CN104975721B - Installing and monitoring method of roof embedded steel beam - Google Patents

Installing and monitoring method of roof embedded steel beam Download PDF

Info

Publication number
CN104975721B
CN104975721B CN201410725618.4A CN201410725618A CN104975721B CN 104975721 B CN104975721 B CN 104975721B CN 201410725618 A CN201410725618 A CN 201410725618A CN 104975721 B CN104975721 B CN 104975721B
Authority
CN
China
Prior art keywords
girder steel
equipment
roof
foundation
buried girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410725618.4A
Other languages
Chinese (zh)
Other versions
CN104975721A (en
Inventor
张涛
张光
张一光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
AVIC ENGINEERING INTEGRATED DEVICE Co Ltd
CHINA AVIATION PLANNING AND CONSTRUCTION DEVELOPMENT Co Ltd
Original Assignee
AVIC ENGINEERING INTEGRATED DEVICE Co Ltd
CHINA AVIATION PLANNING AND CONSTRUCTION DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by AVIC ENGINEERING INTEGRATED DEVICE Co Ltd, CHINA AVIATION PLANNING AND CONSTRUCTION DEVELOPMENT Co Ltd filed Critical AVIC ENGINEERING INTEGRATED DEVICE Co Ltd
Priority to CN201410725618.4A priority Critical patent/CN104975721B/en
Publication of CN104975721A publication Critical patent/CN104975721A/en
Application granted granted Critical
Publication of CN104975721B publication Critical patent/CN104975721B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A roof embedded steel beam is an installing foundation of hanging equipment. Compared with the construction of a foundation fixed on the ground, the construction of the roof embedded steel beam has much higher difficulty and much higher relative construction precision control difficulty; the adjustment cannot be performed after the concrete casting due to the particularity of the foundation embedment; the construction belongs to the irreversible construction; lower equipment connection difficulty can be caused when the embedding deviation occurs; and the installing precision and the test precision of equipment can be directly influenced. The invention provides an installing and monitoring method of a roof embedded steel beam. The method can be used for installing and monitoring a foundation of aero-engine ground test equipment and similar roof hanging equipment, and aims at ensuring the embedding precision of the foundation through continuous measuring and adjusting measures in the embedded steam beam or similar test equipment foundation installation and concrete casting processes. The method has the advantages that the equipment connecting surface parallelism degree error after the embedment of the embedded steel beam foundation can be enabled to be smaller than 1mm to hundred percent, and the basic guarantee is provided for equipment installation and test.

Description

A kind of installation of the pre-buried girder steel in roof and monitoring method
Technical field
The present invention is a kind of installation and the monitoring method of the pre-buried girder steel in roof, belongs to roof hanging test equipment basic pre-buried Construction.
Background technology
Traditional plant equipment and testing equipment are fixed on ground, continuous with require to testing equipment Improve, and the continuous improvement to space availability ratio and using easy to operate requirement, the mode that testing equipment is suspended on roof should Transport and give birth to.
The basis of suspension equipment compare be fixed on ground foundation construction difficulty much bigger, Construction precision control gets up Relative difficulty is much bigger.The ground experiment of such as aero-engine, the precision of the construction requirement on the basis of suspension equipment is direct It is related to the result of the test of aircraft engine.
Basis for lifting Aero Engine Testing equipment is passed through to calculate, and its weight has reached 10 tons, needed by steel Reinforced concrete is cast in roof, its bottom surface joint test equipment, and pre-buried rear bottom surface parallelism error requires to be not more than 1mm, this number Value directly influences the installation accuracy of equipment, but due to the pre-buried particularity in basis, concrete casting just cannot adjust afterwards, The construction that namely cannot reverse.Error is more than the equipment connection difficulty requiring to lead to lower section, after increase pad connects The test frequency of equipment can be affected, and impact is produced on the intensity connecting, so the pre-buried precision on basis may be considered and sets The standby core installed.
Content of the invention
The present invention is exactly directed to above-mentioned prior art situation and designs the installation providing a kind of pre-buried girder steel in roof and prison Survey method, its objective is in the basis installation and concreting process completing testing equipment, by continuously measuring and adjusting Whole means are it is ensured that the pre-buried precision on basis.
The purpose of the present invention is achieved through the following technical solutions:
The installation of the pre-buried girder steel in this kind of roof and monitoring method, described pre-buried girder steel is frame structure, this frame structure by Connection channel-section steel (2) between the I-beam (1) of horizontal parallel arrangement and I-beam (1) is constituted, and this pre-buried girder steel is horizontally arranged at Factory roof, its top is integrally formed with roof concrete (3) pouring, and the lower surface that factory roof is exposed in its underpart is used for equipment Install it is characterised in that:
Step one, in the raised reference platform of the upper surface spaced set of each I-beam (1) of pre-buried girder steel (4) mode, being machined into ensures the equipment in same level and with pre-buried girder steel bottom for all of reference platform (4) Installed surface is parallel;
Step 2, with column (5), pre-buried girder steel is supported to the suitable height of factory roof, by level measurement and adjust The adjusting nut (6) at whole column (5) top makes all of reference platform (4) on each I-beam (1) of pre-buried girder steel be in In same level, then locking adjusting nut (6);
Step 3, installation monitoring frame (7) on all of reference platform (4) on each I-beam (1) of pre-buried girder steel, Top bulb (8) that monitoring acts on is contour and be in same level so that all monitorings frame (7) go up by level measurement;
Step 4, fixing pre-buried girder steel continuous pouring concrete (3), before concrete (3) completes pouring, use level The continuous measurement all monitorings frame (7) of instrument has gone up the top bulb (8) of monitoring effect, by adjusting the regulation spiral shell at column (5) top Female (6), make all monitorings frame (7) go up top bulb (8) that monitoring acts on is contour and is in same level.
The advantage of technical solution of the present invention is:
Technical solution of the present invention solves the controllability of embedded foundation-pre-buried girder steel-during casting concrete, is pouring Can monitor and adjust the level of pre-buried girder steel during building at any time, be its underpart aero-engine ground-testing plant or similar The installation accuracy of equipment provides guarantee.
Brief description
Fig. 1 is the top surface plane structural representation of pre-buried girder steel in technical solution of the present invention
Fig. 2 is the position of pre-buried steel girder erection and placing concrete and structural representation in technical solution of the present invention
Fig. 3 is the structural representation monitoring frame in technical solution of the present invention
Specific embodiment
Below with reference to drawings and Examples, technical solution of the present invention is further described:
Referring to shown in accompanying drawing 1~3, in the installation of the pre-buried girder steel in this kind of roof and monitoring method, described pre-buried girder steel is frame Frame structure, framework overall dimensions are about: long 5000mm, wide 8000mm, high 600mm, certainly weigh about 10 tons, pre-buried girder steel needs level It is installed on 10~12 meters of high roofs of facility floor, be integrally formed with roof concrete 3 pouring, its lower surface exposes room Top 180mm, lower surface is used for equipment and installs, and remainder is all embedded in roof concrete, and this frame structure is by horizontal parallel Connection channel-section steel 2 between the I-beam 1 of arrangement and I-beam 1 is constituted, and the step of the installation process of this pre-buried girder steel is as follows:
Step one, in the raised reference platform 4 of the upper surface spaced set of each I-beam 1 of pre-buried girder steel, use The mode of machining ensures that all of reference platform 4 is put down in same level and with the equipment installed surface of pre-buried girder steel bottom OK;
Step 2, with column 5, pre-buried girder steel is supported to the suitable height of factory roof, column 5 adopt φ 160mm × 8mm steel pipe is manufactured, by level measurement and adjust the adjusting nut 6 at column 5 top and make on each I-beam 1 of pre-buried girder steel All of reference platform 4 be in the upper level such as same, adjusting nut 6 is matched with vertical threaded bore on column 5 top steel plate Close, lift its height by rotating adjusting nut 6, should preferentially adjust I-beam 1 two ends bottom surface adjusting nut 6 during adjustment, treat Again by adjusting nut 6 jacking at column 5 top of the supporting-point in the middle of I-beam 1 after the equal leveling in each I-beam 1 two ends, make The adjusting nut 6 at all column 5 tops is contacted with I-beam 1 lower surface of pre-buried girder steel and holds out against, and then locks adjusting nut 6;
Step 3, on all of reference platform 4 on each I-beam 1 of pre-buried girder steel install monitoring frame 7, monitor frame 7 is the steelframe of a pyramidal structure, and top is semicircular bulb 8 as monitoring point, makes all monitoring framves 7 by level measurement The top bulb 8 having gone up monitoring effect is contour and be in same level, if any slight error can carry out local reconditioning or The method that local increases pad is adjusted;
Step 4, fixing pre-buried girder steel continuous pouring concrete 3, in order to ensure pre-buried girder steel installation accuracy, in coagulation Soil 3 complete irrigation amount 1/3,2/3 and all when, three times with playing monitoring effect on level measurement all monitorings frame 7 respectively Top bulb 8 absolute altitude, by adjusting the adjusting nut 6 at column 5 top, makes to play the top ball of monitoring effect on all monitoring framves 7 8 contour and be in same level, and after mixing up, locking adjusting nut 6 does not allow to do any operation again.
Finally, maintenance the timeliness phase to after again measurement monitoring frame 7 on play monitoring effect top bulb 8 absolute altitude, record The final result that numerical value is installed as equipment.

Claims (1)

1. a kind of installation of the pre-buried girder steel in roof and monitoring method, described pre-buried girder steel is frame structure, and this frame structure is by water Flat connection channel-section steel (2) between I-beam (1) arranged in parallel and I-beam (1) is constituted, and this pre-buried girder steel is horizontally arranged at factory House top, its top is integrally formed with roof concrete (3) pouring, and the lower surface that factory roof is exposed in its underpart is used for equipment peace Dress it is characterised in that:
Step one, in the raised reference platform (4) of the upper surface spaced set of each I-beam (1) of pre-buried girder steel, use The mode of machining ensures the equipment installed surface in same level and with pre-buried girder steel bottom for all of reference platform (4) Parallel;
Step 2, with column (5), pre-buried girder steel is supported to the suitable height of factory roof, by level measurement and adjust vertical It is same that the adjusting nut (6) at post (5) top makes all of reference platform (4) on each I-beam (1) of pre-buried girder steel be in On horizontal plane, then locking adjusting nut (6);
Step 3, installation monitoring frame (7) on all of reference platform (4) on each I-beam (1) of pre-buried girder steel, pass through Level measurement makes all monitorings frame (7) go up, and top bulb (8) that monitoring acts on is contour and be in same level;
Step 4, fixing pre-buried girder steel continuous pouring concrete (3), before concrete (3) completes pouring, with level indicator even Continuous measurement all monitorings frame (7) has gone up the top bulb (8) of monitoring effect, by adjusting the adjusting nut at column (5) top (6) top bulb (8) that monitoring acts on is contour and be in same level so that all monitorings frame (7) go up.
CN201410725618.4A 2014-12-03 2014-12-03 Installing and monitoring method of roof embedded steel beam Active CN104975721B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410725618.4A CN104975721B (en) 2014-12-03 2014-12-03 Installing and monitoring method of roof embedded steel beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410725618.4A CN104975721B (en) 2014-12-03 2014-12-03 Installing and monitoring method of roof embedded steel beam

Publications (2)

Publication Number Publication Date
CN104975721A CN104975721A (en) 2015-10-14
CN104975721B true CN104975721B (en) 2017-02-01

Family

ID=54272648

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410725618.4A Active CN104975721B (en) 2014-12-03 2014-12-03 Installing and monitoring method of roof embedded steel beam

Country Status (1)

Country Link
CN (1) CN104975721B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0941494A (en) * 1995-08-02 1997-02-10 Tokyu Constr Co Ltd Construction method of building structure
CN102888991A (en) * 2012-10-25 2013-01-23 南通纺织职业技术学院 Large-scale profile steel beam and concrete combined house roof constructing method
CN103397701A (en) * 2013-08-13 2013-11-20 中天建设集团有限公司 Adjustable positioning structure for pre-buried bolt double-layered positioning plate and construction method
CN103485549A (en) * 2013-09-23 2014-01-01 中国五冶集团有限公司 Large embedded part location device and method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0941494A (en) * 1995-08-02 1997-02-10 Tokyu Constr Co Ltd Construction method of building structure
CN102888991A (en) * 2012-10-25 2013-01-23 南通纺织职业技术学院 Large-scale profile steel beam and concrete combined house roof constructing method
CN103397701A (en) * 2013-08-13 2013-11-20 中天建设集团有限公司 Adjustable positioning structure for pre-buried bolt double-layered positioning plate and construction method
CN103485549A (en) * 2013-09-23 2014-01-01 中国五冶集团有限公司 Large embedded part location device and method

Also Published As

Publication number Publication date
CN104975721A (en) 2015-10-14

Similar Documents

Publication Publication Date Title
CN105587130B (en) A kind of space net shell solder sphere positioner and its application method
CN102561712B (en) Precise positioning frame for large steel columns and equipment foundation fixing bolts and construction method of precise positioning frame
CN102434003B (en) Heavy battened steel column construction process
CN103556836B (en) Spherical reticulated shells assembling and construction method under restricted clearance condition
CN101451378A (en) 'Drip shaped' radial monolayer steel pipe reticulated shell block and installation method
CN101725255A (en) Segmental slipping and assembling process of overhead large-span steel structure
CN106120559A (en) A kind of bridge limited bracket construction method and bridge
CN104748732B (en) Measurement method for segmental precast bridge erection field
CN203947771U (en) A kind of Bailey beam pendent form support system
CN203625921U (en) Precision control device for pre-embedded mounting of foundation bolts
CN104032969A (en) Precise positioning and process regulation and control device for vibration isolation support embedded plate
CN102493471A (en) Suspending installation construction process method of structural foot margin anchor bolt
CN113123469A (en) Method for constructing complex curved surface modeling roof grid structure
CN106223623A (en) Steel construction box arched roof truss installation method
CN103758359A (en) Safe and reliable construction system for replacing columns by sustaining beams supported by columns and construction method for replacing columns by sustaining beams supported by columns
CN105317052A (en) Tower crane foundation bolt fixing method
CN104975721B (en) Installing and monitoring method of roof embedded steel beam
CN102966254A (en) Measuring tower used for construction of stub matching method and arrangement thereof
CN205776292U (en) A kind of for the centrical positioner in pile foundation engineering hole
CN110318338B (en) Measurement control method for installing and positioning steel anchor beam
CN102642790B (en) A kind of computer-controlled hydraulic jacking system
CN104863259A (en) Upside-down construction method for large-span ultra-high signal-layer cylindrical architectural steel structure
CN104563525B (en) A kind of box steel arch beam Integral horizontal type group is to method
CN103215968B (en) Embedded construction method of circular large-cross-section track-type equipment anchor bolt
CN108179749B (en) Lattice column positioner and positioning method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant