CN104995941B - Multifrequency electrical tilt antenna management method, device and system - Google Patents
Multifrequency electrical tilt antenna management method, device and system Download PDFInfo
- Publication number
- CN104995941B CN104995941B CN201480003863.2A CN201480003863A CN104995941B CN 104995941 B CN104995941 B CN 104995941B CN 201480003863 A CN201480003863 A CN 201480003863A CN 104995941 B CN104995941 B CN 104995941B
- Authority
- CN
- China
- Prior art keywords
- ret
- base station
- antenna equipment
- sent
- antenna
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01Q—ANTENNAS, i.e. RADIO AERIALS
- H01Q3/00—Arrangements for changing or varying the orientation or the shape of the directional pattern of the waves radiated from an antenna or antenna system
- H01Q3/005—Arrangements for changing or varying the orientation or the shape of the directional pattern of the waves radiated from an antenna or antenna system using remotely controlled antenna positioning or scanning
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01Q—ANTENNAS, i.e. RADIO AERIALS
- H01Q1/00—Details of, or arrangements associated with, antennas
- H01Q1/12—Supports; Mounting means
- H01Q1/22—Supports; Mounting means by structural association with other equipment or articles
- H01Q1/24—Supports; Mounting means by structural association with other equipment or articles with receiving set
- H01Q1/241—Supports; Mounting means by structural association with other equipment or articles with receiving set used in mobile communications, e.g. GSM
- H01Q1/246—Supports; Mounting means by structural association with other equipment or articles with receiving set used in mobile communications, e.g. GSM specially adapted for base stations
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Mobile Radio Communication Systems (AREA)
- Signal Processing (AREA)
Abstract
The embodiment of the present invention provides a kind of multifrequency electrical tilt antenna management method, device and system, wherein, the base station for participating in the management of multifrequency electrical tilt antenna includes: transmission unit, for by sending scan command to antenna equipment, the scan command to be used to indicate the antenna equipment and the mark of all remote electricity tune unit R ET is sent to the base station;Receiving unit, for receiving the mark for all RET that the antenna equipment is sent;Processing unit establishes the communication connection about the first RET with the antenna equipment, the first RET is any RET in the antenna equipment for the mark according to received first RET of the receiving unit;Wherein, the base station possesses the administration authority to the first RET.Since base station can receive the mark of all RET, O&M cost can be reduced with quick positioning question when base station cannot configure RET, improve O&M efficiency and quality.
Description
Technical field
The present embodiments relate to field of communication technology more particularly to a kind of multifrequency electrical tilt antenna management method, device and
System.
Background technique
Currently, remote control unit (Remote Control Unit, referred to as: RCU) is placed in antennas, can in order to avoid
The mapping relations for removing record antenna and remote electricity tune unit (Remote Electrical Tilting, referred to as: RET), simplify day
The configuration process of line and RET, so that antenna is easier for installation, quick with RET, while in order to reduce antenna installation number and section
The about occupied space of antenna can also realize that multiple frequency ranges cover the same region using a multifrequency antenna, therefore multiple
RET is built in multifrequency antenna the trend for becoming antenna development, when multiple base stations share a multifrequency electrical tilt antenna, needs pipe
Manage the relationship between multiple base stations and the same multifrequency electrical tilt antenna.
In the prior art, as shown in Figure 1, a RET can only be configured by a base station, base station 1 passes through antennal interface
RET1 that the port 1 standardization (Antenna Interface Standard Group, referred to as: AISG) scanning is reported to RCU,
After the information of RET2 and RET3, the selection of base station 1 is established with RET1 to be communicated to connect and configures the RET1;Then base station 2 passes through AISG2
Information (RET1 by base station 1 configured, RCU will do not report the information of RET1) of the port scan to the RCU RET2 reported and RET3, base
2 selections of standing are established with RET2 and RET3 to be communicated to connect and configures RET2 and RET3, so that it is same to realize that multiple base stations manage jointly
A multifrequency electrical tilt antenna.
However, if the configuration of base station 1 error in the prior art, the i.e. selection of base station 1 establish communication link with RET1, RET2 and RET3
It connects and configures these RET, then information of the base station 2 by the port AISG2 by scanning less than the RCU any RET reported, therefore, it is impossible to
Directly determine the object between the configuration error of base station 1 or AISG2 and intelligent bias device (Smart Bias-Tee, referred to as: SBT)
Manage line disconnect, thus can not quick positioning question, increase O&M cost.
Summary of the invention
Multifrequency electrical tilt antenna management method, the device and system of inventive embodiments offer, are used for quick positioning question, reduce
O&M cost, improves O&M efficiency and quality.
In a first aspect, the embodiment of the present invention provides a kind of base station, comprising:
Transmission unit, for by sending scan command to antenna equipment, the scan command to be used to indicate the antenna
The mark of all remote electricity tune unit R ET is sent to the base station by equipment;
Receiving unit, for receiving the mark for all RET that the antenna equipment is sent;
Processing unit is established with the antenna equipment and is closed for the mark according to received first RET of the receiving unit
In the communication connection of the first RET, the first RET is any RET in the antenna equipment;
Wherein, the base station possesses the administration authority to the first RET.
In the first possible implementation of the first aspect, the transmission unit is also used in the processing unit root
It according to the mark of the first RET, is established after the communication connection about the first RET with the antenna equipment, Xiang Suoshu antenna equipment hair
The first RET administration authority setting command is sent, the first RET administration authority setting command belongs to newly-increased antennal interface standardization
AISG interface command;
The receiving unit is also used to receive the first RET administration authority setting success response that the antenna equipment is sent,
So that the base station possesses the administration authority to the first RET.
In the second possible implementation of the first aspect, the administration authority is the base by the antenna equipment
It stands institute's default setting.
In the possible implementation of second with reference to first aspect, in the third possible implementation of first aspect
In, the transmission unit is specifically used for sending the first RET control authority setting command to the antenna equipment;
The first RET control authority that the receiving unit is specifically used for the reception antenna equipment transmission, which is arranged, successfully rings
It answers;
Wherein, the administration authority includes control authority.
The third possible implementation with reference to first aspect, in the 4th kind of possible implementation of first aspect
In, the processing unit, which is used to receive the first RET control authority that the antenna equipment is sent in the receiving unit, to be arranged to
After function response, determine whether the base station needs to discharge the control authority possessed the first RET;
The transmission unit is also used to, and needs to discharge the control for possessing the first RET when the processing unit determines
When permission processed, Xiang Suoshu antenna equipment sends the first RET search access right setting command;
The receiving unit is also used to receive the first RET search access right setting success response that the antenna equipment is sent,
So that the base station possesses the search access right to the first RET.
The possible implementation of second with reference to first aspect, in the 5th kind of possible implementation of first aspect
In, if the communication connection Shi Weicun in the base station according to the mark of the first RET with antenna equipment foundation about the first RET
In first base station, then the administration authority of antenna equipment institute default setting includes control authority;
Wherein, the first base station has been established the communication connection about the first RET and has been gathered around with the antenna equipment
There is the control authority to the first RET.
The 4th kind of possible implementation of the third possible implementation or first aspect with reference to first aspect or
5th kind of possible implementation of first aspect, in the sixth possible implementation of the first aspect, the transmission are single
Member is also used to the mark in the processing unit according to the first RET, establishes the communication about the first RET with the antenna equipment
After connection, Xiang Suoshu antenna equipment sends the first RET control command;
The receiving unit is also used to receive the first RET control success response that the antenna equipment is sent.
The possible implementation of with reference to first aspect the first, in the 7th kind of possible implementation of first aspect
In, the transmission unit is specifically used for sending the first RET search access right setting command to the antenna equipment;
The receiving unit is also used to receive the first RET search access right setting success response that the antenna equipment is sent;
Wherein, the administration authority includes search access right.
The 7th kind of possible implementation with reference to first aspect, in the 8th kind of possible implementation of first aspect
In, the transmission unit is also used to before sending the first RET search access right setting command to the antenna equipment, to the day
Line equipment sends the first RET control authority setting command;
The receiving unit is also used to receive the first RET control authority conflict response that the antenna equipment is sent.
The possible implementation of second with reference to first aspect, in the 9th kind of possible implementation of first aspect
In, if having been deposited when the communication connection about the first RET is established with the antenna equipment according to the mark of the first RET in the base station
In first base station, then the administration authority of antenna equipment institute default setting includes search access right, and the first base station is
The communication connection about the first RET has been established with the antenna equipment and possesses the control authority to the first RET.
Third with reference to first aspect is to any one possible implementation in the 9th kind, at the tenth kind of first aspect
In possible implementation, the transmission unit is also used to the mark in the processing unit according to the first RET, with the antenna
Equipment is established after the communication connection about the first RET, and Xiang Suoshu antenna equipment sends the first RET querying command;
The receiving unit is also used to receive the first RET query result that the antenna equipment is sent.
The possible implementation of with reference to first aspect the first, in a kind of the tenth possible implementation of first aspect
In, the transmission unit is specifically used for exclusively enjoying priority assignation order to the first RET of antenna equipment transmission;
The first RET that the receiving unit is specifically used for the reception antenna equipment transmission exclusively enjoys priority assignation and successfully rings
It answers;
Wherein, the administration authority includes exclusively enjoying permission.
Any one possible implementation with reference to first aspect or in first to the tenth one kind of first aspect, first
In 12nd kind of possible implementation of aspect, the transmission unit is also used in the processing unit according to the first RET's
Mark is established after the communication connection about the first RET with the antenna equipment, and Xiang Suoshu antenna equipment sends the first RET power
Reading order is limited, the first RET permission reading order belongs to newly-increased AISG interface command;
The receiving unit is also used to receive the first RET rights objects that the antenna equipment is sent, with the determination base
It stands the administration authority that the first RET is possessed.
Second aspect, the embodiment of the present invention provide a kind of antenna equipment, comprising:
Receiving unit, for receiving the scan command of base station transmission, the scan command is used to indicate the antenna equipment
The mark of all remote electricity tune unit R ET is sent to the base station;
Transmission unit, for sending the mark of all RET to the base station;
Processing unit, for establishing the communication connection about the first RET with the base station, the first RET is the day
Any RET in line equipment;
Wherein, the first RET is by the BTS management.
In the first possible implementation of the second aspect, the receiving unit be also used to the processing unit with
The base station is established after the communication connection about the first RET, and the first RET administration authority setting life that the base station is sent is received
It enables, the first RET administration authority setting command belongs to newly-increased AISG interface command;
The transmission unit is also used to send the setting success response of the first RET administration authority to the base station, so that described
Base station possesses the administration authority to the first RET.
In a second possible implementation of the second aspect, the processing unit is also used to establish with the base station
After communication connection about the first RET, base station described in default setting possesses the administration authority to the first RET.
In second of possible implementation in conjunction with second aspect, in the third possible implementation of second aspect
In, the receiving unit is specifically used for receiving the first RET control authority setting command that the base station is sent;
The transmission unit is specifically used for sending the setting success response of the first RET control authority to the base station;
Wherein, the administration authority includes control authority.
In conjunction with the third possible implementation of second aspect, in the 4th kind of possible implementation of second aspect
In, the receiving unit be also used to the transmission unit to the base station send the first RET control authority setting success response it
Afterwards, the first RET search access right setting command that the base station is sent is received;
The transmission unit is also used to send the setting success response of the first RET search access right to the base station, so that described
Base station possesses the search access right to the first RET.
In conjunction with second of possible implementation of second aspect, in the 5th kind of possible implementation of second aspect
In, the processing unit is specifically used for, if there is no the first base when establishing the communication connection about the first RET with the base station
It stands, then base station described in default setting possesses the control authority to the first RET, and the first base station is and the antenna equipment
The communication connection about the first RET has been established and possesses another base station of the control authority to the first RET.
In conjunction with the third possible implementation of second aspect or the 4th kind of possible implementation of second aspect or
5th kind of possible implementation of second aspect, in the sixth possible implementation of the second aspect, the reception are single
Member is also used to after the processing unit and the base station establish the communication connection about the first RET, receives the base station hair
The first RET control command sent;
The processing unit is also used to according to the first RET control command, carries out control processing to the first RET;
The transmission unit is also used to send the first RET control success response to the base station.
In conjunction with the first possible implementation of second aspect, in the 7th kind of possible implementation of second aspect
In, the receiving unit is specifically used for receiving the first RET search access right setting command that the base station is sent;
The transmission unit is specifically used for sending the setting success response of the first RET search access right to the base station;
Wherein, the administration authority includes search access right.
In conjunction with the 7th kind of possible implementation of second aspect, in the 8th kind of possible implementation of second aspect
In, the receiving unit is also used to before receiving the first RET search access right setting command that the base station is sent, described in reception
The first RET control authority setting command that base station is sent;
The transmission unit is also used to, if the receiving unit has received the first RET control of first base station transmission
Setting command is limited, then sends the first RET control authority conflict response to the base station, the first base station is set with the antenna
The standby communication connection established about the first RET.
In conjunction with second of possible implementation of second aspect, in the 9th kind of possible implementation of second aspect
In, the processing unit is specifically used for, if existing first base when establishing the communication connection about the first RET with the base station
It stands, then base station described in default setting possesses the search access right to the first RET, and the first base station is and the antenna equipment
The communication connection about the first RET has been established and possesses the base station of the control authority to the first RET.
In conjunction with second aspect third to any one possible implementation in the 9th kind, at the tenth kind of second aspect
In possible implementation, the receiving unit is also used to establish in the processing unit and the base station about the first RET's
After communication connection, the first RET querying command that the base station is sent is received;
The processing unit is also used to inquire the first RET according to the first RET querying command;
The transmission unit is also used to send the first RET query result to the base station.
In conjunction with the first possible implementation of second aspect, in a kind of the tenth possible implementation of second aspect
In, the first RET that the receiving unit is specifically used for receiving the base station transmission exclusively enjoys priority assignation order;
The transmission unit is specifically used for exclusively enjoying priority assignation success response to the base station the first RET of transmission;
Wherein, the administration authority includes exclusively enjoying permission.
In conjunction with any one possible implementation in first to the tenth one kind of second aspect or second aspect, second
In 12nd kind of possible implementation of aspect, the receiving unit is also used to establish in the processing unit and the base station
After communication connection about the first RET, the first RET permission reading order that the base station is sent, the first RET power are received
Limit reading order belongs to the AISG interface command newly increased;
The transmission unit is also used to send the first RET rights objects to the base station, so that described in the base station is determining
The administration authority that base station possesses the first RET.
The third aspect, the embodiment of the present invention provide a kind of multifrequency electrical tilt antenna management method, comprising:
Base station sends scan command to antenna equipment, and the scan command is used to indicate the antenna equipment will be all remote
The mark of journey electricity tune unit R ET is sent to the base station;
The base station receives the mark for all RET that the antenna equipment is sent;
The communication connection about the first RET, institute are established with the antenna equipment according to the mark of the first RET in the base station
Stating the first RET is any RET in the antenna equipment;
Wherein, the base station possesses the administration authority to the first RET.
In the first possible implementation of the third aspect, the base station is according to the mark of the first RET, with the day
Line equipment is established after the communication connection about the first RET, further includes:
The base station sends the first RET administration authority setting command, the first RET administration authority to the antenna equipment
Setting command belongs to newly-increased antennal interface standardized A ISG interface command;
The base station receives the first RET administration authority setting success response that the antenna equipment is sent, so that the base
Station possesses the administration authority to the first RET.
In the second possible implementation of the third aspect, the administration authority is the base by the antenna equipment
It stands institute's default setting.
In second of possible implementation in conjunction with the third aspect, in the third possible implementation of the third aspect
In, the base station sends the first RET administration authority setting command to the antenna equipment, comprising:
The base station sends the first RET control authority setting command to the antenna equipment;
The base station receives the first RET administration authority setting success response that the antenna equipment is sent, comprising:
The base station receives the first RET control authority setting success response that the antenna equipment is sent;
Wherein, the administration authority includes control authority.
In conjunction with the third possible implementation of the third aspect, in the 4th kind of possible implementation of the third aspect
In, the base station receives after the first RET control authority setting success response that the antenna equipment is sent, further includes:
When the base station needs to discharge the control authority for possessing the first RET, the base station is to the antenna
Equipment sends the first RET search access right setting command;
The base station receives the first RET search access right setting success response that the antenna equipment is sent, so that the base
Station possesses the search access right to the first RET.
In conjunction with second of possible implementation of the third aspect, in the 5th kind of possible implementation of the third aspect
In, if the communication connection Shi Weicun in the base station according to the mark of the first RET with antenna equipment foundation about the first RET
In first base station, then the administration authority of antenna equipment institute default setting includes control authority;
Wherein, the first base station has been established the communication connection about the first RET and has been gathered around with the antenna equipment
There is the control authority to the first RET.
In conjunction with the third possible implementation of the third aspect or the 4th kind of possible implementation of the third aspect or
5th kind of possible implementation of the third aspect, in the 6th kind of possible implementation of the third aspect, the base station root
According to the mark of the first RET, established after the communication connection about the first RET with the antenna equipment, further includes:
The base station sends the first RET control command to the antenna equipment;
The base station receives the first RET control success response that the antenna equipment is sent.
In conjunction with the first possible implementation of the third aspect, in the 7th kind of possible implementation of the third aspect
In, the base station sends the first RET administration authority setting command to the antenna equipment, comprising:
The base station sends the first RET search access right setting command to the antenna equipment;
The base station receives the first RET administration authority setting success response that the antenna equipment is sent, comprising:
The base station receives the first RET search access right setting success response that the antenna equipment is sent;
Wherein, the administration authority includes search access right.
In conjunction with the 7th kind of possible implementation of the third aspect, in the 8th kind of possible implementation of the third aspect
In, the base station is sent to the antenna equipment before the first RET search access right setting command, further includes:
The base station sends the first RET control authority setting command to the antenna equipment;
The base station receives the first RET control authority conflict response that the antenna equipment is sent;
The base station sends the first RET search access right setting command to the antenna equipment, comprising:
The base station is according to the first RET control authority conflict response, by sending the first RET to the antenna equipment
Search access right setting command.
In conjunction with second of possible implementation of the third aspect, in the 9th kind of possible implementation of the third aspect
In, if having been deposited when the communication connection about the first RET is established with the antenna equipment according to the mark of the first RET in the base station
In first base station, then the administration authority of antenna equipment institute default setting includes search access right, and the first base station is
The communication connection about the first RET has been established with the antenna equipment and possesses the control authority to the first RET.
In conjunction with the third aspect third to any one possible implementation in the 9th kind, at the tenth kind of the third aspect
In possible implementation, the base station is established with the antenna equipment about the logical of the first RET according to the mark of the first RET
After letter connection, further includes:
The base station sends the first RET querying command to the antenna equipment;
The base station receives the first RET query result that the antenna equipment is sent.
In conjunction with the first possible implementation of the third aspect, in a kind of the tenth possible implementation of the third aspect
In, the base station sends the first RET administration authority setting command to the antenna equipment, comprising:
The base station sends the first RET to the antenna equipment and exclusively enjoys priority assignation order;
The base station receives the first RET administration authority setting success response that the antenna equipment is sent, comprising:
The base station receives the first RET that the antenna equipment is sent and exclusively enjoys priority assignation success response;
Wherein, the administration authority includes exclusively enjoying permission.
In conjunction with any one possible implementation in first to the tenth one kind of the third aspect or the third aspect, in third
In 12nd kind of possible implementation of aspect, the base station is established with the antenna equipment and is closed according to the mark of the first RET
After the communication connection of the first RET, further includes:
The base station sends the first RET permission reading order, the first RET permission reading order to the antenna equipment
Belong to newly-increased AISG interface command;
The base station receives the first RET rights objects that the antenna equipment is sent, with the determination base station to described the
The administration authority that one RET is possessed.
Fourth aspect, the embodiment of the present invention also provide a kind of multifrequency electrical tilt antenna management method, comprising:
Antenna equipment receives the scan command that base station is sent, and the scan command, which will be used to indicate the antenna equipment, to be owned
The mark of remote electricity tune unit R ET be sent to the base station;
The antenna equipment sends the mark of all RET to the base station;
The communication connection about the first RET is established in the antenna equipment and the base station, and the first RET is the antenna
Any RET in equipment;
Wherein, the base station possesses the administration authority to the first RET.
In the first possible implementation of the fourth aspect, the antenna equipment and the base station are established about first
After the communication connection of RET, further includes:
The antenna equipment receives the first RET administration authority setting command that the base station is sent, the first RET management
Priority assignation order belongs to newly-increased AISG interface command;
The antenna equipment sends the first RET administration authority to the base station and success response is arranged, so that the base station is gathered around
There is the administration authority to the first RET.
In the second possible implementation of the fourth aspect, the antenna equipment and the base station are established about first
After the communication connection of RET, further includes:
Base station described in the antenna equipment default setting possesses the administration authority to the first RET.
In second of possible implementation in conjunction with fourth aspect, in the third possible implementation of fourth aspect
In, the antenna equipment receives the first RET administration authority setting command that the base station is sent, comprising:
The antenna equipment receives the first RET control authority setting command that the base station is sent;
The antenna equipment sends the first RET control authority to the base station and success response is arranged;
Wherein, the administration authority includes control authority.
In conjunction with the third possible implementation of fourth aspect, in the 4th kind of possible implementation of fourth aspect
In, the antenna equipment is sent to the base station after the setting success response of the first RET control authority, further includes:
The antenna equipment receives the first RET search access right setting command that the base station is sent;
The antenna equipment sends the first RET search access right to the base station and success response is arranged, so that the base station is gathered around
There is the search access right to the first RET.
In conjunction with second of possible implementation of fourth aspect, in the 5th kind of possible implementation of fourth aspect
In, base station described in the antenna equipment default setting possesses the administration authority to the first RET, comprising:
If there is no first base station when the antenna equipment and the base station establish the communication connection about the first RET,
Then base station described in the antenna equipment default setting possesses the control authority to the first RET, the first base station for institute
Antenna equipment is stated the communication connection about the first RET has been established and possesses to the another of the control authority of the first RET
One base station.
In conjunction with the third possible implementation of fourth aspect or the 4th kind of possible implementation of fourth aspect or
5th kind of possible implementation of fourth aspect, in the 6th kind of possible implementation of fourth aspect, the antenna is set
It is standby to be established after the communication connection about the first RET with the base station, further includes:
The antenna equipment receives the first RET control command that the base station is sent;
The antenna equipment carries out control processing according to the first RET control command, to the first RET;
The antenna equipment sends the first RET to the base station and controls success response.
In conjunction with the first possible implementation of fourth aspect, in the 7th kind of possible implementation of fourth aspect
In, the antenna equipment receives the first RET administration authority setting command that the base station is sent, comprising:
The antenna equipment receives the first RET search access right setting command that the base station is sent;
The antenna equipment sends the first RET search access right to the base station and success response is arranged;
Wherein, the administration authority includes search access right.
In conjunction with the 7th kind of possible implementation of fourth aspect, in the 8th kind of possible implementation of fourth aspect
In, the antenna equipment receives before the first RET search access right setting command that the base station is sent, further includes:
The antenna equipment receives the first RET control authority setting command that the base station is sent;
If the antenna equipment determines the first RET control authority setting command for having received first base station transmission, institute
State antenna equipment to the base station send the first RET control authority conflict response, the first base station with the antenna equipment
Establish the communication connection about the first RET.
In conjunction with second of possible implementation of fourth aspect, in the 9th kind of possible implementation of fourth aspect
In, base station described in the antenna equipment default setting possesses the administration authority to the first RET, comprising:
If the existing first base station when the antenna equipment and the base station establish the communication connection about the first RET,
Then base station described in the antenna equipment default setting possesses the search access right to the first RET, the first base station for institute
Antenna equipment is stated the communication connection about the first RET has been established and possesses the base of the control authority to the first RET
It stands.
In conjunction with fourth aspect third to any one possible implementation in the 9th kind, at the tenth kind of fourth aspect
In possible implementation, the antenna equipment and the base station are established after the communication connection about the first RET, further includes:
The antenna equipment receives the first RET querying command that the base station is sent;
The antenna equipment inquires the first RET according to the first RET querying command;
The antenna equipment sends the first RET query result to the base station.
In conjunction with the first possible implementation of fourth aspect, in a kind of the tenth possible implementation of fourth aspect
In, the antenna equipment receives the first RET administration authority setting command that the base station is sent, comprising:
The antenna equipment receives the first RET that the base station is sent and exclusively enjoys priority assignation order;
The antenna equipment sends the first RET to the base station and exclusively enjoys priority assignation success response;
Wherein, the administration authority includes exclusively enjoying permission.
In conjunction with any one possible implementation in first to the tenth one kind of fourth aspect or fourth aspect, the 4th
In 12nd kind of possible implementation of aspect, the communication link about the first RET is established in the antenna equipment and the base station
After connecing, further includes:
The antenna equipment receives the first RET permission reading order that the base station is sent, and the first RET permission is read
Order belongs to the AISG interface command newly increased;
The antenna equipment sends the first RET rights objects to the base station, so that the base station determines the base station pair
The administration authority that first RET is possessed.
5th aspect, this hair embodiment provide a kind of multifrequency electrical tilt antenna management system, comprising: first aspect as above provides
Base station and second aspect as above provide antenna equipment.
Multifrequency electrical tilt antenna management method provided in an embodiment of the present invention, device and system, the transmission unit of base station pass through
Scan command is sent to antenna equipment, the scan command is used to indicate the antenna equipment for all remote electricity tune units
The mark of RET is sent to the base station;The receiving unit of base station receives the mark for all RET that the antenna equipment is sent;Base
The processing unit stood is established with the antenna equipment about the first RET according to the mark of received first RET of the receiving unit
Communication connection, the first RET be the antenna equipment in any RET;Wherein, the base station possesses to described first
The administration authority of RET.Since base station can receive the mark of all RET, it can quickly position and ask when base station cannot configure RET
Topic, reduces O&M cost, improves O&M efficiency and quality.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is this hair
Bright some embodiments for those of ordinary skill in the art without creative efforts, can be with root
Other attached drawings are obtained according to these attached drawings.
Fig. 1 is the schematic diagram for the multifrequency electrical tilt antenna management method that the prior art provides;
Fig. 2 is the structural schematic diagram of base station embodiment one of the present invention;
Fig. 3 is the structural schematic diagram of base station embodiment two of the present invention;
Fig. 4 is the structural schematic diagram of inventive antenna apparatus embodiments one;
Fig. 5 is the structural schematic diagram of inventive antenna apparatus embodiments two;
Fig. 6 is the structural schematic diagram of multifrequency electrical tilt antenna management system embodiment of the present invention;
Fig. 7 is the flow chart of multifrequency electrical tilt antenna management method embodiment one of the present invention;
Fig. 8 is the flow chart of multifrequency electrical tilt antenna management method embodiment two of the present invention;
Fig. 9 is the flow chart of multifrequency electrical tilt antenna management method embodiment three of the present invention;
Figure 10 is the flow chart of multifrequency electrical tilt antenna management method example IV of the present invention;
Figure 11 is the flow chart of multifrequency electrical tilt antenna management method embodiment five of the present invention;
Figure 12 is the flow chart of multifrequency electrical tilt antenna management method embodiment six of the present invention;
Figure 13 is the flow chart of multifrequency electrical tilt antenna management method embodiment seven of the present invention;
Figure 14 is the flow chart of multifrequency electrical tilt antenna management method embodiment eight of the present invention;
Figure 15 is a kind of application scenarios schematic diagram of multifrequency electrical tilt antenna management method of the present invention;
Figure 16 is the flow chart of multifrequency electrical tilt antenna management method embodiment nine of the present invention;
Figure 17 is the flow chart of multifrequency electrical tilt antenna management method embodiment ten of the present invention.
Specific embodiment
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention
In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is
A part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art
Every other embodiment obtained without creative efforts, shall fall within the protection scope of the present invention.
Technical solution of the present invention can be applied to various wireless communication systems, such as: global system for mobile communications
(Global System for Mobile Communications, referred to as: GSM), General Packet Radio Service (General
Packet Radio Service, referred to as: GPRS) system, CDMA (Code Division Multiple Access, letter
Claim: CDMA) system, CDMA2000 system, wideband code division multiple access (Wideband Code Division Multiple
Access, referred to as: WCDMA) system, long term evolution (Long Term Evolution, referred to as: LTE) system or Worldwide Interoperability for Microwave connects
Enter interoperability (World Interoperability for Microwave Access, referred to as: WiMAX) system etc..
Base station can be base station controller (the Base Station in gsm system, gprs system or cdma system
Controller, referred to as: BSC), it can also be the evolved base station (Evolved NodeB, referred to as: eNB) in LTE system, also
It can be base station (Access Service Network Base Station, the letter of the access service network in WiMAX network
Claim: ASN BS) etc. network elements.Antenna equipment is multifrequency electric-tuning antenna device.
Fig. 2 is the structural schematic diagram of base station embodiment one of the present invention, as shown in Fig. 2, the base station of the present embodiment may include:
Transmission unit 11, receiving unit 12 and processing unit 13, wherein transmission unit 11 is used to send scan command to antenna equipment,
The scan command is used to indicate the antenna equipment and the mark of all remote electricity tune unit R ET is sent to the base station;
Receiving unit 12 is used to receive the mark for all RET that the antenna equipment is sent;Processing unit 13 is used for according to reception
The mark of received first RET of unit 12 establishes the communication connection about the first RET, the first RET with the antenna equipment
For any RET in the antenna equipment;Wherein, the base station possesses the administration authority to the first RET.
In the present embodiment, when multiple base stations share the same multifrequency electric-tuning antenna device, multiple base stations is needed to manage jointly
The same multifrequency electric-tuning antenna device is managed, that is, multiple base stations is needed to manage the RET in multifrequency electric-tuning antenna device jointly, one
RET corresponds to a frequency range.It is illustrated by taking a base station in multiple base stations as an example in the present embodiment, the implementation of other base stations
Similar, the antenna equipment in the present embodiment is multifrequency electrical tilt antenna, wherein the control that the transmission unit of base station is transmitted to antenna equipment
Signaling processed needs to reach the antenna equipment by the port AISG of antenna equipment.
When base station needs to configure RET, then the transmission unit of base station sends scan command to antenna equipment, this is swept
It retouches order and is used to indicate the antenna equipment and the mark of RET all in the antenna equipment is sent to the base station, antenna equipment connects
The scan command that base station is sent is received, regardless of whether existing base station and the antenna equipment are established about the RET's in the antenna equipment
The mark of RET all in the antenna equipment can be sent to the base according to the scan command by communication connection, the antenna equipment
It stands, the mark of RET can be the sequence number of RET, and then the receiving unit of base station receives all RET's of antenna equipment transmission
Mark, wherein the receiving unit of base station can a receiving antenna equipment send all RET mark, can also repeatedly connect
Receiving the mark of all RET that antenna equipment is sent, (such as only to receive the mark of a part of RET every time more to need to receive for base station
The secondary mark to obtain all RET), then the processing unit of base station can establish the communication about any RET with antenna equipment
Connection, the processing unit of the base station can also be with the antenna equipment foundation in relation to the communication connection of at least one RET, such as base station
Processing unit the communication connection about the first RET can be established with antenna equipment, then base according to the mark of the first RET
Stand the administration authority that can possess to the first RET, subsequent base stations can by the communication connection about the first RET to this
One RET is managed, and what which can be base station active arrangement is also possible to antenna equipment default configuration, the present invention
Embodiment is without limitation.Wherein, which includes following at least one: control authority, search access right and exclusively enjoying power
Limit, it is notable that possess the search access right possessed the base station default of the control authority of RET to the RET.But the present invention is real
It applies the administration authority in example and is not limited to above-mentioned permission.
And in the prior art, antenna equipment only will not be sent to request base station by the mark for the RET that base station configures, if first
Base station has been configured with the first RET, the 2nd RET and the 3rd RET, and the second base station cannot configure any RET, and second
RET and the 3rd RET is really to be configured by the second base station, when first base station belongs to different operators from the second base station, the
Two base stations cannot determine that first base station configuration error or the physical connection between antenna equipment and SBT disconnect, thus can not
Quick positioning question.And in the embodiment of the present invention, the receiving unit of base station is the mark for all RET that receiving antenna equipment is sent
Know, therefore, if the receiving unit of base station does not receive the mark of the RET of antenna equipment transmission, can determine be antenna equipment with
Physical connection between SBT disconnects, so that quick positioning question, reduces O&M cost, improves O&M efficiency and quality.
Optionally, in the first feasible implementation of the present embodiment, transmission unit 11 is also used in processing unit
13 pass through the AISG after communication connection of the antenna equipment foundation about the first RET according to the mark of the first RET
Port sends the first RET administration authority setting command to the antenna equipment, and the first RET administration authority setting command belongs to
Newly-increased AISG interface command;Receiving unit 12 is also used to receive the first RET administration authority setting that the antenna equipment is sent
Success response, so that the base station possesses the administration authority to the first RET.
In second of feasible implementation of the present embodiment, the administration authority is the base by the antenna equipment
It stands institute's default setting.
Optionally, transmission unit 11 is specifically used for sending the first RET control authority setting command to the antenna equipment;It connects
Unit 12 is received to be specifically used for receiving the first RET control authority setting success response that the antenna equipment is sent;Wherein, the pipe
Managing permission includes control authority.
Optionally, processing unit 13 is used to receive the first RET control that the antenna equipment is sent in receiving unit 12
After limit setting success response, determine whether the base station needs to discharge the control authority possessed the first RET;It sends
Unit 11 is also used to, when processing unit 13 determines the control authority for needing release to possess the first RET, to the day
Line equipment sends the first RET search access right setting command;Receiving unit 12 is also used to receive first that the antenna equipment is sent
Success response is arranged in RET search access right, so that the base station possesses the search access right to the first RET.
Optionally, if being established with the antenna equipment about the logical of the first RET in the base station according to the mark of the first RET
When there is no first base station when letter connection, then the administration authority of antenna equipment institute default setting includes control authority;
Wherein, the first base station has been established the communication connection about the first RET with the antenna equipment and has been possessed to described
The control authority of first RET.
Optionally, transmission unit 11 are also used to the mark in processing unit 13 according to the first RET, with the antenna equipment
It establishes after the communication connection about the first RET, Xiang Suoshu antenna equipment sends the first RET control command;Receiving unit 12, also
Success response is controlled for receiving the first RET that the antenna equipment is sent.
Optionally, transmission unit 11 is specifically used for sending the first RET search access right setting command to the antenna equipment;It connects
It receives unit 12 and is also used to receive the first RET search access right setting success response that the antenna equipment is sent;Wherein, the management
Permission includes search access right.
Optionally, transmission unit 11 be also used to the antenna equipment send the first RET search access right setting command it
Before, Xiang Suoshu antenna equipment sends the first RET control authority setting command;Receiving unit 12 is also used to receive the antenna equipment
The first RET control authority conflict response sent.
Optionally, if being established with the antenna equipment about the logical of the first RET in the base station according to the mark of the first RET
Existing first base station when letter connection, then the administration authority of antenna equipment institute default setting includes search access right, institute
Stating first base station is that the communication connection about the first RET has been established with the antenna equipment and possesses to described first
The control authority of RET.
Optionally, transmission unit 11 is also used to the mark in processing unit 13 according to the first RET, builds with the antenna equipment
After the vertical communication connection about the first RET, Xiang Suoshu antenna equipment sends the first RET querying command;Receiving unit 12 is also used
In the first RET query result for receiving the antenna equipment transmission.
Optionally, transmission unit 11 is specifically used for exclusively enjoying priority assignation order to the first RET of antenna equipment transmission;It connects
It receives unit 12 and exclusively enjoys priority assignation success response specifically for receiving the first RET that the antenna equipment is sent;Wherein, the pipe
Reason permission includes exclusively enjoying permission.
Optionally, transmission unit 11 is also used to the mark in processing unit 13 according to the first RET, builds with the antenna equipment
After the vertical communication connection about the first RET, Xiang Suoshu antenna equipment sends the first RET permission reading order, the first RET
Permission reading order belongs to newly-increased AISG interface command;Receiving unit 12 is also used to receive first that the antenna equipment is sent
RET rights objects, the administration authority that the first RET is possessed with the determination base station.
The base station of the present embodiment can be used for executing technical side performed by base station in above method embodiment of the present invention
Case, it is similar that the realization principle and technical effect are similar, and details are not described herein again.
Fig. 3 is the structural schematic diagram of base station embodiment two of the present invention, as shown in figure 3, the base station of the present embodiment may include:
Transmitter 21, receiver 22 and processor 23.Wherein, transmitter 21 is used for by sending scan command to antenna equipment, described
Scan command is used to indicate the antenna equipment and the mark of all remote electricity tune unit R ET is sent to the base station;It receives
Device 22 is used to receive the mark for all RET that the antenna equipment is sent;Processor 23 is used to be received according to receiver 22
The first RET mark, establish communication connection about the first RET with the antenna equipment, the first RET is the antenna
Any RET in equipment;Wherein, the base station possesses the administration authority to the first RET.
In the first feasible implementation, transmitter 21 is also used to the mark in processor 23 according to the first RET, with
The antenna equipment is established after the communication connection about the first RET, and Xiang Suoshu antenna equipment sends the first RET administration authority and sets
Order is set, the first RET administration authority setting command belongs to newly-increased antennal interface standardized A ISG interface command;Receiver
22 are also used to receive the first RET administration authorities setting success response that the antenna equipment is sent, so that the base station possesses pair
The administration authority of first RET.
In second of feasible implementation, the administration authority, which is defaulted by the antenna equipment by the base station, to be set
It sets.
Optionally, transmitter 21 is specifically used for sending the first RET control authority setting command to the antenna equipment;It receives
Device 22 is specifically used for receiving the first RET control authority setting success response that the antenna equipment is sent;Wherein, the administrative power
Limit includes control authority.
Optionally, processor 23 is also used to receive the first RET control authority that the antenna equipment is sent in receiver 22
It is arranged after success response, determines whether the base station needs to discharge the control authority possessed the first RET;Transmitter
21 are also used to, when processor 23 determines the control authority for needing release to possess the first RET, Xiang Suoshu antenna equipment
Send the first RET search access right setting command;Receiver 22 is also used to receive the first RET inquiry power that the antenna equipment is sent
Limit setting success response, so that the base station possesses the search access right to the first RET.
Optionally, if being established with the antenna equipment about the logical of the first RET in the base station according to the mark of the first RET
When there is no first base station when letter connection, then the administration authority of antenna equipment institute default setting includes control authority;
Wherein, the first base station has been established the communication connection about the first RET with the antenna equipment and has been possessed to described
The control authority of first RET.
Optionally, transmitter 21 are also used to the mark in processor 23 according to the first RET, establish with the antenna equipment
After communication connection about the first RET, Xiang Suoshu antenna equipment sends the first RET control command;Receiver 22 is also used to connect
Receive the first RET control success response that the antenna equipment is sent.
Optionally, transmitter 21 is specifically used for sending the first RET search access right setting command to the antenna equipment;
Receiver 22 is also used to receive the first RET search access right setting success response that the antenna equipment is sent;Wherein,
The administration authority includes search access right.
Optionally, transmitter 21 is also used to before sending the first RET search access right setting command to the antenna equipment,
The first RET control authority setting command is sent to the antenna equipment;Receiver 22 is also used to receive the antenna equipment and sends
The first RET control authority conflict response.
Optionally, if being established with the antenna equipment about the logical of the first RET in the base station according to the mark of the first RET
Existing first base station when letter connection, then the administration authority of antenna equipment institute default setting includes search access right, institute
Stating first base station is that the communication connection about the first RET has been established with the antenna equipment and possesses to described first
The control authority of RET.
Optionally, transmitter 21 is also used to the mark in processor 23 according to the first RET, establishes and closes with the antenna equipment
After the communication connection of the first RET, Xiang Suoshu antenna equipment sends the first RET querying command;Receiver 22 is also used to receive
The first RET query result that the antenna equipment is sent.
Optionally, transmitter 21 is specifically used for exclusively enjoying priority assignation order to the first RET of antenna equipment transmission;It receives
The first RET that device 22 is specifically used for receiving the antenna equipment transmission exclusively enjoys priority assignation success response;Wherein, the administrative power
Limit includes exclusively enjoying permission.
Optionally, transmitter 21 is also used to the mark in processor 23 according to the first RET, establishes and closes with the antenna equipment
After the communication connection of the first RET, Xiang Suoshu antenna equipment sends the first RET permission reading order, the first RET permission
Reading order belongs to newly-increased AISG interface command;Receiver 22 is also used to receive the first RET power that the antenna equipment is sent
Limit is as a result, the administration authority possessed with the determination base station the first RET.
The base station of the present embodiment can be used for executing technical side performed by base station in following methods embodiment of the present invention
Case, it is similar that the realization principle and technical effect are similar, and details are not described herein again.
Fig. 4 is the structural schematic diagram of inventive antenna apparatus embodiments one, as shown in figure 4, the antenna equipment of the present embodiment
It may include: receiving unit 31, transmission unit 32 and processing unit 33, wherein receiving unit 31 is used to receive base station transmission
Scan command, the scan command are used to indicate the antenna equipment and are sent to the mark of all remote electricity tune unit R ET
The base station;Transmission unit 32 is used to send the mark of all RET to the base station;Processing unit 33 with the base station for building
The vertical communication connection about the first RET, the first RET are any RET in the antenna equipment;Wherein, the first RET
By the BTS management.
In the present embodiment, when multiple base stations share the same multifrequency electrical tilt antenna, multiple base stations is needed to manage jointly together
One multifrequency electrical tilt antenna, that is, need multiple base stations to manage the RET in multifrequency electrical tilt antenna jointly.Antenna in the present embodiment is set
Standby is multifrequency electrical tilt antenna, is illustrated by taking antenna equipment and the interaction of a base station in multiple base stations as an example in the present embodiment,
The implementation of other base stations is similar, wherein antenna equipment needs to receive what base station was sent by the port AISG of antenna equipment
Control signaling.
When base station needs to configure RET, then base station sends scan command to antenna equipment, which is used for
Indicate that the mark of RET all in the antenna equipment is sent to the base station by the antenna equipment, the receiving unit of antenna equipment connects
The scan command that base station is sent is received, regardless of whether existing base station and the antenna equipment are established about the RET's in the antenna equipment
Communication connection, the transmission unit of the antenna equipment can send out the mark of RET all in the antenna equipment according to the scan command
Give the base station, wherein the transmission unit of antenna equipment can once send the mark of all RET to base station, can also be multiple
(such as only to send the mark of a part of RET every time more to need to send for antenna equipment for the mark of all RET sent to base station
The secondary mark for just making base station obtain all RET), the mark of RET can be the sequence number of RET, then the processing list of antenna equipment
Member can establish communication connection about any RET with base station, which can also related with the antenna equipment foundation at least one
The communication connection of a RET.Such as the processing unit of antenna equipment can establish the communication connection about the first RET with base station,
Then base station can possess the administration authority to the first RET, and subsequent base stations can pass through the communication connection about the first RET
First RET is managed, what which can be base station active arrangement is also possible to antenna equipment default configuration,
The embodiment of the present invention is without limitation.Wherein, which includes following at least one: control authority, search access right and
Exclusively enjoy permission, it is notable that possess the search access right possessed the base station default of the control authority of RET to the RET.But this
Administration authority in inventive embodiments is not limited to above-mentioned permission.
And in the prior art, antenna equipment only will not be sent to request base station by the mark for the RET that base station configures, if first
Base station has been configured with the first RET, the 2nd RET and the 3rd RET, and the second base station cannot configure any RET, and second
RET and the 3rd RET is really to be configured by the second base station, when first base station belongs to different operators from the second base station, the
Two base stations cannot determine that first base station configuration error or the physical connection between antenna equipment and SBT disconnect, thus can not
Quick positioning question.And in the embodiment of the present invention, the transmission unit of antenna equipment is that the mark of all RET is sent to all bases
It stands, therefore, if base station does not receive the mark of the RET of antenna equipment transmission, can determine it is object between antenna equipment and SBT
Reason connection disconnects, so that quick positioning question, reduces O&M success, improve O&M efficiency and quality.
In a kind of feasible implementation of the present embodiment, receiving unit 31 is also used in processing unit 33 and the base
It stands after the communication connection established about the first RET, receives the first RET administration authority setting command that the base station is sent, institute
It states the first RET administration authority setting command and belongs to newly-increased AISG interface command;Transmission unit 32 is also used to send out to the base station
Send the first RET administration authority that success response is set, so that the base station possesses the administration authority to the first RET.
In the feasible implementation of another kind of the present embodiment, processing unit 33 is also used to establishing pass with the base station
After the communication connection of the first RET, base station described in default setting possesses the administration authority to the first RET.
Optionally, receiving unit 31 is specifically used for receiving the first RET control authority setting command that the base station is sent;Hair
Unit 32 is sent to be specifically used for sending the setting success response of the first RET control authority to the base station;Wherein, the administration authority packet
Include control authority.
Optionally, receiving unit 31 be also used to transmission unit 32 to the base station send the first RET control authority be arranged to
After function response, the first RET search access right setting command that the base station is sent is received;Transmission unit 32 is also used to the base
It stands and sends the setting success response of the first RET search access right, so that the base station possesses the search access right to the first RET.
Optionally, processing unit 33 is specifically used for, if not when establishing the communication connection about the first RET with the base station
There are first base station, then base station described in default setting possesses the control authority to the first RET, the first base station for institute
Antenna equipment is stated the communication connection about the first RET has been established and possesses to the another of the control authority of the first RET
One base station.
Optionally, receiving unit 31 is also used to establish the communication link about the first RET in processing unit 33 and the base station
After connecing, the first RET control command that the base station is sent is received;Processing unit 33 is also used to be controlled according to the first RET
Order, carries out control processing to the first RET;Transmission unit 32 is also used to send the first RET to the base station and control successfully
Response.
Optionally, receiving unit 31 is specifically used for receiving the first RET search access right setting command that the base station is sent;Hair
Unit 32 is sent to be specifically used for sending the setting success response of the first RET search access right to the base station;Wherein, the administration authority packet
Include search access right.
Optionally, receiving unit 31 be also used to receive the first RET search access right setting command that the base station is sent it
Before, receive the first RET control authority setting command that the base station is sent;Transmission unit 32 is also used to, if receiving unit 31 is
The first RET control authority setting command of first base station transmission is received, then sends the punching of the first RET control authority to the base station
Prominent response, the first base station have established the communication connection about the first RET with the antenna equipment.
Optionally, processing unit 33 is specifically used for, if when establishing the communication connection about the first RET with the base station
There are first base station, then base station described in default setting possesses the search access right to the first RET, the first base station for institute
Antenna equipment is stated the communication connection about the first RET has been established and possesses the base of the control authority to the first RET
It stands.
Optionally, receiving unit 31 is also used to establish the communication link about the first RET in processing unit 33 and the base station
After connecing, the first RET querying command that the base station is sent is received;Processing unit 33 is also used to be inquired according to the first RET
Order, inquires the first RET;Transmission unit 32 is also used to send the first RET query result to the base station.
Optionally, the first RET that receiving unit 31 is specifically used for receiving the base station transmission exclusively enjoys priority assignation order;Hair
Unit 32 is sent to be specifically used for exclusively enjoying priority assignation success response to the base station the first RET of transmission;Wherein, the administration authority packet
It includes and exclusively enjoys permission.
Optionally, receiving unit 31 is also used to establish the communication link about the first RET in processing unit 33 and the base station
After connecing, the first RET permission reading order that the base station is sent is received, the first RET permission reading order belongs to newly-increased
The AISG interface command added;Transmission unit 32 is also used to send the first RET rights objects to the base station, so that the base station is true
The administration authority that the fixed base station possesses the first RET.
Antenna equipment in the present embodiment can be multifrequency electric-tuning antenna device.
The antenna equipment of the present embodiment can be used for executing the technical side of antenna equipment in following methods embodiment of the present invention
Case, it is similar that the realization principle and technical effect are similar, and details are not described herein again.
Fig. 5 is the structural schematic diagram of inventive antenna apparatus embodiments two, as shown in figure 5, the antenna equipment of the present embodiment
It may include: receiver 41, transmitter 42 and processor 43, wherein receiver 41 is used to receive the scan command of base station transmission,
The scan command is used to indicate the antenna equipment and the mark of all remote electricity tune unit R ET is sent to the base station;
Transmitter 42 is used to send the mark of all RET to the base station;Processor 43 is used to establish with the base station about the
The communication connection of one RET, the first RET are any RET in the antenna equipment;Wherein, the first RET is by the base
Station administration.
In a kind of feasible implementation of the present embodiment, receiver 41 is also used to build in processor 43 and the base station
After the vertical communication connection about the first RET, the first RET administration authority setting command that the base station is sent is received, described the
One RET administration authority setting command belongs to newly-increased AISG interface command;Transmitter 42 is also used to send first to the base station
Success response is arranged in RET administration authority, so that the base station possesses the administration authority to the first RET.
In the feasible implementation of another kind of the present embodiment, processor 43 be also used to the base station establish about
After the communication connection of first RET, base station described in default setting possesses the administration authority to the first RET.
Optionally, receiver 41 is specifically used for receiving the first RET control authority setting command that the base station is sent;It sends
Device 42 is specifically used for sending the setting success response of the first RET control authority to the base station;Wherein, the administration authority includes control
Permission processed.
Optionally, receiver 41 is also used to transmitter 42 and sends the first RET control authority to the base station be arranged and successfully ring
After answering, the first RET search access right setting command that the base station is sent is received;Transmitter 42 is also used to send to the base station
Success response is arranged in first RET search access right, so that the base station possesses the search access right to the first RET.
Optionally, processor 43 is specifically used for, if establishing the communication connection Shi Weicun about the first RET with the base station
In first base station, then base station described in default setting possesses the control authority to the first RET, the first base station be with it is described
Antenna equipment has been established the communication connection about the first RET and possesses to the another of the control authority of the first RET
Base station.
Optionally, receiver 41 be also used to processor 43 and the base station establish about the first RET communication connection it
Afterwards, the first RET control command that the base station is sent is received;Processor 43 is also used to according to the first RET control command, right
First RET carries out control processing;Transmitter 42 is also used to send the first RET control success response to the base station.
Optionally, receiver 41 is specifically used for receiving the first RET search access right setting command that the base station is sent;It sends
Device 42 is specifically used for sending the setting success response of the first RET search access right to the base station;Wherein, the administration authority includes looking into
Ask permission.
Optionally, receiver 41 is also used to before receiving the first RET search access right setting command that the base station is sent,
Receive the first RET control authority setting command that the base station is sent;Transmitter 42 is also used to, if receiver 41 has received
The first RET control authority setting command that one base station is sent then sends the first RET control authority conflict response to the base station,
The first base station has established the communication connection about the first RET with the antenna equipment.
Optionally, processor 43 is specifically used for, if having deposited when establishing the communication connection about the first RET with the base station
In first base station, then base station described in default setting possesses the search access right to the first RET, the first base station be with it is described
Antenna equipment has been established the communication connection about the first RET and possesses the base station of the control authority to the first RET.
Optionally, receiver 41 be also used to processor 43 and the base station establish about the first RET communication connection it
Afterwards, the first RET querying command that the base station is sent is received;Processor 43 is also used to according to the first RET querying command, right
First RET is inquired;Transmitter 42 is also used to send the first RET query result to the base station.
Optionally, the first RET that receiver 41 is specifically used for receiving the base station transmission exclusively enjoys priority assignation order;It sends
Device 42 is specifically used for exclusively enjoying priority assignation success response to the base station the first RET of transmission;Wherein, the administration authority includes only
Enjoy permission.
Optionally, receiver 41 be also used to processor 43 and the base station establish about the first RET communication connection it
Afterwards, the first RET permission reading order that the base station is sent is received, the first RET permission reading order, which belongs to, to be newly increased
AISG interface command;Transmitter 42 is also used to send the first RET rights objects to the base station, so that described in the base station is determining
The administration authority that base station possesses the first RET.
It should be noted that the processor 43 of the antenna equipment of the present embodiment can be RCU, antenna equipment can be multifrequency
Electric-tuning antenna device.
The antenna equipment of the present embodiment can be used for executing in following methods embodiment of the present invention performed by antenna equipment
Technical solution, it is similar that the realization principle and technical effect are similar, and details are not described herein again.
Fig. 6 is the structural schematic diagram of multifrequency electrical tilt antenna management system embodiment of the present invention, as shown in fig. 6, the present embodiment
System include: base station 10 and antenna equipment 20, wherein base station 10 can use Fig. 2 or any device embodiment shown in Fig. 3
Structure accordingly can execute technical solution performed by base station, realization principle in following methods embodiment of the present invention
Similar with technical effect, details are not described herein again.Antenna equipment 20 can be using Fig. 4 or any device embodiment shown in fig. 5
Structure, antenna equipment 20 can accordingly execute in following methods embodiment of the present invention for multifrequency electric-tuning antenna device
Technical solution performed by antenna equipment, it is similar that the realization principle and technical effect are similar, and details are not described herein again.
Fig. 7 is the flow chart of multifrequency electrical tilt antenna management method embodiment one of the present invention, as shown in fig. 7, the present embodiment
Method may include:
S101, base station send scan command to antenna equipment, and the scan command is used to indicate the antenna equipment for institute
The mark of some RET is sent to the base station.
S102, the base station receive the mark for all RET that the antenna equipment is sent.
The communication link about the first RET is established with the antenna equipment according to the mark of the first RET in S103, the base station
It connects, the first RET is any RET in the antenna equipment.
In the present embodiment, when multiple base stations share the same multifrequency electric-tuning antenna device, multiple base stations is needed to manage jointly
The same multifrequency electric-tuning antenna device is managed, that is, multiple base stations is needed to manage the RET in multifrequency electric-tuning antenna device jointly, one
RET corresponds to a frequency range.It is illustrated by taking a base station in multiple base stations as an example in the present embodiment, the implementation of other base stations
Similar, the antenna equipment in the present embodiment is multifrequency electrical tilt antenna, wherein the control signaling that base station is transmitted to antenna equipment needs
The antenna equipment is reached by the port AISG of antenna equipment.
When base station needs to configure RET, then base station sends scan command to antenna equipment, which is used for
Indicate that the mark of RET all in the antenna equipment is sent to the base station by the antenna equipment, antenna equipment receives base station and sends
Scan command should regardless of whether existing base station and the antenna equipment establish the communication connection about the RET in the antenna equipment
The mark of RET all in the antenna equipment can be sent to the base station, the mark of RET according to the scan command by antenna equipment
It can be the sequence number of RET, then base station receives the mark of all RET of antenna equipment transmission, wherein base station can be primary
Receiving antenna equipment send all RET mark, can also repeatedly receiving antenna equipment send all RET mark (example
As base station receives the mark of a part of RET only every time to need to receive the repeatedly mark to obtain all RET), it can be with day
Line equipment establishes communication connection about any RET, which can also at least one RET related with the antenna equipment foundation
Communication connection.By base station with antenna equipment foundation for the communication connection of one of RET (such as the first RET), base station
The communication connection about the first RET can be established with antenna equipment according to the mark of the first RET, specific implementation process can be with
Are as follows: the mark of the first RET is added in the list for the RET that the base station is managed by base station, and then base station sends antenna equipment
The mark of first RET adds order, after antenna equipment receives the mark addition order of the first RET of base station transmission, i.e. table
Show that the communication connection about the first RET has been established in base station and antenna equipment, then base station can possess the management to the first RET
Permission, subsequent base stations can be by being managed the first RET about the communication connection of the first RET, which can
To be that base station active arrangement is also possible to antenna equipment default configuration, the embodiment of the present invention is without limitation.Wherein, should
Administration authority includes following at least one: control authority, search access right and exclusively enjoying permission, it is notable that is possessed to RET's
The base station default of control authority possesses the search access right to the RET.But the administration authority in the embodiment of the present invention is not limited to
The permission stated.
After the base station and antenna equipment establish the communication connection of the first RET, other base stations can also be according to above-mentioned S101-
The step of S103 and antenna equipment establish the communication connection about the first RET, and therefore, there may be multiple base stations to set with antenna
The standby communication connection established about same RET, it should be noted that in this case, can only have a base station to this first
RET possesses the control authority in administration authority.
Possess base station and administration authority is possessed to the first RET, there can be following described two implementations, this
Inventive embodiments are not limited to following two kinds of implementations.
In the first feasible implementation, the base station sends the first RET administration authority to the antenna equipment and sets
Order is set, the first RET administration authority setting command belongs to newly-increased AISG interface command;The base station receives the antenna
Success response is arranged in the first RET administration authority that equipment is sent, so that the base station possesses the management to the first RET
Permission.
After the communication connection that base station and antenna equipment establish about the first RET, base station can actively be arranged to this
The administration authority that one RET possesses, i.e. base station can send the first RET administration authority setting command, the first RET to antenna equipment
Administration authority setting command is newly-increased AISG interface command.Antenna equipment receives the first RET administration authority that base station is sent and sets
Order is set, knows that base station determines active arrangement to the administration authority of the first RET, then antenna equipment sends first to base station
Success response, to notify base station successfully to configure the administration authority to the first RET, then base station is arranged in RET administration authority
Success response is arranged in the first RET administration authority that receiving antenna equipment is sent, so that the base station possesses the management to the first RET
Permission, to realize that base station can administration authority with active arrangement to RET.
It should be noted that when the base station needs to re-establish the communication connection about the first RET with antenna equipment, base
Station is required to send the first RET administration authority setting command again and receives the setting success response of the first RET administration authority, ability
Possess the administration authority to the first RET.
In second of feasible implementation, what base station possessed is to be by antenna equipment to the administration authority of the first RET
Set by the base station, after the communication connection about the first RET is established in base station and antenna equipment, base station can not needed
The administration authority possessed the first RET is actively set, but the first RET is possessed come default setting base station by antenna equipment
Administration authority, i.e., after above-mentioned communication connection establishes, antenna equipment just defaults the base station and possesses pipe to the first RET
Manage permission.
And in the prior art, antenna equipment only will not be sent to request base station by the mark for the RET that base station configures, if first
Base station has been configured with the first RET, the 2nd RET and the 3rd RET, and the second base station cannot configure any RET, and second
RET and the 3rd RET is really to be configured by the second base station, when first base station belongs to different operators from the second base station, the
Two base stations cannot determine that first base station configuration error or the physical connection between antenna equipment and SBT disconnect, thus can not
Quick positioning question.And in the embodiment of the present invention, antenna equipment is that the mark of all RET is sent to all base stations, therefore, if
Base station does not receive the mark of the RET of antenna equipment transmission, then can determine it is that physical connection between antenna equipment and SBT is disconnected
It opens, so that quick positioning question, reduces O&M cost, improves O&M efficiency and quality.
Fig. 8 is the flow chart of multifrequency electrical tilt antenna management method embodiment two of the present invention, as shown in figure 8, the present embodiment
Method may include:
S201, antenna equipment receive the scan command that base station is sent, and the scan command is used to indicate the antenna equipment
The mark of all RET is sent to the base station.
S202, the antenna equipment send the mark of all RET to the base station.
The communication connection about the first RET is established in S203, the antenna equipment and the base station, and the first RET is institute
State any RET in antenna equipment.
In the present embodiment, when multiple base stations share the same multifrequency electrical tilt antenna, multiple base stations is needed to manage jointly together
One multifrequency electrical tilt antenna, that is, need multiple base stations to manage the RET in multifrequency electrical tilt antenna jointly.Antenna in the present embodiment is set
Standby is multifrequency electrical tilt antenna, is illustrated by taking antenna equipment and the interaction of a base station in multiple base stations as an example in the present embodiment,
The implementation of other base stations is similar, wherein antenna equipment needs to receive what base station was sent by the port AISG of antenna equipment
Control signaling.
When base station needs to configure RET, then base station sends scan command to antenna equipment, which is used for
Indicate that the mark of RET all in the antenna equipment is sent to the base station by the antenna equipment, antenna equipment receives base station and sends
Scan command should regardless of whether existing base station and the antenna equipment establish the communication connection about the RET in the antenna equipment
The mark of RET all in the antenna equipment can be sent to the base station, wherein antenna according to the scan command by antenna equipment
Equipment can once send the mark of all RET to base station, can also repeatedly to base station send all RET mark (such as
Antenna equipment sends the mark of a part of RET only every time to need to send the mark for repeatedly base station just being made to obtain all RET),
The mark of RET can be the sequence number of RET, and then antenna equipment can establish the communication connection about any RET with base station, should
It base station can also be with the antenna equipment foundation in relation to the communication connection of at least one RET.With one of RET (such as first
RET for communication connection), antenna equipment can establish the communication connection about the first RET with base station, implement process
It can be with are as follows: the mark of the first RET is added in the list for the RET that the base station is managed by base station, and then base station is by antenna equipment
The mark addition order of the first RET is sent, after antenna equipment receives the mark addition order of the first RET of base station transmission,
Indicate that the communication connection about the first RET has been established in base station and antenna equipment, then base station can possess to the first RET's
Administration authority, subsequent base stations can be by being managed the first RET about the communication connection of the first RET, the administrative power
What limit can be base station active arrangement is also possible to antenna equipment default configuration, and the embodiment of the present invention is without limitation.Its
In, which includes following at least one: control authority, search access right and exclusively enjoying permission, it is notable that is possessed pair
The base station default of the control authority of RET possesses the search access right to the RET.But administration authority in the embodiment of the present invention is simultaneously unlimited
In above-mentioned permission.
After the communication connection about the first RET is established in the antenna equipment and base station, antenna equipment can also be according to above-mentioned
The communication connection about the first RET is established in the step of S201-S203 and other base stations, therefore, there may be antenna equipment with
The communication connection about same RET is established in multiple base stations, it should be noted that in this case, can only there is a base station pair
First RET possesses the control authority in administration authority.
Possess base station and administration authority is possessed to the first RET, there can be following described two implementations, this
Inventive embodiments are not limited to following two kinds of implementations.
In the first feasible implementation, the antenna equipment receives the first RET administrative power that the base station is sent
Setting command is limited, the first RET administration authority setting command belongs to newly-increased AISG interface command;The antenna equipment is to institute
It states base station and sends the setting success response of the first RET administration authority, so that the base station possesses the administrative power to the first RET
Limit.
After the communication connection that base station and antenna equipment establish about the first RET, base station can actively be arranged to this
The administration authority that one RET possesses, i.e. base station can send the first RET administration authority setting command, the first RET to antenna equipment
Administration authority setting command is newly-increased AISG interface command.Antenna equipment receives the first RET administration authority that base station is sent and sets
Order is set, knows that base station determines active arrangement to the administration authority of the first RET, then antenna equipment sends first to base station
Success response, to notify base station successfully to configure the administration authority to the first RET, then base station is arranged in RET administration authority
Success response is arranged in the first RET administration authority that receiving antenna equipment is sent, so that the base station possesses the management to the first RET
Permission, to realize that base station can administration authority with active arrangement to RET.
It should be noted that when the base station needs to re-establish the communication connection about the first RET with antenna equipment, day
Line equipment is required to receive the first RET administration authority setting command of base station transmission again and sends first to the base station
Success response is arranged in RET administration authority, just can determine that base station possesses the administration authority to the first RET.
In second of feasible implementation, base station described in the antenna equipment default setting possesses to described first
The administration authority of RET.After the communication connection about the first RET is established in base station and antenna equipment, base station can be not required to
The administration authority possessed the first RET is actively set, but the first RET is gathered around come default setting base station by antenna equipment
Some administration authorities, i.e., after above-mentioned communication connection establishes, antenna equipment is just defaulted the base station and is possessed to the first RET's
Administration authority.
And in the prior art, antenna equipment only will not be sent to request base station by the mark for the RET that base station configures, if first
Base station has been configured with the first RET, the 2nd RET and the 3rd RET, and the second base station cannot configure any RET, and second
RET and the 3rd RET is really to be configured by the second base station, when first base station belongs to different operators from the second base station, the
Two base stations cannot determine that first base station configuration error or the physical connection between antenna equipment and SBT disconnect, thus can not
Quick positioning question.And in the embodiment of the present invention, antenna equipment is that the mark of all RET is sent to all base stations, therefore, if
Base station does not receive the mark of the RET of antenna equipment transmission, then can determine it is that physical connection between antenna equipment and SBT is disconnected
It opens, so that quick positioning question, reduces O&M success, improve O&M efficiency and quality.
Fig. 9 is the flow chart of multifrequency electrical tilt antenna management method embodiment three of the present invention, as shown in figure 9, base station is to first
The administration authority that RET is possessed is arranged by base station, and the method for the present embodiment may include:
S301, scan command is sent.
S302, the mark for sending all RET.
The communication connection of S303, foundation about the first RET.
S304, the first RET control authority setting command is sent.
S305, the setting success response of the first RET control authority is sent.
In the present embodiment, the specific implementation process of S301-S303 may refer to embodiment of the present invention method one or embodiment
Related record in two, details are not described herein again.
After the communication connection that base station and antenna equipment establish about the first RET, base station can actively be arranged to this
The administration authority that one RET possesses, the administration authority include control authority, i.e., base station can send the first RET control to antenna equipment
Priority assignation order processed, the first RET control authority setting command are newly-increased AISG interface command, it should be noted that base
It stands and sends the first RET control authority setting command, is i.e. expression base station needs to configure the control authority to the first RET, works as base station
The base station is defaulted when possessing the control authority to the first RET possesses search access right to the first RET.Antenna equipment receives base
Stand the first RET control authority setting command sent, know base station determine active arrangement to the control authority of the first RET, so
Aft antenna equipment sends the first RET control authority to base station and success response is arranged, to notify base station that successfully configuration has possessed pair
Success response is arranged in the control authority of first RET, the first RET control authority that then receiving antenna equipment in base station is sent, with
The base station is set to possess the control authority to the first RET, to realize that base station can possess the control to RET with active arrangement
Limit.
It should be noted that antenna equipment is to base station transmission the first RET control authority setting success response, there are two kinds of realities
Existing mode.
In the first feasible implementation, when base station and antenna equipment establish the communication connection about the first RET, do not have
There are other base stations and the antenna equipment in addition to the base station to establish the communication connection about the first RET, i.e., at this point, antenna equipment
The communication connection about the first RET only is established with a base station, therefore, antenna equipment receives the first of base station transmission
RET control authority setting command possesses control authority to the first RET according to only one base station, determines that the base station can gather around
There is the control authority to the first RET, then sends the first RET control authority to the base station and success response is set, to indicate this
Base station can possess the control authority to the first RET.
In second of feasible implementation, when base station and antenna equipment establish the communication connection about the first RET,
Through being there is other base stations and the antenna equipment to establish the communication connection about the first RET, i.e., at this time antenna equipment with multiple base stations
The communication connection about the first RET is established, and these other base stations only possess the search access right to the first RET, if antenna
Equipment receives the first RET control authority setting command of base station transmission, is possessed according to only one base station the first RET
Control authority determines that the base station can possess the control authority to the first RET, then sends the first RET control to the base station
Priority assignation success response, to indicate that the base station can possess the control authority to the first RET.
It should be noted that when base station needs to re-establish the communication connection about the first RET with antenna equipment, base station
It is required to by way of again by S304 as described above and S305, can just possess the control authority to the first RET.
Optionally, the method for the present embodiment can also include:
S306, the first RET control command is sent.
S307, according to the first RET control command, control processing is carried out to the first RET.
S308, the first RET control success response is sent.
In the present embodiment, success command is set in the first RET control authority that the base station receives antenna equipment transmission
Later, indicate that base station has possessed the control authority to the base station, the base station can send the first RET to the antenna equipment
Control command, correspondingly, antenna equipment receive the first RET control command that base station is sent, and are controlled and ordered according to the first RET
Order carries out control processing to the first RET, if the first RET control command is the order for the first RET angle of declination to be arranged,
The angle of declination of first RET is dimensioned to the angle value that has a down dip required by base station by antenna equipment.If the first RET control command is
For calibrating the order of the first RET, then antenna equipment calibrates the first RET.Then antenna equipment sends first to base station
RET controls success response, and correspondingly, the first RET that base station receiving antenna equipment is sent controls success response, indicates antenna equipment
The first RET is handled according to the control instructions of base station.
Optionally, the method for the present embodiment can also include:
S309, the first RET search access right setting command is sent.
S310, the setting success response of the first RET search access right is sent.
It, should after base station receives the first RET control authority setting success response of antenna equipment transmission in the present embodiment
When base station needs to discharge the control authority that the base station possesses the first RET, such as: base station obtains the finger that administrative staff issue
It enables, which indicates that the base station discharges the control authority that the base station possesses the first RET, and base station determination needs to discharge the base station
The control authority that first RET is possessed;Administrative staff, which issue above-metioned instruction and can be another base station, to be needed to gather around the first RET
The administrative staff of base station trigger after holding consultation in the administrative staff of another base station and the present embodiment when having control authority.By
The control authority to the first RET is had in base station, base station sends the first RET search access right setting life to antenna equipment
It enables, the first RET search access right setting command belongs to newly-increased AISG interface command, and correspondingly, antenna equipment receives base station hair
The first RET search access right setting command sent, the principle of the search access right of the same RET can be possessed according to multiple base stations, really
The fixed base station can possess the search access right to the first RET, and discharge the control that the base station possesses the first RET
Permission, then antenna equipment to base station send the first RET search access right configuration successful response so that the base station possess to this first
The search access right of RET, correspondingly, base station receive the first RET search access right configuration successful response of antenna equipment transmission, thus
The base station releases the control authority to the first RET and possesses the search access right to the first RET, and realizing base station can be real
When the base station is arranged to the permission classification of the first RET by AISG interface command.
It should be noted that other base stations need to be arranged when possessing the control authority of the first RET, it can be by similar above-mentioned
S301-S305 is realized.
Optionally, the present embodiment can also include: after executing S305
S311, the first RET querying command is sent.
S312, according to the first RET querying command, the first RET is inquired.
S313, the first RET query result is sent.
In the present embodiment, when the base station possesses the search access right to the first RET, the base station can pass through the AISG
Port sends the first RET querying command to the antenna equipment, and correspondingly, antenna equipment is sent by AISG interface base station
The first RET querying command, and the first RET is inquired according to the first RET querying command, such as: the first RET
Querying command can be the order for inquiring the first RET angle of declination, then antenna equipment looks into the angle of declination of the first RET
It askes, the angle value that has a down dip of the first RET inquired is the first RET query result.Then antenna equipment sends the first RET to base station
Query result, correspondingly, the first RET query result that base station receiving antenna equipment is sent, thus available first RET in base station
Relevant information.
Multifrequency electrical tilt antenna management method provided in an embodiment of the present invention is established in base station and antenna equipment about first
After the communication connection of RET, base station to antenna equipment send the first RET control authority order come be arranged the base station possess to this first
The control authority of RET.When base station needs to discharge the control authority that the base station is possessed, base station sends first to antenna equipment
The order of RET search access right discharges the control authority to the first RET that the base station is possessed, so that other base stations can possess
The control authority of first RET.So as to realize base station by the active of AISG interface command and change in real time to the first RET
Permission classification.
Figure 10 is the flow chart of multifrequency electrical tilt antenna management method example IV of the present invention, and as shown in Figure 10, base station is to the
The administration authority that one RET is possessed is arranged by base station, and the method for the present embodiment may include:
S401, scan command is sent.
S402, the mark for sending all RET.
The communication connection of S403, foundation about the first RET.
S404, the first RET search access right setting command is sent.
S405, the setting success response of the first RET search access right is sent.
In the present embodiment, the specific implementation process of S401-S403 may refer to embodiment of the present invention method one or embodiment
Related record in two, details are not described herein again.
After the communication connection that base station and antenna equipment establish about the first RET, base station can actively be arranged to this
The administration authority that one RET possesses, the administration authority include search access right, i.e., base station can send the first RET to antenna equipment and look into
Priority assignation order is ask, the first RET search access right setting command is newly-increased AISG interface command, it should be noted that base
It stands and sends the first RET search access right setting command, is i.e. expression base station needs to configure the search access right to the first RET.Antenna is set
Standby the first RET search access right setting command for receiving base station and sending knows that base station determines inquiry of the active arrangement to the first RET
Permission can be possessed the search access right of same RET by multiple base stations in this present embodiment simultaneously, and then antenna equipment is sent out to base station
Send the first RET search access right that success response is set, to notify base station successfully to configure the search access right to the first RET, so
Success response is arranged in the first RET search access right that receiving antenna equipment in base station is sent afterwards, so that the base station possesses to the first RET
Search access right, to realize that base station can search access right with active arrangement to RET.
It should be noted that when base station needs to re-establish the communication connection about the first RET with antenna equipment, base station
It is required to by way of again by S404 as described above and S405, can just possess the search access right to the first RET.
Optionally, the method for the present embodiment can also include:
S406, the first RET querying command is sent.
S407, according to the first RET querying command, the first RET is inquired.
S408, the first RET query result is sent.
In the present embodiment, the specific implementation process of S406-S408 is with the S311-S313's in embodiment of the present invention method three
Specific implementation process is similar, and details are not described herein again.
Optionally, the method for the present embodiment can also include: before executing S404
S409, the first RET control authority setting command is sent.
S410, the first RET control authority conflict response is sent.
In the present embodiment, after the communication connection about the first RET is established in base station and antenna equipment, base station can be actively
The control authority possessed the first RET is set, i.e. base station can send the first RET control authority setting life to antenna equipment
It enables, it should be noted that base station sends the first RET control authority setting command, i.e. expression base station is needed to configure to the first RET
Control authority, default when base station possesses the control authority to the first RET the base station possess the inquiry to the first RET power
Limit.Antenna equipment receives the first RET control authority setting command that base station is sent, and knows that base station determines that active arrangement possesses to this
The control authority of first RET, if antenna equipment has established the communication connection about the first RET with first base station, and antenna is set
Standby the first RET control authority setting command that first base station transmission has been received, i.e. expression first base station are actively set
The control authority possessed to the first RET is set.Antenna equipment possesses control to the first RET according to can only have a base station
There is conflict in limit, then the first RET control authority setting command that base station is sent in the present embodiment, antenna equipment not can determine that the base
Station possesses the control authority to the first RET, and then antenna equipment sends the first RET control authority conflict response to base station, with
The control authority of the first RET of base station configuration is notified to there is conflict, the first RET control that then receiving antenna equipment in base station is sent
Rights conflict response processed, so that base station can determine the control authority that cannot possess at this time to the first RET, then base station active
The search access right to RET is configured, the first RET search access right is sent to antenna equipment according to the first RET control authority conflict response
Setting command implements process as shown in S404 and S405.
Multifrequency electrical tilt antenna management method provided in an embodiment of the present invention is established in base station and antenna equipment about first
After the communication connection of RET, base station to antenna equipment send the first RET search access right order come be arranged the base station possess to this first
The search access right of RET.Further, when base station, setting possesses when there is conflict to the control authority of the first RET, and base station can be with
The search access right possessed to the first RET is set.So as to realize base station by AISG interface command actively and in real time more
Change the permission classification to the first RET.
Figure 11 is the flow chart of multifrequency electrical tilt antenna management method embodiment five of the present invention, and as shown in figure 11, base station is to the
The administration authority that one RET is possessed can may include: by antenna equipment institute default setting, the method for the present embodiment
S501, scan command is sent.
S502, the mark for sending all RET.
The communication connection of S503, foundation about the first RET.
Base station described in S504, default setting possesses the control authority to the first RET.
In the present embodiment, the specific implementation process of S501-S503 may refer to embodiment of the present invention method one or embodiment
Related record in two, details are not described herein again.
After the communication connection about the first RET is established in base station and antenna equipment, base station can not need actively to be arranged
To the administration authority that the first RET possesses, but by antenna equipment come the administration authority of default setting base station.In the first situation
Under, when base station and antenna equipment establish the communication connection about the first RET, other base stations not in addition to the base station with should
Antenna equipment establishes the communication connection about the first RET, i.e., at this point, antenna equipment is only established with a base station about first
The communication connection of RET.In the latter case, do not exist when the communication connection about the first RET is established with antenna equipment in base station
First base station, the first base station have been established the communication connection about the first RET with antenna equipment and have been possessed to the first RET's
Control authority has had other base stations and the antenna equipment to establish the communication connection about the first RET, i.e. antenna equipment at this time
The communication connection about the first RET is established with multiple base stations, and these other base stations only possess the inquiry to the first RET
Permission.In above-mentioned two situations, antenna equipment can possess the control authority to the first RET with the default setting base station.
Optionally, the method for the present embodiment can also include:
S505, the first RET control command is sent.
S506, according to the first RET control command, control processing is carried out to the first RET.
S507, the first RET control success response is sent.
In the present embodiment, the specific implementation process of S505-S507 and the specific reality of embodiment of the present invention method S306-S308
Existing process is similar, and details are not described herein again.
It is worth noting that, the base station of antenna equipment institute default setting, which possesses, does not have base station to the control authority of the first RET
Actively setting possesses high to the priority of the control authority of the first RET, i.e., antenna equipment possesses this in the default setting base station
The control authority of first RET, when other base stations send the first RET control authority setting command, then before antenna equipment release
The control authority of first RET of default setting.Therefore, optionally, the method for the present embodiment can also include:
S508, the first RET control authority setting command is sent.
S509, the setting success response of the first RET control authority is sent.
In the present embodiment, the specific implementation process of S508 and S509 is specific with embodiment of the present invention method S304's and S305
Realization process is similar, and details are not described herein again.
Figure 12 is the flow chart of multifrequency electrical tilt antenna management method embodiment six of the present invention, and as shown in figure 12, base station is to the
The administration authority that one RET is possessed can may include: by antenna equipment institute default setting, the method for the present embodiment
S601, scan command is sent.
S602, the mark for sending all RET.
The communication connection of S603, foundation about the first RET.
Base station described in S604, default setting possesses the search access right to the first RET.
In the present embodiment, the specific implementation process of S601-S603 may refer to embodiment of the present invention method one or embodiment
Related record in two, details are not described herein again.
After the communication connection about the first RET is established in base station and antenna equipment, base station can not need actively to be arranged
To the administration authority that the first RET possesses, but by antenna equipment come the administration authority of default setting base station.When base station and antenna
Equipment establishes existing first base station when communication connection about the first RET, the first base station established with antenna equipment about
First RET's communicates to connect and possesses the control authority to the first RET, and antenna equipment is established with multiple base stations and closed at this time
In the communication connection of the first RET, the principle of the control authority to the first RET is possessed according to only one base station, antenna equipment can
Possess the search access right to the first RET with the default setting base station.
Optionally, the method for the present embodiment can also include:
S605, the first RET control command is sent.
S606, the first RET control authority conflict response is sent.
It since base station possesses to the administration authority of the first RET is arranged by antenna equipment, base station is not in the present embodiment
Determine the permission classification that the base station is possessed, if base station sends the first RET control command to antenna equipment, antenna equipment receives base
After the first RET control command sent of standing, possess search access right to the first RET since the base station is arranged in antenna equipment, so
Antenna equipment sends the first RET control authority conflict response, the first RET control that base station receiving antenna equipment is sent to base station
Conflict response is limited, so that base station can determine that it does not possess the control authority to the first RET but there are other base stations to possess
To the control authority of the first RET.
Optionally, if the base station actually possesses the control authority of the first RET, base station, which can be actively arranged, to be possessed to this
The control authority of first RET, detailed process are detailed in the record related to S305's of S304 in embodiment of the present invention method, herein no longer
It repeats.
Figure 13 is the flow chart of multifrequency electrical tilt antenna management method embodiment seven of the present invention, and as shown in figure 13, base station is to the
The administration authority that one RET is possessed can be as set by base station, and the method for the present embodiment may include:
S701, scan command is sent.
S702, the mark for sending all RET.
The communication connection of S703, foundation about the first RET.
S704, the first RET of transmission exclusively enjoy priority assignation order.
S705, the first RET of transmission exclusively enjoy priority assignation success response.
In the present embodiment, the specific implementation process of S701-S703 may refer to embodiment of the present invention method one or embodiment
Related record in two, details are not described herein again.
After the communication connection that base station and antenna equipment establish about the first RET, base station can actively be arranged to this
The administration authority that one RET possesses, the administration authority include exclusively enjoying permission, i.e., it is only can to send the first RET to antenna equipment for base station
Priority assignation order is enjoyed, it is newly-increased AISG interface command that the first RET, which exclusively enjoys priority assignation order, it should be noted that base
The first RET of transmission that stands exclusively enjoys priority assignation order, i.e., expression base station, which is needed to configure, exclusively enjoys permission to the first RET, works as base station
Possess and control authority to the first RET is possessed to base station of defaulting when exclusively enjoying permission of the first RET.Antenna equipment receives base
The first RET sent that stands exclusively enjoys priority assignation order, know base station determine active arrangement to the permission that exclusively enjoys of the first RET, so
Aft antenna equipment sends the first RET to base station and exclusively enjoys priority assignation success response, and further, antenna equipment determination does not receive
The first RET, which is sent, to base station when the first RET that first base station is sent exclusively enjoys priority assignation order exclusively enjoys priority assignation success response,
To notify base station that successfully configuration has possessed control authority to the first RET, then base station receiving antenna equipment send the
One RET exclusively enjoys priority assignation success response so that the base station, which possesses, exclusively enjoys permission to the first RET, the first base station with
The antenna equipment establishes the communication connection about the first RET, at this point, antenna equipment is established with multiple base stations about the first RET
Communication connection, the control authority or search access right that antenna equipment will discharge other base stations and be possessed the first RET, at this time its
Its base station cannot the first RET controlled and/or inquired.
Further, if other base stations, which also send the first RET to antenna equipment, exclusively enjoys priority assignation order, antenna equipment
The first RET will be replied and exclusively enjoy rights conflict response.
Figure 14 is the flow chart of multifrequency electrical tilt antenna management method embodiment eight of the present invention, as shown in figure 14, the present embodiment
Method on the basis of above-mentioned each method embodiment of the invention, the method for the present embodiment may include:
S801, the first RET permission reading order is sent.
S802, the first RET rights objects are sent.
In the present embodiment, when base station needs to obtain the permission classification that the base station possesses the first RET at this time, base station can
To send the first RET permission reading order to antenna equipment, the first RET permission reading order belongs to newly-increased AISG interface life
It enables, correspondingly, antenna equipment receives the first RET permission reading order that base station is sent, and determines pair that the base station is possessed at this time
Then the administration authority of first RET sends the first RET rights objects to base station, correspondingly, what base station receiving antenna equipment was sent
First RET rights objects, so that base station determines the administration authority that the base station possesses the first RET.First RET rights objects
It can be control authority, alternatively, search access right, alternatively, permission is exclusively enjoyed, alternatively, empty permission.If having other base stations to possess to this
First RET's exclusively enjoys permission, then the administration authority that the base station possesses the first RET is empty permission (i.e. no any permission).
Figure 15 is a kind of application scenarios schematic diagram of multifrequency electrical tilt antenna management method of the present invention, as shown in figure 15, base station
By radio-frequency remote unit (Radio Remote Unit, referred to as: RRU), RRU is set with antenna for communication between antenna equipment
SBT is provided between the standby port AISG, SBT is sent for shunting the data that base station is sent to antenna, base station to antenna equipment
All data SBT is reached by RRU, data will be controlled by SBT be sent to the port AISG of antenna equipment and set with reaching antenna
It is standby, the radio frequency (Radio Frequency, referred to as: RF) that business datum is sent to antenna equipment is set with reaching antenna by SBT
It is standby.The each method embodiment of the present embodiment can be applied in application scenarios shown in figure 15, below in application shown in figure 15
Scene column are illustrated for two example two.
Figure 16 is the flow chart of multifrequency electrical tilt antenna management method embodiment nine of the present invention, as shown in figure 16, the present embodiment
It is illustrated by taking a RET (such as RET1) in antenna equipment as an example, the method for the present embodiment may include:
S901, scan command is sent.
S902, mark, the mark of the mark of RET2 and RET3 for sending RET1.
The communication connection of S903, foundation about RET1.
S904, RET1 control authority setting command is sent.
S905, the setting success response of RET1 control authority is sent.
In the present embodiment, base station 1 can send scan command to antenna equipment by the port AISG1 of antenna equipment, should
Scan command is used to indicate antenna equipment and the mark of all RET is sent to base station 1.Then antenna equipment is according to scan command
Mark, the mark of RET2, the mark of RET3 of RET1 are sent to base station 1.Then base station 1 can be with the mark and antenna equipment of RET1
Establish the communication connection about RET1.Base station 1, which can be configured, possesses control authority to RET1, is set by the port AISG1 to antenna
Preparation send RET1 control authority setting command;When antenna equipment, which determines, possesses control authority to REI1 there are no base station at this time,
Antenna equipment replys RET1 control authority to base station and success response is arranged, so that base station 1 possesses control authority to RET1, then base
Standing 1 can be controlled and/or be inquired with RET1, detailed process be detailed in above method embodiment of the present invention it is related record, this
Place repeats no more.
S906, scan command is sent.
S907, mark, the mark of the mark of RET2 and RET3 for sending RET1.
The communication connection of S908, foundation about RET1.
S909, RET1 control authority setting command is sent.
S910, RET1 control authority conflict response is sent.
In the present embodiment, base station 2 can send scan command to antenna equipment by the port AISG2 of antenna equipment, should
Scan command is used to indicate antenna equipment and the mark of all RET is sent to base station 2.Then antenna equipment is according to scan command
Mark, the mark of RET2, the mark of RET3 of RET1 are sent to base station 2.Then base station 2 can be with the mark and antenna equipment of RET1
Establish the communication connection about RET1.Base station 2, which is intended to configure, possesses control authority to RET1, can be by the port AISG1 to antenna
Equipment sends RET1 control authority setting command;Antenna equipment determines that base station 1 has possessed the control authority to REI1, antenna at this time
Equipment replys RET1 control authority conflict response according to that can only have a base station to possess control authority to same RET, to base station, with
Indicate that base station 2 cannot possess control authority to RET1 at this time at this time.
S911, RET1 search access right setting command is sent.
S912, the setting success response of RET1 search access right is sent.
In the present embodiment, if the practical control authority not possessed to RET1 in base station 2, antenna equipment hair is received in base station 2
After the first RET control authority conflict order sent, base station 2 can be sent by the port AISG2 of antenna equipment to antenna equipment
RET1 search access right setting command.Antenna equipment can possess the search access right to the same RET according to multiple base stations simultaneously, to
Base station 2 sends RET1 search access right and success response is arranged.Then base station 2 can be inquired with RET1, and detailed process is detailed in this hair
Related record in bright above method embodiment, details are not described herein again.
Multifrequency electrical tilt antenna management method provided in an embodiment of the present invention is sent out by antenna equipment to base station 1 and base station 2
The mark for sending RET1, RET2 and RET3, solves the problems, such as present technology, and antenna equipment support with base station 1 and
The communication connection about same RET is established in base station 2, while each base station same RET can be set different permissions, make base station
1 not only can control RET1 but also can share the information of RET1 with base station 2.Possess when base station 1 and base station 2 are required to setting to RET1
Control authority, the base station 2 that control authority is arranged in antenna equipment backward reports control authority conflict, facilitates and negotiates between each base station pair
The control authority of same RET configures.
Figure 17 is the flow chart of multifrequency electrical tilt antenna management method embodiment ten of the present invention, as shown in figure 17, the present embodiment
It is illustrated by taking a RET (such as RET1) in antenna equipment as an example, the method for the present embodiment may include:
S1001, scan command is sent.
S1002, mark, the mark of the mark of RET2 and RET3 for sending RET1.
The communication connection of S1003, foundation about RET1.
S1004, RET1 control authority setting command is sent.
S1005, the setting success response of RET1 control authority is sent.
S1006, scan command is sent.
S1007, mark, the mark of the mark of RET2 and RET3 for sending RET1.
The communication connection of S1008, foundation about RET1.
S1009, RET1 control authority setting command is sent.
S1010, RET1 control authority conflict response is sent.
In the present embodiment, the specific implementation process of S1001-1010 and the S901-S910 in embodiment of the present invention method nine
Specific implementation process it is similar, details are not described herein again.
S1011, RET1 search access right setting command is sent.
S1012, the setting success response of RET1 search access right is sent.
In the present embodiment, if base station 2 actually possesses the control authority to RET1, illustrate the configuration to RET1 of base station 1
Error, after the first RET control authority conflict order that base station 2 receives antenna equipment transmission, the administrative staff of base station 2 can be with
It is required that administrative staff's release of base station 1 is to the control authority of RET1, then base station 1 can pass through the port AISG1 of antenna equipment
RET1 search access right setting command is sent to antenna equipment, to discharge the control authority to RET1, antenna equipment is sent to base station 1
Success response is arranged in RET1 search access right, indicates that base station 1 has successfully discharged the control authority to RET1 and possessed to RET1's
Search access right.
S1013, RET1 control authority setting command is sent.
S1014, the setting success response of RET1 control authority is sent.
In the present embodiment, after base station 1 successfully discharges the control authority to RET1, base station 2 can pass through antenna equipment
The port AISG2 to antenna equipment send RET1 control authority setting command, with setting control authority is possessed to RET1, antenna is set
It is standby to send RET1 search access right to base station 2 success response is set, indicate base station 2 successfully possessed to the control authority of RET1 and
Possess the search access right to RET1.
Multifrequency electrical tilt antenna management method provided in an embodiment of the present invention is sent out by antenna equipment to base station 1 and base station 2
The mark for sending RET1, RET2 and RET3, solves the problems, such as present technology, and antenna equipment support with base station 1 and
The communication connection about same RET is established in base station 2, while each base station same RET can be set different permissions, make base station
1 not only can control RET1 but also can share the information of RET1 with base station 2.Possess when base station 1 and base station 2 are required to setting to RET1
Control authority, the base station 2 that control authority is arranged in antenna equipment backward reports control authority conflict, after negotiating between each base station,
Base station 1 is discharged to the control authority of RET1, and base station 2 is reconfigured the control authority to RET, make base station 2 not only and can control RET1 but also
The information of RET1 can be shared with base station 1.
Those of ordinary skill in the art will appreciate that: realize that all or part of the steps of above method embodiment can pass through
The relevant hardware of program instruction is completed, and program above-mentioned can be stored in a computer readable storage medium, the program
When being executed, step including the steps of the foregoing method embodiments is executed;And storage medium above-mentioned includes: ROM, RAM, magnetic disk or light
The various media that can store program code such as disk.
Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent
Pipe present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: its according to
So be possible to modify the technical solutions described in the foregoing embodiments, or to some or all of the technical features into
Row equivalent replacement;And these are modified or replaceed, various embodiments of the present invention technology that it does not separate the essence of the corresponding technical solution
The range of scheme.
Claims (53)
1. a kind of base station characterized by comprising
Transmission unit, for by sending scan command to antenna equipment, the scan command to be used to indicate the antenna equipment
The mark of all remote electricity tune unit R ET is sent to the base station;
Receiving unit, for receiving the mark for all RET that the antenna equipment is sent;
Processing unit is established about the with the antenna equipment for the mark according to received first RET of the receiving unit
The communication connection of one RET, the first RET are any RET in the antenna equipment;
Wherein, the base station possesses the administration authority to the first RET.
2. base station according to claim 1, which is characterized in that the transmission unit be also used to the processing unit according to
The mark of first RET is established after the communication connection about the first RET with the antenna equipment, and Xiang Suoshu antenna equipment is sent
First RET administration authority setting command, the first RET administration authority setting command belong to newly-increased antennal interface standardization
AISG interface command;
The receiving unit is also used to receive the first RET administration authority setting success response that the antenna equipment is sent, so that
The base station possesses the administration authority to the first RET.
3. base station according to claim 1, which is characterized in that the administration authority is the base station by the antenna equipment
Institute's default setting.
4. base station according to claim 2, which is characterized in that the transmission unit is specifically used for sending out to the antenna equipment
Send the first RET control authority setting command;
The receiving unit is specifically used for receiving the first RET control authority setting success response that the antenna equipment is sent;
Wherein, the administration authority includes control authority.
5. base station according to claim 4, which is characterized in that the processing unit is used to receive institute in the receiving unit
After the first RET control authority setting success response for stating antenna equipment transmission, determine whether the base station needs to discharge to institute
State the control authority that the first RET is possessed;
The transmission unit is also used to, and needs to discharge the control for possessing the first RET when the processing unit determines
In limited time, Xiang Suoshu antenna equipment sends the first RET search access right setting command;
The receiving unit is also used to receive the first RET search access right setting success response that the antenna equipment is sent, so that
The base station possesses the search access right to the first RET.
6. base station according to claim 3, which is characterized in that if the base station according to the mark of the first RET with it is described
When there is no first base station when establishing communication connection about the first RET in antenna equipment, then antenna equipment institute default setting
The administration authority include control authority;
Wherein, the first base station has been established the communication connection about the first RET with the antenna equipment and has been possessed pair
The control authority of first RET.
7. base station according to claim 6, which is characterized in that the transmission unit is also used in the processing unit root
It according to the mark of the first RET, is established after the communication connection about the first RET with the antenna equipment, Xiang Suoshu antenna equipment hair
Send the first RET control command;
The receiving unit is also used to receive the first RET control success response that the antenna equipment is sent.
8. base station according to claim 2, which is characterized in that the transmission unit is specifically used for sending out to the antenna equipment
Send the first RET search access right setting command;
The receiving unit is also used to receive the first RET search access right setting success response that the antenna equipment is sent;
Wherein, the administration authority includes search access right.
9. base station according to claim 8, which is characterized in that the transmission unit is also used to send out to the antenna equipment
Before sending the first RET search access right setting command, Xiang Suoshu antenna equipment sends the first RET control authority setting command;
The receiving unit is also used to receive the first RET control authority conflict response that the antenna equipment is sent.
10. base station according to claim 3, which is characterized in that if the base station according to the mark of the first RET with it is described
Antenna equipment establishes existing first base station when communication connection about the first RET, then antenna equipment institute default setting
The administration authority includes search access right, and the first base station is to have been established with the antenna equipment about the first RET's
It communicates to connect and possesses the control authority to the first RET.
11. the base station according to claim 6 or 10, which is characterized in that the transmission unit is also used to single in the processing
Member is established after the communication connection about the first RET, Xiang Suoshu antenna is set according to the mark of the first RET with the antenna equipment
Preparation send the first RET querying command;
The receiving unit is also used to receive the first RET query result that the antenna equipment is sent.
12. base station according to claim 2, which is characterized in that the transmission unit is specifically used for the antenna equipment
It sends the first RET and exclusively enjoys priority assignation order;
The first RET that the receiving unit is specifically used for receiving the antenna equipment transmission exclusively enjoys priority assignation success response;
Wherein, the administration authority includes exclusively enjoying permission.
13. base station described in -10,12 any one according to claim 1, which is characterized in that the transmission unit is also used to
The processing unit is established after the communication connection about the first RET according to the mark of the first RET with the antenna equipment, to
The antenna equipment sends the first RET permission reading order, and the first RET permission reading order belongs to newly-increased AISG interface
Order;
The receiving unit is also used to receive the first RET rights objects that the antenna equipment is sent, with the determination base station pair
The administration authority that first RET is possessed.
14. a kind of antenna equipment characterized by comprising
Receiving unit, for receiving the scan command of base station transmission, the scan command is used to indicate the antenna equipment for institute
The mark of some remote electricity tune unit R ET is sent to the base station;
Transmission unit, for sending the mark of all RET to the base station;
Processing unit, for establishing the communication connection about the first RET with the base station, the first RET is that the antenna is set
Any RET in standby, wherein the first RET is by the BTS management.
15. antenna equipment according to claim 14, which is characterized in that the receiving unit is also used to single in the processing
It is first to be established after the communication connection about the first RET with the base station, it receives the first RET administration authority that the base station is sent and sets
Order is set, the first RET administration authority setting command belongs to newly-increased AISG interface command;
The transmission unit is also used to send the setting success response of the first RET administration authority to the base station, so that the base station
Possess the administration authority to the first RET.
16. antenna equipment according to claim 14, which is characterized in that the processing unit be also used to the base station
It establishes after the communication connection about the first RET, base station described in default setting possesses the administration authority to the first RET.
17. antenna equipment according to claim 15, which is characterized in that the receiving unit is specifically used for receiving the base
Stand send the first RET control authority setting command;
The transmission unit is specifically used for sending the setting success response of the first RET control authority to the base station;
Wherein, the administration authority includes control authority.
18. antenna equipment according to claim 17, which is characterized in that the receiving unit is also used to the transmission unit
After sending the setting success response of the first RET control authority to the base station, the first RET inquiry power that the base station is sent is received
Limit setting command;
The transmission unit is also used to send the setting success response of the first RET search access right to the base station, so that the base station
Possess the search access right to the first RET.
19. antenna equipment according to claim 16, which is characterized in that the processing unit is specifically used for, if with institute
It states when the communication connection about the first RET is established in base station and there is no first base station, then base station described in default setting possesses to described
The control authority of first RET, the first base station are the communication connection being had been established with the antenna equipment about the first RET
And possess another base station of the control authority to the first RET.
20. antenna equipment according to claim 19, which is characterized in that the receiving unit is also used to single in the processing
It is first to be established after the communication connection about the first RET with the base station, receive the first RET control command that the base station is sent;
The processing unit is also used to according to the first RET control command, carries out control processing to the first RET;
The transmission unit is also used to send the first RET control success response to the base station.
21. antenna equipment according to claim 15, which is characterized in that the receiving unit is specifically used for receiving the base
Stand send the first RET search access right setting command;
The transmission unit is specifically used for sending the setting success response of the first RET search access right to the base station;
Wherein, the administration authority includes search access right.
22. antenna equipment according to claim 21, which is characterized in that the receiving unit is also used to receiving the base
Before the first RET search access right setting command sent of standing, the first RET control authority setting life that the base station is sent is received
It enables;
The transmission unit is also used to, if the first RET control authority that the receiving unit has received first base station transmission is set
Order is set, then sends the first RET control authority conflict response to the base station, the first base station is built with the antenna equipment
The vertical communication connection about the first RET.
23. antenna equipment according to claim 16, which is characterized in that the processing unit is specifically used for, if with institute
It states base station and establishes existing first base station when the communication connection about the first RET, then base station described in default setting possesses to described
The search access right of first RET, the first base station are the communication connection being had been established with the antenna equipment about the first RET
And possess the base station of the control authority to the first RET.
24. antenna equipment described in 9 or 23 according to claim 1, which is characterized in that the receiving unit is also used at the place
It manages unit and the base station is established after the communication connection about the first RET, receive the first RET inquiry life that the base station is sent
It enables;
The processing unit is also used to inquire the first RET according to the first RET querying command;
The transmission unit is also used to send the first RET query result to the base station.
25. antenna equipment according to claim 15, which is characterized in that the receiving unit is specifically used for receiving the base
The first RET sent that stands exclusively enjoys priority assignation order;
The transmission unit is specifically used for exclusively enjoying priority assignation success response to the base station the first RET of transmission;
Wherein, the administration authority includes exclusively enjoying permission.
26. 4-23, antenna equipment described in 25 any one according to claim 1, which is characterized in that the receiving unit is also used
In after the communication connection that the processing unit and the base station establish about the first RET, receive that the base station sends the
One RET permission reading order, the first RET permission reading order belong to the AISG interface command newly increased;
The transmission unit is also used to send the first RET rights objects to the base station, so that the base station determines the base station
The administration authority that first RET is possessed.
27. a kind of multifrequency electrical tilt antenna management method characterized by comprising
Base station sends scan command to antenna equipment, and the scan command is used to indicate the antenna equipment for all long-range electricity
The mark of unit R ET is adjusted to be sent to the base station;
The base station receives the mark for all RET that the antenna equipment is sent;
The communication connection about the first RET is established according to the mark of the first RET, with the antenna equipment in the base station, and described the
One RET is any RET in the antenna equipment;
Wherein, the base station possesses the administration authority to the first RET.
28. according to the method for claim 27, which is characterized in that the base station is according to the mark of the first RET, with the day
Line equipment is established after the communication connection about the first RET, further includes:
The base station sends the first RET administration authority setting command, the first RET administration authority setting to the antenna equipment
Order belongs to newly-increased antennal interface standardized A ISG interface command;
The base station receives the first RET administration authority setting success response that the antenna equipment is sent, so that the base station is gathered around
There is the administration authority to the first RET.
29. according to the method for claim 27, which is characterized in that the administration authority is the base by the antenna equipment
It stands institute's default setting.
30. according to the method for claim 28, which is characterized in that the base station sends the first RET to the antenna equipment
Administration authority setting command, comprising:
The base station sends the first RET control authority setting command to the antenna equipment;
The base station receives the first RET administration authority setting success response that the antenna equipment is sent, comprising:
The base station receives the first RET control authority setting success response that the antenna equipment is sent;
Wherein, the administration authority includes control authority.
31. according to the method for claim 30, which is characterized in that the base station receives first that the antenna equipment is sent
RET control authority is arranged after success response, further includes:
When the base station needs to discharge the control authority for possessing the first RET, the base station is to the antenna equipment
Send the first RET search access right setting command;
The base station receives the first RET search access right setting success response that the antenna equipment is sent, so that the base station is gathered around
There is the search access right to the first RET.
32. according to the method for claim 29, which is characterized in that if in mark of the base station according to the first RET and institute
When there is no first base station when stating communication connection of the antenna equipment foundation about the first RET, then the antenna equipment, which is defaulted, sets
The administration authority set includes control authority;
Wherein, the first base station has been established the communication connection about the first RET with the antenna equipment and has been possessed pair
The control authority of first RET.
33. according to the method for claim 32, which is characterized in that the base station is according to the mark of the first RET, with the day
Line equipment is established after the communication connection about the first RET, further includes:
The base station sends the first RET control command to the antenna equipment;
The base station receives the first RET control success response that the antenna equipment is sent.
34. according to the method for claim 28, which is characterized in that the base station sends the first RET to the antenna equipment
Administration authority setting command, comprising:
The base station sends the first RET search access right setting command to the antenna equipment;
The base station receives the first RET administration authority setting success response that the antenna equipment is sent, comprising:
The base station receives the first RET search access right setting success response that the antenna equipment is sent;
Wherein, the administration authority includes search access right.
35. according to the method for claim 34, which is characterized in that the base station sends the first RET to the antenna equipment
Before search access right setting command, further includes:
The base station sends the first RET control authority setting command to the antenna equipment;
The base station receives the first RET control authority conflict response that the antenna equipment is sent;
The base station sends the first RET search access right setting command to the antenna equipment, comprising:
The base station sends the first RET search access right according to the first RET control authority conflict response, Xiang Suoshu antenna equipment
Setting command.
36. according to the method for claim 29, which is characterized in that if in mark of the base station according to the first RET and institute
It states antenna equipment and establishes existing first base station when the communication connection about the first RET, then antenna equipment institute default setting
The administration authority include search access right, the first base station be have been established with the antenna equipment about the first RET
Communication connection and possess control authority to the first RET.
37. the method according to claim 32 or 36, which is characterized in that the base station is according to the mark of the first RET, with institute
Antenna equipment is stated to establish after communication connection about the first RET, further includes:
The base station sends the first RET querying command to the antenna equipment;
The base station receives the first RET query result that the antenna equipment is sent.
38. according to the method for claim 28, which is characterized in that the base station sends the first RET to the antenna equipment
Administration authority setting command, comprising:
The base station sends the first RET to the antenna equipment and exclusively enjoys priority assignation order;
The base station receives the first RET administration authority setting success response that the antenna equipment is sent, comprising:
The base station receives the first RET that the antenna equipment is sent and exclusively enjoys priority assignation success response;
Wherein, the administration authority includes exclusively enjoying permission.
39. according to method described in claim 27-36,38 any one, which is characterized in that the base station is according to the first RET
Mark, established after communication connection about the first RET with the antenna equipment, further includes:
The base station sends the first RET permission reading order to the antenna equipment, and the first RET permission reading order belongs to
Newly-increased AISG interface command;
The base station receives the first RET rights objects that the antenna equipment is sent, with the determination base station to the first RET
The administration authority possessed.
40. a kind of multifrequency electrical tilt antenna management method characterized by comprising
Antenna equipment receives the scan command that base station is sent, and the scan command is used to indicate the antenna equipment will be all remote
The mark of journey electricity tune unit R ET is sent to the base station;
The antenna equipment sends the mark of all RET to the base station;
The communication connection about the first RET is established in the antenna equipment and the base station, and the first RET is the antenna equipment
In any RET;
Wherein, the base station possesses the administration authority to the first RET.
41. according to the method for claim 40, which is characterized in that the antenna equipment and the base station are established about first
After the communication connection of RET, further includes:
The antenna equipment receives the first RET administration authority setting command that the base station is sent, the first RET administration authority
Setting command belongs to newly-increased AISG interface command;
The antenna equipment sends the first RET administration authority to the base station and success response is arranged, so that the base station possesses pair
The administration authority of first RET.
42. according to the method for claim 40, which is characterized in that the antenna equipment and the base station are established about first
After the communication connection of RET, further includes:
Base station described in the antenna equipment default setting possesses the administration authority to the first RET.
43. according to the method for claim 41, which is characterized in that the antenna equipment receives first that the base station is sent
RET administration authority setting command, comprising:
The antenna equipment receives the first RET control authority setting command that the base station is sent;
The antenna equipment sends the first RET control authority to the base station and success response is arranged;
Wherein, the administration authority includes control authority.
44. according to the method for claim 43, which is characterized in that the antenna equipment sends the first RET to the base station
Control authority is arranged after success response, further includes:
The antenna equipment receives the first RET search access right setting command that the base station is sent;
The antenna equipment sends the first RET search access right to the base station and success response is arranged, so that the base station possesses pair
The search access right of first RET.
45. according to the method for claim 42, which is characterized in that base station described in the antenna equipment default setting possesses pair
The administration authority of first RET, comprising:
If there is no first base station when the antenna equipment and the base station establish the communication connection about the first RET, institute
It states base station described in antenna equipment default setting and possesses control authority to the first RET, the first base station is and the day
Line equipment has been established the communication connection about the first RET and possesses another base of the control authority to the first RET
It stands.
46. according to the method for claim 45, which is characterized in that the antenna equipment and the base station are established about first
After the communication connection of RET, further includes:
The antenna equipment receives the first RET control command that the base station is sent;
The antenna equipment carries out control processing according to the first RET control command, to the first RET;
The antenna equipment sends the first RET to the base station and controls success response.
47. according to the method for claim 41, which is characterized in that the antenna equipment receives first that the base station is sent
RET administration authority setting command, comprising:
The antenna equipment receives the first RET search access right setting command that the base station is sent;
The antenna equipment sends the first RET search access right to the base station and success response is arranged;
Wherein, the administration authority includes search access right.
48. according to the method for claim 47, which is characterized in that the antenna equipment receives first that the base station is sent
Before RET search access right setting command, further includes:
The antenna equipment receives the first RET control authority setting command that the base station is sent;
If the antenna equipment determines the first RET control authority setting command for having received first base station transmission, the day
Line equipment sends the first RET control authority conflict response to the base station, and the first base station is established with the antenna equipment
Communication connection about the first RET.
49. according to the method for claim 42, which is characterized in that base station described in the antenna equipment default setting possesses pair
The administration authority of first RET, comprising:
If existing first base station, institute when the antenna equipment and the base station establish the communication connection about the first RET
It states base station described in antenna equipment default setting and possesses search access right to the first RET, the first base station is and the day
Line equipment has been established the communication connection about the first RET and possesses the base station of the control authority to the first RET.
50. the method according to claim 45 or 49, which is characterized in that the antenna equipment and the base station establish about
After the communication connection of first RET, further includes:
The antenna equipment receives the first RET querying command that the base station is sent;
The antenna equipment inquires the first RET according to the first RET querying command;
The antenna equipment sends the first RET query result to the base station.
51. according to the method for claim 41, which is characterized in that the antenna equipment receives first that the base station is sent
RET administration authority setting command, comprising:
The antenna equipment receives the first RET that the base station is sent and exclusively enjoys priority assignation order;
The antenna equipment sends the first RET to the base station and exclusively enjoys priority assignation success response;
Wherein, the administration authority includes exclusively enjoying permission.
52. according to method described in claim 40-49,51 any one, which is characterized in that the antenna equipment and the base
It stands and establishes after communication connection about the first RET, further includes:
The antenna equipment receives the first RET permission reading order that the base station is sent, the first RET permission reading order
Belong to the AISG interface command newly increased;
The antenna equipment sends the first RET rights objects to the base station, so that the base station determines the base station to described
The administration authority that first RET is possessed.
53. a kind of multifrequency electrical tilt antenna management system characterized by comprising as described in claim 1-13 any one
Base station and the antenna equipment as described in claim 14-26 any one.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/CN2014/073110 WO2015135102A1 (en) | 2014-03-10 | 2014-03-10 | Multi-frequency electrical tilting antenna management method, device and system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104995941A CN104995941A (en) | 2015-10-21 |
CN104995941B true CN104995941B (en) | 2019-04-12 |
Family
ID=54070747
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201480003863.2A Active CN104995941B (en) | 2014-03-10 | 2014-03-10 | Multifrequency electrical tilt antenna management method, device and system |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN104995941B (en) |
WO (1) | WO2015135102A1 (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10367261B2 (en) | 2016-06-17 | 2019-07-30 | Commscope Technologies Llc | Base station antennas with remotely reconfigurable electronic downtilt control paths and related methods of reconfiguring such antennas |
CN108496162B (en) * | 2017-06-30 | 2021-08-17 | 深圳市大疆创新科技有限公司 | Method and device for identifying electric regulation, power system and movable platform |
CN111211848B (en) * | 2020-01-07 | 2022-07-08 | 中天通信技术有限公司 | Automatic test method and system for antenna electric tuning unit and related components |
FI129552B (en) * | 2020-12-03 | 2022-04-14 | Elisa Oyj | A computer implemented method for controlling a communications network |
CN114499568A (en) * | 2021-12-30 | 2022-05-13 | 华为技术有限公司 | Communication method and device |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101035328A (en) * | 2007-04-25 | 2007-09-12 | 中兴通讯股份有限公司 | Electrical-adjusting antenna control method and system in the radio communication system |
CN101827374A (en) * | 2009-12-31 | 2010-09-08 | 中兴通讯股份有限公司 | Operation maintenance system for managing electrically adjustable antenna, controller and radio frequency sub-system |
CN102751574A (en) * | 2012-07-09 | 2012-10-24 | 广东博纬通信科技有限公司 | Electronic adjustment device, electronic adjustment control system and electronic adjustment control method |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100558001C (en) * | 2006-08-08 | 2009-11-04 | 华为技术有限公司 | The central controlled method and system of a kind of realization 2G network electrical tilt antenna |
CN102780090B (en) * | 2012-07-24 | 2015-01-07 | 华为技术有限公司 | Electrical tilt antenna and control method and system |
-
2014
- 2014-03-10 CN CN201480003863.2A patent/CN104995941B/en active Active
- 2014-03-10 WO PCT/CN2014/073110 patent/WO2015135102A1/en active Application Filing
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101035328A (en) * | 2007-04-25 | 2007-09-12 | 中兴通讯股份有限公司 | Electrical-adjusting antenna control method and system in the radio communication system |
CN101827374A (en) * | 2009-12-31 | 2010-09-08 | 中兴通讯股份有限公司 | Operation maintenance system for managing electrically adjustable antenna, controller and radio frequency sub-system |
CN102751574A (en) * | 2012-07-09 | 2012-10-24 | 广东博纬通信科技有限公司 | Electronic adjustment device, electronic adjustment control system and electronic adjustment control method |
Also Published As
Publication number | Publication date |
---|---|
CN104995941A (en) | 2015-10-21 |
WO2015135102A1 (en) | 2015-09-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104995941B (en) | Multifrequency electrical tilt antenna management method, device and system | |
CN105850218B (en) | A kind of the discovery method, apparatus and system of D2D communication | |
US11800411B2 (en) | Apparatus and method for supporting session continuity in wireless communication system | |
CN102118812B (en) | Switching method, system, relay station, control base station and base station in relay network, | |
US11190951B2 (en) | Method and apparatus for dimensioning base stations and determining spectrum availability in a spectrum controlled network | |
KR20130023396A (en) | Method and apparatus for television band(tvbd)channel quieting across diverse radio access technologies | |
US10966132B1 (en) | System and method for frequency object enablement in self-organizing networks | |
CN103369535A (en) | Spectrum allocation method, device thereof and system thereof | |
CN102025403B (en) | Multipoint cooperative transmitting and receiving method, device and system | |
US20170353870A1 (en) | Antenna beams in a wireless system | |
CN107666688B (en) | Public flow implementation method, device and system | |
CN103002521A (en) | Context transmission method and mobility management entity | |
JP2020530723A (en) | Beam training methods and equipment, as well as communication systems | |
US11233540B2 (en) | Apparatus and methods for G3-PLC bootstrap in a hybrid network | |
CN107636983A (en) | The System and method for found for active link in wireless network | |
CN102647691B (en) | The sending method of note, Apparatus and system | |
CN115589247B (en) | Communication method, device and computer readable storage medium | |
EP3493597B1 (en) | Handover between an lte cell and a hyper cell | |
US20230397260A1 (en) | Configuration indication | |
KR101271431B1 (en) | Apparatus and method of radio access in reconfigurable wireless communication systems | |
CN111065167B (en) | BSR reporting method, terminal and network side equipment | |
JP5582041B2 (en) | Communication coexistence system between wireless communication networks | |
WO2015135116A1 (en) | System architecture of self-organized network and optimization method | |
CN105101220A (en) | Method, equipment and system for capability information interaction of secondary system equipment | |
EP3432627B1 (en) | Secure devices and methods for lpwa communication networks |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |