CN105019483B - The real-time measurement apparatus and its application method of driven cast-in-place pile filling concrete height - Google Patents
The real-time measurement apparatus and its application method of driven cast-in-place pile filling concrete height Download PDFInfo
- Publication number
- CN105019483B CN105019483B CN201510460120.4A CN201510460120A CN105019483B CN 105019483 B CN105019483 B CN 105019483B CN 201510460120 A CN201510460120 A CN 201510460120A CN 105019483 B CN105019483 B CN 105019483B
- Authority
- CN
- China
- Prior art keywords
- weight
- graduated scale
- fixed pulley
- winding box
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The invention discloses a kind of real-time measurement apparatus of driven cast-in-place pile filling concrete height and its application method, including winding box, graduated scale, weight and fixed pulley, graduated scale passes through fixed pulley, and one end is connected with weight, and the other end is connected with winding box.Fixed pulley is fixed on frame top;In use, installing fixed pulley and graduated scale, graduated scale free end connection weight records initial reading at fixed pulleyl 0, put hammer to ground elevation and record readingl 1, bracket height isl 1‑ l 0;Immersed tube puts hammer to ttom of pipe and records reading to designed elevationl 2, immersed tube depth isl 2‑ l 1;Weight resets, concrete perfusion, puts hammer to free-falling and terminates to record readingl 3, filling concrete is highlyl 2‑l 3.The present invention can test immersed tube depth, demarcation immersed tube perpendicularity, measure influx height in real time, easy to operate, technology simple possible, practical.
Description
Technical field
The invention belongs to civil engineering driven cast-in-place pile construction field, and in particular to a kind of driven cast-in-place pile filling concrete
The real-time measurement apparatus and its application method of height.
Background technology
Driven cast-in-place pile is an important method for the treatment of of soft foundation, by static pressure, hammering or vibration immersed pipe device, will be carried
The stake mould of flap valve shoe or concrete prefabricated pile top sinks to projected depth, is then placed in framework of steel reinforcement, and casting concrete, vibration is pulled out
Pipe, maintenance shaping, just forms the cast-in-place concrete pile of the different pile bodies and cross sectional shape of design.Filling concrete process
In, influx height is to assess one of important parameter of quality of concreting.Appoint and found the state《How is cast-in-situ bored pile concrete face absolute altitude
Measurement and control》One the article pointed out, generally we measure cast-in-situ bored pile filling concrete height by lining rope and weight, so
And, for driven cast-in-place pile, stake mould is located at more than ground tens of rice, traditional lining rope and the method for weight in filling process
It is difficult to realize, differentiate that driven cast-in-place pile stake mould inner concrete influx height mainly strikes pipe by hammering, judged according to sound, the party
Method is only applicable to concrete and pours into the situation that absolute altitude has met or exceeded ground, and differentiates extremely inaccurate, occurs often following
Problem:When penetration concrete surface is less than ground surface, if a tube drawing is highly excessive, pile top extracts concrete surface, causes
Broken pile or constriction;When concrete absolute altitude is close to earth's surface, then stake is long does not reach design standard for deficient filling, and superfilled then waste of materials is pulled out
Superfilled concrete trickles down earth's surface after pipe, forms crust layer, and cleaning pile crown is very difficult.
The content of the invention
Object of the present invention is to provide a kind of real-time measurement apparatus of driven cast-in-place pile filling concrete height and its
Application method, overcomes immersed tube bored pile concrete to pour into the problem of height is difficult to measurement.
The technical solution for realizing the object of the invention is:A kind of real-time measurement of driven cast-in-place pile filling concrete height
Device includes winding box, graduated scale, weight and fixed pulley, and graduated scale one end is connected through fixed pulley with weight, and the other end is with receiving
Line box is connected, and fixed pulley is fixed on a machine frame top;Weight is located at directly over driven cast-in-place pile stake mould so that after weight drop
Fall into the stake mould of driven cast-in-place pile.
The winding box is used for folding and unfolding graduated scale.
The graduated scale is soft, rollable, and itself is indeformable in the presence of weight.
The weight material is concrete, and the free subsidence in water is floated in concrete.
The weight is using the concrete for irrigating lot number.
A kind of application method of the real-time measurement apparatus of driven cast-in-place pile filling concrete height, method and step is as follows:
Step 1, stake machine install fixed pulley afterwards in place, and fixed pulley, which is fixed in a machine frame top, measurement process, highly to be begun
Do not change eventually, be transferred to step 2;
Step 2, pull out winding box in graduated scale free end, by graduated scale free end pass through fixed pulley, graduated scale from
It is connected by end with weight, adjusts winding box so that weight is located at directly over driven cast-in-place pile stake mould, it is ensured that fallen into after weight drop
In the stake mould of driven cast-in-place pile, this is the initial position a of weight0, winding box is adjusted on the premise of not changing weight position, is recorded
Now in winding box graduated scale initial readingl 0, winding box is not moved in follow-up measurement process, is transferred to step 3;
Step 3, unwrapping wire are by weight free-falling to ground, record graduated scale readingl 1, then piling machine bracket height bel 1- l 0, checked with piling machine actual height, piling machine posture adjusted according to check result, step 4 is transferred to;
Step 4, winding box take-up, reset weight, sink to a mould, stop immersed tube, let-down weight during immersed tube to designed elevation
Hammer to free-falling terminates, graduated scale reading in record winding boxl 2, now stake bottom absolute altitude bel 2-l 1, it is further with immersed tube depth
Contrast is checked, and the perpendicularity of immersed tube is judged according to check result, step 5 is transferred to;
Step 5, weight resetted, then concrete perfusion, stops unwrapping wire to weight free-falling after perfusion and terminate, record
Graduated scale reading in winding boxl 3, now filling concrete be highlyl 2-l 3, it is transferred to step 6;
Step 6, repeat step 5, obtain the influx height of any perfusion moment concrete, are transferred to step 7;
Step 7, treat this perfusion after the completion of, move stake position, repeat step 4, the concrete for measuring next pile pours into situation.
Compared with prior art, its remarkable advantage is the present invention:(1)Measurement direction can be changed by fixed pulley, realized
The real-time measurement of filling concrete height.
(2)Graduated scale two ends stress, tight, precision height during measurement.
(3)Weight is using perfusion lot number concrete for making, and measurement accuracy is high.
(4)Device is easy to operate, technology simple possible, practical.
(5)Driven cast-in-place pile filling concrete depth can be not only measured in real time, can also be tested immersed tube depth, demarcation immersed tube and be hung down
Straight degree.
Brief description of the drawings
Fig. 1 is the real-time measurement apparatus structural representation of the driven cast-in-place pile filling concrete height of the present invention.
Fig. 2 is the fundamental diagram of the real-time measurement apparatus of the driven cast-in-place pile filling concrete height of the present invention, wherein
(a)For initial position,(b)For demarcation pile foundation highly,(c)To demarcate immersed tube depth,(d)For measurement filling concrete height.
Embodiment
The embodiment to the present invention is described in detail below in conjunction with the accompanying drawings.
With reference to Fig. 1 ~ Fig. 2, a kind of real-time measurement apparatus of driven cast-in-place pile filling concrete height, including winding box 1, quarter
Chi 2, weight 3 and fixed pulley 4 are spent, the one end of graduated scale 2 is connected through fixed pulley 4 with weight 3, and the other end is connected with winding box 1, it is fixed
Pulley 4 is fixed on the top of a machine frame 5;Winding box 1 be used for folding and unfolding graduated scale 2, weight 3 be located at driven cast-in-place pile stake mould just on
Side, it is ensured that 3 times backwardnesss of weight are fallen into the stake mould of driven cast-in-place pile.
Graduated scale 2 is soft, rollable, and itself is indeformable in the presence of weight 3, can generally use tape measure.
The material of weight 3 is concrete, and the free subsidence in water is floated in concrete.
Weight 3 can be using the concrete for making for irrigating lot number, and measurement result is more accurate.
Graduated scale 2 may pass through fixed pulley 4 to change direction, and two ends stress during measurement is tight, and precision is high.Graduated scale 2 with again
It is unwrapping wire length to hammer the scale that 3 connection end scales are graduated scale at 0, winding box 1 into shape.The present invention not only can measure immersed tube bored at any time
The filling concrete depth of stake, can also test immersed tube depth, demarcate perpendicularity, and it is hidden invisible to solve a machine engineering, coagulation
The problem of native perfusion state can not be learnt.
With reference to Fig. 1 and Fig. 2, a kind of application method of the real-time measurement apparatus of driven cast-in-place pile filling concrete height, side
Method step is as follows:
Step 1, stake machine install fixed pulley 4 afterwards in place, can use fixed pulley 4 to change measurement direction, fixed pulley 4 is fixed on
Height does not change all the time in stake machine frame top, measurement process, is transferred to step 2.
Step 2, the free end for pulling out graduated scale 2 in winding box 1, fixed pulley 4 is passed through by the free end of graduated scale 2.Graduated scale 2
Free end is connected with weight 3, adjusts winding box 1 so that weight 3 is located at directly over driven cast-in-place pile stake mould, it is ensured that weight 3 falls
Fall into afterwards in the stake mould of driven cast-in-place pile, this is the initial position a of weight 30(As shown in Figure 1), do not change before the position of weight 3
Adjustment winding box 1 is put, the initial reading of graduated scale in now winding box 1 is recordedl 0(As shown in Figure 2 a), follow-up measurement process
In do not move winding box 1, be transferred to step 3.
Step 3, unwrapping wire are by the free-falling of weight 3 to ground, record graduated scale readingl 1(As shown in Figure 2 b), then drive piles
Machine bracket height isl 1- l 0, checked with piling machine actual height, piling machine posture adjusted according to check result, step is transferred to
Rapid 4.
Step 4, the take-up of winding box 1, reset weight 3, sink to a mould, stop immersed tube, let-down during immersed tube to designed elevation
Weight 3 to free-falling terminates(To ttom of pipe), record graduated scale reading in winding box 1l 2(As shown in Figure 2 c), now stake bottom mark
It is a height ofl 2- l 1, check is further contrasted with immersed tube depth, the perpendicularity of immersed tube is judged according to check result, step 5 is transferred to.
Step 5, weight 3 resetted, then concrete perfusion, stops unwrapping wire to the free-falling of weight 3 after perfusion and terminate, remember
Record graduated scale reading in winding boxl 3(As shown in Figure 2 d), now filling concrete be highlyl 2-l 3, it is transferred to step 6.
Step 6, repeat step 5, obtain the influx height of any perfusion moment concrete, are transferred to step 7.
Step 7, treat this perfusion after the completion of, move stake position, repeat step 4, the concrete for measuring next pile pours into situation.
Embodiment 1
A kind of real-time measurement apparatus of driven cast-in-place pile filling concrete height, including winding box 1, graduated scale 2, weight 3
With 3 fixed pulleys, 4,2 fixed pulleys 4, a fixed pulley 4 is fixed on the top of a machine frame 5, and another is fixed and stake frame body
On, to change the direction of graduated scale 2, the one end of graduated scale 2 sequentially passes through two fixed pulleys 4 and is connected with weight 3, the other end and take-up
Box 1 is connected;Winding box 1 is used for folding and unfolding graduated scale 2, and weight 3 is located at directly over driven cast-in-place pile stake mould, it is ensured that 3 times backwardnesss of weight
Fall into the stake mould of driven cast-in-place pile.
Graduated scale 2 uses tape measure.
The material of weight 3 is the concrete of perfusion lot number, the free subsidence in water, is floated in concrete so that measurement result
It is more accurate.
The two ends stress of graduated scale 2, tight during measurement, and precision is high.Graduated scale 2 is 0, winding box 1 with the connection end scale of weight 3
The scale for locating graduated scale is unwrapping wire length.
With reference to Fig. 1 and Fig. 2, a kind of application method of the real-time measurement apparatus of driven cast-in-place pile filling concrete height, side
Method step is as follows:
2 fixed pulleys 4 are respectively mounted after step 1, stake machine are in place, a fixed pulley 4 is fixed on the top of a machine frame 5, separately
One fixation with stake frame, not changing highly, being transferred to step 2 all the time in measurement process.
Step 2, the free end for pulling out graduated scale 2 in winding box 1, fixed pulley 4 is passed through by the free end of graduated scale 2.Graduated scale 2
Free end is connected with weight 3, adjusts winding box 1 so that weight 3 is located at directly over driven cast-in-place pile stake mould, it is ensured that weight 3 falls
Fall into afterwards in the stake mould of driven cast-in-place pile, the initial position of weight 3 is more than nature ground 30 m(As shown in Figure 1), do not change
Winding box 1 is adjusted on the premise of the position of weight 3, the m of initial reading 35 of graduated scale in now winding box 1 is recorded(Such as Fig. 2 a institutes
Show), winding box 1 is not moved in follow-up measurement process, is transferred to step 3.
Step 3, unwrapping wire are 65 m by the free-falling of weight 3 to ground, record graduated scale reading(As shown in Figure 2 b), then beat
Stake machine bracket height is 30 m, less than the m of piling machine actual height 31, illustrates that pile foundation has inclination, need to adjust pile foundation posture, then
Again check.Check after pile foundation posture, be transferred to step 4.
Step 4, the take-up of winding box 1, reset weight 3, sink to a mould, stop immersed tube, let-down during immersed tube to designed elevation
Weight 3 to free-falling terminates(To ttom of pipe), record the m of graduated scale reading 90 in winding box 1(As shown in Figure 2 c), now stake bottom
Absolute altitude is 25 m, is coincide with the m of immersed tube depth 25, illustrates that immersed tube perpendicularity meets requirement, is transferred to step 5.
Step 5, weight 3 resetted, then concrete perfusion, stops unwrapping wire to the free-falling of weight 3 after perfusion and terminate, remember
Record the m of graduated scale reading 80 in winding box(As shown in Figure 2 d), now filling concrete is highly 10 m, is transferred to step 6.
Step 6, repeat step 5, obtain the influx height of any perfusion moment concrete, are transferred to step 7.
Step 7, treat this perfusion after the completion of, move stake position, repeat step 4, the concrete for measuring next pile pours into situation.
The present invention changes measurement direction by fixed pulley, realizes the real-time measurement of driven cast-in-place pile filling concrete height;
Graduated scale two ends stress, tight, precision height during measurement;Weight is using perfusion lot number concrete for making, and measurement accuracy is high;Device is grasped
Make convenience, it is technology simple possible, practical;Driven cast-in-place pile filling concrete depth can be not only measured in real time, can also be tested
Immersed tube depth, demarcation immersed tube perpendicularity, solution stake machine engineering are hidden invisible, the problem of filling concrete state can not be learnt.
Claims (6)
1. a kind of real-time measurement apparatus of driven cast-in-place pile filling concrete height, it is characterised in that:Including winding box(1), carve
Spend chi(2), weight(3)With fixed pulley group(4), wherein fixed pulley group(4)The quantity of middle fixed pulleyn=3, graduated scale(2)Wear one end
Cross fixed pulley group(4)With weight(3)Connection, the other end and winding box(1)Connection, wherein fixed pulley group(4)In two it is fixed sliding
Wheel is fixed on a machine frame(5)Top, the fixed position of another fixed pulley is observed bearing;Weight(3)Filled positioned at immersed tube
Note directly over stake stake mould so that weight(3)Lower backwardness is fallen into the stake mould of driven cast-in-place pile.
2. the real-time measurement apparatus of driven cast-in-place pile filling concrete height according to claim 1, it is characterised in that:Institute
State winding box(1)For folding and unfolding graduated scale(2).
3. the real-time measurement apparatus of driven cast-in-place pile filling concrete height according to claim 1, it is characterised in that:Institute
State graduated scale(2)It is soft, rollable, and in weight(3)In the presence of itself is indeformable.
4. the real-time measurement apparatus of driven cast-in-place pile filling concrete height according to claim 1, it is characterised in that:Institute
State weight(3)Material is concrete, the free subsidence in water, is floated in concrete.
5. the real-time measurement apparatus of driven cast-in-place pile filling concrete height according to claim 4, it is characterised in that:Institute
State weight(3)Using the concrete for making of lot number identical with concrete perfusion.
6. a kind of user of the real-time measurement apparatus of the driven cast-in-place pile filling concrete height based on described in claim 1
Method, it is characterised in that method and step is as follows:
Step 1, stake machine install fixed pulley group afterwards in place(4), two of which fixed pulley is fixed on a machine frame top, another
The fixed position of fixed pulley is fixed pulley group in observed bearing, measurement process(4)Position does not change all the time, is transferred to step 2;
Step 2, pull-out winding box(1)Middle graduated scale(2)Free end, by graduated scale(2)Free end passes through fixed pulley group(4),
Graduated scale(2)Free end and weight(3)Connection, adjusts winding box(1)So that weight(3)Positioned at driven cast-in-place pile stake mould just
Top, it is ensured that weight(3)Lower backwardness is fallen into the stake mould of driven cast-in-place pile, and this is weight(3)Initial position a0, do not change weight
Hammer(3)Winding box is adjusted on the premise of position(1), record now winding box(1)The initial reading of interior graduated scalel 0, follow-up measurement
During do not move winding box(1), it is transferred to step 3;
Step 3, unwrapping wire are by weight(3)Free-falling is to ground level, and recording graduated scale reading isl 1, then piling machine bracket height
Forl 1- l 0, checked with piling machine actual height, piling machine posture adjusted according to check result, step 4 is transferred to;
Step 4, winding box(1)Take-up, makes weight(3)Reset, sink to a mould, stop immersed tube, let-down during immersed tube to designed elevation
Weight(3)Terminate to free-falling, record winding box(1)Interior graduated scale readingl 2, now stake bottom absolute altitude bel 2-l 1, it is deep with immersed tube
Degree further checked by contrast, and the perpendicularity of immersed tube is judged according to check result, step 5 is transferred to;
Step 5, by weight(3)Reset, then concrete perfusion, stop after perfusion unwrapping wire to weight(3)Free-falling terminates, note
Record graduated scale reading in winding boxl 3, now filling concrete be highlyl 2-l 3, it is transferred to step 6;
Step 6, repeat step 5, obtain the influx height of any perfusion moment concrete, are transferred to step 7;
Step 7, treat this perfusion after the completion of, move stake position, repeat step 4, the concrete for measuring next pile pours into situation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510460120.4A CN105019483B (en) | 2015-07-30 | 2015-07-30 | The real-time measurement apparatus and its application method of driven cast-in-place pile filling concrete height |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510460120.4A CN105019483B (en) | 2015-07-30 | 2015-07-30 | The real-time measurement apparatus and its application method of driven cast-in-place pile filling concrete height |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105019483A CN105019483A (en) | 2015-11-04 |
CN105019483B true CN105019483B (en) | 2017-08-04 |
Family
ID=54409754
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510460120.4A Active CN105019483B (en) | 2015-07-30 | 2015-07-30 | The real-time measurement apparatus and its application method of driven cast-in-place pile filling concrete height |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105019483B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105649119B (en) * | 2016-02-20 | 2017-09-26 | 青岛蓝天创先科技服务有限公司 | A kind of deep measurement apparatus of Punching Borehole Cast-in-place Concrete Pile stake and method |
CN106014386A (en) * | 2016-06-12 | 2016-10-12 | 刘旭玲 | Exploration device used for measuring depth of cast-in-place pile |
CN106120717A (en) * | 2016-06-28 | 2016-11-16 | 东南大学 | Control modulus stake band pressure balanced pile making method |
CN109141572A (en) * | 2018-06-25 | 2019-01-04 | 中煤建工集团有限公司 | A kind of bored concrete pile perfusion face height determining device and method |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN200986440Y (en) * | 2006-12-22 | 2007-12-05 | 任雁胜 | Device for detecting height of concrete filling pile |
KR101017567B1 (en) * | 2009-01-16 | 2011-02-28 | 삼성물산 주식회사 | Design and construction method of Cast in place piles |
CN202925579U (en) * | 2012-12-03 | 2013-05-08 | 中建海峡建设发展有限公司 | Cast-in-place pile top concrete surface measuring component |
CN103267464A (en) * | 2013-05-03 | 2013-08-28 | 中冶集团武汉勘察研究院有限公司 | Tool for measuring concrete pouring height |
CN203256733U (en) * | 2013-05-06 | 2013-10-30 | 中国建筑第八工程局有限公司 | Device for detecting pile top concrete elevation of cast-in-place pile |
CN204269044U (en) * | 2014-12-16 | 2015-04-15 | 山西华晋岩土工程勘察有限公司 | A kind of priming concrete pile hole depth measurement device |
-
2015
- 2015-07-30 CN CN201510460120.4A patent/CN105019483B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN105019483A (en) | 2015-11-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105019483B (en) | The real-time measurement apparatus and its application method of driven cast-in-place pile filling concrete height | |
CN105044306B (en) | A kind of transparent soil model experimental rig of Piled Embankments and method | |
CN206752536U (en) | A kind of cast-in-situ bored pile bottom hole sediment measurement apparatus | |
CN206862755U (en) | A kind of embedding rock friction pile experimental rig of the confining pressure of measurement in real time | |
CN104866709B (en) | A kind of underground engineering anchor notes quality evaluating method | |
Zhou et al. | Effect of relative density on settlements above tunnels in sands | |
CN105625485B (en) | A kind of method of Accurate Determining snag filling concrete absolute altitude | |
CN107102378B (en) | Utilize the method for hole pressure touching methods measurement artesian aquifer water level and head height | |
CN106643649B (en) | Device and method for measuring deep settlement and pore water pressure of soil body | |
NO823193L (en) | PROCEDURE AND APPARATUS FOR ANTIFICATION OF ANGLES FOR AA IMPROVE BLOOD FOUNDATION | |
WO2019240716A2 (en) | An apparatus and a method for soil survey involving continuity | |
CN205102878U (en) | Underwater concrete face elevation measurement hammer of adjustable proportion | |
CN206034512U (en) | Bored concrete pile of driling under water construction monitoring devices | |
JP6799253B2 (en) | How to excavate the ground | |
CN110230327B (en) | Real-time monitoring system and method for sand pile construction quality | |
CN104153341B (en) | A kind of flatly moving type soil pressure surveys model test device | |
CN106836320A (en) | Provided pipe bottom exciting side hole receives velocity of wave test pile bottom slip casting test apparatus and method | |
CN206556962U (en) | A kind of preparation of soil sample device | |
CN204125976U (en) | For measuring the survey basket of the empty pile length of castinplace pile | |
CN105806761B (en) | A kind of capillary rise height and specific yield while assay method and measurement device | |
CN204475381U (en) | Filling concrete height real-time measurement apparatus in cast-in-place large-diameter thin-wall tubular pile construction | |
CN104563090A (en) | Control method for increasing air pressure intensity in pile sleeve of sand pile through extrusion | |
Mahmood et al. | A Comprehensive Study of Franki pile with the other pile models Embedded within cohesionless soils | |
CN109141572A (en) | A kind of bored concrete pile perfusion face height determining device and method | |
CN214616501U (en) | CFG pile drilling construction depth detection and construction control system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |