CN105005659B CN201510419565.8A CN201510419565A CN105005659B CN 105005659 B CN105005659 B CN 105005659B CN 201510419565 A CN201510419565 A CN 201510419565A CN 105005659 B CN105005659 B CN 105005659B
Authority
CN
China
Prior art keywords
cable
span structure
crane span
information
laying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510419565.8A
Other languages
Chinese (zh)
Other versions
CN105005659A (en
Inventor
陈衡
陈一衡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd
Original Assignee
China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd filed Critical China Energy Engineering Group Guangdong Electric Power Design Institute Co Ltd
Priority to CN201510419565.8A priority Critical patent/CN105005659B/en
Publication of CN105005659A publication Critical patent/CN105005659A/en
Application granted granted Critical
Publication of CN105005659B publication Critical patent/CN105005659B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Control And Safety Of Cranes (AREA)

Abstract

The present invention relates to a kind of cable laying method and system, the three-dimensional crane span structure information established by obtaining Three-dimensional Design Software, three-dimensional crane span structure information central bridge is numbered and matched with database central bridge type, find crane span structure type corresponding with crane span structure numbering, realize conversion of the crane span structure numbering to crane span structure type, further according to the crane span structure positional information in the three-dimensional crane span structure information of importing, device location information and crane span structure type form three-dimensional crane span structure model, without by resetting crane span structure positional information in cable laying system, device location information and crane span structure type are to establish three-dimensional crane span structure model.By information matches, the crane span structure numbering in the three-dimensional crane span structure information that Three-dimensional Design Software is established changes into the information of cable laying needs, i.e. crane span structure type, i.e., without being set again to crane span structure type, improves laying efficiency.Most reasonable cable trace is found according to cable laying relevant parameter, it is quick and accurate, searching path is carried out without artificial, improves laying efficiency.

Description

Cable laying method and system
Technical field
The present invention relates to cable laying technical field, more particularly to a kind of cable laying method and system.
Background technology
Cable laying refers to be placed into cable on pre-designed crane span structure path.Pass through the good electricity of Computer Design first The crane span structure path of cable laying, according to the crane span structure path of designed cable laying, cable laying is carried out, obtains cable laying inventory And more intuitively cable layout, during subsequent construction, purchased and constructed according to the information on cable laying inventory.
Using existing cable laying software carry out cable laying when, it is necessary to reference to Three-dimensional Design Software establish three-dimensional bridge Frame illustraton of model, the information that cable laying needs is reset, crane span structure is established, greatly reduces laying efficiency.And need manually to exist The start-stop apparatus of cable connection is found on crane span structure plan, then finds from point device to the optimal path of end device, according to Optimal path, carry out cable laying.It is artificial find optimal path, it is necessary to by laying personnel working experience, workload is big, applies If efficiency is low and result is inaccurate.
The content of the invention
Based on this, it is necessary to for laying the problem of efficiency is low, there is provided a kind of cable laying method for improving laying efficiency And system.
A kind of cable laying method, including step:
Cable laying relevant parameter is set;
Import the three-dimensional crane span structure information that device location information and Three-dimensional Design Software are established;
Crane span structure in the three-dimensional crane span structure information is numbered and matched with database central bridge type, is obtained and the bridge Crane span structure type corresponding to frame numbering;
Crane span structure positional information, the device location information in the three-dimensional crane span structure information and with the crane span structure class Type information, establish three-dimensional crane span structure model;
Import cable inventory;
According to the cable inventory, the device location information, the cable laying relevant parameter and the crane span structure class Type, the most reasonable cable trace of cable point device equipment to terminal from is found in the three-dimensional crane span structure model;
According to the most reasonable cable trace, cable laying is carried out.
The present invention also provides a kind of cable laying system, including:
Setup module, for setting cable laying relevant parameter;
First import modul, the three-dimensional crane span structure information established for importing device location information and Three-dimensional Design Software;
Matching module, for the crane span structure in the three-dimensional crane span structure information to be numbered and the progress of database central bridge type Match somebody with somebody, obtain crane span structure type corresponding with crane span structure numbering;
Model building module, believe for the crane span structure positional information in the three-dimensional crane span structure information, the device location Breath and the crane span structure type, establish three-dimensional crane span structure model;
Second import modul, for importing cable inventory;
Path finding module, for according to the cable inventory, the device location information and the cable laying phase Related parameter and the crane span structure type, the most conjunction of cable point device equipment to terminal from is found in the three-dimensional crane span structure model Manage cable trace;
Module is laid, for the most reasonable cable trace according to, carries out cable laying.
Above-mentioned cable laying method, the three-dimensional crane span structure information established by obtaining Three-dimensional Design Software, believes three-dimensional crane span structure Breath central bridge numbering is matched with database central bridge type, is found crane span structure type corresponding with crane span structure numbering, is realized crane span structure The conversion of crane span structure type is numbered, further according to the crane span structure positional information in the three-dimensional crane span structure information of importing, the equipment position Confidence ceases and crane span structure type forms three-dimensional crane span structure model, without by resetting crane span structure position in cable laying system Confidence breath, device location information and crane span structure type are to establish three-dimensional crane span structure model.By information matches, Three-dimensional Design Software is built Crane span structure numbering in vertical three-dimensional crane span structure information changes into the information of cable laying needs, i.e. crane span structure type, without passing through cable again Laying system resets the information that cable laying needs, i.e., without being set again to crane span structure type, improves laying efficiency. It is each type of, it is necessary to carry out routing according to crane span structure type and cable laying relevant parameter when carrying out Path selection to cable Cable has the crane span structure that each self energy passes through, i.e., each type of cable can only pass through corresponding crane span structure, find and meet that cable applies If the most reasonable cable trace of relevant parameter carries out cable laying.Most reasonable cable road is found according to cable laying relevant parameter Footpath, it is quick and accurate, searching path is carried out without artificial, improves efficiency.
Brief description of the drawings
Fig. 1 is the flow chart of the cable laying method of an embodiment;
Fig. 2 is the flow chart of the cable laying method of another embodiment;
Fig. 3 is the sub-process figure of the cable laying method of another embodiment;
Fig. 4 is the sub-process figure of the cable laying method of another embodiment;
Fig. 5 is the sub-process figure of the cable laying method of another embodiment;
Fig. 6 is the module diagram of the cable laying system of an embodiment;
Fig. 7 is the submodule schematic diagram of the cable laying system of another embodiment;
Fig. 8 is the module diagram of the cable laying system of another embodiment.
Embodiment
Referring to Fig. 1, a kind of cable laying method of embodiment is provided, including step:
S100:Cable laying relevant parameter is set.
For a Design of Cable Layout engineering, the database of a corresponding engineering need to be established.It is new by establishing one Project, that is, a new engineering, the difference of each Design of Cable Layout engineering is, it is necessary to individually to cable laying relevant parameter Set, when carrying out cable trace selection, the difference of cable laying relevant parameter, obtained most reasonable cable trace also with Difference.
S200:Import the three-dimensional crane span structure information that device location information and Three-dimensional Design Software are established.
The three-dimensional crane span structure information that Three-dimensional Design Software is established is imported into cable laying system, set so as to obtain three-dimensional Count the three-dimensional crane span structure information that software is established.When designing three-dimensional crane span structure using Three-dimensional Design Software, three-dimensional crane span structure letter is not only established Breath, and device location information can be obtained, device location information export is converted into EXCEL forms, imported into cable laying In system.Device location information provides foundation for the position of the follow-up equipment for determining the connection of cable both ends.
S300:Crane span structure in three-dimensional crane span structure information is numbered and matched with database central bridge type, acquisition and crane span structure Crane span structure type corresponding to numbering.
When carrying out Path selection to cable, it is necessary to carry out routing according to crane span structure type and cable laying relevant parameter. In database, there is corresponding relation in crane span structure numbering with crane span structure type, by information matches, obtains and is established with Three-dimensional Design Software Three-dimensional crane span structure information in crane span structure numbering matching crane span structure type, for example, in database, crane span structure and control that numbering is C Class crane span structure is corresponding, by information matches, control class crane span structure corresponding with the crane span structure that numbering is C is obtained, so as to which three dimensional design is soft Three-dimensional crane span structure information in part is converted to the type of cable of cable laying needs, without resetting crane span structure type again, i.e., need not Crane span structure type is set again, improves efficiency.
S400:Crane span structure positional information, device location information and crane span structure type in three-dimensional crane span structure information, establish three Tie up crane span structure model.
Using prior art carry out cable laying when, it is necessary to according to Three-dimensional Design Software establish three-dimensional crane span structure information, lead to Cross and crane span structure positional information, device location information and crane span structure type are reset in cable laying system to establish three-dimensional crane span structure Model.In the present embodiment, according to crane span structure positional information, device location information and and the crane span structure in the three-dimensional crane span structure information of importing The crane span structure type of numbering matching forms three-dimensional crane span structure model, without by resetting crane span structure position in cable laying system Confidence breath, device location information and crane span structure type are to establish three-dimensional crane span structure model.So as to which effectively Three-dimensional Design Software be built Vertical three-dimensional crane span structure Information application improves efficiency and accuracy into cable laying system.
S500:Import cable inventory.
In the present embodiment, cable inventory includes cable number, type of cable, cable specification, cable color and cable The information such as start-stop apparatus information.Cable number, type of cable, cable that cable inventory refers to preparing needs into laying is imported to advise In the information input data storehouses such as lattice, cable color and cable start-stop apparatus information, to be laid.
S600:According to cable inventory, device location information, cable laying relevant parameter and crane span structure type, in three-dimensional bridge The most reasonable cable trace of cable point device equipment to terminal from is found in frame model.
By the cable start-stop apparatus information in device location information and cable inventory, cable both ends are connected respectively Play point device and end device carries out position positioning, so that cable laying system knows what cable since where, terminates at Place.By the device location information of importing, what cable laying system positioning cable connected respectively plays point device and end device, really Protect the accuracy of equipment positioning.Cable need to connect two equipment respectively by crane span structure, find between point device and end device Most reasonable cable trace when, the difference of cable laying relevant parameter, the most reasonable cable trace eventually found is also different.Example Such as, look for cable from most reasonable cable trace between starting point device A to terminal equipment B when, the electricity in cable laying relevant parameter Cable type is different from the corresponding relation of cable testing bridge, and crane span structure that cable can pass through and the crane span structure that cannot pass through can change, so as to The path of searching does not also pass through.
S700:According to most reasonable cable trace, cable laying is carried out.
After being laid to cable, user thinks that some cable traces need to adjust, and can pass through the people on display interface For specified path, after cable laying system receives the information of artificial specified path, change the path that cable was originally laid.
Above-mentioned cable laying method, the three-dimensional crane span structure information established by obtaining Three-dimensional Design Software, believes three-dimensional crane span structure Breath central bridge numbering is matched with database central bridge type, is found crane span structure type corresponding with crane span structure numbering, is realized crane span structure Number the conversion of crane span structure type, further according to the crane span structure positional information in the three-dimensional crane span structure information of importing, device location information with And crane span structure type forms three-dimensional crane span structure model, without by reset in cable laying system crane span structure positional information, Device location information and crane span structure type are to establish three-dimensional crane span structure model.By information matches, three that Three-dimensional Design Software is established Crane span structure numbering in dimension crane span structure information changes into the information of cable laying needs, i.e. crane span structure type, without passing through cable laying system again System resets the information that cable laying needs, i.e., without being set again to crane span structure type, improves laying efficiency.To cable , it is necessary to carry out routing according to crane span structure type and cable laying relevant parameter when carrying out Path selection, each type of cable has The crane span structure that each self energy passes through, i.e., each type of cable can only pass through corresponding crane span structure, find and meet cable laying correlation The most reasonable cable trace of parameter carries out cable laying.Most reasonable cable trace is found according to cable laying relevant parameter, fast And it is accurate, searching path is carried out without artificial, improves efficiency.
In one of the embodiments, the crane span structure positional information in three-dimensional crane span structure information, device location information and Crane span structure type, establish the step S400 of three-dimensional crane span structure model also includes step afterwards:
According to three-dimensional crane span structure model, generate three-dimensional crane span structure figure and show.
Three-dimensional crane span structure figure is shown, facilitates the observation of user.
In one of the embodiments, according to most reasonable cable trace, also wrap after the step S700 of cable laying Include step:
Generation cable layout is simultaneously shown.
After the completion of cable laying, according to cable laying result, cable layout is generated, and cable layout is shown, i.e., The cable layout of generation is shown on the display interface of cable laying system, facilitates user more intuitively to observe.
Referring to Fig. 2, in one of the embodiments, according to cable inventory, device location information, the related ginseng of cable laying Number and crane span structure type, cable point device most reasonable cable trace of equipment to terminal from is found in three-dimensional crane span structure model Step S600 includes step:
S610:According to cable inventory, device location information and crane span structure type, to cable from point device equipment to terminal Meet cable laying relevant parameter cable trace carry out length computation.
Cable laying is carried out using traditional cable laying method, when finding optimal path, it is necessary to manually measure cable Length, manually to calculate length of the cable by path, the arrangement in space can not be considered, workload is big and measuring and calculating is inaccurate, Waste time and energy, efficiency is low.And it is hardly formed the record of cable trace and length inventory and the clear and definite file of guiding construction.Pass through Cable laying system measuring and calculating cable passes through the path length of crane span structure, path that can be with accurate measure cable in space, it is quick and Accuracy is high, can form the record of cable trace and length inventory and the clear and definite file of guiding construction, aspect user check.
S620:According to cable allowance and the cable trace length of calculating, cable length information is obtained.
Cable length needs to provide foundation to purchase during subsequent construction, however, the cable trace length being calculated is straight Line length, in practice of construction, cable is possible to bend, and can so cause cable not enough, so as to setting by cable allowance It is fixed, along with the cable allowance of setting on the cable trace length of calculating, cable length information is obtained, follow-up basis should Cable length information is purchased, it is ensured that cable is enough.
S630:It is most reasonable cable to select the most short cable trace for meeting cable laying relevant parameter of cable trace length Path.
In one of the embodiments, cable laying relevant parameter include type of cable and crane span structure type corresponding relation, Type of cable, cable plot ratio, cable allowance, cable color, cable specification, crane span structure color, cable color and crane span structure color Corresponding relation.
Type of cable, cable start-stop apparatus information in crane span structure type, device location information, cable inventory, cable The corresponding relation and cable color of cable plot ratio, type of cable and crane span structure type in color, cable laying relevant parameter With the corresponding relation of crane span structure color, the most reasonable cable of cable point device equipment to terminal from is found in three-dimensional crane span structure model Path.
Cable laying relevant parameter refers to carry out laid condition setting according to specific laying, to reach the mesh accurately laid 's.For example, type of cable different types of crane span structure corresponding with the different types of cable of corresponding relation expression of crane span structure type, passes through Type of cable and the setting of the corresponding relation of crane span structure type, make cable cannot pass through not corresponding crane span structure, reach laying.Cable holds Product rate expression cable accounts for crane span structure area when passing through crane span structure to cable area, passes through the setting to cable plot ratio so that through passing a bridge When the cable count of frame has exceeded cable plot ratio, sufficient cable laying relevant parameter with thumb down, then need to look for cable another Path.The corresponding relation of cable color and crane span structure color represent cable color passes through with cable in pathfinding crane span structure color will Match somebody with somebody, if mismatching, cable can not be passed through on the crane span structure.The setting of above-mentioned cable laying relevant parameter, to meet quickly, accurately to enter Row path finding purpose.
Cable laying relevant parameter also includes path display mode and cable crane span structure length computation mode etc. up and down, passes through Setting to crane span structure length computation mode above and below path display mode and cable, cable laying system are joined according to the correlation of setting Number is operated accordingly.Path display mode is included by crane span structure numbering display, i.e., after cable laying is carried out, display cable warp The crane span structure crossed, so that user observes.
Please continue to refer to Fig. 2, in one of the embodiments, according to most reasonable cable trace, cable laying step is carried out Include step after S700:
S800:According to the cable length information of most reasonable cable trace and most reasonable cable trace, cable laying is formed Inventory.
Information of the workmen in cable laying inventory, is purchased to cable, it is ensured that various cable buyings are corresponding Length, workmen can know clearly the path that cable passes through, when carrying out site operation, it is ensured that accuracy.
In one of the embodiments, according to most reasonable cable trace, after cable laying step S700 also include Step:
Cabling is counted, forms cable statistical form.
Cabling is counted by using cable laying system, it is quick accurate without artificial statistics.
Referring to Fig. 3, in one of the embodiments, above-mentioned cable laying method also includes step:
S910:Receive the change order to cable laying relevant parameter;
S920:According to the cable laying relevant parameter that change order change is selected.
Different engineerings, corresponding different three-dimensional cable laying information, when finding most reasonable cable trace, according to electricity Cable laying relevant parameter may be also different, so as to need that cable laying relevant parameter is modified, to meet different occasions Demand.
Referring to Fig. 4, in one of the embodiments, above-mentioned cable laying method also includes step:
S930:Receive the increase order to cable laying relevant parameter;
S940:Increase cable laying relevant parameter is ordered according to increase.
When the cable laying relevant parameter set is inadequate, it is also necessary to increase cable laying relevant parameter to meet difference Cable laying engine request.
Referring to Fig. 5, in one of the embodiments, above-mentioned cable laying method also includes step:
S950:Receive the delete command to cable laying relevant parameter;
S960:Selected cable laying relevant parameter is deleted according to delete command.
Cable laying engineering in cable laying relevant parameter without during one or more parameters, related to cable laying can join Number is deleted.
Referring to Fig. 6, a kind of cable laying system of embodiment is provided, including setup module 100, the first import modul 200th, matching module 300, model building module 400, the second import modul 500, path finding module 600 and laying module 700。
Setup module 100, for setting cable laying relevant parameter.
For a Design of Cable Layout engineering, the database of a corresponding engineering need to be established.It is new by establishing one Project, that is, a new engineering, the difference of each Design of Cable Layout engineering is, it is necessary to individually to cable laying relevant parameter Set, when carrying out cable trace selection, the difference of cable laying relevant parameter, obtained most reasonable cable trace also with Difference.
First import modul 200, the three-dimensional crane span structure letter established for importing device location information and Three-dimensional Design Software Breath.
The three-dimensional crane span structure information that Three-dimensional Design Software is established is imported into cable laying system, set so as to obtain three-dimensional Count the three-dimensional crane span structure information that software is established.When designing three-dimensional crane span structure using Three-dimensional Design Software, three-dimensional crane span structure letter is not only established Breath, and device location information can be obtained, device location information export is converted into EXCEL forms, imported into cable laying In system.Device location information provides foundation for the position of the follow-up equipment for determining the connection of cable both ends.
Modular converter 300, matched for the crane span structure in three-dimensional crane span structure information to be numbered with database central bridge type, Obtain crane span structure type corresponding with crane span structure numbering.
When carrying out Path selection to cable, it is necessary to carry out routing according to crane span structure type and cable laying relevant parameter. In database, there is corresponding relation in crane span structure numbering with crane span structure type, by information matches, obtains and is established with Three-dimensional Design Software Three-dimensional crane span structure information in crane span structure numbering matching crane span structure type, for example, in database, crane span structure and control that numbering is C Class crane span structure is corresponding, by information matches, control class crane span structure corresponding with the crane span structure that numbering is C is obtained, so as to which three dimensional design is soft Three-dimensional crane span structure information in part is converted to the type of cable of cable laying needs, without resetting crane span structure type again, i.e., need not Crane span structure type is set again, improves efficiency.
Model building module 400, for the crane span structure positional information in three-dimensional crane span structure information, device location information and Crane span structure type, establish three-dimensional crane span structure model.
Using prior art carry out cable laying when, it is necessary to according to Three-dimensional Design Software establish three-dimensional crane span structure information, lead to Cross and crane span structure positional information, device location information and crane span structure type are reset in cable laying system to establish three-dimensional crane span structure Model.In the present embodiment, according to crane span structure positional information, device location information and and the crane span structure in the three-dimensional crane span structure information of importing The crane span structure type of numbering matching forms three-dimensional crane span structure model, without by resetting crane span structure position in cable laying system Confidence breath, device location information and crane span structure type are to establish three-dimensional crane span structure model.So as to which effectively Three-dimensional Design Software be built Vertical three-dimensional crane span structure Information application improves efficiency and accuracy into cable laying system.
Second import modul 500, for importing cable inventory.
In the present embodiment, cable inventory includes cable number, type of cable, cable specification, cable color and cable The information such as start-stop apparatus information.Cable number, type of cable, cable that cable inventory refers to preparing needs into laying is imported to advise In the information input data storehouses such as lattice, cable color and cable start-stop apparatus information, to be laid.
Path finding module 600, for according to cable inventory, device location information and cable laying relevant parameter and Crane span structure type, the most reasonable cable trace of cable point device equipment to terminal from is found in three-dimensional crane span structure model.
By the cable start-stop apparatus information in device location information and cable inventory, cable both ends are connected respectively Play point device and end device carries out position positioning, so that cable laying system knows what cable since where, terminates at Place.By the device location information of importing, what cable laying system positioning cable connected respectively plays point device and end device, really Protect the accuracy of equipment positioning.Cable need to connect two equipment respectively by crane span structure, find between point device and end device Most reasonable cable trace when, the difference of cable laying relevant parameter, the most reasonable cable trace eventually found is also different.Example Such as, look for cable from most reasonable cable trace between starting point device A to terminal equipment B when, the electricity in cable laying relevant parameter Cable type is different from the corresponding relation of cable testing bridge, and crane span structure that cable can pass through and the crane span structure that cannot pass through can change, so as to The path of searching does not also pass through.
Module 700 is laid, for according to most reasonable cable trace, carrying out cable laying.
After being laid to cable, user thinks that some cable traces need to adjust, and can pass through the people on display interface For specified path, after laying module 700 receives the information of artificial specified path, change the path that cable was originally laid.
Above-mentioned cable laying system, the three-dimensional crane span structure information established by obtaining Three-dimensional Design Software, believes three-dimensional crane span structure Breath central bridge numbering is matched with database central bridge type, is found crane span structure type corresponding with crane span structure numbering, is realized crane span structure Number the conversion of crane span structure type, further according to the crane span structure positional information in the three-dimensional crane span structure information of importing, device location information with And crane span structure type forms three-dimensional crane span structure model, without by reset in cable laying system crane span structure positional information, Device location information and crane span structure type are to establish three-dimensional crane span structure model.By information matches, three that Three-dimensional Design Software is established Crane span structure numbering in dimension crane span structure information changes into the information of cable laying needs, i.e. crane span structure type, without passing through cable laying system again System resets the information that cable laying needs, i.e., without being set again to crane span structure type, improves laying efficiency.To cable , it is necessary to carry out routing according to crane span structure type and cable laying relevant parameter when carrying out Path selection, each type of cable has The crane span structure that each self energy passes through, i.e., each type of cable can only pass through corresponding crane span structure, find and meet cable laying correlation The most reasonable cable trace of parameter carries out cable laying.Most reasonable cable trace is found according to cable laying relevant parameter, fast And it is accurate, searching path is carried out without artificial, improves efficiency.
Referring to Fig. 7, in one of the embodiments, above-mentioned cable laying system also includes:
Image generation module 800, for generating cable layout;
Display module 900, for showing cable layout.
After the completion of cable laying, according to cable laying result, cable layout is generated, electricity is shown by display module 900 Cable laying figure, the cable layout that will be formed is shown on the display interface of cable laying system, facilitates user more intuitive Observation.
In one of the embodiments, graph generation module 800, it is additionally operable to, according to three-dimensional crane span structure model, generate three-dimensional bridge Frame figure;
Display module 900, it is additionally operable to show three-dimensional crane span structure figure.
Three-dimensional crane span structure figure is shown, facilitates the observation of user.
Referring to Fig. 8, in one of the embodiments, path finding module 600 includes length computation module 610 and choosing Select module 620.
Length computation module 610, for according to cable inventory, device location information and crane span structure type, to cable from Point device to terminal equipment meet cable laying relevant parameter cable trace carry out length computation;It is additionally operable to abundant according to cable Amount and the cable trace length calculated, obtain cable length information.
Cable laying is carried out using traditional cable laying method, when finding optimal path, it is necessary to manually measure cable Length, manually to calculate length of the cable by path, the arrangement in space can not be considered, workload is big and measuring and calculating is inaccurate, Waste time and energy, efficiency is low.And it is hardly formed the record of cable trace and length inventory and the clear and definite file of guiding construction.Pass through Cable laying system measuring and calculating cable passes through the path length of crane span structure, path that can be with accurate measure cable in space, it is quick and Accuracy is high, can form the record of cable trace and length inventory and the clear and definite file of guiding construction, aspect user check.
Cable length needs to provide foundation to purchase during subsequent construction, however, the cable trace length being calculated is straight Line length, in practice of construction, cable is possible to bend, and can so cause cable not enough, so as to setting by cable allowance It is fixed, along with the cable allowance of setting on the cable trace length of calculating, cable length information is obtained, follow-up basis should Cable length information is purchased, it is ensured that cable is enough, avoids the adjustment in work progress with doing over again.
Selecting module 620, for selecting the most short cable trace for meeting cable laying relevant parameter of cable trace length For most reasonable cable trace.
In one of the embodiments, cable laying relevant parameter include type of cable and crane span structure type corresponding relation, Type of cable, cable plot ratio, cable allowance, cable color, cable specification, crane span structure color, cable color and crane span structure color Corresponding relation.
Path finding module 600, specifically for the type of cable in cable inventory, cable start-stop apparatus information, electricity Cable plot ratio, type of cable pass corresponding with crane span structure type in cable color, device location information, cable laying relevant parameter System and cable color and the corresponding relation of crane span structure color, searching cable point device from is set to terminal in three-dimensional crane span structure model Standby most reasonable cable trace.
Cable laying relevant parameter refers to carry out laid condition setting according to specific laying, to reach the mesh accurately laid 's.For example, type of cable different types of crane span structure corresponding with the different types of cable of corresponding relation expression of crane span structure type, passes through Type of cable and the setting of the corresponding relation of crane span structure type, make cable cannot pass through not corresponding crane span structure, reach laying.Cable holds Product rate expression cable accounts for crane span structure area when passing through crane span structure to cable area, passes through the setting to cable plot ratio so that through passing a bridge When the cable count of frame has exceeded cable plot ratio, sufficient cable laying relevant parameter with thumb down, then need to look for cable another Path.The corresponding relation of cable color and crane span structure color represent cable color passes through with cable in pathfinding crane span structure color will Match somebody with somebody, if mismatching, cable can not be passed through on the crane span structure.The setting of above-mentioned cable laying relevant parameter, to meet quickly, accurately to enter Row path finding purpose.
Cable laying relevant parameter also includes path display mode and cable crane span structure length computation mode etc. up and down, passes through Setting of the setup module 100 to crane span structure length computation mode above and below path display mode and cable, cable laying system according to The relevant parameter of setting is operated accordingly.Path display mode includes by crane span structure numbering display, that is, carrying out cable laying Afterwards, the crane span structure that cable passes through is shown, so that user observes.
In one of the embodiments, above-mentioned cable laying system also includes:
Inventory forms module 1000, for the cable length letter according to most reasonable cable trace and most reasonable cable trace Breath, form cable laying inventory.
Information of the workmen in cable laying inventory, is purchased to cable, it is ensured that various cable buyings are corresponding Length, workmen can know clearly the path that cable passes through, when carrying out site operation, it is ensured that accuracy, and can improve and apply Work efficiency rate.
In one of the embodiments, above-mentioned cable laying system also includes:
Statistical module 1100, for being counted to cabling, form cable statistical form.
Cabling is counted by using cable laying system, without artificial statistics, reduces the mistake manually counted Difference, improve laying accuracy and laying speed.Cable statistical form includes most reasonable cable trace and most reasonable cable road The cable length information in footpath, result statistics is laid according to a large amount of actual cables, passes through above-mentioned cable laying method, average energy saving More than 10% cable.
In one of the embodiments, above-mentioned setup module 100 includes:
Module is changed, for receiving the change order to cable laying relevant parameter, selected according to change order change Cable laying relevant parameter.
Different engineerings, corresponding different three-dimensional cable laying information, when finding most reasonable cable trace, according to electricity Cable laying relevant parameter may be also different, so as to need that cable laying relevant parameter is modified, to meet different occasions Demand.
In one of the embodiments, above-mentioned setup module 100 also includes:
Increase module, for receiving the increase order to cable laying relevant parameter, order increase cable to apply according to increase If relevant parameter.
When the cable laying relevant parameter set is inadequate, it is also necessary to increase cable laying relevant parameter to meet difference Cable laying engine request.
In one of the embodiments, above-mentioned setup module 100 also includes:
Removing module, for receiving the delete command to cable laying relevant parameter, according to selected by being deleted delete command Cable laying relevant parameter.
Cable laying engineering in cable laying relevant parameter without during one or more parameters, related to cable laying can join Number is deleted.
Each technical characteristic of above example can be combined arbitrarily, to make description succinct, not to above-described embodiment In each technical characteristic it is all possible combination be all described, as long as however, lance is not present in the combination of these technical characteristics Shield, all it is considered to be the scope of this specification record.
Above example only expresses the several embodiments of the present invention, and its description is more specific and detailed, but can not Therefore it is construed as limiting the scope of the patent.It should be pointed out that for the person of ordinary skill of the art, On the premise of not departing from present inventive concept, various modifications and improvements can be made, these belong to protection scope of the present invention. Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (10)

  1. A kind of 1. cable laying method, it is characterised in that including step:
    Cable laying relevant parameter is set;
    Import the three-dimensional crane span structure information that device location information and Three-dimensional Design Software are established;
    Crane span structure in the three-dimensional crane span structure information is numbered and matched with database central bridge type, obtains and is compiled with the crane span structure Crane span structure type corresponding to number;
    Crane span structure positional information, the device location information in the three-dimensional crane span structure information and believe with the crane span structure type Breath, establishes three-dimensional crane span structure model;
    Import cable inventory;
    According to the cable inventory, the device location information, the cable laying relevant parameter and the crane span structure type, The most reasonable cable trace of cable point device equipment to terminal from is found in the three-dimensional crane span structure model;
    According to the most reasonable cable trace, cable laying is carried out.
  2. 2. cable laying method according to claim 1, it is characterised in that according to the cable inventory, the equipment position Confidence breath, the cable laying relevant parameter and the crane span structure type, cable is found in the three-dimensional crane span structure model from Point device to terminal the most reasonable cable trace of equipment the step of include step:
    According to the cable inventory, the device location information and the crane span structure type, to cable from described point device to The cable trace for meeting the cable laying relevant parameter of the end device carries out length computation;
    According to cable allowance and the cable trace length of the calculating, cable length information is obtained;
    The most short cable trace for meeting the cable laying relevant parameter of cable trace length is selected as the most reasonable cable Path.
  3. 3. cable laying method according to claim 1 or 2, it is characterised in that the cable laying relevant parameter includes Corresponding relation, type of cable, cable plot ratio, cable allowance, cable color, the cable of the type of cable and crane span structure type are advised Lattice, crane span structure color, the corresponding relation of cable color and crane span structure color;The cable inventory includes cable number, type of cable, electricity Cable specification, cable color and cable start-stop apparatus information;
    According to the cable inventory, the device location information, the cable laying relevant parameter and the crane span structure type, In the three-dimensional crane span structure model find cable from point device to terminal the most reasonable cable trace of equipment the step of also include step Suddenly:
    The type of cable, the cable in the crane span structure type, the device location information, the cable inventory rise Only the cable plot ratio in facility information, the cable color, the cable laying relevant parameter, the type of cable with The corresponding relation of crane span structure type and the cable color and the corresponding relation of crane span structure color, seek in the three-dimensional crane span structure model Look for the most reasonable cable trace of cable point device equipment to terminal from.
  4. 4. cable laying method according to claim 2, it is characterised in that the most reasonable cable trace of the basis, carry out Include step after cable laying step:
    According to the cable length information of the most reasonable cable trace and the most reasonable cable trace, it is clear to form cable laying It is single.
  5. 5. cable laying method according to claim 1, it is characterised in that most reasonable cable trace described in the basis, Carry out including step after cable laying step:
    Generation cable layout is simultaneously shown.
  6. A kind of 6. cable laying system, it is characterised in that including:
    Setup module, for setting cable laying relevant parameter;
    First import modul, the three-dimensional crane span structure information established for importing device location information and Three-dimensional Design Software;
    Matching module, matched, obtained with database central bridge type for the crane span structure in the three-dimensional crane span structure information to be numbered Take crane span structure type corresponding with crane span structure numbering;
    Model building module, for the crane span structure positional information in the three-dimensional crane span structure information, the device location information with And the crane span structure type, establish three-dimensional crane span structure model;
    Second import modul, for importing cable inventory;
    Path finding module, for according to the related ginseng of the cable inventory, the device location information and the cable laying Several and described crane span structure type, in the three-dimensional crane span structure model find cable from point device to terminal equipment most rationally electricity Cable path;
    Module is laid, for the most reasonable cable trace according to, carries out cable laying.
  7. 7. cable laying system according to claim 6, it is characterised in that path finding module includes:
    Length computation module, for according to the cable inventory, the device location information and the crane span structure type, to cable The cable trace for meeting the cable laying relevant parameter of point device to the end device carries out length computation from described; The cable trace length according to cable allowance and the calculating is additionally operable to, obtains cable length information;
    Selecting module, the cable trace for meeting the cable laying relevant parameter for selecting cable trace length most short are institute State most reasonable cable trace.
  8. 8. the cable laying system according to claim 6 or 7, it is characterised in that the cable laying relevant parameter includes Corresponding relation, type of cable, cable plot ratio, cable allowance, cable color, the cable of the type of cable and crane span structure type are advised Lattice, crane span structure color, the corresponding relation of cable color and crane span structure color;The cable inventory includes cable number, type of cable, electricity Cable specification, cable color and cable start-stop apparatus information;
    The path finding module, set specifically for the type of cable in the cable inventory, the cable start-stop The cable plot ratio in standby information, the cable color, the device location information, the cable laying relevant parameter, The type of cable and the corresponding relation of crane span structure type and the cable color and the corresponding relation of crane span structure color, described three Tie up the most reasonable cable trace that cable point device equipment to terminal from is found in crane span structure model.
  9. 9. cable laying system according to claim 7, it is characterised in that also include:
    Inventory forms module, for the cable length of most reasonable cable trace and the most reasonable cable trace letter according to Breath, form cable laying inventory.
  10. 10. cable laying system according to claim 6, it is characterised in that also include:
    Graph generation module, for generating cable layout;
    Display module, for showing the cable layout.
CN201510419565.8A 2015-07-16 2015-07-16 cable laying method and system Active CN105005659B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510419565.8A CN105005659B (en) 2015-07-16 2015-07-16 cable laying method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510419565.8A CN105005659B (en) 2015-07-16 2015-07-16 cable laying method and system

Publications (2)

Publication Number Publication Date
CN105005659A CN105005659A (en) 2015-10-28
CN105005659B true CN105005659B (en) 2018-01-05

Family

ID=54378335

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510419565.8A Active CN105005659B (en) 2015-07-16 2015-07-16 cable laying method and system

Country Status (1)

Country Link
CN (1) CN105005659B (en)

Families Citing this family (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105574235B (en) * 2015-12-10 2019-05-10 国网山东省电力公司经济技术研究院 Cable and earth work amount statistics nucleus correcting system and method are installed by substation
CN107368909A (en) * 2016-05-13 2017-11-21 张德操 It is a kind of to solve cable with BIM technology(Line)The method that laying calculates with dosage
CN106096079B (en) * 2016-05-26 2020-05-01 中国能源建设集团广东省电力设计研究院有限公司 Design method and system for improving cable laying length precision
CN106021758A (en) * 2016-05-26 2016-10-12 中国能源建设集团广东省电力设计研究院有限公司 Design method for cable laying and cable laying system
CN106126824A (en) * 2016-06-27 2016-11-16 武汉开目信息技术有限责任公司 The laying method of cable in a kind of three-dimensional assembly simulation
CN106202622A (en) * 2016-06-27 2016-12-07 武汉开目信息技术有限责任公司 Along the method for the quick laying wires of spiral path in a kind of three-dimensional assembly simulation
CN106407505B (en) * 2016-08-24 2019-11-19 江苏国泰新点软件有限公司 Based on Revit platform bridge rack wiring method and apparatus
CN106980708B (en) * 2017-02-23 2020-11-27 国网河北省电力公司石家庄供电分公司 Cable laying space occupation analysis method and system in cable channel
CN107103559A (en) * 2017-06-29 2017-08-29 大唐贵州兴仁发电有限公司 A kind of cable " price fixing scale " laying system
CN107563023A (en) * 2017-08-18 2018-01-09 中广核工程有限公司 A kind of nuclear power plant's three-dimensional Design of Cable Layout system and method
CN107657093A (en) * 2017-09-14 2018-02-02 广东电网有限责任公司东莞供电局 A kind of cable laying tractive force and lateral pressure method
CN107818233B (en) * 2017-11-30 2021-03-02 中广核工程有限公司 Nuclear power plant cable laying design path optimization method and system
CN108182313B (en) * 2017-12-26 2021-04-27 海洋石油工程(青岛)有限公司 Method for setting cable path section
CN109087058B (en) * 2018-07-05 2021-06-29 国家电网有限公司 On-site operation terminal, server and system for cable laying of transformer substation
CN111293632A (en) * 2018-12-07 2020-06-16 中车唐山机车车辆有限公司 Modularized pre-wiring method for railway vehicle and simulation wire slot
CN109858087B (en) * 2018-12-26 2021-03-26 中冶南方都市环保工程技术股份有限公司 Electrical pipeline laying collaborative design method
CN109948277A (en) * 2019-03-28 2019-06-28 盐城市科恒达材料有限公司 A kind of Design of Cable Layout method
CN110162880B (en) * 2019-05-22 2023-05-16 上海电力设计院有限公司 Optical cable laying method, device, equipment and medium
CN110401145B (en) * 2019-06-24 2021-01-19 国网山西电力勘测设计研究院有限公司 Cable laying method
CN110442996B (en) * 2019-08-13 2020-07-14 四川电力设计咨询有限责任公司 Intelligent entity cable laying method based on PDMS platform
CN110880717B (en) * 2019-11-04 2021-11-12 中国电力工程顾问集团中南电力设计院有限公司 Automatic cable laying method based on equipment and bridge positioning digitization
CN111400899B (en) * 2020-03-13 2023-11-28 广州轨道交通建设监理有限公司 Processing method, system and storage medium for cable laying modeling
CN112418549A (en) * 2020-12-03 2021-02-26 华能秦煤瑞金发电有限责任公司 Cable in-out management method
CN112561195A (en) * 2020-12-23 2021-03-26 华能秦煤瑞金发电有限责任公司 Refined cable management and control method
CN112733234B (en) * 2021-01-08 2024-03-19 珠海新势力创建筑设计有限公司 Device for automatically calculating and generating three-dimensional bridge based on cable information transmission
CN114006312B (en) * 2021-09-29 2023-12-19 中国水利水电第六工程局有限公司 BIM-based cable laying method
CN113987639A (en) * 2021-10-27 2022-01-28 中铁建华南建设有限公司 Intelligent three-dimensional cable addressing analysis system and method based on subway BIM model
CN114491729A (en) * 2021-12-22 2022-05-13 中建安装集团有限公司 Intelligent calculation system for installing cable

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102156776A (en) * 2011-04-08 2011-08-17 中国核电工程有限公司 Method for establishing cable bridge network by using relational database
CN102254056A (en) * 2011-04-08 2011-11-23 中国核电工程有限公司 Method for designing cable path of nuclear power station
CN103258300A (en) * 2013-04-15 2013-08-21 河北省电力勘测设计研究院 Method for designing cable bridge in cable passage of thermal power plant
CN104376171A (en) * 2014-11-17 2015-02-25 陕西合信诚铭软件科技有限公司 Automatic design method and system for terminal block drawing and cable detailed list

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102156776A (en) * 2011-04-08 2011-08-17 中国核电工程有限公司 Method for establishing cable bridge network by using relational database
CN102254056A (en) * 2011-04-08 2011-11-23 中国核电工程有限公司 Method for designing cable path of nuclear power station
CN103258300A (en) * 2013-04-15 2013-08-21 河北省电力勘测设计研究院 Method for designing cable bridge in cable passage of thermal power plant
CN104376171A (en) * 2014-11-17 2015-02-25 陕西合信诚铭软件科技有限公司 Automatic design method and system for terminal block drawing and cable detailed list

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
核电三维可视化电缆敷设协同设计平台研究与应用;邱永生 等;《中国核科学技术进展报告(第三卷)》;20130930;第378-383页 *

Also Published As

Publication number Publication date
CN105005659A (en) 2015-10-28

Similar Documents

Publication Publication Date Title
CN105005659B (en) cable laying method and system
CN110880717B (en) Automatic cable laying method based on equipment and bridge positioning digitization
CN109377066A (en) A kind of live Schedule monitoring system and method based on threedimensional model
CN106096079B (en) Design method and system for improving cable laying length precision
CN105069524B (en) Planned dispatching optimization method based on big data analysis
CN109460595A (en) A kind of power cable laying design method
CN111767632B (en) BIM modeling method for realizing automatic joint matching of steel support by adopting Dynamo
CN107563023A (en) A kind of nuclear power plant's three-dimensional Design of Cable Layout system and method
CN111400899A (en) Processing method, system and storage medium for cable laying modeling
CN105958654A (en) Real-time monitoring method and system for line loss rate
CN110188150A (en) The modeling method and computer readable storage medium of distribution network line figure
KR100904868B1 (en) Cable quantity totalizing device, cable quantity totalizing method, and computer readable recording medium storing cable quantity totalizing program
CN109784622A (en) Power grid project process monitoring method and system based on geographical wiring diagram
CN104732340A (en) Auxiliary power grid planning decision-making method based on annual time scales
CN112733234B (en) Device for automatically calculating and generating three-dimensional bridge based on cable information transmission
CN108920718A (en) For the template system of power transformer winding D. C. resistance test data in-situ processing, implementation method and operating method
JP5169923B2 (en) Coke oven flue temperature measurement method
CN110096782A (en) A kind of oil-gas pipeline engineering power cable minute design method
CN104050342B (en) Transformer substation soft wire assembling simulating optimization design system
CN113378509B (en) Cable type selection method, device and storage medium
CN109684695A (en) A kind of electrical design method and apparatus
CN115292858A (en) Method, device and equipment for counting length of secondary cable based on digital three-dimensional technology
CN113836248A (en) Communication line emergency repair method and equipment based on Internet of things and computer readable storage medium
CN102945627B (en) Distribution network overhead line regular inspection tour simulation training system and training method thereof
CN110390725A (en) A kind of pipeline completion drawing generating method, device and system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant