CN104975547A - Intersection road bridge - Google Patents
Intersection road bridge Download PDFInfo
- Publication number
- CN104975547A CN104975547A CN201410141673.9A CN201410141673A CN104975547A CN 104975547 A CN104975547 A CN 104975547A CN 201410141673 A CN201410141673 A CN 201410141673A CN 104975547 A CN104975547 A CN 104975547A
- Authority
- CN
- China
- Prior art keywords
- intersection
- traffic
- vehicles
- bridge
- road
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
An intersection road bridge includes a pedestrian underpass, a traffic lane, and a traffic steel bridge. The pedestrian underpass is I-shaped in structure and is transversally arranged at the middle of an intersection. The traffic lane includes more than bi-directional four lanes, wherein the lane pavement being closed to a starting junction of vehicles is marked with traffic guiding arrows and six traffic lights are arranged over the position being closed to a drive-to junction. The traffic steel bridge is arranged in the middle of the intersection. Straight-driving vehicles at the two ends of the traffic steel bridge is free of control of the traffic lights and the right-turning vehicles at the four directions are free of control of the traffic lights too. The six traffic lights are divided into two groups and send control signals contrarily and cyclically. The vehicles on the traffic lane are divided into two groups in a manner of two vehicles turns left while one vehicle runs straightly, so that the vehicles passes the intersection orderly in turns according to signals with the groups as units, wherein the left-turning vehicles are driven out from the road intersection in a 90-degree turning path. According to the invention, the intersection road bridge achieves people and vehicles to be separated from each other by means of the pedestrian underpass and the traffic steel bridge, so that the cyclic period of the traffic signal is reduced from four times to two times and the traffic capacity of the intersection road bridge is increased by more than 75%.
Description
Technical field
The present invention relates to intersection field of traffic, specifically a kind of intersection bridge.
Background technology
Intersection, particularly urban road intersection are the poly-loose points of wagon flow, the stream of people, be also jam, traffic accident multiplely.The traffic lights of usual employing, traffic cycle, multilayer viaduct three kinds of control measures, while the progress of promotion intersection traffic order, yet there are some drawbacks: single " traffic lights " means, (intersection has 12 strands to the wagon flow of 12 direction runnings always to make 80% wagon flow that need pass through be trapped in intersection and periphery thereof, but only have 2 bursts of wagon flows to 2 direction runnings flowing in turn all the time, other 10 bursts of wagon flows to 10 direction runnings are all in retaining state in turn), lose time and the energy while, also create the concentrated discharge that Vehicular exhaust pollutes, " traffic cycle " land area is large, and serious forgiveness is also poor, multilayer viaduct not only takes up room greatly, and build difficulty and construction cost all very high.
Summary of the invention
Technical problem to be solved by this invention is, the partial element of the control measures such as traffic lights, rotating disk, multilayer viaduct and underground passage is organically arranged in pairs or groups, form a kind of new underpass, ground level road and single bridge deck triple-decker stomatodeum road and bridge, to make up and to improve the deficiency of background technology.
Technical scheme of the present invention is: a kind of intersection bridge, comprise--underpass, road--carriageway, bridge--garage steel bridge three parts, described underpass is two horizontal one perpendicular " work " shapes, in the middle of it the one perpendicular center being positioned at intersection, with garage steel bridge in " ten " font, two of two horizontal strokes is respectively equipped with one and prolongs the access rising to road surface, sidewalk from tunnel; Described carriageway is more than two-way Four-Lane Road, set out close to four vehicles 12 carriageway surfacing Jun Huayou garages guiding arrows at crossing, the top driving towards crossing close to four vehicles is provided with 6 automobile traffic signal lamps altogether, its Central-South, northern two crossings respectively have one, and east, crossing, west two respectively have 2; Described garage's steel bridge north and south is longitudinally positioned in the middle of intersection, is made up of the main bridge of garage's steel bridge and garage's steel bridge access bridge.
Beneficial effect of the present invention has: one is arrange underpass and garage steel bridge shunting stream of people wagon flow, and change automobile traffic signal lamp change cycle period into secondary by four times, compared with single traffic lights control measures, the traffic continuity of intersection, the traffic capacity improves more than 75% (intersection 12 strands in the wagon flow of 12 direction runnings, 2 bursts of craspedodrome wagon flows and 4 bursts of right-hand bend wagon flows are in lasting flow regime all the time, one craspedodrome wagon flow and 2 bursts of left-hand bend wagon flows are one group and are in flow regime in turn, only have one craspedodrome wagon flow and 2 bursts of left-hand bend wagon flows to be one group and be in retaining state in turn), the time that motor vehicle is detained also shortens more than 75% generally thereupon, and stop (stopping) car, starting (needing larger power during vehicle start) number of times and exhaust emissions amount reduce in a large number, save the energy and time, facilitate atmospheric environment protection.Two is in the 9 bursts of wagon flows simultaneously flowed at whole intersection (other 3 bursts of wagon flows are in retaining state in turn), the while of only having in one group 2 strands to be in, the left-hand bend wagon flow of flow regime has the intertwined point of " doing one-way movement in the counterclockwise direction " in turn, safety is high, effectively alleviate the situation that intersection is crowded, block up, decrease that traffic accident is easily sent out, multiple condition; Four is that underpass and garage's steel bridge construction are simple, build difficulty and cost low, take up room little, any negative effect do not increased to intersection periphery.
Accompanying drawing explanation
Fig. 1 is intersection bridge construction top view of the present invention (underpass, carriageway and garage's steel bridge stack combinations structure top view);
Fig. 2-1 is that the intersection ground each track of automobile traffic signal lamp of the present invention when changing 1 allows current and no through traffic situation map;
Fig. 2-2 is that the intersection ground each track of automobile traffic signal lamp of the present invention when changing 2 allows current and no through traffic situation map.
In accompanying drawing, the parts representated by each label are as follows:
1. underpass; 2. carriageway (2-3 vehicle left-hand bend route, 2-4 green allows right of way signal lamp, 2-5 is red no through traffic signal lamp for 2-1 track number, 2-2 garage guiding arrow); 3. garage's steel bridge (the main bridge of 3-1 garage steel bridge, 3-2 garage steel bridge access bridge).
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the invention will be further described:
As shown in Figure 1, intersection bridge of the present invention, comprises 1. road--underpass, 2. road--carriageway, 3. bridge--garage steel bridge three parts.
Described underpass is two horizontal one perpendicular " work " shapes, in the middle of it the one perpendicular center being positioned at intersection, and with garage steel bridge in " ten " font, two of two horizontal strokes is respectively equipped with one and prolongs the access rising to road surface, sidewalk from tunnel.Within the scope of intersection, as long as the pedestrian on any sidewalk enters the access of a underpass nearby, just arrive at the sidewalk in other three directions easily by underpass.
Described carriageway is more than two-way Four-Lane Road, the carriageway surfacing Jun Huayou garage guiding arrow at crossing of setting out close to four vehicles; The top driving towards crossing close to four vehicles is provided with 6 automobile traffic signal lamps altogether, each 2 of its Middle East, western two crossings, each one of south, crossing, north two; Be positioned at south, track, two crossings 3, north two-way through vehicles not by Traffic signal control, continuously pass through intersection through garage's steel bridge straight; The right-hand bend vehicle being positioned at track, four crossings 1, too not by Traffic signal control, is continuously turned right and is passed through intersection.
Described garage's steel bridge north and south is longitudinally positioned in the middle of intersection, is made up of main bridge and access bridge.
As shown in Fig. 2-1,6 signal lamps at four crossings are divided into two groups, and wherein South Road Kou Yizhihe East Road mouth 2 is only one group, and 2, Kou Yizhihe West Road, North Road mouth is another group; Contrary interval turn colors while that two groups of Signalized control signals being in units of group, converting one time with greenish-yellow red color sequential batch is once be a cycle period with twice colour switching; The control signal instruction sent is changed 2 times according to traffic lights, the left-hand bend vehicle at east southeast two crossing and the through vehicles of East Road mouth form one group, the left-hand bend vehicle at northwest (NW) two crossing and the through vehicles of West Road mouth form another group, and in units of group, wheel flows through intersection successively.
The first time change of automobile traffic signal lamp, a signal lamp of North Road mouth, two signal lamps of West Road mouth are green permission right of way signal; A signal lamp of South Road mouth, two signal lamps of East Road mouth are red no through traffic signal.Now, be positioned at South Road mouth 2 track and the left-hand bend vehicle being positioned at East Road mouth 3 track, utilizing the rotating disk traffic flow of " doing one-way movement in the counterclockwise direction " to dredge principle Sum fanction, is that the turning route of 90 degree rolls intersection away from respectively westerly, southward according to crossing of setting out with driving towards crossing; The through vehicles being positioned at East Road mouth 2 track rolls intersection away from westerly straight; Then temporarily no through traffic to be positioned at North Road mouth 2 track, West Road mouth 3 track left-hand bend vehicle and West Road mouth 2 track through vehicles.
As shown in Fig. 2-2, the change of automobile traffic signal lamp second time, two signal lamps of the Zhi He East Road mouth above the mouth of South Road be greenly allow right of way signal, and two signal lamps of a Zhi He West Road mouth of North Road mouth are redness no through traffic signal.Now, be positioned at the vehicle of North Road mouth 2 track and the left-hand bend of West Road mouth 3 track, utilize the rotating disk traffic flow of " doing one-way movement in the counterclockwise direction " to dredge principle Sum fanction, according to set out crossing with drive towards the turning route that crossing be 90 degree, roll intersection away from toward eastern, past north respectively; Be positioned at the vehicle of keeping straight in West Road mouth 2 track and roll intersection away from toward east straight, be positioned at South Road mouth 2 track, then temporarily no through traffic for the through vehicles in the left-hand bend vehicle in East Road mouth 3 track and East Road mouth 2 track.
Claims (5)
1. an intersection bridge, comprise underpass, carriageway, garage's steel bridge three parts, described underpass is two horizontal one perpendicular " work " shapes, in the middle of it the one perpendicular center being positioned at intersection, with garage steel bridge in " ten " font, two of two horizontal strokes is respectively equipped with one and prolongs the access rising to road surface, sidewalk from tunnel; Described carriageway is more than two-way Four-Lane Road, set out close to four vehicles 12 carriageway surfacing Jun Huayou garages guiding arrows at crossing, the top driving towards crossing close to four vehicles is provided with 6 traffic lights altogether, and its Central-South, northern two crossings respectively have one, and east, crossing, west two respectively have 2; Described garage's steel bridge north and south is longitudinally positioned in the middle of intersection, is made up of the main bridge of garage's steel bridge and garage's steel bridge access bridge.
2. intersection bridge according to claim 1, is characterized in that: be positioned at south, track, two crossings 3, north two-way through vehicles not by Traffic signal control, continuously pass through intersection through garage's steel bridge straight.
3. intersection bridge according to claim 1, is characterized in that: the right-hand bend vehicle being positioned at track, four crossings 1, too not by Traffic signal control, is continuously turned right and passed through intersection.
4. intersection bridge according to claim 1, is characterized in that: 6 motor vehicle signal lamps at four crossings are divided into two groups, and wherein South Road Kou Yizhihe East Road mouth 2 is only one group, and 2, Kou Yizhihe West Road, North Road mouth is another group; Contrary interval turn colors while that two groups of Signalized control signals being in units of group, converting one time with greenish-yellow red color sequential batch is once be a cycle period with twice colour switching; The control signal instruction sent is changed 2 times according to traffic lights, the left-hand bend vehicle at east southeast two crossing and the through vehicles of East Road mouth form one group, the left-hand bend vehicle at northwest (NW) two crossing and the through vehicles of West Road mouth form another group, and in units of group, wheel flows through intersection successively.
5. intersection bridge according to claim 1, it is characterized in that: the left-hand bend vehicle at four crossings all utilizes the rotating disk traffic flow of " doing one-way movement in the counterclockwise direction " to dredge principle Sum fanction, is that the turning route of 90 degree rolls intersection away from according to crossing of setting out with driving towards crossing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410141673.9A CN104975547A (en) | 2014-04-01 | 2014-04-01 | Intersection road bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410141673.9A CN104975547A (en) | 2014-04-01 | 2014-04-01 | Intersection road bridge |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104975547A true CN104975547A (en) | 2015-10-14 |
Family
ID=54272483
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410141673.9A Pending CN104975547A (en) | 2014-04-01 | 2014-04-01 | Intersection road bridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104975547A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108330761A (en) * | 2018-05-17 | 2018-07-27 | 王利芳 | Miniature anti-clogging leads to bridge soon |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1242454A (en) * | 1998-07-21 | 2000-01-26 | 陈建源 | Road crossing design or layout for vehicles passing through and vehicles passing mode therefor |
CN2890146Y (en) * | 2004-10-10 | 2007-04-18 | 倪既民 | Urban interchanged intersection using ramp |
KR100893329B1 (en) * | 2008-07-18 | 2009-04-14 | 복 성 김 | 2-phase signal intersection system |
CN202090252U (en) * | 2011-01-10 | 2011-12-28 | 卢泉生 | Road structure for relieving urban traffic jam |
CN102383350A (en) * | 2011-08-19 | 2012-03-21 | 吴诗兰 | U-shaped combined passageway for crossroad |
CN202705838U (en) * | 2012-05-18 | 2013-01-30 | 陈春林 | Three-bridge combined crossroad achieving complete interchange |
CN202925407U (en) * | 2012-06-11 | 2013-05-08 | 何晓艳 | Level-crossing crossed type or level-crossing X type intersection system |
-
2014
- 2014-04-01 CN CN201410141673.9A patent/CN104975547A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1242454A (en) * | 1998-07-21 | 2000-01-26 | 陈建源 | Road crossing design or layout for vehicles passing through and vehicles passing mode therefor |
CN2890146Y (en) * | 2004-10-10 | 2007-04-18 | 倪既民 | Urban interchanged intersection using ramp |
KR100893329B1 (en) * | 2008-07-18 | 2009-04-14 | 복 성 김 | 2-phase signal intersection system |
CN202090252U (en) * | 2011-01-10 | 2011-12-28 | 卢泉生 | Road structure for relieving urban traffic jam |
CN102383350A (en) * | 2011-08-19 | 2012-03-21 | 吴诗兰 | U-shaped combined passageway for crossroad |
CN202705838U (en) * | 2012-05-18 | 2013-01-30 | 陈春林 | Three-bridge combined crossroad achieving complete interchange |
CN202925407U (en) * | 2012-06-11 | 2013-05-08 | 何晓艳 | Level-crossing crossed type or level-crossing X type intersection system |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108330761A (en) * | 2018-05-17 | 2018-07-27 | 王利芳 | Miniature anti-clogging leads to bridge soon |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103046444B (en) | Intersection with optimized settings and traffic control method of the intersection | |
CN102646331A (en) | Design method for cooperating street crossing of opposite-angle pedestrians and left turning of motor vehicles at intersection | |
CN104074112A (en) | Tidal lane of upstream and downstream intersection of urban road and design method of tidal lane | |
CN102277806B (en) | Shift-type interchange for all-time omnidirectional traffic at intersection of roads | |
CN102268852A (en) | Two-phase implementation method of urban road transport system | |
CN102787541A (en) | Crossroad traffic system with no traffic light | |
WO2016165637A1 (en) | Optimized development of multi-dimensional traffic road network | |
CN204530358U (en) | Track, crossroad is without intersection current traffic system continuously | |
CN103161108A (en) | Intersection bridge | |
CN103161107A (en) | Road intersection bridge | |
CN102383350A (en) | U-shaped combined passageway for crossroad | |
CN107988866B (en) | Simple overpass | |
CN202865713U (en) | Downtown overpass | |
CN202390736U (en) | Urban single-layered full-enclosed and full-intercommunicated fly-over bridge | |
CN202466336U (en) | Interchange overpass without traffic light | |
CN104975547A (en) | Intersection road bridge | |
CN108978384A (en) | A kind of ground straight trip viaduct | |
CN202181491U (en) | U-shaped combined passage of crossroad | |
CN202247566U (en) | Lane facility capable of smoothly separating vehicles at urban lane intersection | |
CN103806354A (en) | Road layout and traffic control method for urban road plane intersection | |
CN204023344U (en) | A kind of intersection bridge | |
CN204959529U (en) | Fast -slow separation grade separation system | |
CN203174451U (en) | Intelligent transportation system | |
CN102535287A (en) | Crossed intersection pass system | |
CN202559200U (en) | Urban road traffic optimization function system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20151014 |
|
WD01 | Invention patent application deemed withdrawn after publication |