CN104998890B - Industrial slags processing system - Google Patents

Industrial slags processing system Download PDF

Info

Publication number
CN104998890B
CN104998890B CN201510423521.2A CN201510423521A CN104998890B CN 104998890 B CN104998890 B CN 104998890B CN 201510423521 A CN201510423521 A CN 201510423521A CN 104998890 B CN104998890 B CN 104998890B
Authority
CN
China
Prior art keywords
slag bath
slag
steam
processing system
clinker
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510423521.2A
Other languages
Chinese (zh)
Other versions
CN104998890A (en
Inventor
高麟
汪涛
方波
曾武祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Intermet Technology Chengdu Co Ltd
Original Assignee
Intermet Technology Chengdu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Intermet Technology Chengdu Co Ltd filed Critical Intermet Technology Chengdu Co Ltd
Priority to CN201510423521.2A priority Critical patent/CN104998890B/en
Priority to CN201710398966.9A priority patent/CN107350261B/en
Publication of CN104998890A publication Critical patent/CN104998890A/en
Application granted granted Critical
Publication of CN104998890B publication Critical patent/CN104998890B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B09DISPOSAL OF SOLID WASTE; RECLAMATION OF CONTAMINATED SOIL
    • B09BDISPOSAL OF SOLID WASTE
    • B09B3/00Destroying solid waste or transforming solid waste into something useful or harmless
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D53/00Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
    • B01D53/002Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by condensation

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Analytical Chemistry (AREA)
  • General Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Environmental & Geological Engineering (AREA)
  • Furnace Details (AREA)
  • Treating Waste Gases (AREA)

Abstract

The invention discloses a kind of industrial slags processing system, including fill the slag bath of cooling water, it is characterised in that:The slag bath includes the second slag bath for receiving the first slag bath of Industrial Stoves clinker and being connected with the first slag bath bottom, the first slag bath Chi Ding is provided with steam collection structure, the steam collection structure is provided with exhaust outlet, the exhaust outlet is connected with vapour condensation device, the condensation-water drain of the vapour condensation device is connected with the second slag bath, provided with so that clinker slides to the inclined ramp of the second slag bath between the first slag bath bottom and the second slag bath bottom, The present invention reduces cause that clinker cleaning is more concentrated after cooling during slag treatment while the discharge capacity of dangerous vapors, system architecture is simple, it is easy to operate, and production cost is reduced to a certain extent.

Description

Industrial slags processing system
Technical field
The present invention relates to a kind of industrial slags processing system.
Background technology
In the industrial production, the link for smelting burning is related in the industrial processes especially based on chemical industry and metallurgy Typically there is high temperature furnace slag discharge, the slag temperature from Industrial Stoves out is often very high, it is general up to 1200 DEG C~1600 DEG C, Therefore it can not be expelled directly out or for other techniques, it is necessary to carry out cooling down operation to it before this, current Industrial Stoves clinker The type of cooling generally using the clinker of discharge is first placed in the slag bath for filling cooling water, high temperature furnace slag is dropped using cooling water Temperature, is afterwards salvaged the clinker after cooling by device for dragging dregs, and the clinker salvaged can be transported to other technique productions.This Shen Ask someone to notice in actual production process:The slag surface come out from Industrial Stoves is typically attached with harmful and volatile thing Matter, harmful smoke is easily produced when the moment that high temperature furnace slag is contacted with cooling water, and these fume emissions cause air into air Pollution, for example, in phosphorus production technique, the high temperature yellow phosphorus furnace slag discharged from Yellow phosphorus furnace is just accompanied with a large amount of harmful substances, Substantial amounts of steam can be produced when its moment for contacting cooling water, phosphorus pentoxide particle and sulfur-bearing are carried in these water vapours Gas etc. is harmful to and strong corrosive material, and these fume emissions can cause serious dirt into air to health and air Dye.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of reduction dangerous vapors discharge capacity and facilitate clinker to clear up Industrial slags processing system.
In order to solve above-mentioned the problems of the prior art, the present invention is achieved through the following technical solutions:
Industrial slags processing system of the present invention includes filling the slag bath of cooling water, and the slag bath includes receiving Industrial Stoves stove First slag bath of slag and the second slag bath connected with the first slag bath bottom, the first slag bath Chi Ding collect knot provided with steam Structure, the steam collection structure is provided with exhaust outlet, and the exhaust outlet is connected with vapour condensation device, the vapour condensation device Condensation-water drain is connected with the second slag bath, provided with causing clinker to slide to the between the first slag bath bottom and the second slag bath bottom The inclined ramp of two slag baths.Cooling water is filled in first slag bath and the second slag bath, the first slag bath is received to be arranged from Industrial Stoves The high temperature furnace slag gone out, the temperature moment of cooling water raises and produced a large amount of after these clinkers are contacted with the cooling water in the first slag bath Harmful smoke is carried in steam, steam, these flue gases are by the first slag bath Chi Ding steam collection structure centralized collection, and from row Steam port enters vapour condensation device formation condensed water, and harmful smoke enters the second relatively low slag of temperature together with condensed water Focused in pond, the clinker after cooling is settled down to the first slag bath bottom, the first slag bath bottom connects with the second slag bath bottom Logical, the clinker of the first slag bath bottom flows to the second slag bath bottom in the case where the clinker newly entered is promoted and further cools down and salvage, Because cooling water temperature is relatively low in the second slag bath, steam generation is not had, and whole slag handling system is simple in construction, described first Provided with so that clinker slides to the inclined ramp of the second slag bath between slag bath bottom and the second slag bath bottom so that be deposited on the first slag The clinker in bottom of pond portion is timely by slag bath bottom along the dragveyer structure that inclined ramp is slided at the top of the first slag bath bottom, the second slag bath The clinker cleaning in portion, thus steam collection operation is separated with dragging for slag operation, and both will not interfere with each other each other.
Further, the angle of inclination of the inclined ramp is 30 °~70 °, in this range of tilt angles, the first slag bath It is more preferable that the clinker of bottom slides to the second clinker effect.
As the further improvement of above-mentioned industrial slags processing system, dragveyer structure is provided with above second slag bath, is dragged for Slag mechanism is arranged at the convenient timely salvaging of clinker progress at any time to deposition above the second slag bath and cleared up.
Further, the vapour condensation device includes spray equipment and the water pump being connected with spray equipment, the spray Shower device is connected with the exhaust outlet, and the delivery port of the spray equipment is connected with the second slag bath, and the water pump is connected with cooling water Source.The steam produced in first slag bath enters in spray equipment through exhaust outlet, and at the same time water pump is pumped into cold into spray equipment But water, steam switchs to condensed water in spray equipment, enters eventually into and remain to focus in the second slag bath, thus reach condensation Steam and the purpose focused on.The invention provides two kinds of spray equipments, the first spray equipment includes steam blower fan and spray Tower is drenched, the steam fan inlet is connected with the exhaust outlet, and the steam fan outlet is connected with spray column, and the water pump is Feeding spraying pump, the feeding spraying pump water inlet is connected with the second slag bath, and the liquid outlet of the spray column is connected with the second slag bath, from The steam of exhaust outlet discharge is entered in spray column in the presence of steam blower fan, and the cooling water washing being pumped into through feeding spraying pump is cold Enter after solidifying in the second slag bath;Second of spray equipment includes jet tower, and the jet tower is connected with the exhaust outlet, described Water pump is high-pressure hydraulic pump, and the high-pressure hydraulic pump water inlet is connected with the second slag bath, the liquid outlet and the second slag bath of the jet tower Connection, the principle of jet tower described herein is identical with the structure of jet pump in the prior art, and the applicant zooms into its structure Jet tower, the specific size of jet tower according to produce quantity of steam determine, its structure include nozzle, mixing chamber, trunnion, airway tube and Anemostat, the high-pressure cooling water that the high-pressure hydraulic pump is produced sprays into mixing chamber, trunnion entrance as working fluid from nozzle at high speeds Region is swept away to form negative pressure because of the cooling water that surrounding air is sprayed at a high speed, and the airway tube air inlet connected with negative pressure region is with steaming The exhaust outlet connection of vapour cover, is pumped into mixing chamber by steam in the presence of negative pressure, enters after mixing in anemostat, flow into afterwards To the second slag bath, such a spray equipment is easier compared to the first spray equipment, is equally reached spray effect well Really.
Further, the steam collection structure is the vapour hood for being arranged at the first slag bath Chi Ding, and the exhaust outlet is set Connected on vapour hood and with vapour condensation device.Steam collection structure is designed as the form of vapour hood so that steam more preferably collects It is middle to collect, convenient follow-up spray operation.
Further, second slag bath is circumscribed with small pump, and high temperature furnace slag can produce steam after entering the first slag bath, The part water in the first slag bath is taken away, because the second slag bath bottom of pond is connected with the first slag bath bottom of pond, the water in the second slag bath It can gradually decrease therewith, in order to ensure the lasting normal operation of equipment, applicant is using small pump is set up, and small pump is connected with cooling Water source, cooling water is filled into this into above-mentioned slag bath in time.
Further, it is connected between first slag bath and the second slag bath by water circulating pump and constitutes circulation loop.One side Face, because high temperature furnace slag enters the coolant-temperature gage rise caused after the first slag bath in the first slag bath, water circulating pump is by the first slag bath In water and the second slag bath in water circulation flowing so that the coolant-temperature gage in the first slag bath is unlikely to too high, it is ensured that stove Cooling effect of the slag in the first slag bath, is allowed to cool effect and is regenerated;On the other hand, the clinker settled in the first slag bath exists Constantly the second slag bath is pushed into the presence of circulating water flow so that clinker concentrates on the second slag bath after further being cooled down, Thus facilitate and the clinker in the second slag bath is salvaged.
Further, the industrial slags import is yellow phosphorus furnace slag import.It is attached in high temperature furnace slag from Yellow phosphorus furnace out With the harmful substance such as phosphorus pentoxide and sulfide, it is therefore desirable to which it is passed through into the first slag bath simultaneously from yellow phosphorus furnace slag import The steam for being contacted cooling water generation is collected condensation, finally focuses on, it is therefore prevented that carry the steam of harmful substance Leak.
The present invention by slag bath be divided into and receive and cooling down high-temperature clinker produce steam the first slag bath and remain low temperature The second slag bath, the first slag bath produce steam obtain collect condensation, the condensed water containing nuisance produced after condensation is in second Facilitated in slag bath and concentration purified treatment is carried out to it, thus prevent the discharge of steam containing harmful substance into air, cooled down Clinker afterwards can also be focused on.
Lead to below and the present invention is further described with reference to accompanying drawing and embodiment.
Brief description of the drawings
Fig. 1 is yellow phosphorus furnace slag processing system structural representation in the prior art.
Fig. 2 is the yellow phosphorus furnace slag processing system structural representation in embodiment 1.
Fig. 3 is the yellow phosphorus furnace slag processing system structural representation in embodiment 2.
Fig. 4 is the structural representation of jet tower in embodiment 2.
Embodiment
As shown in figure 1, being the yellow phosphorus furnace slag processing system in the prior art mentioned in background technology, including receive yellow phosphorus Slag bath 9 and the device for dragging dregs 10 being arranged above slag bath, practical operation by the high temperature furnace slag discharged in Yellow phosphorus furnace put into In slag bath, the temperature of high temperature yellow phosphorus furnace slag is generally 1200 DEG C~1600 DEG C, cooling water is filled in slag bath, high temperature furnace slag is touched The moment of cooling water can produce substantial amounts of steam, and harmful substance is carried in these steam, and being emitted into air can cause serious Environmental pollution.
Embodiment 1:
As shown in Fig. 2 the industrial slags processing system in the present embodiment is yellow phosphorus furnace slag processing system, including receive from Huang First slag bath 1 of the high temperature yellow phosphorus furnace slag in phosphorus stove out and the second slag bath 2 connected with the bottom of the first slag bath 1, the yellow phosphorus Clinker main component is CaSiO3, slag temperature is 1200 DEG C~1600 DEG C, and first slag bath 1 is provided with to be entered for yellow phosphorus furnace slag The yellow phosphorus furnace slag import entered, provided with so that yellow phosphorus furnace slag slides to second between the bottom of the first slag bath 1 and the bottom of the second slag bath 2 The inclined ramp 3 of slag bath 2, the angle of inclination of inclined ramp 3 is 45 °, in this angle of inclination clinker sliding effect preferably, described the The Chi Ding of one slag bath 1 is provided with steam collection structure, and the steam collection structure is the vapour hood 4 for being arranged at the Chi Ding of the first slag bath 1, steams Vapour cover 4 covers the Chi Ding of the first slag bath 1, and by the steam centralized collection of generation, the top of vapour hood 4 is provided with exhaust outlet 410, described Exhaust outlet 410 is connected with vapour condensation device 5, and the vapour condensation device 5 includes steam blower fan 510 and spray column 540a, described The import of steam blower fan 510 is connected with the exhaust outlet 410 by pipeline 810a, and the steam blower fan 510 is exported and spray column 540a steam inlet is connected by pipeline 820a, and the feeding spraying pump 530a water inlets and the second slag bath 2 pass through pipeline 830a is connected, and the delivery port of the feeding spraying pump 530a is connected with spray column 540a water inlet by pipeline 840a, the spray The liquid outlet for drenching tower 540a is connected with the second slag bath 2 by pipeline 850a, is passed through between the slag bath 2 of the first slag bath 1 and second Pipeline 870 and pipeline 860 are connected with water circulating pump 7 respectively, thus by the water in the water body in the first slag bath 1 and the second slag bath 2 Body constitutes circulating water flow loop, and circulating water flow loop realizes in the first slag bath 1 low-temp recovery and is clinker from the pond of the first slag bath 1 Bottom slides to the bottom of pond of the second slag bath 2 and provides motive force so that clinker is concentrated in the second slag bath 2, and the water inlet of pipeline 860 is located at the Under the page of two slag bath 2, water inlet of the pipeline 870 on the first slag bath 1 is preferably arranged at and the corresponding position of inclined ramp 3 On, so that directly rushing at the clinker on inclined ramp into the water in the first slag bath 1 so that the motive force that clinker is subject to is most Greatly, clinker is easier to slide to the bottom of pond of the second slag bath 2, and the flow velocity of circulating water flow is preferably controlled in 3~10m/s, and its scouring effect is Most preferably, second slag bath 2 is circumscribed with small pump, and the small pump is connected with cooling water source, and cooling water source is supplemented in slag bath in time Cooling water, the top of the second slag bath 2 is provided with dragveyer structure 6.
The present invention yellow phosphorus furnace slag handling process be:By the high temperature yellow phosphorus furnace slag discharged in Yellow phosphorus furnace by yellow phosphorus furnace slag import It is passed through into the first slag bath, due to filling cooling water in the first slag bath, the moment entered in high temperature yellow phosphorus furnace slag produces substantial amounts of The harmful substance such as phosphorus pentoxide and a variety of sulfide is carried in steam, steam, vapour hood prevents steam from overflowing and right It carries out centralized collection, and the steam of centralized collection enters spray column in the presence of steam blower fan, and at the same time feeding spraying pump will Cooling water in second slag bath is pumped into spray column, and steam cooled water wash condensation in spray column ultimately forms condensed water row Into the second slag bath, after liquid level has declined in the first slag bath and the second slag bath, cooling water is filled into by small pump in time, by The need for this ensure that to chilling temperature, clinker is settled down to the first slag bath bottom of pond after cooling, finally slides to the second slag bath pond Bottom, the clinker that opening water circulating pump can wash away on inclined ramp accelerates clinker and is slided to the second slag bath and reach the first slag of reduction The effect of pond temperature, the clinker of cooling concentrates on the second slag bath bottom of pond, and operating personnel are periodically cleared up clinker by salvaging mechanism, Thereby guarantee that slag bath effectively cools down space, the clinker pulled out can be used as preparing bonding agent, the water contained hazardous substance stayed in pond Can periodic purge.
It can be realized by the present embodiment and condensation process is collected to the dangerous vapors that yellow phosphorus furnace slag cools down generation, prevented Air is only polluted, at the same time also facilitates and unified cleaning is carried out to the clinker after cooling, whole inventive structure is simple, operation side Just, production cost is reduced.
Embodiment 2:
As shown in figure 3, the present embodiment and the difference of embodiment 1 are, the jet tower 540b of vapour condensation device 5 and height Water pump 530b, as shown in figure 4, the jet tower 540b includes nozzle 542b, mixing chamber, trunnion 543b, connected with mixing chamber Airway tube 541b and anemostat 544b, the exhaust outlet 410 connected by pipeline 810b with airway tube 541b, the high pressure Water pump 530b water inlets are connected with the second slag bath 2 by pipeline 820b, and the high-pressure hydraulic pump 530b delivery ports enter with nozzle 542b Mouth is connected by pipeline 830b, and the liquid outlet of the jet tower 540b is connected by pipeline 840b with the second slag bath 2.
Difference of the present embodiment with embodiment 1 in yellow phosphorus furnace slag handling process is:In vapour hood centralized collection steam While start high-pressure hydraulic pump, high-pressure hydraulic pump is by the cooling water express pump incident flow tower in the second slag bath, and high-velocity fluid is from nozzle Ejection enters mixing chamber, because surrounding air is taken away by high-velocity fluid, in throat's water inlet formation negative pressure region, in negative pressure The lower steam of effect is mixed and condensed with cooling water from airway tube suction mixing chamber, finally drains into the second slag bath from jet tower bottom of towe.
The present embodiment is on the basis for realizing the equivalent technology effect of embodiment 1, and the present embodiment is in structure compared to reality Apply that example 2 is simpler, operating process is more easy, and production cost is lower compared with embodiment 1.

Claims (7)

1. industrial slags processing system, including fill the slag bath of cooling water, it is characterised in that:The slag bath includes receiving industry kiln The first slag bath (1) of stove clinker and the second slag bath (2) connected with the first slag bath (1) bottom, the first slag bath (1) Chi Ding Provided with steam collection structure, the steam collection structure is provided with exhaust outlet (410), and it is cold that the exhaust outlet (410) is connected with steam Solidifying device (5), the condensation-water drain of the vapour condensation device (5) is connected with the second slag bath (2), the first slag bath (1) bottom Provided with so that clinker slides to the inclined ramp (3) of the second slag bath (2), vapour condensation device between portion and the second slag bath (2) bottom (5) spray equipment and the water pump being connected with spray equipment are included, the spray equipment is connected with the exhaust outlet (410), institute The delivery port for stating spray equipment is connected with the second slag bath (2), and the water pump is connected with cooling water source, and the spray equipment includes steam Blower fan (510) and spray column (540a), the steam fan inlet are connected with the exhaust outlet (410), the steam blower fan (510) outlet is connected with spray column (540a), and the water pump is feeding spraying pump (530a), feeding spraying pump (530a) water inlet Connected with the second slag bath (2), the liquid outlet of the spray column (540a) is connected with the second slag bath (2).
2. industrial slags processing system as claimed in claim 1, it is characterised in that:The angle of inclination of the inclined ramp (3) For 30 °~70 °.
3. industrial slags processing system as claimed in claim 1, it is characterised in that:It is provided with and drags for above second slag bath (2) Slag mechanism (6).
4. industrial slags processing system as claimed in claim 1, it is characterised in that:The steam collection structure is is arranged at the One slag bath Chi Ding vapour hood (4), the exhaust outlet (410) is arranged on vapour hood (4) and connected with vapour condensation device (5) It is logical.
5. industrial slags processing system as claimed in claim 1, it is characterised in that:Second slag bath (2) is circumscribed with moisturizing Pump, the small pump is connected to cooling water source.
6. industrial slags processing system as claimed in claim 1, it is characterised in that:First slag bath (1) and the second slag bath (2) it is connected between by water circulating pump (7) and constitutes circulation loop.
7. industrial slags processing system as claimed in claim 1, it is characterised in that:First slag bath (1) is received from yellow phosphorus Yellow phosphorus furnace slag in stove out.
CN201510423521.2A 2015-07-17 2015-07-17 Industrial slags processing system Active CN104998890B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201510423521.2A CN104998890B (en) 2015-07-17 2015-07-17 Industrial slags processing system
CN201710398966.9A CN107350261B (en) 2015-07-17 2015-07-17 Industrial slags processing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510423521.2A CN104998890B (en) 2015-07-17 2015-07-17 Industrial slags processing system

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN201710398966.9A Division CN107350261B (en) 2015-07-17 2015-07-17 Industrial slags processing system

Publications (2)

Publication Number Publication Date
CN104998890A CN104998890A (en) 2015-10-28
CN104998890B true CN104998890B (en) 2017-10-03

Family

ID=54371897

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201710398966.9A Active CN107350261B (en) 2015-07-17 2015-07-17 Industrial slags processing system
CN201510423521.2A Active CN104998890B (en) 2015-07-17 2015-07-17 Industrial slags processing system

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201710398966.9A Active CN107350261B (en) 2015-07-17 2015-07-17 Industrial slags processing system

Country Status (1)

Country Link
CN (2) CN107350261B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106675653B (en) * 2017-02-08 2022-07-22 中国东方电气集团有限公司 Liquid-state deslagging system and deslagging method for normal-pressure fixed bed
CN110523208A (en) * 2019-09-19 2019-12-03 云南磷化集团有限公司 A kind of system reducing slag bath moisture discharge of quenching when yellow phosphorus furnace slag water quenching
CN111151086A (en) * 2020-01-21 2020-05-15 成都易态科技有限公司 Three-phase separation device for water quenching product and water quenching flue gas treatment system and method

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1009207B (en) * 1986-04-21 1990-08-15 Ajo钢铁制造有限公司 Process and apparatus for manufacturing slag sand (granular solids) with blast furnace slag
JP3746896B2 (en) * 1998-02-20 2006-02-15 新日本製鐵株式会社 Method and apparatus for processing molten blast furnace slag
CN101423876A (en) * 2007-11-01 2009-05-06 姜学仕 Blast furnace slag treatment and slag heat energy utilization method and implementing apparatus
JP2009227495A (en) * 2008-03-20 2009-10-08 Jfe Steel Corp Method for treating slag
KR101302025B1 (en) * 2011-05-12 2013-08-30 지에스플라텍 주식회사 Apparatus and method for treating ash from waste incinerators using plasma arc
CN103196124B (en) * 2012-01-06 2015-04-22 姜学仕 Slag disposing technology device by evaporating pot method
CN202830050U (en) * 2012-08-22 2013-03-27 保尔沃特冶金技术(北京)有限公司 Slag processing system
CN103553557B (en) * 2013-11-05 2015-09-09 北京科技大学 The continuous casting calendering technology method of blast furnace slag production cast stone and equipment thereof
CN104108691B (en) * 2014-07-21 2016-03-16 贵州开磷集团股份有限公司 A kind of gaseous state phosphorus washing device
CN104745829A (en) * 2015-04-16 2015-07-01 湖南水口山有色金属集团有限公司 Fuming furnace and slag flushing device thereof

Also Published As

Publication number Publication date
CN104998890A (en) 2015-10-28
CN107350261B (en) 2019-10-08
CN107350261A (en) 2017-11-17

Similar Documents

Publication Publication Date Title
CN104998890B (en) Industrial slags processing system
US20210197113A1 (en) Device for producing and treating a gas stream through a volume of liquid, and facility and method implementing said device
CN104745829A (en) Fuming furnace and slag flushing device thereof
KR102095722B1 (en) Impinger
CN108384908A (en) A kind of granulating pit vapour condensation device and its gas gathering mask and application method
CN104353663A (en) Soil thermal desorption treatment system with discharge dust removal function
US20180200643A1 (en) Compact wastewater concentrator utilizing a low temperature thermal energy source
CN107726337B (en) A kind of smoke processing system of garbage disposal furnace
CN109432969A (en) A kind of three-circulation desulphurization disappears white integrated apparatus
JPH0970517A (en) Dust collector for high temperature incineration ash
CN205340454U (en) Grid casting flue gas dust removal device
CN208074996U (en) A kind of exhaust gas purification system of dangerous waste incineration
CN208055380U (en) A kind of granulating pit vapour condensation device and its gas gathering mask
EP2507570B1 (en) Method and apparatus for handling gases
CN111363868A (en) Steel slag heat treatment system and method
CN101476822A (en) Burner gas purification system and process for silicon-manganese alloy electric furnace
CN104107612B (en) A kind of processing unit of bitumen flue gas containing dust
JP2013039527A (en) Wet-type flue gas desulfurization apparatus, and thermal power generation plant provided with the same
CN205815406U (en) Flame retardant type dust separation system
KR101697095B1 (en) Seal tank in gas clean line for preventing hinderance of dust
CN114849431A (en) Air box assembly, clinker production device and flue gas pollutant treatment equipment
CN106498120A (en) A kind of converter gas evaporation cooling washing system
CN207622036U (en) A kind of smoke processing system of garbage disposal furnace
CN207649389U (en) A kind of lead reduction melting flue gas treating process line
CN206778128U (en) The exhaust treatment system that a kind of metal sludge is smelted

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant