CN107368909A - It is a kind of to solve cable with BIM technology(Line)The method that laying calculates with dosage - Google Patents
It is a kind of to solve cable with BIM technology(Line)The method that laying calculates with dosage Download PDFInfo
- Publication number
- CN107368909A CN107368909A CN201610314975.0A CN201610314975A CN107368909A CN 107368909 A CN107368909 A CN 107368909A CN 201610314975 A CN201610314975 A CN 201610314975A CN 107368909 A CN107368909 A CN 107368909A
- Authority
- CN
- China
- Prior art keywords
- cable
- line
- dosage
- race
- laying
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 15
- 238000005516 engineering process Methods 0.000 title claims abstract description 14
- 238000005457 optimization Methods 0.000 claims abstract description 9
- 238000006243 chemical reaction Methods 0.000 claims abstract description 4
- 230000000712 assembly Effects 0.000 claims description 3
- 238000000429 assembly Methods 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000004364 calculation method Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000007619 statistical method Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Human Resources & Organizations (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- General Health & Medical Sciences (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
One kind solves cable using BIM technology(Line)Laying optimization and the method for dosage statistics are made a summary:Solves cable using BIM technology the invention discloses one kind(Line)Laying optimization and the method for dosage statistics, comprise the following steps:Step 1, the foundation of model, it is threedimensional model by Structures CAD conversion of drawings;Step 2, cable testing bridge, cable(Line), conduit, electrically related component Data Enter;Step 3, cable testing bridge race, distribution box race, power distribution cabinet race, conduit race, the ID of electric related component are obtained in BIM related softwares;Step 4, according to starting point, cable testing bridge, conduit path automatic laying cable(Line);Step 5, cable is calculated(Line)Dosage.It is an advantage of the invention that:Accurate statistics that is directly perceived and quickly improving cable dosage, and quickly calculating, preferably cable trace and logical relation, amendment crane span structure are laid, and instruct procurement staff to save material expense, the cabling that guiding construction personnel specification is quick, scientific and reasonable.
Description
Technical field
The present invention relates to a kind of architectural design and construction method, is that one kind BIM technology solves cable(Line)The method that laying calculates with dosage.
Background technology
The laying optimization and the accurate statistical analysis of dosage of cable are the indispensable parts of construction project.Various problems can be run into the installation implementation process of reality, cause larger loss.At present BIM technology in cable calculation amount also without well utilization, it is necessary to establish the correlating method supporting with actual cable.
The content of the invention
The present invention provides one kind and quickly solves cable with BIM technology to the deficiencies in the prior art(Line)The method that laying optimization accurately calculates with dosage.
The a kind of of the present invention solves cable with BIM technology(Line)The method that laying optimization accurately calculates with dosage, comprises the following steps:
Step 1, the foundation of model, it is threedimensional model by Structures CAD conversion of drawings;
Step 2, cable testing bridge, cable(Line)Laying, electrically conduit, related component Data Enter;
Step 3, cable testing bridge race, distribution box race, power distribution cabinet race, conduit race, the ID of electric related component are obtained in BIM correlation t softwares;
Step 4, according to the path automatic laying cable of cable testing bridge(Line), user's selection starting point(Power distribution cabinet), some crane span structure and pipe arrangement and terminal(Power distribution cabinet or loop terminal)System automatically forms optimal cable run figure after setting the rule of the model of cable manually according to the rule of cable distribution or user according to the path that user chooses, and directly calculate the cable theory dosage in the loop, in laid processes, dark pipe arrangement is marked, while irrational place progress re-optimization is laid to the crane span structure of discovery;
Step 5, cable is calculated(Line)Dosage, including the specification of various model cables, model, length, weight, estimate that loss, cable both ends are reserved etc., and when user changes or adjusts circuit assemblies, loop parameters update or manually adjusted by user therewith.
The cable(Line)Laying includes power distribution cabinet, distribution box, crane span structure, conduit, cable duct, cable and loop terminal.
Beneficial effects of the present invention:(1)Intuitively, fast, improve operating efficiency;(2)Secondary development is carried out on the basis of BIM technology, can quickly find the logical path of cable laying automatically, amendment crane span structure is laid, and automatic computing dosage, reduces the loss in work progress.
Embodiment
The invention will be further described below.
The a kind of of the present invention solves cable with BIM technology(Line)The method that laying optimization accurately calculates with dosage, comprises the following steps:
Step 1, the foundation of model, it is threedimensional model by Structures CAD conversion of drawings;
Step 2, cable testing bridge, cable(Line)Laying, electrically conduit, related component Data Enter;
Step 3, cable testing bridge race, distribution box race, power distribution cabinet race, conduit race, the ID of electric related component are obtained in BIM related softwares;
Step 4, according to the path automatic laying cable of cable testing bridge(Line), user's selection starting point(Power distribution cabinet), some crane span structure and pipe arrangement and terminal(Power distribution cabinet or loop terminal)System automatically forms optimal cable run figure after setting the rule of the model of cable manually according to the rule of cable distribution or user according to the path that user chooses, and directly calculate the cable theory dosage in the loop, in laid processes, dark pipe arrangement is marked, while irrational place progress re-optimization is laid to the crane span structure of discovery;
Step 5, cable is calculated(Line)Dosage, including the specification of various model cables, model, length, weight, estimate that loss, cable both ends are reserved etc., and when user changes or adjusts circuit assemblies, loop parameters update or manually adjusted by user therewith.
The cable(Line)Laying includes power distribution cabinet, distribution box, crane span structure, conduit, cable duct, cable and loop terminal.
Beneficial effects of the present invention:(1)Intuitively, fast, improve operating efficiency;(2)Secondary development is carried out on the basis of BIM technology, can quickly find cable automatically(Line)The logical path most preferably laid, amendment crane span structure are laid, and automatic computing dosage, reduce the loss in work progress.
Claims (2)
1. solves cable with BIM technology in one kind(Line)The method that laying calculates with dosage, it is characterised in that comprise the following steps:
Step 1, the foundation of model, it is threedimensional model by Structures CAD conversion of drawings;
Step 2, cable testing bridge, cabling(Line), conduit, electrically related component Data Enter;
Step 3, cable testing bridge race, distribution box race, power distribution cabinet race, conduit race, the ID of electric related component are obtained in BIM related softwares;
Step 4, according to starting point, cable testing bridge, conduit path automatic laying cable(Line);User chooses starting point(Power distribution cabinet), some crane span structure and pipe arrangement and terminal(Power distribution cabinet or loop terminal)System automatically forms cable and most preferably lays path profile after setting the rule of the model of cable manually according to the rule of cable distribution or user according to the path that user chooses, and directly calculate the cable theory dosage in the loop, in laid processes, dark pipe arrangement is marked, while irrational place progress re-optimization is laid to the crane span structure of discovery;
Step 5, cable is calculated(Line)Dosage, including the specification of various model cables, model, length, weight, estimate that loss, cable both ends are reserved etc., and when user changes or adjusts circuit assemblies, loop parameters update or manually adjusted by user therewith.
A kind of 2. BIM technology solution cable according to claim 1(Line)The method that laying calculates with dosage, it is characterised in that the cable laying includes power distribution cabinet, distribution box, crane span structure, conduit, cable duct, cable and loop terminal.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610314975.0A CN107368909A (en) | 2016-05-13 | 2016-05-13 | It is a kind of to solve cable with BIM technology(Line)The method that laying calculates with dosage |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610314975.0A CN107368909A (en) | 2016-05-13 | 2016-05-13 | It is a kind of to solve cable with BIM technology(Line)The method that laying calculates with dosage |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107368909A true CN107368909A (en) | 2017-11-21 |
Family
ID=60304660
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610314975.0A Pending CN107368909A (en) | 2016-05-13 | 2016-05-13 | It is a kind of to solve cable with BIM technology(Line)The method that laying calculates with dosage |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107368909A (en) |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109033631A (en) * | 2018-07-25 | 2018-12-18 | 中国长江电力股份有限公司 | A kind of power station optical cable or cable routing three-dimensional display method based on design information |
CN109244933A (en) * | 2018-11-12 | 2019-01-18 | 中国十七冶集团有限公司 | A method of the installation of electric substation's cable is solved based on BIM technology |
CN109284534A (en) * | 2018-08-10 | 2019-01-29 | 五冶集团上海有限公司 | A kind of method and system that the cable dosage information based on BIM technology accurately counts |
CN109472044A (en) * | 2018-09-18 | 2019-03-15 | 上海斯涵福信息科技有限公司 | A kind of cable calculation amount method, system and medium based on BIM |
CN109766601A (en) * | 2018-12-26 | 2019-05-17 | 中冶京诚工程技术有限公司 | Computer aided drawing method and device for electric piping |
CN110096782A (en) * | 2019-04-24 | 2019-08-06 | 中国石油天然气集团有限公司 | A kind of oil-gas pipeline engineering power cable minute design method |
CN112733234A (en) * | 2021-01-08 | 2021-04-30 | 珠海新势力创建筑设计有限公司 | Three-dimensional bridge automatic calculation and generation device based on cable information transmission |
CN112883452A (en) * | 2019-11-29 | 2021-06-01 | 北京博超时代软件有限公司 | Method, device and equipment for generating lighting design protection tube and storage medium |
CN113113875A (en) * | 2021-04-22 | 2021-07-13 | 湖南浩宇建设有限公司 | Novel building ground electricity cable rack installation method |
US11120171B2 (en) | 2019-09-13 | 2021-09-14 | Mccormick Systems Llc. | System and method for construction cost estimation for non-computer aided design (CAD) files |
CN113742832A (en) * | 2021-09-17 | 2021-12-03 | 中建八局第二建设有限公司 | Cable construction control method based on BIM depth plan |
CN117350669A (en) * | 2023-10-18 | 2024-01-05 | 内蒙古电力勘测设计院有限责任公司 | Method, device and equipment for determining consumption information of cable fireproof blocking material |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070038415A1 (en) * | 2005-08-15 | 2007-02-15 | Kabushiki Kaisha Toshiba | Cable quantity totalizing device, cable quantity totalizing method and cable quantity totalizing program |
CN102495930A (en) * | 2011-12-12 | 2012-06-13 | 河北省电力勘测设计研究院 | Automatic generation method of cable bridge |
CN104361185A (en) * | 2014-11-21 | 2015-02-18 | 南京航空航天大学 | Wire distribution space automatic generating method for cable virtual design |
CN105005659A (en) * | 2015-07-16 | 2015-10-28 | 中国能源建设集团广东省电力设计研究院有限公司 | Cable laying method and system |
CN105005676A (en) * | 2015-08-13 | 2015-10-28 | 国网上海市电力公司 | Three-dimension design method based on cable engineering information model |
-
2016
- 2016-05-13 CN CN201610314975.0A patent/CN107368909A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070038415A1 (en) * | 2005-08-15 | 2007-02-15 | Kabushiki Kaisha Toshiba | Cable quantity totalizing device, cable quantity totalizing method and cable quantity totalizing program |
CN102495930A (en) * | 2011-12-12 | 2012-06-13 | 河北省电力勘测设计研究院 | Automatic generation method of cable bridge |
CN104361185A (en) * | 2014-11-21 | 2015-02-18 | 南京航空航天大学 | Wire distribution space automatic generating method for cable virtual design |
CN105005659A (en) * | 2015-07-16 | 2015-10-28 | 中国能源建设集团广东省电力设计研究院有限公司 | Cable laying method and system |
CN105005676A (en) * | 2015-08-13 | 2015-10-28 | 国网上海市电力公司 | Three-dimension design method based on cable engineering information model |
Non-Patent Citations (2)
Title |
---|
刘东 等: "BRCM软件在选煤厂电缆敷设中的应用", 《中州煤炭》 * |
解莎莎 等: "基于 BIM 技术的 BRCM 三维电缆敷设软件在营口五矿600m2烧结工程中的应用", 《施工技术》 * |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109033631A (en) * | 2018-07-25 | 2018-12-18 | 中国长江电力股份有限公司 | A kind of power station optical cable or cable routing three-dimensional display method based on design information |
CN109284534A (en) * | 2018-08-10 | 2019-01-29 | 五冶集团上海有限公司 | A kind of method and system that the cable dosage information based on BIM technology accurately counts |
CN109472044A (en) * | 2018-09-18 | 2019-03-15 | 上海斯涵福信息科技有限公司 | A kind of cable calculation amount method, system and medium based on BIM |
CN109472044B (en) * | 2018-09-18 | 2022-12-02 | 上海斯涵福信息科技有限公司 | Cable calculation method, system and medium based on BIM |
CN109244933A (en) * | 2018-11-12 | 2019-01-18 | 中国十七冶集团有限公司 | A method of the installation of electric substation's cable is solved based on BIM technology |
CN109766601A (en) * | 2018-12-26 | 2019-05-17 | 中冶京诚工程技术有限公司 | Computer aided drawing method and device for electric piping |
CN110096782A (en) * | 2019-04-24 | 2019-08-06 | 中国石油天然气集团有限公司 | A kind of oil-gas pipeline engineering power cable minute design method |
US11120171B2 (en) | 2019-09-13 | 2021-09-14 | Mccormick Systems Llc. | System and method for construction cost estimation for non-computer aided design (CAD) files |
CN112883452A (en) * | 2019-11-29 | 2021-06-01 | 北京博超时代软件有限公司 | Method, device and equipment for generating lighting design protection tube and storage medium |
CN112883452B (en) * | 2019-11-29 | 2024-02-20 | 北京博超时代软件有限公司 | Lighting design protection tube generation method, device, equipment and storage medium |
CN112733234A (en) * | 2021-01-08 | 2021-04-30 | 珠海新势力创建筑设计有限公司 | Three-dimensional bridge automatic calculation and generation device based on cable information transmission |
CN112733234B (en) * | 2021-01-08 | 2024-03-19 | 珠海新势力创建筑设计有限公司 | Device for automatically calculating and generating three-dimensional bridge based on cable information transmission |
CN113113875A (en) * | 2021-04-22 | 2021-07-13 | 湖南浩宇建设有限公司 | Novel building ground electricity cable rack installation method |
CN113742832A (en) * | 2021-09-17 | 2021-12-03 | 中建八局第二建设有限公司 | Cable construction control method based on BIM depth plan |
CN117350669A (en) * | 2023-10-18 | 2024-01-05 | 内蒙古电力勘测设计院有限责任公司 | Method, device and equipment for determining consumption information of cable fireproof blocking material |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107368909A (en) | It is a kind of to solve cable with BIM technology(Line)The method that laying calculates with dosage | |
CN103066698B (en) | Implement method for automatic generation of visible power grid trend chart in dispatching system | |
CN110401145B (en) | Cable laying method | |
CN103020335A (en) | Method for automatically converting distribution network geographic wiring diagram into region orthogonal diagram | |
CN109214684A (en) | A kind of distribution line theory wire loss on-line calculation method | |
CN105811452A (en) | Power distribution network distributed photovoltaic limit permeability analysis method and device | |
CN102436534A (en) | Simulating method for electric power system | |
CN112287540A (en) | Electromagnetic transient joint simulation method for accessing wind power plant to power grid | |
CN106026178B (en) | A kind of more distributed generation resources self-discipline electricity-generating control methods in region and device | |
CN110299713A (en) | A kind of tractive power supply system imbalance of three-phase voltage compensation method counted and wind power plant influences | |
CN105184508A (en) | Harmonic measuring point optimal allocation method for distribution network | |
CN110705739B (en) | New energy power station power generation plan making method and system | |
CN108108888A (en) | The active command cooperative control method and device of wind-power electricity generation and photovoltaic generation | |
CN105095659B (en) | Coordinate distributed state estimation method to province based on cloud computing | |
CN106013798A (en) | Marker bed construction method based on building information modeling (BIM) | |
CN112231790B (en) | BIM-based layout method for power utilization lines in engineering construction | |
CN105046585A (en) | Multi-region security checking method with freely tailorable calculation range | |
CN104732456A (en) | Regional power grid planning and designing method based on MATLAB | |
CN103543509B (en) | The method and system of laying optical cable in intelligent substation | |
CN109038640A (en) | Capacity determining method for UPFC serial side converter based on phase diagram method | |
CN106169089A (en) | A kind of progress monitoring method of cable construction | |
CN105514981A (en) | Photovoltaic inverter access position optimization method based on building information model | |
CN206820366U (en) | Secondary cable lays servicing unit | |
CN105335609B (en) | A kind of method for assessing power transmission section power transfer ratio | |
CN111598522A (en) | Electrified railway contact net computing system and method based on cloud platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20171121 |
|
WD01 | Invention patent application deemed withdrawn after publication |