CN104985226B - Electric drill erecting bed on three coordinates - Google Patents
Electric drill erecting bed on three coordinates Download PDFInfo
- Publication number
- CN104985226B CN104985226B CN201510396375.9A CN201510396375A CN104985226B CN 104985226 B CN104985226 B CN 104985226B CN 201510396375 A CN201510396375 A CN 201510396375A CN 104985226 B CN104985226 B CN 104985226B
- Authority
- CN
- China
- Prior art keywords
- support base
- slide rail
- electric drill
- chute
- support column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B25—HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
- B25H—WORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
- B25H1/00—Work benches; Portable stands or supports for positioning portable tools or work to be operated on thereby
- B25H1/0021—Stands, supports or guiding devices for positioning portable tools or for securing them to the work
- B25H1/0035—Extensible supports, e.g. telescopic
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B25—HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
- B25H—WORKSHOP EQUIPMENT, e.g. FOR MARKING-OUT WORK; STORAGE MEANS FOR WORKSHOPS
- B25H1/00—Work benches; Portable stands or supports for positioning portable tools or work to be operated on thereby
- B25H1/10—Work benches; Portable stands or supports for positioning portable tools or work to be operated on thereby with provision for adjusting holders for tool or work
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Drilling And Boring (AREA)
Abstract
The invention discloses the electric drill erecting bed on a kind of three coordinate, support base upper surface offers U-shaped chute, slide rail is arranged in chute and slide rail pinning can be provided with support base side along slide, and slide rail pinning enters to be against slide rail side when needing and pinning slide rail from chute wall;Electric drill installing mechanism is provided with slide rail;Support base bottom surface is provided with a neck, and support column upper end is stretched into neck and is connected by shipping and reselling on another market with support base, and support base can be around rotation of shipping and reselling on another market.Support base positioning knob is provided with support base, support base positioning knob is to prop up support column upper end after support base is adjusted in place, and support column lower end is used to be connected with three dimension coordinate measurement arm.In use, directly electric drill is arranged on three dimension coordinate measurement arm by this erecting bed, the data of needs are first set, operator directly operates electric drill to get into the numerical value just can be so that speed is fast, and precision is high, easy to operate.
Description
Technical field
The present invention relates to electric drill erecting bed, the electric drill erecting bed on more particularly to a kind of three coordinate, electric drill is installed on this
It is used for the measurement of plasticine model on erecting bed.
Background technology
When making plasticine model, due to the requirement of model bilateral symmetry and size, generally with three dimension coordinate measurement its
Size, symmetry and morpheme etc..This measurement is that the probe on three coordinates is completed, and three coordinate probes can only measurement model
Surface size, if the size that obtain interior of articles only leans on electric drill, that is, first passes through electric drill and gets into after certain depth again with spy
Pin is measured, and is not enough bored again, and so repeated multiple times, efficiency is very low.If accidentally boring many, only add greasy filth and come school repeatedly
It is right, more waste time and energy.
The content of the invention
For deficiencies of the prior art, it is an object of the invention to provide a kind of speed is fast, precision is high, operation
Electric drill erecting bed on convenient three coordinate.
To achieve these goals, the technical solution adopted by the present invention is such:
Electric drill erecting bed on three coordinates, including support base, slide rail and support column;Support base upper surface offers U-shaped
Chute, slide rail is arranged in chute and can be along slide, in support base side provided with slide rail pinning, and slide rail pinning is from chute side
Wall enters to be against slide rail side when needing and pinning slide rail;Electric drill installing mechanism is provided with slide rail;The support base bottom surface
Provided with a neck, support column upper end is stretched into neck and is connected by shipping and reselling on another market with support base, and support base can be rotated with logical around shipping and reselling on another market
The luffing angle that support base regulation is arranged on the electric drill on support base is crossed, is positioned on support base by screwed hole provided with support base
Knob, support base positioning knob is to prop up support column upper end after support base is adjusted in place, and support column lower end is used for and three coordinates
Measuring arm is connected.
Electric drill is arranged on this erecting bed by electric drill installing mechanism, can both realize the translation forward during electric drill drilling,
The luffing angle of electric drill can also be adjusted as needed.In use, directly electric drill is surveyed installed in three coordinates by this erecting bed
Measure on arm, first set the data of needs, operator directly operates electric drill to get into the numerical value just can be so that speed is fast, and precision is high, behaviour
Facilitate.
The slide rail is frame structure, the spring conductor rod parallel with glide direction is provided with the middle part of slide rail, in support base
The upper chute one end that is located at is provided with spring stop, spring stop provided with perforation, spring conductor rod from perforation through;It is oriented in spring
Back-moving spring is set with bar, back-moving spring one end is against on slide rail, and the other end is against on spring stop.During drilling, operator
Need to overcome the active force of back-moving spring to push away electric drill forward, it is sliding under action of reset spring power when drilling in place and unclamping
Rail automatically falls back on initial position, and the structure can increase the operation sense of operator, makes easy to operate light.
The slide rail front end is provided with switch mounting, switch mounting provided with a switch solution striking plate in support base side
Pillar power switch provided with control electric drill break-make, the lever that can be rotated around the axis is provided with switch mounting by rotating shaft
Arm, lever arm one end is connected by extension spring with switch mounting, and extension spring is enclosed on pillar power switch, lever arm other end direction
Switch solution striking plate.Under original state, electric drill power supply should disconnect.In the presence of spring conductor rod upper reset spring, switch solution
Striking plate and lever arm upper-end contact simultaneously have certain active force, and the active force makes lever arm lower end overcome extension spring to act on and remote
Pillar power switch, i.e. pillar power switch are not acted on and are off by lever arm lower end, conform exactly to original state
Under, the requirement that electric drill power supply should disconnect.When needing drilling, the effect sliding forward of spring conductor rod upper reset spring is overcome
Electric drill and switch solution striking plate on rail, slide rail are moved forward together, and switch solution striking plate is disengaged with lever arm upper end at once, in extension spring
The lower lever arm lower end of effect presses to pillar power switch, connects pillar power switch, conforms exactly under working condition, electric drill electricity
The requirement that source should be connected.Therefore, this structure need not be operated specially to power switch, can be certainly by the motion of slide rail
It is dynamic to judge that electric drill is work or rested, so as to realize being switched on or switched off for switch automatically.
The support column is provided with the position-arresting disk vertical with support column, and support column lower end is branch apart from the distance of position-arresting disk
Dagger inserts three dimension coordinate measurement arm(Mounting hole)Depth.When installing support column, once position-arresting disk and three dimension coordinate measurement arm end
Face is contacted, the mounting hole that support column just can not go deep into measuring arm again.When the structure may insure each install, support column insertion
The depth of three dimension coordinate measurement arm is consistent, so as to be easier to determine the motion coordinate of electric drill.
The slide rail bottom surface is provided with banking pin, and banking pin is used to contact to limit maximum of the slide rail on chute with support base
Sliding distance.When slide rail is along along chute forward sliding process, once banking pin, which is supported, encounters support base, slide rail just can not be again toward advancing slip
It is dynamic.If without the spacing of banking pin, slide rail may be disengaged from chute, therefore this structure can avoid slide rail from being slipped from chute
The mechanisms such as electric drill are caused to damage and increase the trouble reinstalled.
The support base upper surface is provided with symmetrical two slide rails pressing plate, and two slide rail pressing plates, which are suspended in above chute, to be used for
Slide rail is pushed down and is allowed to disengage above chute.Banking pin and switch solution striking plate define slide rail not from chute both direction
It can be disengaged left and right from chute, and slide rail pressing plate then defines that slide rail can not be disengaged above and below chute.
Brief description of the drawings
Fig. 1-dimensional structure diagram of the present invention.
Fig. 2-front view of the present invention.
Fig. 3-Fig. 2 upward views.
Fig. 4-Fig. 2 top views.
Fig. 5-Fig. 2 left views.
Scheme of installation of Fig. 6-present invention on three coordinates.
Embodiment
The present invention is described in further detail below in conjunction with the accompanying drawings.
Referring to Fig. 1-Fig. 5, the electric drill erecting bed on a kind of three coordinate of the present invention, including support are can be seen that from figure
Seat 1, slide rail 2 and support column 3;The upper surface of support base 1 offers U-shaped chute, slide rail be arranged in chute and can along slide,
Slide rail pinning 4 is provided with the side of support base 1, slide rail pinning 4 enters needing to pin with thread connecting mode from chute wall
The side of slide rail 2 is against during slide rail(The position for making slide rail using the frictional force of slide rail pinning and slide rail is locked).Set on slide rail 2
There is electric drill installing mechanism, during specific design, electric drill installing mechanism is electric drill installing plate 5 and clip 6 on slide rail, electric drill 8
It is fixed on by electric drill installing plate 5 and clip 6 on slide rail 2.The bottom surface of support base 1 is provided with a neck, and the upper end of support column 3 is stretched into
7 it is connected in neck and by shipping and reselling on another market with support base 1, support base 1 can be supported around 7 rotations of shipping and reselling on another market with being arranged on by support base regulation
The luffing angle of electric drill on seat.Support base positioning knob 9, support base positioning knob 9 are provided with by screwed hole on support base 1
To prop up the upper end of support column 3 after support base regulation in place(Make branch using the frictional force of support base positioning knob and support column
Put locking in support seat), support column lower end is used to be connected with three dimension coordinate measurement arm.It is provided with along its length on three dimension coordinate measurement arm
Mounting hole, support column lower end is stretched into the mounting hole and locked by bolt.
The slide rail 2 is(Rectangle)Frame structure, the spring conductor rod parallel with glide direction is provided with the middle part of slide rail 2
10, chute one end is located on support base 1 and is provided with spring stop 11, spring stop is provided with perforation, and spring conductor rod is from perforation
Pass through.Back-moving spring 12 is set with spring conductor rod 10, the one end of back-moving spring 12 is against on slide rail 2, and the other end is against bullet
On spring baffle plate 11.During drilling, operator needs to overcome the active force of back-moving spring to push away electric drill forward, when drilling in place and is unclamped
When, under action of reset spring power, slide rail automatically falls back on initial position, and the structure can increase the operation sense of operator, make
It is easy to operate light.
The front end of slide rail 2 is provided with a switch solution striking plate 13 moved with slide rail, is installed in the side of support base 1 provided with switch
Frame 14, pillar power switch 15 of the switch mounting 14 provided with control electric drill break-make, rotating shaft is passed through on switch mounting 14
Provided with the lever arm 16 that can be rotated around the axis, the one end of lever arm 16 is connected by extension spring 17 with switch mounting 14, and extension spring is enclosed on
On pillar power switch, the other end of lever arm 16 solves striking plate 13 towards switch.Under original state, electric drill power supply should disconnect.
In the presence of spring conductor rod upper reset spring, switch solution striking plate, should with lever arm upper-end contact and with certain active force
Active force makes lever arm lower end overcome extension spring to act on and remote pillar power switch, i.e., pillar power switch is not by lever arm lower end
Act on and be off, conform exactly under original state, the requirement that electric drill power supply should disconnect.When needing drilling, gram
Take the electric drill on the effect of spring conductor rod upper reset spring sliding rail forward, slide rail and switch solution striking plate moved forward together,
Switch solution striking plate is disengaged with lever arm upper end at once, and lever arm lower end presses to pillar power switch under extension spring effect, makes pillar
Power switch is connected, and is conformed exactly under working condition, the requirement that electric drill power supply should be connected.Therefore, this structure need not be special
Power switch is operated, by the motion of slide rail can automatic decision electric drill be work or rest, so as to realize automatically
What is switched is switched on or switched off.
Further, the other end of the lever arm 16 is provided with pulley 18, and pulley 18 solves striking plate 13 towards switch.Pass through cunning
Wheel is contacted with switch solution striking plate, can be with protection switch solution striking plate contact site.
The support column 3 is provided with the position-arresting disk 19 vertical with support column, and support column lower end is apart from the distance of position-arresting disk
Three dimension coordinate measurement arm is inserted for support column(Mounting hole)Depth.When installing support column, once position-arresting disk and three dimension coordinate measurement
Arm end contact, the mounting hole that support column just can not go deep into measuring arm again.When the structure may insure each install, support column
The depth for inserting three dimension coordinate measurement arm is consistent, so as to be easier to determine the motion coordinate of electric drill.
The bottom surface of slide rail 2 is provided with banking pin 20, and banking pin is used to contact to limit slide rail on chute with support base
Maximum sliding distance.When slide rail is along along chute forward sliding process, once banking pin, which is supported, encounters support base, slide rail just can not be past again
Front slide.If without the spacing of banking pin, slide rail may be disengaged from chute, therefore this structure can avoid slide rail from chute
Slippage causes the mechanisms such as electric drill to damage and increase the trouble reinstalled.
The upper surface of support base 1 is provided with symmetrical two slide rails pressing plate 21, and two slide rail pressing plates 21 are suspended on chute
Side, which is used to push down slide rail 2, to be allowed to disengage above chute.Banking pin 20 and switch solution striking plate 13 from chute former and later two
Direction defines that slide rail 2 can not be disengaged left and right from chute, and slide rail pressing plate 21 then defines that slide rail 2 can not be from chute upper and lower
To disengagement.
Electric drill 8 is arranged on this erecting bed by electric drill installing mechanism, can both realize the translation forward during electric drill drilling,
The luffing angle of electric drill can also be adjusted as needed.In use, directly electric drill 8 is surveyed installed in three coordinates by this erecting bed
Measure on arm 22, see Fig. 6, wherein label 23 is workbench, for laying plasticine model.First set the data of needs, operator
Directly operating electric drill to get into the numerical value just can be so that speed is fast, and precision is high, easy to operate.
Finally illustrate, the above embodiments are merely illustrative of the technical solutions of the present invention and it is unrestricted, although with reference to compared with
The present invention is described in detail good embodiment, it will be understood by those within the art that, can be to skill of the invention
Art scheme is modified or equivalent substitution, and without departing from the objective and scope of technical solution of the present invention, it all should cover at this
Among the right of invention.
Claims (5)
1. the electric drill erecting bed on a kind of three coordinate, it is characterised in that:Including support base, slide rail and support column;On support base
Surface offers U-shaped chute, and slide rail is arranged in chute and can be provided with slide rail pinning in support base side along slide, sliding
Rail pinning enters to be against slide rail side when needing and pinning slide rail from chute wall;Electric drill installing mechanism is provided with slide rail;
The support base bottom surface is provided with a neck, and support column upper end is stretched into neck and is connected by shipping and reselling on another market with support base, and support base can
Rotated around shipping and reselling on another market to adjust the luffing angle for the electric drill being arranged on support base by support base, pass through screwed hole on support base
Provided with support base positioning knob, support base positioning knob is after support base is adjusted in place to prop up under support column upper end, support column
Hold for being connected with three dimension coordinate measurement arm;
The slide rail front end is provided with switch mounting, switch mounting is provided with provided with a switch solution striking plate in support base side
The pillar power switch of electric drill break-make is controlled, the lever arm that can be rotated around the axis, thick stick are provided with by rotating shaft on switch mounting
Lever arm one end is connected by extension spring with switch mounting, and extension spring is enclosed on pillar power switch, lever arm other end direction switch
Solve striking plate.
2. the electric drill erecting bed on three coordinate according to claim 1, it is characterised in that:The slide rail is framework knot
Structure, is provided with the spring conductor rod parallel with glide direction in the middle part of slide rail, and chute one end is located on support base and is provided with spring catch
Plate, spring stop provided with perforation, spring conductor rod from perforation through;Back-moving spring is set with spring conductor rod, is resetted
Spring one end is against on slide rail, and the other end is against on spring stop.
3. the electric drill erecting bed on three coordinate according to claim 1, it is characterised in that:The support column be provided with
The vertical position-arresting disk of support column, support column lower end is apart from the depth that the distance of position-arresting disk is that support column inserts three dimension coordinate measurement arm
Degree.
4. the electric drill erecting bed on three coordinate according to claim 1, it is characterised in that:The slide rail bottom surface is provided with limit
Position nail, banking pin is used to contact to limit maximum sliding distance of the slide rail on chute with support base.
5. the electric drill erecting bed on three coordinate according to claim 1, it is characterised in that:The support base upper surface is set
There is a symmetrical two slide rails pressing plate, two slide rail pressing plates, which are suspended in above chute, is used to push down slide rail that be allowed to can not be from chute
Side is disengaged.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510396375.9A CN104985226B (en) | 2015-07-08 | 2015-07-08 | Electric drill erecting bed on three coordinates |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510396375.9A CN104985226B (en) | 2015-07-08 | 2015-07-08 | Electric drill erecting bed on three coordinates |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104985226A CN104985226A (en) | 2015-10-21 |
CN104985226B true CN104985226B (en) | 2017-09-05 |
Family
ID=54297182
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510396375.9A Expired - Fee Related CN104985226B (en) | 2015-07-08 | 2015-07-08 | Electric drill erecting bed on three coordinates |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104985226B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105437179B (en) * | 2016-01-11 | 2017-11-24 | 中国航空动力机械研究所 | Auxiliary support apparatus |
CN111922372A (en) * | 2020-05-29 | 2020-11-13 | 安徽利锋机械科技有限公司 | Slide rail electric drill track angular adjustment and fixed subassembly |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6447221B1 (en) * | 2001-03-05 | 2002-09-10 | Mei-Tung Chen | Structure of drilling machine |
DE20211393U1 (en) * | 2002-07-11 | 2003-01-16 | Pasdzior Dieter | Drilling column comprises upright tube with baseplate and clamp fixture for dip tube together with dip tube with accommodation for support lever |
CN201089022Y (en) * | 2007-10-30 | 2008-07-23 | 武汉钢铁(集团)公司 | Railway signal steel rail hole drill having supporting stand |
CN101758266B (en) * | 2009-10-12 | 2011-09-28 | 力帆实业(集团)股份有限公司 | Point machining three-coordinate instrument of vehicle oil sludge model |
CN104028803A (en) * | 2014-05-30 | 2014-09-10 | 爱佩仪中测(成都)精密仪器有限公司 | Pistol-drill clamping mechanism suitable for milling of circular groove |
CN204294999U (en) * | 2014-11-20 | 2015-04-29 | 重庆市华青汽车配件有限公司 | Instrument panel beam hole clipping processing unit (plant) electric drill installing rack |
CN204770809U (en) * | 2015-07-08 | 2015-11-18 | 力帆实业(集团)股份有限公司 | Electric drill mount table of using on three coordinates |
-
2015
- 2015-07-08 CN CN201510396375.9A patent/CN104985226B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN104985226A (en) | 2015-10-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203595593U (en) | Novel case drop hammer impact testing machine | |
CN104985226B (en) | Electric drill erecting bed on three coordinates | |
CN206748767U (en) | A kind of Manual stone drilling machine | |
CN103042244A (en) | Electric drill | |
CN206717063U (en) | A kind of tapping machine | |
CN203712340U (en) | Clamping device for processing wedge | |
CN202377813U (en) | Clamp for punching side of nut | |
CN203918019U (en) | A kind of drilling machine processing tapered hole apparatus | |
CN108746768A (en) | A kind of lathe with Liftable and movable | |
CN204135820U (en) | Lever meter alignment device special | |
CN202667710U (en) | Novel multi-shaft drilling machine | |
CN207386647U (en) | A kind of perforating positioning apparatus of shower house center pillar panel | |
CN207447952U (en) | A kind of location adjusting device of mechanical equipment | |
CN206803881U (en) | A kind of cubing for radiator skeleton hole location detecting | |
CN109719565A (en) | Bench drill that is a kind of removable and having detection function | |
CN204770809U (en) | Electric drill mount table of using on three coordinates | |
CN205704524U (en) | A kind of drilling equipment that wood can be positioned | |
CN205861578U (en) | A kind of Non-Destructive Testing exposure support | |
CN206065970U (en) | A kind of fixture for drilling machine | |
CN209656315U (en) | A kind of oil drilling sampler mobile device | |
CN205426126U (en) | Coaxiality detector | |
CN203566367U (en) | Clamp device for drilling holes in diesel engine fan support frame plate | |
CN107217848B (en) | Spread grey cylinder | |
CN206540978U (en) | A kind of liquid heating class cordless device plug tester | |
CN207181612U (en) | A kind of Schottky diode high temperature reverse bias experimental rig |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170905 Termination date: 20200708 |
|