CN104985226B - Electric drill erecting bed on three coordinates - Google Patents

Electric drill erecting bed on three coordinates Download PDF

Info

Publication number
CN104985226B
CN104985226B CN201510396375.9A CN201510396375A CN104985226B CN 104985226 B CN104985226 B CN 104985226B CN 201510396375 A CN201510396375 A CN 201510396375A CN 104985226 B CN104985226 B CN 104985226B
Authority
CN
China
Prior art keywords
support base
slide rail
electric drill
chute
support column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510396375.9A
Other languages
Chinese (zh)
Other versions
CN104985226A (en
Inventor
赵正东
梁云峰
田江文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lifan Technology Group Co Ltd
Original Assignee
Lifan Industry Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lifan Industry Group Co Ltd filed Critical Lifan Industry Group Co Ltd
Priority to CN201510396375.9A priority Critical patent/CN104985226B/en
Publication of CN104985226A publication Critical patent/CN104985226A/en
Application granted granted Critical
Publication of CN104985226B publication Critical patent/CN104985226B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25HWORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
    • B25H1/00Work benches; Portable stands or supports for positioning portable tools or work to be operated on thereby
    • B25H1/0021Stands, supports or guiding devices for positioning portable tools or for securing them to the work
    • B25H1/0035Extensible supports, e.g. telescopic
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25HWORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
    • B25H1/00Work benches; Portable stands or supports for positioning portable tools or work to be operated on thereby
    • B25H1/10Work benches; Portable stands or supports for positioning portable tools or work to be operated on thereby with provision for adjusting holders for tool or work

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Drilling And Boring (AREA)

Abstract

The invention discloses the electric drill erecting bed on a kind of three coordinate, support base upper surface offers U-shaped chute, slide rail is arranged in chute and slide rail pinning can be provided with support base side along slide, and slide rail pinning enters to be against slide rail side when needing and pinning slide rail from chute wall;Electric drill installing mechanism is provided with slide rail;Support base bottom surface is provided with a neck, and support column upper end is stretched into neck and is connected by shipping and reselling on another market with support base, and support base can be around rotation of shipping and reselling on another market.Support base positioning knob is provided with support base, support base positioning knob is to prop up support column upper end after support base is adjusted in place, and support column lower end is used to be connected with three dimension coordinate measurement arm.In use, directly electric drill is arranged on three dimension coordinate measurement arm by this erecting bed, the data of needs are first set, operator directly operates electric drill to get into the numerical value just can be so that speed is fast, and precision is high, easy to operate.

Description

Electric drill erecting bed on three coordinates
Technical field
The present invention relates to electric drill erecting bed, the electric drill erecting bed on more particularly to a kind of three coordinate, electric drill is installed on this It is used for the measurement of plasticine model on erecting bed.
Background technology
When making plasticine model, due to the requirement of model bilateral symmetry and size, generally with three dimension coordinate measurement its Size, symmetry and morpheme etc..This measurement is that the probe on three coordinates is completed, and three coordinate probes can only measurement model Surface size, if the size that obtain interior of articles only leans on electric drill, that is, first passes through electric drill and gets into after certain depth again with spy Pin is measured, and is not enough bored again, and so repeated multiple times, efficiency is very low.If accidentally boring many, only add greasy filth and come school repeatedly It is right, more waste time and energy.
The content of the invention
For deficiencies of the prior art, it is an object of the invention to provide a kind of speed is fast, precision is high, operation Electric drill erecting bed on convenient three coordinate.
To achieve these goals, the technical solution adopted by the present invention is such:
Electric drill erecting bed on three coordinates, including support base, slide rail and support column;Support base upper surface offers U-shaped Chute, slide rail is arranged in chute and can be along slide, in support base side provided with slide rail pinning, and slide rail pinning is from chute side Wall enters to be against slide rail side when needing and pinning slide rail;Electric drill installing mechanism is provided with slide rail;The support base bottom surface Provided with a neck, support column upper end is stretched into neck and is connected by shipping and reselling on another market with support base, and support base can be rotated with logical around shipping and reselling on another market The luffing angle that support base regulation is arranged on the electric drill on support base is crossed, is positioned on support base by screwed hole provided with support base Knob, support base positioning knob is to prop up support column upper end after support base is adjusted in place, and support column lower end is used for and three coordinates Measuring arm is connected.
Electric drill is arranged on this erecting bed by electric drill installing mechanism, can both realize the translation forward during electric drill drilling, The luffing angle of electric drill can also be adjusted as needed.In use, directly electric drill is surveyed installed in three coordinates by this erecting bed Measure on arm, first set the data of needs, operator directly operates electric drill to get into the numerical value just can be so that speed is fast, and precision is high, behaviour Facilitate.
The slide rail is frame structure, the spring conductor rod parallel with glide direction is provided with the middle part of slide rail, in support base The upper chute one end that is located at is provided with spring stop, spring stop provided with perforation, spring conductor rod from perforation through;It is oriented in spring Back-moving spring is set with bar, back-moving spring one end is against on slide rail, and the other end is against on spring stop.During drilling, operator Need to overcome the active force of back-moving spring to push away electric drill forward, it is sliding under action of reset spring power when drilling in place and unclamping Rail automatically falls back on initial position, and the structure can increase the operation sense of operator, makes easy to operate light.
The slide rail front end is provided with switch mounting, switch mounting provided with a switch solution striking plate in support base side Pillar power switch provided with control electric drill break-make, the lever that can be rotated around the axis is provided with switch mounting by rotating shaft Arm, lever arm one end is connected by extension spring with switch mounting, and extension spring is enclosed on pillar power switch, lever arm other end direction Switch solution striking plate.Under original state, electric drill power supply should disconnect.In the presence of spring conductor rod upper reset spring, switch solution Striking plate and lever arm upper-end contact simultaneously have certain active force, and the active force makes lever arm lower end overcome extension spring to act on and remote Pillar power switch, i.e. pillar power switch are not acted on and are off by lever arm lower end, conform exactly to original state Under, the requirement that electric drill power supply should disconnect.When needing drilling, the effect sliding forward of spring conductor rod upper reset spring is overcome Electric drill and switch solution striking plate on rail, slide rail are moved forward together, and switch solution striking plate is disengaged with lever arm upper end at once, in extension spring The lower lever arm lower end of effect presses to pillar power switch, connects pillar power switch, conforms exactly under working condition, electric drill electricity The requirement that source should be connected.Therefore, this structure need not be operated specially to power switch, can be certainly by the motion of slide rail It is dynamic to judge that electric drill is work or rested, so as to realize being switched on or switched off for switch automatically.
The support column is provided with the position-arresting disk vertical with support column, and support column lower end is branch apart from the distance of position-arresting disk Dagger inserts three dimension coordinate measurement arm(Mounting hole)Depth.When installing support column, once position-arresting disk and three dimension coordinate measurement arm end Face is contacted, the mounting hole that support column just can not go deep into measuring arm again.When the structure may insure each install, support column insertion The depth of three dimension coordinate measurement arm is consistent, so as to be easier to determine the motion coordinate of electric drill.
The slide rail bottom surface is provided with banking pin, and banking pin is used to contact to limit maximum of the slide rail on chute with support base Sliding distance.When slide rail is along along chute forward sliding process, once banking pin, which is supported, encounters support base, slide rail just can not be again toward advancing slip It is dynamic.If without the spacing of banking pin, slide rail may be disengaged from chute, therefore this structure can avoid slide rail from being slipped from chute The mechanisms such as electric drill are caused to damage and increase the trouble reinstalled.
The support base upper surface is provided with symmetrical two slide rails pressing plate, and two slide rail pressing plates, which are suspended in above chute, to be used for Slide rail is pushed down and is allowed to disengage above chute.Banking pin and switch solution striking plate define slide rail not from chute both direction It can be disengaged left and right from chute, and slide rail pressing plate then defines that slide rail can not be disengaged above and below chute.
Brief description of the drawings
Fig. 1-dimensional structure diagram of the present invention.
Fig. 2-front view of the present invention.
Fig. 3-Fig. 2 upward views.
Fig. 4-Fig. 2 top views.
Fig. 5-Fig. 2 left views.
Scheme of installation of Fig. 6-present invention on three coordinates.
Embodiment
The present invention is described in further detail below in conjunction with the accompanying drawings.
Referring to Fig. 1-Fig. 5, the electric drill erecting bed on a kind of three coordinate of the present invention, including support are can be seen that from figure Seat 1, slide rail 2 and support column 3;The upper surface of support base 1 offers U-shaped chute, slide rail be arranged in chute and can along slide, Slide rail pinning 4 is provided with the side of support base 1, slide rail pinning 4 enters needing to pin with thread connecting mode from chute wall The side of slide rail 2 is against during slide rail(The position for making slide rail using the frictional force of slide rail pinning and slide rail is locked).Set on slide rail 2 There is electric drill installing mechanism, during specific design, electric drill installing mechanism is electric drill installing plate 5 and clip 6 on slide rail, electric drill 8 It is fixed on by electric drill installing plate 5 and clip 6 on slide rail 2.The bottom surface of support base 1 is provided with a neck, and the upper end of support column 3 is stretched into 7 it is connected in neck and by shipping and reselling on another market with support base 1, support base 1 can be supported around 7 rotations of shipping and reselling on another market with being arranged on by support base regulation The luffing angle of electric drill on seat.Support base positioning knob 9, support base positioning knob 9 are provided with by screwed hole on support base 1 To prop up the upper end of support column 3 after support base regulation in place(Make branch using the frictional force of support base positioning knob and support column Put locking in support seat), support column lower end is used to be connected with three dimension coordinate measurement arm.It is provided with along its length on three dimension coordinate measurement arm Mounting hole, support column lower end is stretched into the mounting hole and locked by bolt.
The slide rail 2 is(Rectangle)Frame structure, the spring conductor rod parallel with glide direction is provided with the middle part of slide rail 2 10, chute one end is located on support base 1 and is provided with spring stop 11, spring stop is provided with perforation, and spring conductor rod is from perforation Pass through.Back-moving spring 12 is set with spring conductor rod 10, the one end of back-moving spring 12 is against on slide rail 2, and the other end is against bullet On spring baffle plate 11.During drilling, operator needs to overcome the active force of back-moving spring to push away electric drill forward, when drilling in place and is unclamped When, under action of reset spring power, slide rail automatically falls back on initial position, and the structure can increase the operation sense of operator, make It is easy to operate light.
The front end of slide rail 2 is provided with a switch solution striking plate 13 moved with slide rail, is installed in the side of support base 1 provided with switch Frame 14, pillar power switch 15 of the switch mounting 14 provided with control electric drill break-make, rotating shaft is passed through on switch mounting 14 Provided with the lever arm 16 that can be rotated around the axis, the one end of lever arm 16 is connected by extension spring 17 with switch mounting 14, and extension spring is enclosed on On pillar power switch, the other end of lever arm 16 solves striking plate 13 towards switch.Under original state, electric drill power supply should disconnect. In the presence of spring conductor rod upper reset spring, switch solution striking plate, should with lever arm upper-end contact and with certain active force Active force makes lever arm lower end overcome extension spring to act on and remote pillar power switch, i.e., pillar power switch is not by lever arm lower end Act on and be off, conform exactly under original state, the requirement that electric drill power supply should disconnect.When needing drilling, gram Take the electric drill on the effect of spring conductor rod upper reset spring sliding rail forward, slide rail and switch solution striking plate moved forward together, Switch solution striking plate is disengaged with lever arm upper end at once, and lever arm lower end presses to pillar power switch under extension spring effect, makes pillar Power switch is connected, and is conformed exactly under working condition, the requirement that electric drill power supply should be connected.Therefore, this structure need not be special Power switch is operated, by the motion of slide rail can automatic decision electric drill be work or rest, so as to realize automatically What is switched is switched on or switched off.
Further, the other end of the lever arm 16 is provided with pulley 18, and pulley 18 solves striking plate 13 towards switch.Pass through cunning Wheel is contacted with switch solution striking plate, can be with protection switch solution striking plate contact site.
The support column 3 is provided with the position-arresting disk 19 vertical with support column, and support column lower end is apart from the distance of position-arresting disk Three dimension coordinate measurement arm is inserted for support column(Mounting hole)Depth.When installing support column, once position-arresting disk and three dimension coordinate measurement Arm end contact, the mounting hole that support column just can not go deep into measuring arm again.When the structure may insure each install, support column The depth for inserting three dimension coordinate measurement arm is consistent, so as to be easier to determine the motion coordinate of electric drill.
The bottom surface of slide rail 2 is provided with banking pin 20, and banking pin is used to contact to limit slide rail on chute with support base Maximum sliding distance.When slide rail is along along chute forward sliding process, once banking pin, which is supported, encounters support base, slide rail just can not be past again Front slide.If without the spacing of banking pin, slide rail may be disengaged from chute, therefore this structure can avoid slide rail from chute Slippage causes the mechanisms such as electric drill to damage and increase the trouble reinstalled.
The upper surface of support base 1 is provided with symmetrical two slide rails pressing plate 21, and two slide rail pressing plates 21 are suspended on chute Side, which is used to push down slide rail 2, to be allowed to disengage above chute.Banking pin 20 and switch solution striking plate 13 from chute former and later two Direction defines that slide rail 2 can not be disengaged left and right from chute, and slide rail pressing plate 21 then defines that slide rail 2 can not be from chute upper and lower To disengagement.
Electric drill 8 is arranged on this erecting bed by electric drill installing mechanism, can both realize the translation forward during electric drill drilling, The luffing angle of electric drill can also be adjusted as needed.In use, directly electric drill 8 is surveyed installed in three coordinates by this erecting bed Measure on arm 22, see Fig. 6, wherein label 23 is workbench, for laying plasticine model.First set the data of needs, operator Directly operating electric drill to get into the numerical value just can be so that speed is fast, and precision is high, easy to operate.
Finally illustrate, the above embodiments are merely illustrative of the technical solutions of the present invention and it is unrestricted, although with reference to compared with The present invention is described in detail good embodiment, it will be understood by those within the art that, can be to skill of the invention Art scheme is modified or equivalent substitution, and without departing from the objective and scope of technical solution of the present invention, it all should cover at this Among the right of invention.

Claims (5)

1. the electric drill erecting bed on a kind of three coordinate, it is characterised in that:Including support base, slide rail and support column;On support base Surface offers U-shaped chute, and slide rail is arranged in chute and can be provided with slide rail pinning in support base side along slide, sliding Rail pinning enters to be against slide rail side when needing and pinning slide rail from chute wall;Electric drill installing mechanism is provided with slide rail; The support base bottom surface is provided with a neck, and support column upper end is stretched into neck and is connected by shipping and reselling on another market with support base, and support base can Rotated around shipping and reselling on another market to adjust the luffing angle for the electric drill being arranged on support base by support base, pass through screwed hole on support base Provided with support base positioning knob, support base positioning knob is after support base is adjusted in place to prop up under support column upper end, support column Hold for being connected with three dimension coordinate measurement arm;
The slide rail front end is provided with switch mounting, switch mounting is provided with provided with a switch solution striking plate in support base side The pillar power switch of electric drill break-make is controlled, the lever arm that can be rotated around the axis, thick stick are provided with by rotating shaft on switch mounting Lever arm one end is connected by extension spring with switch mounting, and extension spring is enclosed on pillar power switch, lever arm other end direction switch Solve striking plate.
2. the electric drill erecting bed on three coordinate according to claim 1, it is characterised in that:The slide rail is framework knot Structure, is provided with the spring conductor rod parallel with glide direction in the middle part of slide rail, and chute one end is located on support base and is provided with spring catch Plate, spring stop provided with perforation, spring conductor rod from perforation through;Back-moving spring is set with spring conductor rod, is resetted Spring one end is against on slide rail, and the other end is against on spring stop.
3. the electric drill erecting bed on three coordinate according to claim 1, it is characterised in that:The support column be provided with The vertical position-arresting disk of support column, support column lower end is apart from the depth that the distance of position-arresting disk is that support column inserts three dimension coordinate measurement arm Degree.
4. the electric drill erecting bed on three coordinate according to claim 1, it is characterised in that:The slide rail bottom surface is provided with limit Position nail, banking pin is used to contact to limit maximum sliding distance of the slide rail on chute with support base.
5. the electric drill erecting bed on three coordinate according to claim 1, it is characterised in that:The support base upper surface is set There is a symmetrical two slide rails pressing plate, two slide rail pressing plates, which are suspended in above chute, is used to push down slide rail that be allowed to can not be from chute Side is disengaged.
CN201510396375.9A 2015-07-08 2015-07-08 Electric drill erecting bed on three coordinates Expired - Fee Related CN104985226B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510396375.9A CN104985226B (en) 2015-07-08 2015-07-08 Electric drill erecting bed on three coordinates

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510396375.9A CN104985226B (en) 2015-07-08 2015-07-08 Electric drill erecting bed on three coordinates

Publications (2)

Publication Number Publication Date
CN104985226A CN104985226A (en) 2015-10-21
CN104985226B true CN104985226B (en) 2017-09-05

Family

ID=54297182

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510396375.9A Expired - Fee Related CN104985226B (en) 2015-07-08 2015-07-08 Electric drill erecting bed on three coordinates

Country Status (1)

Country Link
CN (1) CN104985226B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105437179B (en) * 2016-01-11 2017-11-24 中国航空动力机械研究所 Auxiliary support apparatus
CN111922372A (en) * 2020-05-29 2020-11-13 安徽利锋机械科技有限公司 Slide rail electric drill track angular adjustment and fixed subassembly

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6447221B1 (en) * 2001-03-05 2002-09-10 Mei-Tung Chen Structure of drilling machine
DE20211393U1 (en) * 2002-07-11 2003-01-16 Pasdzior Dieter Drilling column comprises upright tube with baseplate and clamp fixture for dip tube together with dip tube with accommodation for support lever
CN201089022Y (en) * 2007-10-30 2008-07-23 武汉钢铁(集团)公司 Railway signal steel rail hole drill having supporting stand
CN101758266B (en) * 2009-10-12 2011-09-28 力帆实业(集团)股份有限公司 Point machining three-coordinate instrument of vehicle oil sludge model
CN104028803A (en) * 2014-05-30 2014-09-10 爱佩仪中测(成都)精密仪器有限公司 Pistol-drill clamping mechanism suitable for milling of circular groove
CN204294999U (en) * 2014-11-20 2015-04-29 重庆市华青汽车配件有限公司 Instrument panel beam hole clipping processing unit (plant) electric drill installing rack
CN204770809U (en) * 2015-07-08 2015-11-18 力帆实业(集团)股份有限公司 Electric drill mount table of using on three coordinates

Also Published As

Publication number Publication date
CN104985226A (en) 2015-10-21

Similar Documents

Publication Publication Date Title
CN203595593U (en) Novel case drop hammer impact testing machine
CN104985226B (en) Electric drill erecting bed on three coordinates
CN206748767U (en) A kind of Manual stone drilling machine
CN103042244A (en) Electric drill
CN206717063U (en) A kind of tapping machine
CN203712340U (en) Clamping device for processing wedge
CN202377813U (en) Clamp for punching side of nut
CN203918019U (en) A kind of drilling machine processing tapered hole apparatus
CN108746768A (en) A kind of lathe with Liftable and movable
CN204135820U (en) Lever meter alignment device special
CN202667710U (en) Novel multi-shaft drilling machine
CN207386647U (en) A kind of perforating positioning apparatus of shower house center pillar panel
CN207447952U (en) A kind of location adjusting device of mechanical equipment
CN206803881U (en) A kind of cubing for radiator skeleton hole location detecting
CN109719565A (en) Bench drill that is a kind of removable and having detection function
CN204770809U (en) Electric drill mount table of using on three coordinates
CN205704524U (en) A kind of drilling equipment that wood can be positioned
CN205861578U (en) A kind of Non-Destructive Testing exposure support
CN206065970U (en) A kind of fixture for drilling machine
CN209656315U (en) A kind of oil drilling sampler mobile device
CN205426126U (en) Coaxiality detector
CN203566367U (en) Clamp device for drilling holes in diesel engine fan support frame plate
CN107217848B (en) Spread grey cylinder
CN206540978U (en) A kind of liquid heating class cordless device plug tester
CN207181612U (en) A kind of Schottky diode high temperature reverse bias experimental rig

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170905

Termination date: 20200708

CF01 Termination of patent right due to non-payment of annual fee