CN104973707B - A kind of seasonal high turbid original sub-block technique - Google Patents

A kind of seasonal high turbid original sub-block technique Download PDF

Info

Publication number
CN104973707B
CN104973707B CN201510370648.2A CN201510370648A CN104973707B CN 104973707 B CN104973707 B CN 104973707B CN 201510370648 A CN201510370648 A CN 201510370648A CN 104973707 B CN104973707 B CN 104973707B
Authority
CN
China
Prior art keywords
water
concentration
sedimentation
preliminary sedimentation
tank
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510370648.2A
Other languages
Chinese (zh)
Other versions
CN104973707A (en
Inventor
许嘉炯
徐俊
张增荣
高志强
尤嬿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority to CN201510370648.2A priority Critical patent/CN104973707B/en
Publication of CN104973707A publication Critical patent/CN104973707A/en
Application granted granted Critical
Publication of CN104973707B publication Critical patent/CN104973707B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Treatment Of Sludge (AREA)
  • Separation Of Suspended Particles By Flocculating Agents (AREA)

Abstract

The invention discloses a kind of seasonal high turbid original sub-block technique, after raw water is introduced into preliminary sedimentation concentration reuse tank preliminary sedimentation, water outlet is precipitated into sedimentation basin, after precipitation water outlet enters filter, after water outlet is regulated and stored into clear water reserviors, pressurizeed by repumping house and be sent into city planting ductwork, the spoil disposal access counterbalance cell of preliminary sedimentation concentration reuse tank is stored, mud extraction is carried out dehydrating into dehydration machine room, deviates from dry mud outward transport disposal, and filtrate is discharged into concentration mass energy conversion pool.The technique is adapted to different raw water situations and service requirement, water for drainage slurry technique and water-purifying process are combined together, adapt to seasonal high concentrtion and usually low turbidity operating mode at the same time, it will be easy to the concentration basin supernatant of discharge beyond standards in production Waste water concentrating and dewatering process and dehydration filtrate carry out after-treatment with concentration mass energy conversion pool, efficiently using structures disposal ability to save floor occupying area, realize that the discharge of water-purifying process standard water discharge and the useless Organic substance in water of production are converted into the effect that bioenergy further recycles.

Description

A kind of seasonal high turbid original sub-block technique
It is on July 30th, 2014 applying date that the present invention, which is, and the patent application of Application No. 201410368768.4 is " seasonal The divisional application of high turbid original sub-block technique ".
Technical field
A kind of reply seasonal high turbidity raw sewage treatment process of the present invention involved in water supply and sewage work, specifically A kind of combined treatment process for being applied to take seasonal high turbidity raw sewage waterworks.The high concentrtion occurred for seasonality is former Water, raw water preliminary sedimentation and sludge condensation processing are combined together, realize water factory's water outlet water under the high low turbidity difference operating mode of raw water Matter is up to standard, and realizes the optimum organization treatment process of the concentration for producing sludge, dehydration and characteristic energy changes at the same time.
Background technology
Contain gas chromatography and inorganic matter in the water inlet of city tap-water factory, earth surface water source is easily flowed at the change of season The factor change such as amount and water temperature, turbidity significantly raises in short-term for appearance, and water factory's process flow can not be tackled, while produces a large amount of raw Waste water is produced as production accessory substance discharge technological process, surrounding enviroment are produced with larger pressure, becoming city tap-water factory must The environment and social concern that must be solved.
At present, in the waterworks for taking high turbidity raw sewage generally simple preliminary sedimentation is used before routinely filtration treatment is precipitated Technique tackles the high turbidity water quality of seasonal appearance, and produces contained sludge impurity in waste water and often treated as pollution sources, By concentration, natural desiccation or mechanical dehydration, the contained production sludge in production waste water is set to be transported outward in the form of dry solid, to subtract Few influence to environment.The major defect of above-mentioned technology is after working as ultra, and raw water of waterworks presents lasting relatively low turbid When spending, preliminary sedimentation procedure can not play a role in treatment process, and produce the discharge of wastewater time and generally more concentrate, and processing is constructed Thing floor space is larger, and operating cost is higher, and concentrated supernatant and dehydration filtrate are often relatively inaccessible to discharge standard, wherein largely Organic matter becomes environmental pressure again as pollutant, it has also become the technical barrier of seasonal high turbidity raw sewage processing.
The content of the invention
The object of the present invention is to provide a kind of seasonal high turbid original sub-block technique, it is suitable for seasonal high turbidity raw sewage bar Combined treatment process under part, the conventional art prejudice for overcoming water and sludge to handle respectively, preliminary sedimentation is handled, filtering is precipitated, is dirty Mud thickening is combined together with Sewage treatment and characteristic energy changes function, is ensuring up to standard same for the treatment of process effluent quality When, realize that the thickening of production spoil disposal water, Treatment of Sludge tail water qualified discharge and Organic substance in water are converted into bioenergy into one Walk the function of recycling.
To achieve these goals, the technical scheme is that:A kind of seasonal high turbid original sub-block technique, its feature After being that raw water is introduced into preliminary sedimentation concentration reuse tank preliminary sedimentation, water outlet is precipitated into sedimentation basin, after precipitation water outlet enters filter, After water outlet is regulated and stored into clear water reserviors, pressurizeed by repumping house and be sent into city planting ductwork, the spoil disposal access balance of preliminary sedimentation concentration reuse tank Pond is stored, and mud extraction is carried out dehydrating into dehydration machine room, deviates from dry mud outward transport disposal, and filtrate is discharged into concentration mass energy conversion Pond.
According to an embodiment of the invention, when water factory's land used is well-to-do and construction fund is more nervous, depositing technology is contemplated that Using the horizontal sedimentation tank or inclined-tube sedimentation tank that floor space is larger, horizontal sedimentation tank or inclined-tube sedimentation tank spoil disposal access spoil disposal pond After be lifted into concentration basin concentration, concentration basin supernatant is discharged into concentration mass energy conversion pool, concentration basin spoil disposal and preliminary sedimentation concentration reuse Pond spoil disposal is carried out dehydrating after counterbalance cell is regulated and stored into dehydration machine room in the lump.
After filter cell rinse waste water is discharged into blowoff basin, reuse is mixed with raw water after general lifting, concentration is discharged under emergency condition Mass energy conversion pool.Concentration mass energy conversion pool carries out in-depth processing, part after receiving dehydration machine room filtrate and blowoff basin emergency drainage Organic matter is converted into bioenergy recycling, remaining sludge carries out sludge drying processing;Concentration mass energy conversion pool filter liquor can be discharged into Utilized after blowoff basin lifting as raw water, or up to standard be discharged into river water body.Usually raw water turbidity is less than during low turbidity operating mode 200NTU or silt content are less than 0.20 kg/m3, raw water can surmount preliminary sedimentation concentration reuse tank be directly entered sedimentation basin processing;Work as original Water turbidity is more than 200NTU or silt content in 0.20 ~ 3.5kg/m3When, raw water should first pass through preliminary sedimentation concentration reuse tank preliminary sedimentation after again Into sedimentation basin processing;When raw water silt content is more than 3.5kg/m3When, raw water should first be introduced into setting pot sand setting at dry point, Water outlet concentrates reuse tank into sedimentation basin processing by preliminary sedimentation again.Increase potassium manganate before sediment outflow pond and preliminary sedimentation concentration reuse tank, Add PAM before sediment outflow pond and preliminary sedimentation concentration reuse tank and in efficient sedimentation tank, alum is added before efficient sedimentation tank, before and after clear water reserviors Chlorination, adds burgy after setting pot.
Sand setting is handled, precipitates filtering, sludge concentration and dewatering and Sewage treatment and characteristic energy changes function carries out group by the present invention Close, be first combined together the Treatment for Reuse for producing waste water and preliminary sedimentation, be arranged on one as water-purifying process before sedimentation basin Part, and the supernatant produced in wastewater treatment and dehydration filtrate are subjected to characteristic energy changes, the organic matter conversion of part is made a living The thing energy.The different coprecipitation modes that the present invention is used according to treatment process, treatment process are classified, then according to different operations Condition forms the complete process system of two sets for the treatment of process compositions with requiring.The advantages of technique, is to be adapted to different originals Regimen condition and service requirement, water for drainage slurry technique and water-purifying process are combined together, at the same adapt to seasonal high concentrtion and Usually low turbidity operating mode, will be easy to the concentration basin supernatant and dehydration filtrate of discharge beyond standards in production Waste water concentrating and dewatering process After-treatment is carried out with concentration mass energy conversion pool, efficiently realizes water purification work using structures disposal ability to save floor occupying area Skill standard water discharge is discharged and the useless Organic substance in water of production is converted into the effect that bioenergy further recycles.
Brief description of the drawings
Fig. 1 is for the seasonal ultra's treatment process schematic diagram of efficient sedimentation tank processing.
Fig. 2 is for using horizontal sedimentation tank or the seasonal ultra's treatment process schematic diagram of inclined-tube sedimentation tank processing.
Fig. 3 is the structure diagram that preliminary sedimentation concentrates reuse tank.
Fig. 4 is the A-A profiles of Fig. 3.
Fig. 5 is the B-B profiles of Fig. 3.
Fig. 6 is adjustable perforation effluent trough horizontal layout schematic diagram.
Fig. 7 is adjustable perforation effluent trough side arrangement schematic diagram.
Fig. 8 is the profile of adjustable perforation effluent trough line C-C along Fig. 7.
Fig. 9 is the profile of adjustable perforation effluent trough line D-D along Fig. 7.
Figure 10 arranges schematic diagram for adjustable tooth form weir plate effluent trough.
Figure 11 is the tooth form weir plate detail drawing of adjustable tooth form weir plate effluent trough.
Figure 12 is the weir plate gasket detail drawing of adjustable tooth form weir plate effluent trough.
Embodiment
The invention will be further described below in conjunction with the accompanying drawings.
Situations such as being a kind of seasonal ultra's treatment process, being first according to water factory's land used and fund of the invention, it will locate Science and engineering skill is divided into the seasonal ultra's treatment process of efficient sedimentation tank processing and horizontal sedimentation tank or inclined-tube sedimentation tank processing season Two class of section property ultra treatment process.When water factory place is nervous and construction fund is well-to-do, depositing technology is contemplated that use Occupation of land face is small and efficient sedimentation tank with sludge reflux and concentrating function;When water factory's land used is well-to-do and construction fund is more nervous When, depositing technology is contemplated that using occupation of land face larger horizontal sedimentation tank or inclined-tube sedimentation tank.Usually raw water during low turbidity operating mode Turbidity is less than 200NTU or silt content is less than 0.20 kg/m3, raw water can surmount preliminary sedimentation concentration reuse tank be directly entered at sedimentation basin Reason;When raw water turbidity more than 200NTU or silt content in 0.20 ~ 3.5kg/m3When, it is pre- that raw water should first pass through preliminary sedimentation concentration reuse tank Sedimentation basin processing is entered back into after heavy;When raw water silt content is more than 3.5kg/m3When, raw water should first be introduced into sand setting at dry point Pond sand setting, water outlet concentrate reuse tank into sedimentation basin processing by preliminary sedimentation again.
Efficient sedimentation tank 2 is handled in seasonal ultra's treatment process, and it is pre- that raw water 1 is introduced into preliminary sedimentation concentration reuse tank 2 After heavy, water outlet is precipitated into efficient sedimentation tank 3, after precipitation water outlet enters the filtering of filter tank 4, after water outlet is regulated and stored into clear water reserviors 5, by City planting ductwork 7 is sent into the pressurization of repumping house 6.Preliminary sedimentation concentrates reuse tank 2 and the spoil disposal access counterbalance cell 8 of efficient sedimentation tank 3 carries out Storage, mud extraction are carried out dehydrating into dehydration machine room 9, deviate from dry mud outward transport disposal, and filtrate is discharged into concentration mass energy conversion pool 10. After 4 flushing waste water of filter tank is discharged into blowoff basin 14, reuse is mixed with raw water 1 after general lifting, concentration mass energy is discharged under emergency condition Conversion pool 10.Concentration mass energy conversion pool 10 carries out in-depth processing, portion after receiving 14 emergency drainage of 9 filtrate of dehydration machine room and blowoff basin Organic matter is divided to be converted into bioenergy recycling 11, remaining sludge carries out sludge drying disposal 12;Concentration mass energy conversion pool 10 filters out Liquid can be discharged into after blowoff basin 14 is lifted and be utilized as raw water, or up to standard be discharged into river water 13.When 1 silt content of raw water exceedes 3.5kg/m3When, raw water 1 is introduced into 15 sand setting of setting pot at dry point;When 1 turbidity of raw water is low less than 200NTU or silt content In 0.20 kg/m3When, raw water 1 can surmount preliminary sedimentation concentration reuse tank 2 and be directly entered efficient sedimentation tank 3.Setting pot 15 and preliminary sedimentation are dense 2 regular sediment outflow of contracting reuse tank.Increase potassium manganate 16 before setting pot 15 and preliminary sedimentation concentration reuse tank 2, in setting pot 15 and preliminary sedimentation Add PAM17 before concentration reuse tank 2 and in efficient sedimentation tank 3, alum 18, the chlorination before and after clear water reserviors 5 are added before efficient sedimentation tank 3 19, burgy 20 is added after setting pot 15.
Horizontal sedimentation tank 21 or inclined-tube sedimentation tank 22 are handled in seasonal ultra's treatment process, and raw water 1 is introduced into pre- After heavy concentration 2 preliminary sedimentation of reuse tank, water outlet enters horizontal sedimentation tank 21 or inclined-tube sedimentation tank 22 precipitates, and precipitation water outlet enters filter tank 4 After filtering, after water outlet is regulated and stored into clear water reserviors 5, pressurizeed by repumping house 6 and be sent into city planting ductwork 7.Horizontal sedimentation tank 21 or inclined tube Concentration basin 24 is lifted into after 22 spoil disposal of sedimentation basin access spoil disposal pond 23 to concentrate, 24 supernatant of concentration basin is discharged into concentration mass energy conversion Pond 10,24 spoil disposal of concentration basin and preliminary sedimentation concentration 2 spoil disposal of reuse tank carry out after counterbalance cell 8 is regulated and stored into dehydration machine room 9 in the lump Dehydration, deviates from dry mud outward transport disposal, and filtrate is discharged into concentration mass energy conversion pool 10.4 flushing waste water of filter tank is discharged into blowoff basin 14 Afterwards, reuse is mixed with raw water 1 after general lifting, concentration mass energy conversion pool 10 is discharged under emergency condition.Concentration mass energy conversion pool 10 In-depth processing is carried out after receiving 14 emergency drainage of 24 supernatant of concentration basin, 9 filtrate of dehydration machine room and blowoff basin, partial organic substances turn Bioenergy recycling 11 is turned to, remaining sludge carries out sludge drying processing 12;10 filter liquor of concentration mass energy conversion pool can be discharged into Pond 14 utilizes after being lifted as raw water, or up to standard is discharged into river water 13.When 1 silt content of raw water is more than 3.5kg/m3When, it is former Water 1 is introduced into 15 sand setting of setting pot at dry point;When 1 turbidity of raw water is less than 200NTU or silt content is less than 0.20 kg/m3 When, raw water 1 can surmount preliminary sedimentation concentration reuse tank 2 and be directly entered horizontal sedimentation tank 21 or inclined-tube sedimentation tank 22.Setting pot 15 and pre- Heavy concentration 2 regular sediment outflow of reuse tank.Increase potassium manganate 16 and PAM17 before sediment outflow pond 15 and preliminary sedimentation concentration reuse tank 2, in advection Add alum 18 before sedimentation basin 21 or inclined-tube sedimentation tank 22, the chlorination 19 before and after clear water reserviors 5, adds burgy 20 after setting pot 15.
Fig. 3 ~ Fig. 5 is a kind of structure diagram of preliminary sedimentation concentration reuse tank, and preliminary sedimentation concentration reuse tank includes 30 He of pond body Slush pump room 31, it is characterised in that the center with distributing hole 57 is set in pond body 30 with bucket 32 and centrally disposed matches somebody with somebody bucket 32 Outer rectification bucket 53, the center are connected with bucket 32 with being arranged on the water inlet pipe 33 of pool bottom, the upper end-face edge of pond body 30 Effluent trough and weir plate matched with effluent trough 34 are provided with, effluent trough is connected by outlet pipe 35 with post precipitation pond, pond Concentrated mud scraper 36 is set in body 30, and pool bottom sets mud-removing bucket 37, and 30 bottom of pond body sets out sandpipe 38 and mud-removing bucket 37 Connection, slush pump room 31 set water pump 42, manually-operated gate 39 are installed on unit fixed on water pump suction pipeline, non-return is installed on exit of pump pipeline Valve 40 and manually-operated gate 39, go out and electrically operated valve 41 are also installed on sandpipe 38, and the inlet pipeline of water pump 42 passes through with going out sandpipe upstream Take out sandpipe 43 to connect, the outlet conduit of water pump is connected with going out sandpipe downstream by sediment outflow pipe 44, and the inlet pipeline of water pump passes through pumping Mud pipe 45 is connected with water inlet pipe, and the outlet conduit of water pump is also connected with sludge pipe 46.The effluent trough includes being arranged in pond body The company of effluent trough 47 and outer effluent trough 48 in the interior effluent trough 47 of side and the outer effluent trough 48 being arranged on the outside of pond body, and connection Access slot 49, outer effluent trough 48 are connected with outlet pipe 35.Pool bottom side is provided with evacuated tube 50.Water inlet pipe also sets up recycle-water Pipe 51 is connected with 14 water outlet of plant area blowoff basin.Set in preliminary sedimentation concentration reclamation set upper and lower part and rinse bolt 55, shaked out Flush pipe 54 with check-valves and manually-operated gate is set on pipe, as in pond and pipeline cleaning measure.Preliminary sedimentation concentrates reclamation set Water inlet pipe on set PAM toss areas 56.Water inlet pipe 33, go out setting valve well 52 on sandpipe 38 and blow-down pipe 50.
Wherein interior effluent trough and outer effluent trough use adjustable perforation effluent trough or adjustable tooth form weir plate effluent trough.
For the structure of adjustable perforation effluent trough as shown in Fig. 6 ~ 9, the adjustable effluent trough includes perforation effluent trough 101, 101 bottom of perforation effluent trough sets adjustable plate 104, and adjustable plate 104 is connected by adjusting bolt 106 with screed 105, screed 105 are fixed on support beam column or the top of bracket 103, and perforation effluent trough 101 also passes through fixed channel steel 102 and support beam column or bracket 103 connections.Perforation effluent trough 101 and fixed channel steel 102 are connected by connecting bolt 109, and fixed channel steel 102 passes through fixing bolt 108 are fixed on support beam column or bracket 103, offer on fixed channel steel 102 and are adjusted with 108 matched strip of fixing bolt Hole 118.Adjustable plate is respectively arranged with regulating nut 107 matched with adjusting bolt 106 about 104.101 bottom of perforation effluent trough Portion sets intercommunicating pore 110, and side sets inlet opening 111 and water-line target line 112.When effluent trough 101 of perforating is adjusted, first pass through adjusting and wear 101 both sides adjusting bolt of hole effluent trough, 106 up and down adjustment nut 107 makes the water-line target line 112 and pool inner water of effluent trough side Bit line overlaps, and then tightens fixing bolt 108, you can completes whole adjusting process.
As shown in Figure 10 ~ 12, the adjustable tooth form weir plate effluent trough includes the structure of adjustable tooth form weir plate effluent trough Armored concrete effluent trough 113, armored concrete effluent trough 113 are provided with tooth form weir plate 114, and tooth form weir plate 114 passes through weir plate Gasket 115 is connected with armored concrete effluent trough 113, and tooth form weir plate 114 also passes through support plate 116 and armored concrete effluent trough 113 connections.Tooth form weir plate 114 is connected by fixing bolt 108 and weir plate gasket 115 with armored concrete effluent trough 113;Support Plate 116 is connected by connecting bolt 109 and tooth form weir plate 114, and strip tune is provided with tooth form weir plate 114 and weir plate gasket 115 Knothole 118,114 side of tooth form weir plate set water-line target line 112.When tooth form weir plate 114 is adjusted, first pass through connection bolt 109 and adjust Section support plate 116 and 114 relative position of tooth form weir plate make the water-line target line 112 and pool inner water bit line of 114 side of tooth form weir plate Overlap, then tighten fixing bolt 108, you can complete whole adjusting process.
Raw water concentrates reuse tank pool bottom from preliminary sedimentation by water inlet pipe and matches somebody with somebody bucket into the center with distributing hole, then passes through Distributing hole and with bucket water distribution, water outlet enters interior effluent trough by weir plate after preliminary sedimentation and outer effluent trough, water outlet are connected by link slot Logical be pooled to after outer effluent trough enters post precipitation pond by outlet pipe, in spoil disposal after sludge is concentrated by concentrated mud scraper in water Bucket collects, and is arranged by going out outside sandpipe.Set in slush pump room extract sludge water pump, water inlet pipe and shake out blockage when, pass through Deposition and product sand in extraction mud pipe and pumping sandpipe extraction conduit, sandpipe can be drained into out by sediment outflow pipe and powers on movable valve downstream, or logical Cross sludge pipe and be discharged into plant area's sewage sludge storage system.
The processing of raw water preliminary sedimentation and spoil disposal water concentration technique are combined together by the preliminary sedimentation concentration reuse tank, are fitted at the same time Seasonal high concentrtion and usually low turbidity operating mode are answered, efficiently realizes water purification using structures disposal ability to save floor occupying area The combination of technique and production wastewater treatment technique
Wherein setting pot, efficient sedimentation tank, horizontal sedimentation tank, inclined-tube sedimentation tank, filter tank, clear water reserviors, repumping house, draining Pond, spoil disposal pond, concentration basin, counterbalance cell, dehydration machine room and concentration mass energy conversion pool are the prior art, are no longer described in detail.

Claims (6)

  1. A kind of 1. seasonal high turbid original sub-block technique, it is characterised in that preliminary sedimentation concentration reuse tank includes pond body and slush pump room, The center with distributing hole is set in pond body, and with bucket and the centrally disposed rectification bucket with outside bucket, the center is with bucket with setting Put the water inlet pipe connection in pool bottom, the upper end-face edge of pond body be provided with effluent trough and with the matched weir plate of effluent trough, Effluent trough is connected by outlet pipe with post precipitation pond, and concentrated mud scraper is set in pond body, and pool bottom sets mud-removing bucket, pond body Bottom sets out sandpipe to be connected with mud-removing bucket, and slush pump room sets water pump, installs manually-operated gate on unit fixed on water pump suction pipeline, water pumps out Check-valves and manually-operated gate are installed on mouth pipeline, goes out and electrically operated valve is also installed on sandpipe, the inlet pipeline of water pump is with going out on sandpipe Trip is connected by taking out sandpipe, and the outlet conduit of water pump is connected with going out sandpipe downstream by sediment outflow pipe, and the inlet pipeline of water pump passes through Extraction mud pipe is connected with water inlet pipe, and the outlet conduit of water pump is also connected with sludge pipe, and raw water is introduced into preliminary sedimentation concentration reuse tank preliminary sedimentation Afterwards, concentrate reuse tank pool bottom from preliminary sedimentation and match somebody with somebody bucket into the center with distributing hole, then by distributing hole, with bucket water distribution, Water outlet enters interior effluent trough and outer effluent trough by weir plate after preliminary sedimentation, and water outlet is led to after being pooled to outer effluent trough by link slot connection Cross outlet pipe and enter post precipitation pond, sludge collects after being concentrated by concentrated mud scraper in mud-removing bucket in water, by going out outside sandpipe Row, preliminary sedimentation concentrate reuse tank water outlet and are precipitated into sedimentation basin, and after precipitation water outlet enters filter, water outlet is regulated and stored into clear water reserviors Afterwards, pressurizeed by repumping house and be sent into city planting ductwork, the spoil disposal access counterbalance cell of preliminary sedimentation concentration reuse tank is stored, and mud extraction enters Dehydration machine room is carried out dehydrating, and deviates from dry mud outward transport disposal, and filtrate is discharged into concentration mass energy conversion pool, and sedimentation basin uses occupation of land face It is lifted into after larger horizontal sedimentation tank or inclined-tube sedimentation tank, horizontal sedimentation tank or inclined-tube sedimentation tank spoil disposal access spoil disposal pond dense Contracting pond concentrates, and concentration basin supernatant is discharged into concentration mass energy conversion pool, and concentration basin spoil disposal and preliminary sedimentation concentration reuse tank spoil disposal pass through in the lump Overbalance pond is carried out dehydrating after regulating and storing into dehydration machine room.
  2. 2. seasonal high turbid original sub-block technique as claimed in claim 1, it is characterised in that filter cell rinse waste water is discharged into draining Chi Hou, reuse is mixed with raw water after general lifting, and concentration mass energy conversion pool is discharged under emergency condition, and concentration mass energy conversion pool receives In-depth processing is carried out after dehydration machine room filtrate and blowoff basin emergency drainage, partial organic substances are converted into bioenergy recycling, remaining Sludge carries out sludge drying disposal;Concentration mass energy conversion pool filter liquor utilizes after being discharged into blowoff basin lifting as raw water, or reaches Mark is discharged into river water.
  3. 3. seasonal high turbid original sub-block technique as claimed in claim 1, it is characterised in that usually raw water during low turbidity operating mode Turbidity is less than 200NTU or silt content is less than 0.20 kg/m3, raw water surmount preliminary sedimentation concentration reuse tank be directly entered at sedimentation basin Reason;When raw water turbidity more than 200NTU or silt content in 0.20 ~ 3.5kg/m3When, raw water first passes through preliminary sedimentation concentration reuse tank preliminary sedimentation After enter back into sedimentation basin processing;When raw water silt content is more than 3.5kg/m3When, raw water should first be introduced into setting pot at dry point Sand setting, water outlet concentrate reuse tank into sedimentation basin processing by preliminary sedimentation again.
  4. 4. seasonal high turbid original sub-block technique as claimed in claim 3, it is characterised in that concentrated back in setting pot and preliminary sedimentation With potassium manganate is increased before pond, add PAM before setting pot and preliminary sedimentation concentration reuse tank and in efficient sedimentation tank.
  5. 5. seasonality ultra's treatment process as claimed in claim 3, it is characterised in that concentrated back in setting pot and preliminary sedimentation With increasing potassium manganate and PAM before pond.
  6. 6. seasonal high turbid original sub-block technique as claimed in claim 1, it is characterised in that extraction sludge is set in slush pump room Water pump, water inlet pipe and shake out blockage when, by extraction mud pipe and take out sandpipe extraction conduit in deposition and product sand, row can be passed through Sandpipe drains into out sandpipe and powers on movable valve downstream, or is discharged into plant area's sewage sludge storage system by sludge pipe.
CN201510370648.2A 2014-07-30 2014-07-30 A kind of seasonal high turbid original sub-block technique Active CN104973707B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510370648.2A CN104973707B (en) 2014-07-30 2014-07-30 A kind of seasonal high turbid original sub-block technique

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201410368768.4A CN104140166B (en) 2014-07-30 2014-07-30 Seasonal high turbid original sub-block technique
CN201510370648.2A CN104973707B (en) 2014-07-30 2014-07-30 A kind of seasonal high turbid original sub-block technique

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201410368768.4A Division CN104140166B (en) 2014-07-30 2014-07-30 Seasonal high turbid original sub-block technique

Publications (2)

Publication Number Publication Date
CN104973707A CN104973707A (en) 2015-10-14
CN104973707B true CN104973707B (en) 2018-04-20

Family

ID=51849521

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201410368768.4A Active CN104140166B (en) 2014-07-30 2014-07-30 Seasonal high turbid original sub-block technique
CN201510370648.2A Active CN104973707B (en) 2014-07-30 2014-07-30 A kind of seasonal high turbid original sub-block technique

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201410368768.4A Active CN104140166B (en) 2014-07-30 2014-07-30 Seasonal high turbid original sub-block technique

Country Status (1)

Country Link
CN (2) CN104140166B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105396335B (en) * 2015-12-18 2018-04-03 新昌中法供水有限公司 A kind of middle-size and small-size water treatment plant's water for drainage slurry technique
CN110448940B (en) * 2018-05-07 2024-01-23 浙江联池水务设备股份有限公司 Mud water treatment system and mud water treatment method for water purification plant
CN115180700A (en) * 2022-07-21 2022-10-14 安徽东至广信农化有限公司 Tail water treatment process for water purification station

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202465420U (en) * 2012-02-17 2012-10-03 上海市政工程设计研究总院(集团)有限公司 Combined enhanced treatment device for seasonal metal-polluted raw water with low turbidity and high algae
JP5121983B1 (en) * 2011-07-06 2013-01-16 磯村豊水機工株式会社 Flocculant injection method and injection apparatus
CN103241856A (en) * 2012-02-06 2013-08-14 上海市政工程设计研究总院(集团)有限公司 Water treatment device for treating raw water with relatively large turbidity variation, and water treatment process thereof
CN203513453U (en) * 2013-09-03 2014-04-02 上海市政工程设计研究总院(集团)有限公司 Mass energy conversion treatment device for production waste water

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5121983B1 (en) * 2011-07-06 2013-01-16 磯村豊水機工株式会社 Flocculant injection method and injection apparatus
CN103241856A (en) * 2012-02-06 2013-08-14 上海市政工程设计研究总院(集团)有限公司 Water treatment device for treating raw water with relatively large turbidity variation, and water treatment process thereof
CN202465420U (en) * 2012-02-17 2012-10-03 上海市政工程设计研究总院(集团)有限公司 Combined enhanced treatment device for seasonal metal-polluted raw water with low turbidity and high algae
CN203513453U (en) * 2013-09-03 2014-04-02 上海市政工程设计研究总院(集团)有限公司 Mass energy conversion treatment device for production waste water

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
新型中置式高密度沉淀池的开发与应用;许嘉炯等;《给水排水》;20070228;第33卷(第2期);第21-22页第2.2小节及图1-4 *

Also Published As

Publication number Publication date
CN104973707A (en) 2015-10-14
CN104140166A (en) 2014-11-12
CN104140166B (en) 2016-02-24

Similar Documents

Publication Publication Date Title
US9675907B2 (en) Quick-dry filter dewatering mobile process and apparatus
CN104973707B (en) A kind of seasonal high turbid original sub-block technique
CN203878648U (en) Multifunctional rainwater collecting system
CN107285562B (en) Garden water self-purification circulating system
CN101209885A (en) Wastewater treatment method of garbage leachate
WO2018032814A1 (en) Multi-functional sludge conditioning pool for treating and mechanical dewatering of polluted river and lake mouth sediment
CN206279002U (en) Sponge urban sewage treatment system
CN102535624A (en) Sewage concentration drainage device
CN201809191U (en) Automatic purifying device
CN108457178A (en) A kind of environmentally friendly collection and purification system of across rivers bridge floor sewage/wastewaters
CN106638889A (en) Un-obvious initial rain characteristic online fragment treatment discharge system under combined system or mixed system and control method of discharge system
CN204058089U (en) Seasonal high turbid original sub-block device
CN104128020B (en) Preliminary sedimentation concentrates reuse tank and treatment process thereof
CN203989971U (en) Preliminary sedimentation concentrates reclamation set
CN209011284U (en) A kind of double abandoned stream rain water separators
CN207391216U (en) A kind of integrated facility of closure option processing
CN211284118U (en) Sludge drying bed for treating sludge discharged from small-sized feed water treatment station
CN205313214U (en) Field town sewage treatment system that construction cost is low
CN205442817U (en) Be fit for a domestic sewage purification system that town used
CN204737847U (en) Municipal administration sewage treatment system
CN204400745U (en) A kind of high-iron and high manganese highly-mineralized mine water treatment system
RU2153045C1 (en) Storm-sewer system
CN205461169U (en) Dross device is filtered in two heavy ponds
CN210915522U (en) Water body purification system and river water body purification system
RU36940U1 (en) INSTALLATION FOR BIOLOGICAL CLEANING OF HOUSEHOLD AND INDUSTRIAL WASTE

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant