CN105019462B - Excavation method for outseam rock-socketed cast-in-place pile retaining foundation pit - Google Patents

Excavation method for outseam rock-socketed cast-in-place pile retaining foundation pit Download PDF

Info

Publication number
CN105019462B
CN105019462B CN201410172213.2A CN201410172213A CN105019462B CN 105019462 B CN105019462 B CN 105019462B CN 201410172213 A CN201410172213 A CN 201410172213A CN 105019462 B CN105019462 B CN 105019462B
Authority
CN
China
Prior art keywords
rock
hole
depth
foundation ditch
soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410172213.2A
Other languages
Chinese (zh)
Other versions
CN105019462A (en
Inventor
何健
孔维
孔维一
文登国
肖建波
代景艳
陈大刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201410172213.2A priority Critical patent/CN105019462B/en
Publication of CN105019462A publication Critical patent/CN105019462A/en
Application granted granted Critical
Publication of CN105019462B publication Critical patent/CN105019462B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention relates to foundation pit construction, and in particular to a construction method for a foundation pit on a rock foundation. An excavation method for an outseam rock-socketed cast-in-place pile retaining foundation pit comprises the steps that firstly, stratum soil is analyzed, and the minimum surrounding rock thickness of a retaining spud is determined; secondly, a rock-socketed cast-in-place pile is constructed, and a post-grouting hole is formed; thirdly, presplitting charging hole is constructed; fourthly, a static fracturing agent is used for fracturing and excavating bed rock; and fifthly, original groove casting of a foundation pit structure is carried out. According to the method, accidents happening during excavating are avoided, and the construction cost and the construction period are ensured.

Description

Hang pin piles set into rock and go along with sb. to guard him foundation ditch excavation method
Technical field
The present invention relates to the foundation ditch construction method on foundation pit construction, more particularly, to rock foundation.
Background technology
In coastal plastic flow mud weak soil, Denudation monadnock geomorphologic subregion, in many plastic flow mud soil layers under sleeping sial bury Deeply in 4 ~ 7m, the foundation ditch such as underground pipe canal built therebetween needs to carry out pledge excavation.The stratum of sleeping granite under mud, generally Foundation ditch is gone along with sb. to guard him using punching embedded rock pile, but because basement rock is hard, increases the Percussion Piles depth duration and expense cost is higher, and stratum Scar big rise and fall, can affect structure construction using increasing inner support mode, being affected by mud geology using anchor pole form can not OK.
Content of the invention
It is contemplated that overcoming the defect of prior art, providing one kind to hang pin piles set into rock and going along with sb. to guard him foundation ditch excavation method. Present invention, avoiding excavation and have an accident it is ensured that construction cost and duration.
The present invention is realized in:One kind is hung pin piles set into rock and is gone along with sb. to guard him foundation ditch excavation method, and it includes:
Step one:Analysis stratum soil property, determines and goes along with sb. to guard him footing minimum country rock thickness;Including:
A) according to foundation ditch section, analysis geology soil layer and survey report, take vertical unit length foundation ditch as research object, Space problem is converted into plane problem, fender post stake is calculated according to the thickness of the layer, natural density, internal friction angle and cohesive strength The active earth pressure of the soil body afterwards, computing formula is:
In formula: e:Active earth pressure, kpa;
γ:The natural density of soil, KN/m;s:The depth of soil, m;
Φ:The internal friction angle of soil, °; C:The cohesive strength of soil, kpa;
Active earth pressure make a concerted effort be E, E=0.5e*s, point of resultant force in 2s/3 depth, the country rock that support pile is subject to Pressure is p;
B) foundation ditch is gone along with sb. to guard him for band inner support piles set into rock it is assumed that support pile building-in depth is z, then pressure from surrounding rock is made a concerted effort For pz, apart from support force T application point a+0.5z, the distance away from support force T application point d for the E is a-s/3, active earth pressure and country rock Pressure takes square to T point, by Σ M T=0, that is,:
In formula:a:Support center is to the distance of country rock top surface, m;
γ:The natural density of soil, kn/m;
s:Foundation depth, m;
c:Cohesive strength, kpa;φ:Internal friction angle, °;
p:Pressure from surrounding rock, kpa; z:Building-in depth;
The solution equation can try to achieve footing pressure from surrounding rock p value size;Stake bottom country rock section turn moment is maximum, and Mmax= 0.5pz2, country rock allowable tensile stress is<σ>, country rock section composite bending modulus are W=h2/ 6, in order that country rock is in trouble free service shape State, needs to meet:W≥Mmax/<σ>, i.e. h2/6≥0.5pz2/<σ>, country rock thickness minimum of a value h can be tried to achieve, actual value is according to base Hole safe class is multiplied by the safety coefficient more than 1;Take different building-in depth z, calculate corresponding country rock by above-mentioned steps thick Degree h, considers determination building-in depth and country rock thickness from duration, cost and security standpoint;
Step 2:Construction piles set into rock, arranges grouting behind shaft or drift lining hole;Including:
a)Minimum country rock thickness according to determining in step one carries out unwrapping wire, determines grout pile position, and according to step one The building-in depth of middle determination is punched out or drilled pile construction;
b)Install going along with sb. to guard him filling pile cage of reinforcement, after borehole cleaning, pre-buried elongated Grouting Pipe in stake holes steel reinforcement cage;
Step 3:Construction presplitting medicine hole;Including:
A) in the curing period after the completion of going along with sb. to guard him filling pile construction, carry out the construction of presplitting medicine hole, the arrangement principle in medicine hole is: Arranged to two side row holes with foundation ditch center line, median pore radius are maximum, are gradually reduced to both sides aperture, each according to 1#, 2#, 3#, 4# numbers, and country rock sideline arrangement is close in the right and left outermost medicine hole;Aperture 20mm-100mm, may be selected 80 for sial Mm, 42 mm, 20mm apertures, hole depth is foundation depth, and medicine hole vertical, horizontal spacing is 6d-7d (d is aperture), in quincunx cloth Put;B) often constructed complete opening sand grout closing behind a medicine hole;
Step 4:Basement rock crushes and excavates;Including:
A) carry out excavation of foundation pit after bored concrete pile curing age terminates, dig principle afterwards in strict accordance with first supportting, be excavated to bedrock surface, Observe bedrock surface cranny development degree:If footing position basement rock has crack, need with by going along with sb. to guard him reserved note in bored concrete pile Slurry hole carries out grouting reinforcing, and ordinary circumstance selects 42.5 high-early (strength) cements, the ratio of mud 0.5, grouting pressure 0.8 ~ 3Mpa;
B) basement rock excavates and adopts the broken digging mode of static fracturing agents, and the Depth Stratification according to foundation ditch crushes and excavates, and excavates Mode is symmetrical from foundation ditch to be advanced to fender post side;
C) Ф 80 in foundation ditch midline position 0# hole, as initial apertures, serves as the free face of Stress Release, and remaining hole is powder charge Hole;
Step 5:The former groove of foundation pit structure pours;Including:Static crushing finishes afterwards scar chipping, because foundation ditch surrounding is Rock surrounds, can be using surrounding scar as template, and directly assembling reinforcement casting concrete in foundation trench, when foundation ditch inner structure is high Start formwork supporting plate from former base scar when former base scar absolute altitude.
The described pin piles set into rock that hangs goes along with sb. to guard him foundation ditch excavation method, also includes, c) for granite in described step one Layer band inner support hangs bottoms fender pile foundation ditch, fender post minimum socket length and minimum country rock thickness:Minimum socket length z=1.5 ~ 2D, D are fender post stake footpath, minimum country rock thickness h=2 ~ 3D;
Grouting Pipe adopt steel pipe or hard PVC pipe, caliber 30 ~ 60mm, pipe end as deep as stake bottom, lower pipe end about 500mm scope Quincunx injected hole, aperture 5 ~ 8mm, spacing 30mm are set, and slip casting plum blossom hole rubber case parcel prevents from blocking, Grouting Pipe upper end Expose the high 20cm of bored concrete pile Guan Liang top mark.
The described pin piles set into rock that hangs goes along with sb. to guard him foundation ditch excavation method, and in described step 4, broken excavation step includes:
The first step:Remove the part sand of 1# medicine in the hole, be scavenged into the Ith grade of excavation line absolute altitude, then fill static fracturing agents, dress Blocked up with sand encapsulation to 4/5 depth, after static fracturing agents expand, rock ruptures to 0# hole free face direction, after catalase finishes Removing is scattered rubble;
Second step:Remove the sand of 0#, 1# and 2# medicine in the hole, fill toward 1# and 2# medicine hole after being scavenged into the IIth grade of excavation line absolute altitude Static fracturing agents, are blocked up with sand encapsulation after being filled to 4/5 depth, and after static fracturing agents expand, rock ruptures to free face direction, rupture The rubble that is scattered is removed after finishing;
3rd step:Remove the sand of 0#, 1#, 2# and 3# medicine in the hole, be scavenged into past 1#, 2# and 3# after the IIIth grade of excavation line absolute altitude Medicine in the hole fills static fracturing agents, is blocked up with sand encapsulation after being filled to 4/5 depth, and after static fracturing agents expand, rock breaks to free face direction Split, rupture removes, after finishing, the rubble that is scattered;
4th step:Remove the sand of 0#, 1#, 2#, 3# and 4# medicine in the hole, be scavenged into after the IVth grade of excavation line absolute altitude toward 1#, 2#, 3# and 4# medicine hole fills static fracturing agents, is blocked up with sand encapsulation after being filled to 4/5 depth, and after static fracturing agents expansion, rock is to free face side To rupture, rupture removes, after finishing, the rubble that is scattered.
The present invention is using shallower punching fender post socket length, and formation is hung pin stake and gone along with sb. to guard him foundation ditch, by pre- in footing Stay certain thickness country rock to guarantee to go along with sb. to guard him foundation horizontal resist forces, basement rock is realized by controlling Static crushing method in foundation ditch Excavation without friction, so that it is guaranteed that deep pit monitor.What the present invention can substantially reduce piles set into rock enters rock depth, saves bored concrete pile Construction period and cost, propose a kind of method that pin piles set into rock building-in depth and country rock thickness are hung in calculating simultaneously, are existing Field construction provides foundation and the safety guarantee of science;Using the mode excavation pit of Static crushing, effective protection foundation ditch props up Protection structure and the safety of surrounding pipeline, have obvious economic benefit and social benefit.
Specific embodiment
The present invention hangs pin piles set into rock and goes along with sb. to guard him foundation ditch excavation method, using shallower punching fender post socket length, shape Become to hang pin stake and go along with sb. to guard him foundation ditch, guarantee to go along with sb. to guard him foundation horizontal resist forces by reserving certain thickness country rock in footing, by foundation ditch Interior controlling Static crushing method, to realize basement rock excavation without friction, so that it is guaranteed that deep pit monitor, lifts base pit engineering benefit.
The present invention comprises the following steps:
Step one:Analysis stratum soil property, determines and goes along with sb. to guard him footing minimum country rock thickness;
Step 2:Construction piles set into rock, arranges grouting behind shaft or drift lining hole;
Step 3:Construction presplitting medicine hole;
Step 4:Basement rock crushes and excavates;
Step 5:The former groove of foundation pit structure pours.
Described step one:Analysis stratum soil property, determines and goes along with sb. to guard him footing minimum country rock thickness it is desirable to include:
Analysis foundation ditch geology soil layer and survey report, take vertical unit length foundation ditch as research object, space problem It is converted into plane problem, calculate the master of the soil body after fender post stake according to the thickness of the layer, natural density, internal friction angle and cohesive strength Dynamic soil pressure, computing formula is:
In formula: e:Active earth pressure, kpa;
γ:The natural density of soil, KN/m;s:The depth of soil, m;
Φ:The internal friction angle of soil, °; C:The cohesive strength of soil, kpa;
Active earth pressure make a concerted effort be E, E=0.5e*s, point of resultant force in 2s/3 depth, the country rock that support pile is subject to Pressure is p;
B) foundation ditch is gone along with sb. to guard him for band inner support piles set into rock it is assumed that support pile building-in depth is z, then pressure from surrounding rock is made a concerted effort For pz, apart from support force T application point a+0.5z, the distance away from support force T application point d for the E is a-s/3, active earth pressure and country rock Pressure takes square to T point, by Σ MT=0, that is,:
In formula:a:Support center is to the distance of country rock top surface, m;
γ:The natural density of soil, kn/m;{ }
s:Foundation depth, m;
c:Cohesive strength, kpa;φ:Internal friction angle, °;
p:Pressure from surrounding rock, kpa;z:Building-in depth.
The solution equation can try to achieve footing pressure from surrounding rock p value size;Stake bottom country rock section turn moment is maximum, and Mmax= 0.5pz2, country rock allowable tensile stress is<σ>, country rock section composite bending modulus are W=h2/ 6, in order that country rock is in trouble free service shape State, needs to meet:W≥Mmax/<σ>, i.e. h2/6≥0.5pz2/<σ>, country rock thickness minimum of a value h can be tried to achieve, actual value can basis Deep pit monitor grade is multiplied by the safety coefficient more than 1;Take different building-in depth z, calculate corresponding country rock by above-mentioned steps Thickness h, considers determination building-in depth and country rock thickness from duration, cost and security standpoint;
C) bottoms fender pile foundation ditch is hung for sial band inner support, fender post minimum socket length and minimum country rock are thick Degree:Minimum socket length z=1.5 ~ 2D(D is fender post stake footpath), minimum country rock thickness h=2 ~ 3D.
Step 2:Construction piles set into rock, arranges grouting behind shaft or drift lining hole;Require to include:
a)Minimum country rock thickness according to determining in step one carries out unwrapping wire, determines grout pile position, and according to step one The building-in depth of middle determination is punched out or drilled pile construction;
b)Install going along with sb. to guard him filling pile cage of reinforcement, after borehole cleaning, pre-buried elongated Grouting Pipe, slip casting in stake holes steel reinforcement cage Pipe can adopt steel pipe or hard PVC pipe, caliber 30 ~ 60mm, and, as deep as stake bottom, the setting of lower pipe end about 500mm scope is quincunx for pipe end Injected hole, aperture about 5 ~ 8mm, spacing about 30mm, slip casting plum blossom hole need to prevent from blocking with rubber case parcel, and Grouting Pipe upper end is exposed The high 20cm of bored concrete pile Guan Liang top mark.
Step 3:Construction presplitting medicine hole;Require to include:
A) in the curing period after the completion of going along with sb. to guard him filling pile construction, carry out the construction of presplitting medicine hole, the arrangement principle in medicine hole is: Arranged to two side row holes with foundation ditch center line, median pore radius are maximum, are gradually reduced to both sides aperture, each according to 1#, 2#, 3#, 4# numbers, and country rock sideline arrangement is close in the right and left outermost medicine hole;Aperture 20mm-100mm, may be selected 80 for sial Mm, 42 mm, 20mm apertures, hole depth is foundation depth, and medicine hole vertical, horizontal spacing is 6d-7d (d is aperture), in quincunx cloth Put;B) often constructed complete opening sand grout closing behind a medicine hole;
Step 4:Basement rock crushes and excavates;Require to include:
A) carry out excavation of foundation pit after bored concrete pile curing age terminates, dig principle afterwards in strict accordance with first supportting, be excavated to bedrock surface, Observe bedrock surface cranny development degree.If footing position basement rock has crack, need with by going along with sb. to guard him reserved note in bored concrete pile Slurry hole carries out grouting reinforcing, and ordinary circumstance selects 42.5 high-early (strength) cements, the ratio of mud 0.5, grouting pressure 0.8 ~ 3Mpa.
B) basement rock excavates and adopts the broken digging mode of static fracturing agents, and the Depth Stratification according to foundation ditch crushes and excavates, and excavates Mode is symmetrical from foundation ditch to be advanced to fender post side.
C) foundation ditch midline position 0# Ф 80 hole is initial apertures, and as the free face of Stress Release, remaining hole is powder charge hole. Broken excavation step:The first step, removes the part sand of 1# medicine in the hole, is scavenged into the Ith grade of excavation line absolute altitude, then fills Static crushing Agent, is blocked up with sand encapsulation after being filled to 4/5 depth, and after static fracturing agents expand, rock ruptures to 0# hole free face direction, catalase The rubble that is scattered is removed after finishing;Second step:Remove the sand of 0#, 1# and 2# medicine in the hole, be scavenged into past after the IIth grade of excavation line absolute altitude 1# and 2# medicine hole fills static fracturing agents, is blocked up with sand encapsulation after being filled to 4/5 depth, and after static fracturing agents expansion, rock is to free face side To rupture, rupture removes, after finishing, the rubble that is scattered;3rd step:Remove the sand of 0#, 1#, 2# and 3# medicine in the hole, be scavenged into the IIIth grade Fill static fracturing agents toward 1#, 2# and 3# medicine in the hole after excavation line absolute altitude, blocked up with sand encapsulation after being filled to 4/5 depth, static fracturing agents After expansion, rock ruptures to free face direction, and rupture removes, after finishing, the rubble that is scattered;4th step:Remove 0#, 1#, 2#, 3# and 4# The sand of medicine in the hole, fills static fracturing agents toward 1#, 2#, 3# and 4# medicine hole after being scavenged into the IVth grade of excavation line absolute altitude, is filled to 4/5 depth Blocked up with sand encapsulation afterwards, after static fracturing agents expand, rock ruptures to free face direction, rupture removes, after finishing, the rubble that is scattered;
Step 5:The former groove of foundation pit structure pours;Require to include:Static crushing finishes afterwards scar chipping, due to foundation ditch four Week is that rock surrounds, can be using surrounding scar as template, and directly assembling reinforcement casting concrete in foundation trench, when foundation ditch inner structure Thing starts formwork supporting plate from former base scar when being higher than former base scar absolute altitude.

Claims (3)

1. one kind is hung pin piles set into rock and is gone along with sb. to guard him foundation ditch excavation method it is characterised in that it includes:
Step one:Analysis stratum soil property, determines and goes along with sb. to guard him footing minimum country rock thickness;Including:
A) according to foundation ditch section, report is surveyed on analysis geology soil layer and ground, takes vertical unit length foundation ditch as research object, sky Between problem be converted into plane problem, according to the thickness of the layer, natural density, internal friction angle and cohesive strength calculate fender post stake after soil The active earth pressure of body, computing formula is:
In formula: e:Active earth pressure, kpa;
γ:The natural density of soil, KN/m;s:The depth of soil, m;
Φ:The internal friction angle of soil, °; C:The cohesive strength of soil, kpa;
Active earth pressure make a concerted effort be E, E=0.5e*s, point of resultant force in 2s/3 depth, the pressure from surrounding rock that support pile is subject to For p;
B) for band inner support piles set into rock go along with sb. to guard him foundation ditch it is assumed that support pile building-in depth be z, then pressure from surrounding rock make a concerted effort be Pz, apart from support force T application point a+0.5z, the distance away from support force T application point d for the E is a-s/3, active earth pressure and country rock pressure Power takes square to T point, by Σ M T=0, that is,:
In formula:a:Support center is to the distance of country rock top surface, m;
γ:The natural density of soil, kn/m;
s:The depth of soil, m;
c:Soil cohesion, kpa;
φ:The internal friction angle of soil, °;
p:Pressure from surrounding rock, kpa;
z:Building-in depth;
The solution equation can try to achieve footing pressure from surrounding rock p value size;Stake bottom country rock section turn moment is maximum, Mmax=0.5pz2, enclose Rock allowable tensile stress is<σ>, country rock section composite bending modulus are W=h2/ 6, in order that country rock is in safe work state, need to meet: W≥Mmax/<σ>, i.e. h2/6≥0.5pz2/<σ>, country rock thickness minimum of a value h can be tried to achieve, actual value is according to deep pit monitor grade It is multiplied by the safety coefficient more than 1;Take different building-in depth z, calculate corresponding country rock thickness h by above-mentioned steps, from the duration, Cost and security standpoint consider determination building-in depth and country rock thickness;
Step 2:Construction piles set into rock, arranges grouting behind shaft or drift lining hole;Including:
a)Minimum country rock thickness according to determining in step one carries out unwrapping wire, determines grout pile position, and according to true in step one Fixed building-in depth is punched out or drilled pile construction;
b)Install going along with sb. to guard him filling pile cage of reinforcement, after borehole cleaning, pre-buried elongated Grouting Pipe in stake holes steel reinforcement cage;
Step 3:Construction presplitting medicine hole;Including:
A) in the curing period after the completion of going along with sb. to guard him filling pile construction, carry out the construction of presplitting medicine hole, the arrangement principle in medicine hole is:With base Hole center line arranges to two side row holes, median pore radius are maximum, are gradually reduced to both sides aperture, each compiles according to 1#, 2#, 3#, 4# Number, country rock sideline arrangement is close in the right and left outermost medicine hole;Aperture 20mm-100mm, for sial select 80 mm, 42 Mm, 20mm aperture, hole depth is foundation depth, and medicine hole vertical, horizontal spacing is 6d-7d, and d is aperture, in quincuncial arrangement;B) every Construct complete opening sand grout closing behind a medicine hole;
Step 4:Basement rock crushes and excavates;Including:
A) carry out excavation of foundation pit after bored concrete pile curing age terminates, dig principle afterwards in strict accordance with first supportting, be excavated to bedrock surface, observe Bedrock surface cranny development degree:If footing position basement rock has crack, need with by going along with sb. to guard him reserved injected hole in bored concrete pile Carry out grouting reinforcing, from 42.5 high-early (strength) cements, the ratio of mud 0.5, grouting pressure 0.8 ~ 3Mpa;
B) basement rock excavates and adopts the broken digging mode of static fracturing agents, and the Depth Stratification according to foundation ditch crushes and excavates, digging mode Symmetrically to the propulsion of fender post side from foundation ditch;
C) Ф 80 in foundation ditch midline position 0# hole, as initial apertures, serves as the free face of Stress Release, and remaining hole is powder charge hole;
Step 5:The former groove of foundation pit structure pours;Including:Static crushing finishes afterwards scar chipping, because foundation ditch surrounding is rock Surround, using surrounding scar as template, directly assembling reinforcement casting concrete in foundation trench, when foundation ditch inner structure is higher than former base Start formwork supporting plate from former base scar during scar absolute altitude.
2. the pin piles set into rock that hangs according to claim 1 goes along with sb. to guard him foundation ditch excavation method it is characterised in that described step one In also include, c) bottoms fender pile foundation ditch hangs for sial band inner support, fender post minimum socket length and minimum country rock are thick Degree:Minimum socket length z=1.5 ~ 2D, D are fender post stake footpath, minimum country rock thickness h=2 ~ 3D,
Grouting Pipe adopts steel pipe or hard PVC pipe, caliber 30 ~ 60mm, and as deep as stake bottom, lower pipe end 500mm scope arranges plum to pipe end Flower-shape injected hole, aperture 5 ~ 8mm, spacing 30mm, slip casting plum blossom hole rubber case parcel prevents from blocking, and filling is exposed in Grouting Pipe upper end Note dowel crown back absolute altitude 20cm.
3. the pin piles set into rock that hangs according to claim 1 goes along with sb. to guard him foundation ditch excavation method it is characterised in that described step 4 In broken excavation step include:
The first step:Remove the part sand of 1# medicine in the hole, be scavenged into the Ith grade of excavation line absolute altitude, then fill static fracturing agents, be filled to 4/ Blocked up with sand encapsulation after 5 depth, after static fracturing agents expand, rock ruptures to 0# hole free face direction, catalase is removed after finishing Be scattered rubble;
Second step:Remove the sand of 0#, 1# and 2# medicine in the hole, after being scavenged into the IIth grade of excavation line absolute altitude, fill static(al) toward 1# and 2# medicine hole Cracking agent, is blocked up with sand encapsulation after being filled to 4/5 depth, and after static fracturing agents expand, rock ruptures to free face direction, and rupture finishes Remove the rubble that is scattered afterwards;
3rd step:Remove the sand of 0#, 1#, 2# and 3# medicine in the hole, be scavenged into past 1#, 2# and 3# medicine hole after the IIIth grade of excavation line absolute altitude Built-in static fracturing agents, are blocked up with sand encapsulation after being filled to 4/5 depth, and after static fracturing agents expand, rock ruptures to free face direction, Rupture removes, after finishing, the rubble that is scattered;
4th step:Remove the sand of 0#, 1#, 2#, 3# and 4# medicine in the hole, be scavenged into after the IVth grade of excavation line absolute altitude toward 1#, 2#, 3# and 4# medicine hole fills static fracturing agents, is blocked up with sand encapsulation after being filled to 4/5 depth, and after static fracturing agents expand, rock breaks to free face direction Split, rupture removes, after finishing, the rubble that is scattered.
CN201410172213.2A 2014-04-28 2014-04-28 Excavation method for outseam rock-socketed cast-in-place pile retaining foundation pit Active CN105019462B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410172213.2A CN105019462B (en) 2014-04-28 2014-04-28 Excavation method for outseam rock-socketed cast-in-place pile retaining foundation pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410172213.2A CN105019462B (en) 2014-04-28 2014-04-28 Excavation method for outseam rock-socketed cast-in-place pile retaining foundation pit

Publications (2)

Publication Number Publication Date
CN105019462A CN105019462A (en) 2015-11-04
CN105019462B true CN105019462B (en) 2017-02-15

Family

ID=54409733

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410172213.2A Active CN105019462B (en) 2014-04-28 2014-04-28 Excavation method for outseam rock-socketed cast-in-place pile retaining foundation pit

Country Status (1)

Country Link
CN (1) CN105019462B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106088165B (en) * 2016-06-13 2018-05-11 贵州正业工程技术投资有限公司 A kind of karst area basement bottom board Anti-floating design method
CN109854285B (en) * 2019-02-28 2020-10-02 长沙有色冶金设计研究院有限公司 Deep vertical shaft supporting structure and construction method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1164606A (en) * 1996-05-07 1997-11-12 邹宗煊 Differential control, nondestructive blasting rock-implanting process for punching, drilling and filling pile for building foundation
KR20100026433A (en) * 2008-08-29 2010-03-10 중앙대학교 산학협력단 Finishing block and retaining wall using the same
CN102518135A (en) * 2011-12-29 2012-06-27 标力建设集团有限公司 Foundation pit support construction method combining horizontal rotary jet-grouting soil bolting and bore concrete piles
CN103046556A (en) * 2011-10-17 2013-04-17 五冶集团上海有限公司 Inside-support-free ring-shaped enclosure structure and manufacturing method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1164606A (en) * 1996-05-07 1997-11-12 邹宗煊 Differential control, nondestructive blasting rock-implanting process for punching, drilling and filling pile for building foundation
KR20100026433A (en) * 2008-08-29 2010-03-10 중앙대학교 산학협력단 Finishing block and retaining wall using the same
CN103046556A (en) * 2011-10-17 2013-04-17 五冶集团上海有限公司 Inside-support-free ring-shaped enclosure structure and manufacturing method thereof
CN102518135A (en) * 2011-12-29 2012-06-27 标力建设集团有限公司 Foundation pit support construction method combining horizontal rotary jet-grouting soil bolting and bore concrete piles

Also Published As

Publication number Publication date
CN105019462A (en) 2015-11-04

Similar Documents

Publication Publication Date Title
CN104264688B (en) Manually digging hole non-uniform pile support construction process
CN106150506B (en) A kind of entrance open excavation section inverted side-wall construction method
CN105648921B (en) Construction method of suspension bridge rock mass and reinforced concrete plate composited type anchorage
CN105239586B (en) Method for supporting foundation pit by adopting support structure
CN106988302B (en) A kind of high inclination-angle competent bed rotary digging pile driving construction engineering method
CN205013013U (en) Secretly dig station supporting construction suitable for last soft hard formation down
CN105134219B (en) Soft rock strata freezing shaft borehole wall construction technology
CN112832802B (en) Large-bottom plate supporting structure and method for asymmetric pressure
CN110284885A (en) Shield inspection-pit construction method
CN104196014A (en) Combined rock-embedded anchor cable slide-resistant pile where round steel is implanted and construction method thereof
CN102828517A (en) Hierarchical control construction method of foundation pit excavation at entrance and exit of station
CN107642041A (en) The hollow clump of piles anchorage of super-large diameter
CN110397050A (en) A kind of light-duty draining barricade of novel beam anchor formula and its construction method
CN105019462B (en) Excavation method for outseam rock-socketed cast-in-place pile retaining foundation pit
CN105019431B (en) Crush and complete alternate steep dip stratified rock masses Large Diameter Super-long Bored Piles construction method
CN204311456U (en) Foundation ditch strengthening structure
CN109208594A (en) Processing method, steel pile casting structure and the drilled pile of sinking steel protecting canister chance boulder
CN104831742B (en) The Method on Dewatering of Foundation Pit that adjacent two layers low pressure water layer is not cut off by water barrier
CN107700434A (en) A kind of dome grating formula armored concrete mud-rock flow blocking dam and its construction process
JP2010522289A (en) Rock blasting method for constructing foundation of transmission tower
CN108775036A (en) A kind of construction method for replacing bored concrete pile
CN108677984A (en) A kind of land sunk well helps heavy technique
CN211080248U (en) Deep foundation pit supporting structure of adjacent road under complex geological condition
KR101437882B1 (en) Tunnel excavating method having various cross sectional shapes
CN209907365U (en) Treatment structure of stepped easily-weathered soft sandstone layer foundation

Legal Events

Date Code Title Description