沫板与外环板径向宽度相同。
固定在内套筒外壁上的限位消阻轮3包括滚轮、轮轴、滚轮支架,其中滚轮通过轮轴固定在滚轮支架上,滚轮支架固定在内套筒外壁上。为了防止内套筒因受到不可控外力而发生较大偏移,保持内、外套筒间的相对位置,保证内套筒的垂直度,设置多个限位消阻轮,多个限位消阻轮分成多组,多组限位消阻轮沿内套筒外壁轴向均匀分布,每组限位消阻轮包括至少3个限位消阻轮,且均匀分布在内套筒外壁上,每组中的限位消阻轮的中心轴线垂直于内套筒中心轴线且位于同一平面内;多组限位消阻轮之间的轴向间距是2~4m;所述限位消阻轮与外套筒内筒壁之间的间隙≤5mm。
为保证吊装方便以及混凝土浇筑时,内、外套筒之间的相对位置关系,外套筒1上端口与内套筒2之间采用固定件8固定,固定时,采用多个固定件8均匀间隔固定,或者采用整体环状固定件8固定,当采用多个固定件均匀间隔固定时,步骤6)中将内套筒底端放至孔φ2底后,还需要对外套筒上端口加装防护板,防止地面杂物落入内、外套筒之间的空隙中;固定件的固定方式为焊接固定或者螺栓固定,当采用焊接固定时,分离需要采用气割的方法。
在钻孔过程中,钻孔φ2时,保证孔φ2与孔φ1同心,钻孔φ时,保证孔φ与孔φ1以及孔φ2同心。本发明在钻孔过程中,采用旋挖转,对粘结性好的岩土层,可采用干式或清水钻进工艺,无需泥浆护壁。而对于松散易坍塌地层,或有地下水分布,孔壁不稳定,必须采用静态泥浆护壁钻进工艺,向孔内投入护壁泥浆或稳定液进行护壁。
为方便吊装,内套筒2的上端伸出外套筒1的部分≥500mm。

Claims (5)

1.一种大直径超长试验桩制造施工方法,其特征在于:该方法包括以下工艺步骤:
1)内套筒(2)、外套筒(1)制备,内套筒(2)内径D4,壁厚T4,外壁上均布多组限位消阻轮(3),外套筒(1)内径D3,壁厚T3,下端口焊接内环板(7);
2)钻孔φ1,钻孔直径D1,深度H1,H1为地面到工程桩顶标高;
3)将步骤1)制备好的外套筒(1)吊装入步骤2)钻好的孔φ1中,外套筒(1)底端放至孔φ1底;
4)在步骤3)基础上继续钻孔φ2,钻孔直径D2,深度H2;
5)在步骤4)的基础上将制备好的内套筒(2)吊入外套筒(1)内,内套筒(2)底端放至孔φ2底,内套筒(2)顶端伸出外套筒(1),调整内、外套筒同心度并将外套筒(1)上端口与内套筒(2)固定;
6)将内、外套筒整体吊出,在内套筒(2)外壁上固定外环板(5),外环板(5)下方粘贴环形泡沫板(4),外环板(5)与内套筒(2)下端口的内环板(7)之间填充密封条(5)并调整同心度,同时继续钻孔φ,钻孔直径D,深度H,D是工程桩直径,H=工程桩长度-H2;
7)将内、外套筒整体再次吊入孔φ1、孔φ2,内套筒底端放至孔φ2底,清孔,吊放钢筋笼,浇筑混凝土,并按规定进行养护;
8)养护期满,将外套筒上端口与内套筒之间进行分离,试验桩加载测试,内、外套筒分离,采集测试数据。
2.根据权利要求1所述的一种大直径超长试验桩制造施工方法,其特征在于D1=D3+2T3+0~100mm,D2=D+0~30mm,D3=D4+2T4+200mm,D4=D2+0~30mm,H≥500mm,内环板径向宽度是80mm;钻孔φ2以及钻孔φ时,保证孔φ2、孔φ与孔φ1同心。
3.根据权利要求1所述的一种大直径超长试验桩制造施工方法,其特征在于所述限位消阻轮(3)包括滚轮、轮轴、滚轮支架,其中滚轮通过轮轴固定在滚轮支架上,滚轮支架固定在内套筒外壁上。
4.根据权利要求1或3所述的一种大直径超长试验桩制造施工方法,其特征在于所述限位消阻轮(3)与外套筒(1)内筒壁之间的间隙≤5mm。
5.根据权利要求1所述的一种大直径超长试验桩制造施工方法,其特征在于步骤5)中外套筒(1)上端口与内套筒(2)之间固定时,采用多个固定件(8)均匀间隔固定,或者采用整体环状固定件(8)固定,当采用多个固定件均匀间隔固定时,步骤6)中将内套筒底端放至孔φ2底后,还需要对外套筒上端口加装防护板,防止地面杂物落入内、外套筒之间的空隙中;固定件的固定方式为焊接固定或者螺栓固定,当采用焊接固定时,分离需要采用气割的方法。
CN201510428747.1A 2015-07-21 2015-07-21 一种大直径超长试验桩制造施工方法 Active CN105040681B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510428747.1A CN105040681B (zh) 2015-07-21 2015-07-21 一种大直径超长试验桩制造施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510428747.1A CN105040681B (zh) 2015-07-21 2015-07-21 一种大直径超长试验桩制造施工方法

Publications (2)

Publication Number Publication Date
CN105040681A true CN105040681A (zh) 2015-11-11
CN105040681B CN105040681B (zh) 2017-01-25

Family

ID=54447628

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510428747.1A Active CN105040681B (zh) 2015-07-21 2015-07-21 一种大直径超长试验桩制造施工方法

Country Status (1)

Country Link
CN (1) CN105040681B (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106065622A (zh) * 2016-07-19 2016-11-02 中建局集团建设发展有限公司 抗拔试验桩高效减阻双套筒及抗拔试验桩减阻方法
CN106988353A (zh) * 2017-05-24 2017-07-28 深圳宏业基岩土科技股份有限公司 基坑试验桩施工检测方法
CN107386277A (zh) * 2017-07-25 2017-11-24 中建五局土木工程有限公司 柔性基桩侧摩阻力隔离结构及施工方法
CN109056857A (zh) * 2018-09-11 2018-12-21 上海建科工程咨询有限公司 试验桩侧摩阻力消除装置及方法
CN109706921A (zh) * 2019-01-29 2019-05-03 中国港湾工程有限责任公司 灌注桩双护筒施工工艺
CN110080314A (zh) * 2019-04-11 2019-08-02 中国地质大学(武汉) 一种减小桩基侧摩阻力的方法
CN110206024A (zh) * 2019-05-07 2019-09-06 中建八局第二建设有限公司 一种消除灌注桩侧面摩阻力的方法和结构
CN112523210A (zh) * 2020-11-12 2021-03-19 中铁四局集团有限公司 一种可有效控制溶洞范围内地表沉降的桩基快速施工方法
CN114908738A (zh) * 2022-06-08 2022-08-16 中铁一局集团(广州)建设工程有限公司 一种深水桥梁基础桩施工方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB476615A (en) * 1936-03-27 1937-12-13 Braithwaite & Company Engineer Improvements in or relating to screw bearing piles
CN201236347Y (zh) * 2008-06-04 2009-05-13 北京城建建设工程有限公司 用于试验桩消除摩阻力的双层套筒
CN201502060U (zh) * 2009-08-10 2010-06-09 湖北中建三局建筑工程技术有限责任公司 一种钻孔灌注桩双护筒系统
CN102660943A (zh) * 2012-05-31 2012-09-12 福州市第三建筑工程公司 一种就地现注空心桩的成型设备及其施工方法
CN203603180U (zh) * 2013-12-02 2014-05-21 中建八局大连建设工程有限公司 配合试验桩双套筒检测装置
CN104110032A (zh) * 2014-07-29 2014-10-22 福建永强岩土股份有限公司 大直径空腔长螺旋薄壁灌注桩桩套管

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB476615A (en) * 1936-03-27 1937-12-13 Braithwaite & Company Engineer Improvements in or relating to screw bearing piles
CN201236347Y (zh) * 2008-06-04 2009-05-13 北京城建建设工程有限公司 用于试验桩消除摩阻力的双层套筒
CN201502060U (zh) * 2009-08-10 2010-06-09 湖北中建三局建筑工程技术有限责任公司 一种钻孔灌注桩双护筒系统
CN102660943A (zh) * 2012-05-31 2012-09-12 福州市第三建筑工程公司 一种就地现注空心桩的成型设备及其施工方法
CN203603180U (zh) * 2013-12-02 2014-05-21 中建八局大连建设工程有限公司 配合试验桩双套筒检测装置
CN104110032A (zh) * 2014-07-29 2014-10-22 福建永强岩土股份有限公司 大直径空腔长螺旋薄壁灌注桩桩套管

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106065622A (zh) * 2016-07-19 2016-11-02 中建局集团建设发展有限公司 抗拔试验桩高效减阻双套筒及抗拔试验桩减阻方法
CN106065622B (zh) * 2016-07-19 2018-05-11 中建一局集团建设发展有限公司 抗拔试验桩高效减阻双套筒及抗拔试验桩减阻方法
CN106988353A (zh) * 2017-05-24 2017-07-28 深圳宏业基岩土科技股份有限公司 基坑试验桩施工检测方法
CN107386277A (zh) * 2017-07-25 2017-11-24 中建五局土木工程有限公司 柔性基桩侧摩阻力隔离结构及施工方法
CN107386277B (zh) * 2017-07-25 2020-03-24 中建五局土木工程有限公司 柔性基桩侧摩阻力隔离结构及施工方法
CN109056857A (zh) * 2018-09-11 2018-12-21 上海建科工程咨询有限公司 试验桩侧摩阻力消除装置及方法
CN109706921A (zh) * 2019-01-29 2019-05-03 中国港湾工程有限责任公司 灌注桩双护筒施工工艺
CN110080314A (zh) * 2019-04-11 2019-08-02 中国地质大学(武汉) 一种减小桩基侧摩阻力的方法
CN110080314B (zh) * 2019-04-11 2020-11-24 中国地质大学(武汉) 一种减小桩基侧摩阻力的方法
CN110206024A (zh) * 2019-05-07 2019-09-06 中建八局第二建设有限公司 一种消除灌注桩侧面摩阻力的方法和结构
CN112523210A (zh) * 2020-11-12 2021-03-19 中铁四局集团有限公司 一种可有效控制溶洞范围内地表沉降的桩基快速施工方法
CN114908738A (zh) * 2022-06-08 2022-08-16 中铁一局集团(广州)建设工程有限公司 一种深水桥梁基础桩施工方法

Also Published As

Publication number Publication date
CN105040681B (zh) 2017-01-25

Similar Documents

Publication Publication Date Title
CN105040681A (zh) 一种大直径超长试验桩制造施工方法
CN110409405B (zh) 一种prb墙内地下水监测井的建井方法
CN204803928U (zh) 一种大直径超长试验桩消阻套筒
CN110847177A (zh) 钢管支撑柱兼做结构柱的固定调垂防上浮装置及方法
CN109667985B (zh) 顶管施工中顶管机与接收井钢套管对接的方法
CN108560545B (zh) 旋挖桩防塌孔的施工方法及防塌孔装置
CN111962505A (zh) 准直桩双护筒定位结构、双护筒装置、准直桩及施工方法
CN109372015B (zh) 逆作法钢管柱与钢筋笼活动式连接装置
JP5696516B2 (ja) 杭構造及び杭の構築方法
CN105350540A (zh) 一种旋挖孔灌注桩施工中的桩底清渣装置及清渣方法
CN209368877U (zh) 逆作法钢管柱与钢筋笼活动式连接装置
US10472790B2 (en) Jet grouting method, ground improvement body, and ground improvement structure
CN205154025U (zh) 一种施工钻孔灌注桩用的钻头
CN108301402B (zh) 一种新型钻孔灌注桩的施工方法
CN215105278U (zh) 一种地下空间拓建锚杆桩定位器
CN111005361A (zh) 一种深水岩溶裂隙发育地质高压注浆装置及施工方法
CN216474980U (zh) 一种免挖桩间土灌注桩灌注模具
CN111677513B (zh) 一种涌水溃砂扰动深厚松散地层地面注浆成孔方法
CN108086322B (zh) 去泥皮装置以及使用该装置提高灌注桩承载力的方法
CN109056857B (zh) 试验桩侧摩阻力消除装置及方法
CN209923971U (zh) 逆作法施工钢管柱与钢筋笼悬吊连接装置
CN207660543U (zh) 一种松软破碎厚托顶煤巷道顶板锚固孔成孔装置
CN111720134B (zh) 一种tbm刀盘无扩大洞室洞内更换方法
US8206064B2 (en) Voided drilled shafts
CN219975790U (zh) 一种增加应力释放孔的胀管式管道更新施工装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 471009 the Red Road in the old city of Luoyang City, Henan

Co-patentee after: SHIJIAZHUANG INSTITUTE OF RAILWAY TECHNOLOGY

Patentee after: CHINA RAILWAY TUNNEL GROUP Co.,Ltd.

Address before: 471009 the Red Road in the old city of Luoyang City, Henan

Co-patentee before: SHIJIAZHUANG INSTITUTE OF RAILWAY TECHNOLOGY

Patentee before: CHINA RAILWAY TUNNELS GROUP Co.,Ltd.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20180625

Address after: 471009 the Red Road in the old city of Luoyang City, Henan

Co-patentee after: SHIJIAZHUANG INSTITUTE OF RAILWAY TECHNOLOGY

Patentee after: CHINA RAILWAY TUNNEL GROUP Co.,Ltd.

Co-patentee after: CHINA RAILWAY TUNNEL GROUP NO.5 CONSTRUCTION CO.,LTD.

Address before: 471009 the Red Road in the old city of Luoyang City, Henan

Co-patentee before: SHIJIAZHUANG INSTITUTE OF RAILWAY TECHNOLOGY

Patentee before: CHINA RAILWAY TUNNEL GROUP Co.,Ltd.

TR01 Transfer of patent right