CN104986297B - A kind of installation method of launching barge horizontal slide - Google Patents

A kind of installation method of launching barge horizontal slide Download PDF

Info

Publication number
CN104986297B
CN104986297B CN201510325548.8A CN201510325548A CN104986297B CN 104986297 B CN104986297 B CN 104986297B CN 201510325548 A CN201510325548 A CN 201510325548A CN 104986297 B CN104986297 B CN 104986297B
Authority
CN
China
Prior art keywords
slideway
deck
installation
launching barge
horizontal slide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510325548.8A
Other languages
Chinese (zh)
Other versions
CN104986297A (en
Inventor
练博强
冯仕清
罗玖田
李家林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CSSC Huangpu Wenchong Shipbuilding Co Ltd
Original Assignee
CSSC Huangpu Wenchong Shipbuilding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSSC Huangpu Wenchong Shipbuilding Co Ltd filed Critical CSSC Huangpu Wenchong Shipbuilding Co Ltd
Priority to CN201510325548.8A priority Critical patent/CN104986297B/en
Publication of CN104986297A publication Critical patent/CN104986297A/en
Application granted granted Critical
Publication of CN104986297B publication Critical patent/CN104986297B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to marine installation mounting technique field,A kind of specifically related to installation method of launching barge horizontal slide,Determine installation site on launching barge deck for the slideway first,And survey a stroke hookup wire in described installed position,Then measure the horizontal accuracy in hookup wire region,Calculated according to the accuracy data that measurement obtains and form horizontal line,Installation accuracy according to horizontal slide requires,Gap between analysis slideway and deck,Calculate the specification of required adjust pad,Slideway is installed and using preprepared adjust pad, leveling is filled with to the gap between slideway and deck,Finally using kneepiece, the both sides of slideway and deck are welded and fixed,The present invention passes through to measure the deck level precision of slideway installation site in advance,Form horizontal line,Installation level requirement in conjunction with slideway,Corresponding pad is prepared for the excessive place in slideway installation site gap the levelness of slideway is adjusted,Leveling work when slideway is installed can be reduced,Improve efficiency.

Description

A kind of installation method of launching barge horizontal slide
Technical field
The present invention relates to marine installation mounting technique field is and in particular to a kind of installation side of launching barge horizontal slide Method.
Background technology
With the development of Offshore Engineering, oil field newly developed is increasing, large jacket, chunk sliding launch and Floating support engineering substantial increase, the also more and more higher of the requirement to engineer equipment.Launching barge is a kind of dedicated for large jacket Deng the engineer equipment of water operation under main equipment, common large-sized launching barge has two and sets for carrier catheter frame etc. is large-scale Standby slideway, slideway is primarily subjected to the skid force of jacket launching, usually more than 100 meters of the length of wall scroll slideway, every slideway Combined by more piece and constitute, each section slideway is an independent entirety, and slideway can move along launching barge cross direction Move and required with adapting to the jacket launching of different in width.Launching barge requires higher, not only in straight line to the installation accuracy of slideway Degree direction has higher requirement, and also has very high requirement in levelness and slideway with the gap of launching barge hull, All have to check for the levelness of slideway after the installation and translation of slideway, then using pad, levelness is adjusted, with Ensure that slideway is installed and meet corresponding required precision.
The Level-adjusting work of prior art middle slideway installation process is very loaded down with trivial details, and the installation process of slideway is typically will Slideway is positioned on launching barge deck, is then constantly prepared various according to the gap length between slideway and launching barge deck Pad is filled with to gap, and it is necessary to checking again for the levelness of slideway and passing through pad after each translation slideway It is adjusted, in order to ensure the installation accuracy of slideway, not only installation period is long for existing slideway installation method, and levelness inspection Look into, pad is installed and adjustment tedious process, inefficiency.
Content of the invention
Present invention aims to the deficiencies in the prior art provide a kind of installation method of launching barge horizontal slide, By measuring the deck level precision of slideway installation site in advance, form horizontal line, in conjunction with the installation level requirement of slideway, for The excessive place in slideway installation site gap prepares corresponding pad and the levelness of slideway is adjusted, and can reduce slideway and install When leveling work, improve efficiency.
The present invention is achieved through the following technical solutions this purpose:
A kind of installation method of launching barge horizontal slide, comprises the following steps:
1) determine installation site on launching barge deck for the slideway, and survey a stroke hookup wire in described installed position;
2) measure the horizontal accuracy in hookup wire region on launching barge deck, the accuracy data that measurement is obtained is remembered Record;
3) calculated according to the accuracy data that measurement obtains and form horizontal line;
4) installation accuracy according to horizontal slide requires, the gap between analysis slideway and launching barge deck, calculates institute The specification of the adjust pad needing;
5) the installation positioning of adjust pad, the adjust pad of dimension is installed on the correspondence position on deck, to slideway Gap and launching barge deck between is filled with leveling using preprepared adjust pad;
6) slideway is installed, slideway is installed on deck and mounted adjust pad, using kneepiece by slideway Both sides are welded and fixed with launching barge deck.
Wherein, described step 2) it is specially:In the range of described hookup wire, select some measurement points respectively from horizontal and vertical To the horizontal accuracy on measurement launching barge deck, and the accuracy data that measurement is obtained records.
As preferred, described some measurement point intervals selection determination.
Wherein, the installation accuracy of described horizontal slide requires the difference in height of the top panel for horizontal slide in ± 25mm.
Wherein, all it is not welded and fixed between described adjust pad and slideway and launching barge deck.
With respect to prior art, beneficial effects of the present invention are:The installation method of the launching barge horizontal slide of the present invention, Determine installation site on launching barge deck for the slideway first, and survey a stroke hookup wire in described installed position, then measure The horizontal accuracy in hookup wire region, the accuracy data that measurement is obtained records, and is calculated according to described accuracy data and forms water Horizontal line, the installation accuracy according to horizontal slide requires, the gap between analysis slideway and launching barge deck, calculates required tune The specification of whole pad, installs slideway, and utilizes preprepared adjusting pad to the gap between slideway and launching barge deck Piece is filled with leveling, is finally welded and fixed the both sides of slideway with launching barge deck using kneepiece, the present invention By measuring the deck level precision of slideway installation site in advance, form horizontal line, in conjunction with the installation level requirement of slideway, for The excessive place in slideway installation site gap prepares corresponding pad and the levelness of slideway is adjusted, and can reduce slideway and install When leveling work, improve efficiency.
Brief description
Fig. 1 is that the hookup wire of slideway surveys a stroke schematic diagram.
Fig. 2 is the transverse precision instrumentation plan of adjust pad.
Fig. 3 is the Longitudinal precision instrumentation plan of adjust pad.
Fig. 4 is the fixed installation schematic diagram of slideway.
In figure:1- deck, 2- hookup wire, 3- adjust pad, 4- slideway, 5- kneepiece.
Specific embodiment
Describe the present invention below in conjunction with drawings and the specific embodiments.
Embodiment 1.
The installation method of the launching barge horizontal slide of the present embodiment, comprises the following steps:
1) as shown in figure 1, determining installation site on launching barge deck 1 for the slideway 4, and survey in described installed position Draw hookup wire 2;
2) measure the horizontal accuracy in hookup wire 2 region on launching barge deck 1, the accuracy data that measurement is obtained is remembered Record;
3) calculated according to the accuracy data that measurement obtains and form horizontal line;
4) installation accuracy according to horizontal slide 4 requires, the gap between analysis slideway 4 and launching barge deck 1, calculates The specification of required adjust pad 3;
5) the installation positioning of adjust pad, the adjust pad of dimension is installed on the correspondence position on deck, to slideway 4 Gap and launching barge deck 1 between is filled with leveling using preprepared adjust pad 3;
6) as shown in figure 4, installing slideway 4, slideway 4 is installed on deck and mounted adjust pad, using triangle The both sides of slideway 4 are welded and fixed by bracket 5 with launching barge deck 1.
As Figure 2-3, described step 2) it is specially:In the range of described hookup wire 2, select some measurement points respectively from The horizontal accuracy on horizontal and vertical measurement launching barge deck 1, and the accuracy data of measurement acquisition is recorded.
As preferred, described some measurement points intervals select to determine, the spacing distance between cross measure point is 8.5~ 11.5 meters, the spacing distance between longitudinal measurement point is 2.5 meters, corresponding with the installation site of adjust pad 3 respectively.
Wherein, the installation accuracy of the horizontal slide 4 of the present embodiment requires the difference in height of the top panel for horizontal slide 4 to exist ± 25mm, the installation accuracy of specific horizontal slide 4 can be adjusted according to actual needs.
Wherein, all it is not welded and fixed, by triangle between described adjust pad 3 and slideway 4 and launching barge deck 1 Bracket 5 is welded and fixed, and advantageously reduces adjust pad 3 and the loss of slideway 4, can be used repeatedly, low cost.
The installation method operation principle of the launching barge horizontal slide 4 of the present invention:Determine slideway 4 in launching barge first first Installation site on plate 1, and survey a stroke hookup wire 2 in described installed position, then measure the horizontal accuracy in hookup wire 2 region, The accuracy data that measurement is obtained records, and is calculated according to described accuracy data and forms horizontal line, according to the peace of horizontal slide 4 Dress required precision, the gap between analysis slideway 4 and launching barge deck 1, calculate the specification of required adjust pad 3, install Slideway 4, and the gap between slideway 4 and launching barge deck 1 is filled with adjusting using preprepared adjust pad 3 Flat, finally using kneepiece 5, the both sides of slideway 4 are welded and fixed with launching barge deck 1, the present invention passes through to survey in advance Deck 1 horizontal accuracy of amount slideway 4 installation site, forms horizontal line, in conjunction with the installation level requirement of slideway 4, pacifies for slideway 4 The excessive place in holding position gap prepares corresponding pad and the levelness of slideway 4 is adjusted, and can reduce when slideway 4 is installed Leveling works, and improves efficiency.
Embodiment described above only have expressed some embodiments of the present invention, and its description is more concrete and detailed, but simultaneously Therefore the restriction to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, some deformation can also be made and improve, these broadly fall into the guarantor of the present invention Shield scope.Therefore, the protection domain of patent of the present invention should be defined by claims.

Claims (5)

1. a kind of installation method of launching barge horizontal slide is it is characterised in that comprise the following steps:
1) determine installation site on launching barge deck for the slideway, and survey a stroke hookup wire in described installed position;
2) measure the horizontal accuracy in hookup wire region on launching barge deck, the accuracy data that measurement is obtained records;
3) calculated according to the accuracy data that measurement obtains and form horizontal line;
4) installation accuracy according to horizontal slide requires, the gap between analysis slideway and launching barge deck, needed for calculating The specification of adjust pad;
5) adjust pad installation positioning, the adjust pad of dimension is installed on the correspondence position on deck, to slideway with Gap between water barge boat deck is filled with leveling using preprepared adjust pad;
6) slideway is installed, slideway is installed on deck and mounted adjust pad, using kneepiece by the both sides of slideway It is welded and fixed with launching barge deck.
2. the installation method of launching barge horizontal slide according to claim 1 is it is characterised in that described step 2) concrete For:In described hookup wire region, select some measurement points respectively from the level essence on horizontal and vertical measurement launching barge deck Degree, and the accuracy data of measurement acquisition is recorded.
3. the installation method of launching barge horizontal slide according to claim 2 is it is characterised in that described some measurement points Interval selects to determine.
4. the installation method of launching barge horizontal slide according to claim 1 is it is characterised in that described horizontal slide Installation accuracy requires the difference in height of the top panel for horizontal slide in ± 25mm.
5. the installation method of the launching barge horizontal slide according to claim 1-4 any one is it is characterised in that described All it is not welded and fixed between adjust pad and slideway and launching barge deck.
CN201510325548.8A 2015-06-12 2015-06-12 A kind of installation method of launching barge horizontal slide Active CN104986297B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510325548.8A CN104986297B (en) 2015-06-12 2015-06-12 A kind of installation method of launching barge horizontal slide

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510325548.8A CN104986297B (en) 2015-06-12 2015-06-12 A kind of installation method of launching barge horizontal slide

Publications (2)

Publication Number Publication Date
CN104986297A CN104986297A (en) 2015-10-21
CN104986297B true CN104986297B (en) 2017-03-08

Family

ID=54298230

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510325548.8A Active CN104986297B (en) 2015-06-12 2015-06-12 A kind of installation method of launching barge horizontal slide

Country Status (1)

Country Link
CN (1) CN104986297B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109357602B (en) * 2018-10-30 2021-01-29 中船动力研究院有限公司 Horizontal adjustment method for iron stool

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2447852A1 (en) * 1979-02-02 1980-08-29 Entrepose Gtm Travaux Petrol M Pipe-laying barge with winder - with system for continuous laying of long pipeline at depth without stresses exceeding elastic limit and independently of support position
CN201999177U (en) * 2011-01-21 2011-10-05 中国海洋石油总公司 Super-large barge for float-over installation
CN102328731A (en) * 2011-05-31 2012-01-25 江苏熔盛造船有限公司 Method for arranging overlong guide rail of pipe stevedoring crane
CN202131015U (en) * 2011-05-05 2012-02-01 江苏熔盛重工有限公司 Guide rail structure of ship pipe loading and unloading crane
CN202358280U (en) * 2011-11-25 2012-08-01 天津港航工程有限公司 Special ship for transporting large-diameter steel pipe piles and assisting in pile hoisting construction
CN202987471U (en) * 2012-10-19 2013-06-12 江苏龙源振华海洋工程有限公司 Special barge suitable for bulk transportation of shallow sea area wind power plant infrastructure and equipment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2447852A1 (en) * 1979-02-02 1980-08-29 Entrepose Gtm Travaux Petrol M Pipe-laying barge with winder - with system for continuous laying of long pipeline at depth without stresses exceeding elastic limit and independently of support position
CN201999177U (en) * 2011-01-21 2011-10-05 中国海洋石油总公司 Super-large barge for float-over installation
CN202131015U (en) * 2011-05-05 2012-02-01 江苏熔盛重工有限公司 Guide rail structure of ship pipe loading and unloading crane
CN102328731A (en) * 2011-05-31 2012-01-25 江苏熔盛造船有限公司 Method for arranging overlong guide rail of pipe stevedoring crane
CN202358280U (en) * 2011-11-25 2012-08-01 天津港航工程有限公司 Special ship for transporting large-diameter steel pipe piles and assisting in pile hoisting construction
CN202987471U (en) * 2012-10-19 2013-06-12 江苏龙源振华海洋工程有限公司 Special barge suitable for bulk transportation of shallow sea area wind power plant infrastructure and equipment

Also Published As

Publication number Publication date
CN104986297A (en) 2015-10-21

Similar Documents

Publication Publication Date Title
CN104631419B (en) The method of monitoring foundation ditch top horizontal movement
CN104260643B (en) A kind of wind-proof overall steel bracket installation method
CN102175417B (en) Spatial positioning test rack for use in tunnel body of wind tunnel
CN205002959U (en) Measuring instrument of axial clearance of bearing
CN107741361B (en) Device and method for measuring bonding performance of reinforcing steel bars
CN104986297B (en) A kind of installation method of launching barge horizontal slide
CN103994956A (en) Test device for determining permeability of large-scale single fracture medium under triaxial stress
CN205156894U (en) Case roof beam scene displacement sensor fixed bolster for loading test
CN104805817A (en) Self-elevating offshore platform and submersible pump tower thereof
CN104457678A (en) Building engineering quality planeness detection device
CN202511727U (en) Motion detection apparatus
CN205388469U (en) U shaped steel yieldable support connects displacement measurement device
CN202002606U (en) Sheet metal part planeness measuring device
CN105066943A (en) Portable reflector surface detection apparatus and method
CN201874586U (en) Positioner used for installing tunnel arch center
CN106949886B (en) Rapid positioning device and positioning method for subway tunnel engineering line measuring point positions
CN105887632A (en) Leveling method and device of hanging type paver
CN102700725B (en) Method for installing fuel tank of large aircraft on test bench
CN201355239Y (en) Check tool surface error measuring instrument
CN104697420B (en) A kind of quick bearing block positioning spline measurement apparatus and measuring method
CN209763941U (en) Piping lane structure displacement guyed measuring device
CN203657691U (en) Workpiece thickness detection device
CN207335776U (en) A kind of road survey ruler
CN105066853A (en) Method for measuring verticality of slide carriage joint surface relative to feeding box mounting surface
CN204359279U (en) A kind of three-dimensional line laser rut detection equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant