CN105002833B - Suspension Hanging Basket preloading method - Google Patents

Suspension Hanging Basket preloading method Download PDF

Info

Publication number
CN105002833B
CN105002833B CN201510443725.2A CN201510443725A CN105002833B CN 105002833 B CN105002833 B CN 105002833B CN 201510443725 A CN201510443725 A CN 201510443725A CN 105002833 B CN105002833 B CN 105002833B
Authority
CN
China
Prior art keywords
hanging basket
carrying platform
distribution beam
heap carrying
end template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510443725.2A
Other languages
Chinese (zh)
Other versions
CN105002833A (en
Inventor
任翔
柴生波
张岩
张玥
杜亚文
赵桂娟
董鹂宁
吝红育
高迎社
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian University of Science and Technology
Original Assignee
Xian University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Science and Technology filed Critical Xian University of Science and Technology
Priority to CN201510443725.2A priority Critical patent/CN105002833B/en
Publication of CN105002833A publication Critical patent/CN105002833A/en
Application granted granted Critical
Publication of CN105002833B publication Critical patent/CN105002833B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The invention discloses a kind of suspension Hanging Basket preloading method, the device used includes the heap carrying platform for placing mass and the distribution beam being arranged in Hanging Basket, described distribution beam is arranged on Hanging Basket end template, described heap carrying platform is suspended in the lower section of described Hanging Basket by steel strand wires, the upper end of described steel strand wires is connected with described distribution beam, and the lower end of described steel strand wires is connected with described heap carrying platform;The method includes: step one, installation distribution beam;Step 2, suspention heap carrying platform;Step 3, classification apply prefabricating load;Step 4, unloading;Step 5, the elastic deformation amount of calculating Hanging Basket end template.The simple in construction of suspension Hanging Basket prepressing device of the present invention, it is the most convenient to mount and dismount, and has saved cost, and can reuse;Hanging Basket preloading method of the present invention is simple to operate, and operating efficiency is high, it is simple to promote the use of.

Description

Suspension Hanging Basket preloading method
Technical field
The invention belongs to Hanging Basket prestressing technology field, be specifically related to a kind of suspension Hanging Basket precompressed side Method.
Background technology
Large span prestressed concrete continuous rigid frame bridge, continuous bridge are across zanjon, rivers, Hu Hai Deng the most competitive bridge type.Owing to by the influence of topography at bridge location, the construction of Hanging Basket cantilever pouring becomes One of main construction method.Hanging Basket is mainly made up of steel, will produce non-resilient under load action Deformation and elastic deformation, the purpose of Hanging Basket precompressed, primarily to eliminate Hanging Basket inelastic deformation, determines Elastic deformation (takes in pre-arch value in mould absolute altitude), and secondly precompressed is also for checking Hanging Basket Safety and stability.Therefore, Hanging Basket must carry out precompressed before cantilever construction uses.
At present, the common methods of Hanging Basket precompressed be on Hanging Basket end template piling prepressing, reverse drawing precompressed, Back-pressure precompressed.Specific as follows:
It is identical that piling prepressing needs that prefabricating load (sandbag or water tank and other) is divided into weight specification Fractional pack, during precompressed, needs these prefabricating loads utilize tower crane or alternate manner are transported at the bottom of Hanging Basket In template, when bridge pier is higher, hierarchical loading, unloading consuming time can be caused long, workload is big, Prefabricating load recycling rate of waterused is low, and whole precompressed cost is high.
Reverse drawing precompressed is to utilize drag unit to carry out Hanging Basket precompressed, and prepressing device needs on cushion cap or ground Face arranges fixing device, utilizes jack device to carry out the one side of stretch-draw precompressed on Hanging Basket end template Method, this preloading method needs to arrange anchorage, steel strand wires (essence pricks screw-thread steel), and cost is of a relatively high. Pre-pressing system safety simultaneously depends primarily on anchor system, accordingly, it would be desirable to spend the highest cost to protect The safety of whole system during card precompressed, anchor system is installed, is removed workload greatly simultaneously, expends Time, reusable relatively inefficient.More importantly limited by bridge pier height, when When load transfer device uses steel strand wires, bridge pier height is the highest, and steel strand wires deformation is the biggest, is likely to result in very heavy Top line journey is not enough, makes, by stretch-draw pressure operating difficulties, even cannot implement.
Back-pressure precompressed is to utilize to be embedded in the pre-embedded steel slab pouring beam section termination, is welded by precompressed reaction frame It is connected on steel plate, a kind of Hanging Basket prepressing device that jack is placed between reaction frame and template.This dress Put to add and unload carried convenient, time-consuming;Reaction frame makes simple, low cost;Pre-press operation is at the bottom of Hanging Basket In template, space is big, easy to operate.But this device is installed, is dismounted utilization rate complicated, repeatable Low;Pre-compaction process is likely to be due to reaction frame deformation big, causes jack to occur partially with reaction rack equipment The heart, causes reaction frame torsional buckling, and precompressed success rate is relatively low.
Summary of the invention
It is an object of the invention to overcome above-mentioned deficiency of the prior art, it is provided that a kind of Hanging Basket precompressed side Method, this preloading method is simple to operate, and operating efficiency is high, it is simple to promote the use of.
For achieving the above object, the technical solution used in the present invention is: a kind of suspension Hanging Basket press-fits in advance Put the method that Hanging Basket is carried out precompressed, it is characterised in that: described suspension Hanging Basket prepressing device includes using In the heap carrying platform (1) placing mass and the distribution beam (3) being arranged in Hanging Basket (4), institute Stating distribution beam (3) to be arranged on Hanging Basket end template (4-1), described heap carrying platform (1) passes through steel Twisted wire (2) is suspended in the lower section of described Hanging Basket (4), and the upper end of described steel strand wires (2) is with described Distribution beam (3) connects, and the lower end of described steel strand wires (2) is connected with described heap carrying platform (1); Described heap carrying platform (1) distance ground 1m~1.5m;Described distribution beam (3) and heap carrying platform (1) All along the horizontal laying of bridge;The quantity of described distribution beam (3) is two, two described distribution beam (3) be parallel to each other laying;It is provided with in described distribution beam (3) for being connected with steel strand wires (2) First hook (7), described heap carrying platform (1) is provided with for being connected with steel strand wires (2) Second hook (9);Described distribution beam (3) is to be welded, by two channel-section steels, the box-girder constituted;Institute State the ring baffle (8) being provided with on heap carrying platform (1) for preventing mass from coming off;
The step that described preloading method includes is as follows:
Step one, installation distribution beam (3): distribution beam (3) is arranged on Hanging Basket end template (4-1) On;
Step 2, suspention heap carrying platform (1): by under heap carrying platform (1) transport to Hanging Basket (4) Side, is fixed on the upper end of steel strand wires (2) in distribution beam (3), and another by steel strand wires (2) One end is fixed on heap carrying platform (1), then measures the initial deflection value of Hanging Basket end template (4-1) y0;
Step 3, classification apply prefabricating load: carry out point to the upper mass of placing of heap carrying platform (1) Level loads, and reaches prefabricating load when being loaded onto the 120% of maximum beam section weight, then stops loading, The Hanging Basket end template (4-1) maximum immunity value y under described prefabricating load is measured after stopping loadingmax
Step 4, unloading: remove the mass on heap carrying platform (1) and by described suspension Hanging Basket Prepressing device is removed, and then measures the unloaded deflection value y after Hanging Basket end template (4-1) unloadingmin
Step 5, the elastic deformation amount X of calculating Hanging Basket end template (4-1)2:
First with formula X=ymax-y0Calculate total deformation X of Hanging Basket end template (4-1);
Recycling formula X1=ymin-y0Calculate inelastic deformation amount X of Hanging Basket end template (4-1)1; Finally utilize formula X2=X-X1Calculate the elastic deformation amount X of Hanging Basket end template (4-1)2
Before carrying out described step 3, carry out prestrain to the upper mass of placing of heap carrying platform (1), The weight of prestrain is the 40%~50% of described prefabricating load, checks described suspention under preload condition The safe condition of formula Hanging Basket prepressing device.
The present invention compared with prior art has the advantage that
1, suspension Hanging Basket prepressing device of the present invention and Hanging Basket preloading method are pre-with preloading in prior art Pressure mode is compared, it is possible to be prevented effectively from and prefabricating load utilizes the modes such as tower crane transport to Hanging Basket end template On, save the substantial amounts of time, and decrease workload, reduce precompressed cost.
2, suspension Hanging Basket prepressing device of the present invention and Hanging Basket preloading method are pre-with reverse drawing in prior art Pressure mode is compared, and eliminates the installation and removal of anchor system, while cost-effective, additionally it is possible to Save the substantial amounts of time.
3, suspension Hanging Basket prepressing device of the present invention and Hanging Basket preloading method are pre-with back-pressure in prior art Pressure mode is compared, and eliminates the installation of reaction frame, and then avoid causing because of the large deformation of reaction frame Reaction frame torsional buckling and precompressed success rate are relatively low, and safety is high.
In sum, the simple in construction of suspension Hanging Basket prepressing device of the present invention, convenient disassembly, can weigh Multiple utilization rate is high, and low cost saves the time, and available one or two set suspension Hanging Basket prepressing device is carried out Turnover uses, across interior, quick across a movement.Hanging Basket preloading method of the present invention loads and unloads carried convenient, Simple to operate, it is greatly saved the time, saves the duration.
Below by drawings and Examples, technical scheme is described in further detail.
Accompanying drawing explanation
Fig. 1 is the front view of suspension Hanging Basket prepressing device of the present invention.
Fig. 2 is the right view of suspension Hanging Basket prepressing device of the present invention.
Fig. 3 is the structural representation of distribution beam in suspension Hanging Basket prepressing device of the present invention.
Fig. 4 is that in suspension Hanging Basket prepressing device of the present invention, the annexation of heap carrying platform and ring baffle is shown It is intended to.
Fig. 5 is the method flow diagram of Hanging Basket preloading method of the present invention.
Description of reference numerals:
1 heap carrying platform;2 steel strand wires;3 distribution beam;
4 Hanging Baskets;4-1 Hanging Basket end template;5 have watered beam section;
6 bridge piers;7 first hooks;8 ring baffles;
9 second hooks.
Detailed description of the invention
A kind of suspension Hanging Basket prepressing device as depicted in figs. 1 and 2, including for placing mass Heap carrying platform 1 and the distribution beam 3 that is arranged in Hanging Basket 4, described distribution beam 3 is arranged at the bottom of Hanging Basket In template 4-1, described heap carrying platform 1 is suspended in the lower section of described Hanging Basket 4, institute by steel strand wires 2 The upper end stating steel strand wires 2 is connected with described distribution beam 3, the lower end of described steel strand wires 2 and described preloading Platform 1 connects.
In the present embodiment, this suspension Hanging Basket prepressing device in use, by being positioned at bridge pier 6 one Place mass on the heap carrying platform 1 of side to load, utilize steel hinge line 2 by heap carrying platform 1 Loading force is delivered in distribution beam 3, then by distribution beam 3, Hanging Basket end template 4-1 is applied precompression, I.e. by heap carrying platform 1, distribution beam 3 and steel strand wires 2 constitute a kind of suspension structure with effectively to Hanging Basket end template 4-1 applies precompression, its simple in construction, and it is the most convenient to mount and dismount, it is possible to weight Multiple utilization.And owing to heap carrying platform 1 is suspended in the lower section of Hanging Basket 4, facilitate to heap carrying platform 1 Upper placement mass, improves precompressed efficiency.
In the present embodiment, described heap carrying platform 1 is near ground.Further facilitate to heap carrying platform 1 Upper placement mass, and further increase precompressed efficiency, and the height of heap carrying platform 1 is low, i.e. Make on heap carrying platform 1, to place the heaviest configuration thing, there will not be potential safety hazard.In the present embodiment, excellent The way of choosing is that described heap carrying platform 1 is apart from ground 1m~1.5m.The most both heap carrying platform will not have been made 1 contacts with ground, also greatly facilitates placement mass on heap carrying platform 1 simultaneously.
As depicted in figs. 1 and 2, described distribution beam 3 and heap carrying platform 1 are all along the horizontal laying of bridge. By distribution beam 3 being laid along the horizontal of bridge, facilitate the installation and removal of distribution beam 3, simultaneously Can make distribution beam 3 that Hanging Basket end template 4-1 is applied uniform precompression.By by heap carrying platform 1 Along the horizontal laying of bridge, described heap carrying platform 1 is corresponding with distribution beam 3, so can make preloading Loading force on platform 1 is delivered in distribution beam 3 uniformly.
In the present embodiment, the quantity of described distribution beam 3 is two, and two described distribution beam 3 are the most flat Row is laid.Two parallel distribution beam 3 effectively can apply precompression to Hanging Basket end template 4-1.
As it is shown on figure 3, be provided with in described distribution beam 3 for be connected with steel strand wires 2 upper end first Hook 10.By arranging the first hook 10 in distribution beam 3, it is possible to realize steel strand wires 2 and distribution The firm connection of beam 3, it is to avoid steel strand wires 2 produce sliding with the junction point of distribution beam 3.
As shown in Figure 4, described heap carrying platform 1 is provided with for be connected with steel strand wires 2 lower end Two hooks 9.By arranging the second hook 9 on heap carrying platform 1, it is possible to realize steel strand wires 2 and heap The firm connection of carrying platform 1, it is to avoid steel strand wires 2 produce sliding with the junction point of heap carrying platform 1.
In the present embodiment, described distribution beam 3 is to be welded, by two channel-section steels, the box-girder constituted.This sample prescription The making of distribution beam 3, meanwhile, when installing distribution beam 3, as long as distribution beam 3 is placed on On Hanging Basket end template 4-1, the distribution beam 3 of box beam form is utilized to contact cooperation with Hanging Basket end template 4-1, And under the pulling force effect of heap carrying platform 1, the distribution beam 3 peace on Hanging Basket end template 4-1 can be realized Dress.
As shown in Figure 4, described heap carrying platform 1 is provided with the annular gear for preventing mass from coming off Plate 8.By arranging ring baffle 8 on heap carrying platform 1, it is possible to effectively prevent mass from coming off, Ensure that safety.
A kind of side utilizing above-mentioned suspension Hanging Basket prepressing device that Hanging Basket carries out precompressed as shown in Figure 5 Method, the method includes:
Step one, installation distribution beam 3: distribution beam 3 is arranged on Hanging Basket end template 4-1, Hanging Basket 4 are arranged on and water in beam section 5;
Step 2, suspention heap carrying platform 1: heap carrying platform 1 is transported to Hanging Basket 4, steel is twisted The upper end of line 2 is fixed in distribution beam 3, and the other end of steel strand wires 2 is fixed on heap carrying platform 1 On, then measure initial deflection value y of Hanging Basket end template 4-10
Step 3, classification apply prefabricating load: place mass on heap carrying platform and carry out hierarchical loading, Reach prefabricating load when being loaded onto the 120% of maximum beam section weight, then stop loading, stop loading Rear measurement Hanging Basket end template maximum immunity value y under prefabricating loadmax, described maximum immunity value ymax It is the stabilization at Hanging Basket end template 4-1, i.e. when Hanging Basket end template 4-1 deflection value does not changes Record;While hierarchical loading, the classification measured under Hanging Basket end template 4-1 loads at every grade is scratched Angle value yn, to monitor the deformation of Hanging Basket end template 4-1 in real time, when the deformation of Hanging Basket end template 4-1 goes out When now suddenling change, then explanation Hanging Basket quality goes wrong;
Step 4, unloading: remove the mass on heap carrying platform 1 and by described suspension Hanging Basket precompressed Device is removed, and then measures the unloaded deflection value y after Hanging Basket end template 4-1 unloadingmin
Step 5, the elastic deformation amount X of calculating Hanging Basket end template 4-12:
First with formula X=ymax-y0Calculate total deformation X of Hanging Basket end template 4-1;
Recycling formula X1=ymin-y0Calculate inelastic deformation amount X of Hanging Basket end template 4-11
Finally utilize formula X2=X-X1Calculate the elastic deformation amount X of Hanging Basket end template 4-12
In the present embodiment, this preloading method is simple to operate, and operating efficiency is high, it is possible to eliminate Hanging Basket 4 Inelastic deformation, and then determine elastic deformation, secondly can effectively verify that the safety of Hanging Basket 4 is with steady Qualitative.In the present embodiment, utilize level gauge and total station survey deflection value.
In the present embodiment, before step 3, on heap carrying platform 1, place mass carry out prestrain, The weight of prestrain is the 40%~50% of described prefabricating load, checks described suspention under preload condition The safe condition of formula Hanging Basket prepressing device.
The above, be only presently preferred embodiments of the present invention, not impose any restrictions the present invention, all It is any simple modification, change and equivalence above example made according to the technology of the present invention essence Reconfiguration, all still falls within the protection domain of technical solution of the present invention.

Claims (1)

1. the method that a suspension Hanging Basket prepressing device carries out precompressed to Hanging Basket, it is characterised in that: Described suspension Hanging Basket prepressing device includes the heap carrying platform (1) for placing mass and is arranged on Distribution beam (3) in Hanging Basket (4), described distribution beam (3) is arranged on Hanging Basket end template (4-1) On, described heap carrying platform (1) is suspended in the lower section of described Hanging Basket (4) by steel strand wires (2), The upper end of described steel strand wires (2) is connected with described distribution beam (3), under described steel strand wires (2) End is connected with described heap carrying platform (1);Described heap carrying platform (1) distance ground 1m~1.5m;Institute State distribution beam (3) and heap carrying platform (1) all along the horizontal laying of bridge;Described distribution beam (3) Quantity be two, two described distribution beam (3) are parallel to each other laying;In described distribution beam (3) It is provided with the first hook (7) for being connected with steel strand wires (2), on described heap carrying platform (1) It is provided with the second hook (9) for being connected with steel strand wires (2);Described distribution beam (3) is served as reasons The box-girder that two channel-section steel welding are constituted;It is provided with for preventing counterweight on described heap carrying platform (1) The ring baffle (8) that thing comes off;
The step that described preloading method includes is as follows:
Step one, installation distribution beam (3): distribution beam (3) is arranged on Hanging Basket end template (4-1) On;
Step 2, suspention heap carrying platform (1): by under heap carrying platform (1) transport to Hanging Basket (4) Side, is fixed on the upper end of steel strand wires (2) in distribution beam (3), and another by steel strand wires (2) One end is fixed on heap carrying platform (1), then measures the initial deflection value of Hanging Basket end template (4-1) y0;
Step 3, classification apply prefabricating load: carry out point to the upper mass of placing of heap carrying platform (1) Level loads, and reaches prefabricating load when being loaded onto the 120% of maximum beam section weight, then stops loading, The Hanging Basket end template (4-1) maximum immunity value y under described prefabricating load is measured after stopping loadingmax
Step 4, unloading: remove the mass on heap carrying platform (1) and by described suspension Hanging Basket Prepressing device is removed, and then measures the unloaded deflection value y after Hanging Basket end template (4-1) unloadingmin
Step 5, the elastic deformation amount X of calculating Hanging Basket end template (4-1)2:
First with formula X=ymax-y0Calculate total deformation X of Hanging Basket end template (4-1);
Recycling formula X1=ymin-y0Calculate inelastic deformation amount X of Hanging Basket end template (4-1)1; Finally utilize formula X2=X-X1Calculate the elastic deformation amount X of Hanging Basket end template (4-1)2
Before carrying out described step 3, carry out prestrain to the upper mass of placing of heap carrying platform (1), The weight of prestrain is the 40%~50% of described prefabricating load, checks described suspention under preload condition The safe condition of formula Hanging Basket prepressing device.
CN201510443725.2A 2015-07-25 2015-07-25 Suspension Hanging Basket preloading method Expired - Fee Related CN105002833B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510443725.2A CN105002833B (en) 2015-07-25 2015-07-25 Suspension Hanging Basket preloading method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510443725.2A CN105002833B (en) 2015-07-25 2015-07-25 Suspension Hanging Basket preloading method

Publications (2)

Publication Number Publication Date
CN105002833A CN105002833A (en) 2015-10-28
CN105002833B true CN105002833B (en) 2016-10-12

Family

ID=54375677

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510443725.2A Expired - Fee Related CN105002833B (en) 2015-07-25 2015-07-25 Suspension Hanging Basket preloading method

Country Status (1)

Country Link
CN (1) CN105002833B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111693366A (en) * 2020-05-27 2020-09-22 中冶建筑研究总院有限公司 Construction method for pre-loading structure in limited space
CN113152293B (en) * 2021-04-16 2023-02-24 中国葛洲坝集团第一工程有限公司 Continuous rigid frame bridge cast-in-place bracket prepressing device and prepressing method
CN113585073B (en) * 2021-06-28 2024-10-11 浙江理工大学 Counterweight method for suspension platform
CN113430953B (en) * 2021-07-28 2022-10-28 江苏瑞沃建设集团有限公司 Pre-compaction device of hanging basket for cantilever construction bridge support
CN114182649B (en) * 2021-12-10 2024-01-02 中铁十局集团青岛工程有限公司 Continuous beam hanging basket construction pre-pressing loading device

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3946342B2 (en) * 1998-03-09 2007-07-18 三井住友建設株式会社 Bridge erection device
CN201972094U (en) * 2011-03-03 2011-09-14 中铁四局集团第一工程有限公司 Prepressing system of hanging basket in suspending irrigation construction
CN202766971U (en) * 2011-12-26 2013-03-06 中铁七局集团有限公司 A ground counter-pull pre-pressing device for a continuous beam cantilever cast-in-place hanging basket
CN102912738B (en) * 2012-11-07 2014-12-03 北京市公路桥梁建设集团有限公司 Overall prepressing device for hanging basket
CN103362074B (en) * 2013-07-31 2015-07-01 中交二航局第三工程有限公司 Bridge cantilever box girder construction hanging basket pre-pressing loading device
CN204163412U (en) * 2014-10-27 2015-02-18 重庆建工集团股份有限公司 Steel truss precompressed Special hoop
CN204940135U (en) * 2015-07-25 2016-01-06 西安科技大学 Suspension Hanging Basket prepressing device

Also Published As

Publication number Publication date
CN105002833A (en) 2015-10-28

Similar Documents

Publication Publication Date Title
CN105002833B (en) Suspension Hanging Basket preloading method
CN206146751U (en) A loading device for monospar static test
CN103437291B (en) Monolithic water tank precompressed construction technology
CN202023150U (en) Reaction frame pre-pressing system used in bridge hanging basket construction
CN201402180Y (en) Stacked detection device for detecting weighing performance of large-scale weighing machines
CN103352429B (en) Bracket reverse drawing loads the stretch-draw preloading method of prepressing device
CN104843582A (en) Method for hoisting steel safe bottom seal head at nuclear power station and special-purpose sling tool thereof
CN102995669B (en) Large-tonnage foundation pile uplift-resistant static test connection device, loading counter-force system and method
CN106702906A (en) Pre-pressing device for hanging baskets and pre-pressing method thereof
CN106012848B (en) A kind of pre-buried bracket construction method of cast-in-situ box girder and bridge
CN110359374A (en) A kind of Hanging Basket precompressed counter-force bracket and its construction method
CN202766971U (en) A ground counter-pull pre-pressing device for a continuous beam cantilever cast-in-place hanging basket
CN205223871U (en) Suspension bridge bridge tower overarm brace pre -compaction device
CN102998168B (en) Fixing device for load test of prestressed concrete beam and test method
CN103469769B (en) Concrete material taking platform and anti-collision damping device
CN201972094U (en) Prepressing system of hanging basket in suspending irrigation construction
CN204940135U (en) Suspension Hanging Basket prepressing device
CN105800456B (en) A kind of container crane loading test apparatus and method
CN209508825U (en) Bridge High-pier 0# block bracket counter-force prepressing structure
CN214695184U (en) Pre-pressing system for double-thin-wall pier beam support bracket
CN206267033U (en) A kind of Hanging Basket prepressing device
CN202041361U (en) Static load test-bed of terrestrial anchor pile self-balanced bridge
CN104894981B (en) Reaction frame pre-pressing system for bracket of cantilever section
CN203824626U (en) Roller-way scale sensor bearing box girder structure device
CN215714703U (en) Anti-pre-compaction device that draws of box girder bracket steel strand wires that waters of hanging

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161012

CF01 Termination of patent right due to non-payment of annual fee