CN104963688B - Prevention and control method for falling of pumice at roof and two slopes of stope in medium-long hole mining - Google Patents

Prevention and control method for falling of pumice at roof and two slopes of stope in medium-long hole mining Download PDF

Info

Publication number
CN104963688B
CN104963688B CN201510302693.4A CN201510302693A CN104963688B CN 104963688 B CN104963688 B CN 104963688B CN 201510302693 A CN201510302693 A CN 201510302693A CN 104963688 B CN104963688 B CN 104963688B
Authority
CN
China
Prior art keywords
bag
stope
air
protective air
article points
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510302693.4A
Other languages
Chinese (zh)
Other versions
CN104963688A (en
Inventor
马云庆
王瑞星
王辉
何顺斌
李威
杜飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sanshandao Gold Mine, Shandong Gold Mining (Laizhou) Co., Ltd.
Shandong Gold Group Co., Ltd.
Original Assignee
SANSHANDAO GOLD MINE SHANDONG GOLD MINING (LAIZHOU) CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SANSHANDAO GOLD MINE SHANDONG GOLD MINING (LAIZHOU) CO Ltd filed Critical SANSHANDAO GOLD MINE SHANDONG GOLD MINING (LAIZHOU) CO Ltd
Priority to CN201510302693.4A priority Critical patent/CN104963688B/en
Publication of CN104963688A publication Critical patent/CN104963688A/en
Application granted granted Critical
Publication of CN104963688B publication Critical patent/CN104963688B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The invention relates to a prevention and control method for falling of pumice at the roof and two slopes of a stope in medium-long hole mining. According to the invention, a protection air bag is installed at a central-and-upper position of a subsection; high pressure wind is injected into the protection air bag through a pressure ventilation pipeline in the stope so as to allow the wall of the air bag to extrude rock, so falling of loose ore blocks at the two slopes is prevented and ore blocks falling from the roof are prevented from directly falling into a bottom cleaning work zone of the subsection; thus, operation safety in the subsection is guaranteed.

Description

Medium-long hole mining method Stope roof and two helps Pumex inbreak prevention and control method
Technical field
The present invention relates to a kind of Pumex inbreak prevention of underground mine stope and control method.
Background technology
Domestic metal mine is all being actively introduced inexpensive, efficient oper cylinler Longhole Mining method at present.Pushing away The greatest problem running in wide application process is, because stope sky is risen, two help and upper disk Pumex cannot examine sled it is difficult to ensure to adopt Job safety in, especially in the operation such as the clear bottom of stope and stope bottom application work, potential safety hazard is bigger.With reference to external warp Test, indivedual large-scale mines have introduced remote-controlled scraper, the safety of operator during basic guarantee ore removal, but equipment safety cannot Ensure;In addition, when constructing stope bottom, need operating personnel's entrance stope to carry out reinforcing bar and lay and bundle work, Need to be fully exposed under goaf, safety it is difficult to ensure that.
Content of the invention
The technical problem to be solved is to provide a kind of Medium-long hole mining method Stope roof and two and helps Pumex inbreak Prevention and control method,
Technical scheme is as follows:
Medium-long hole mining method Stope roof and two help Pumex inbreak prevention and control method it is characterised in that: cutting adopt connection And cutting adopt connection internal cutting return air raise engineering terminate after, cutting is adopted connection carry out wall caving bear down on one trapezoidal, bear down on one end after, enter The cementing slurry placement of row simultaneously connects the trapezoidal article points ore removal dam body of top formation;Wear arteries and veins along ore removal to constructing one or several ore removal edge both sides Arteries and veins to trapezoidal article points ore removal dam body and with cut return air raise insertion;Lane is cut in construction rock drilling, and carries out the back production preparation of trapezoidal article points And stoping operation;Trapezoidal stripping recovery carries out filling after terminating, and then carries out the continuous stoping of Inclined strips;Through adopting, cut After journey construction, goaf across pitch section is parallelogram, a width of trapezoidal article points thickness, a height of trapezoidal article points height, mined out Area's capwise section is parallelogram, a width of orebody thickness, a height of trapezoidal article points height;Protective air-bag is now set;Institute State protective air-bag to be fully contacted with Inclined strips upper lower burrs, protective air-bag length is close to ore body width, protective air-bag height and width Degree is equivalently-sized;Described protective air-bag is shaped as the slightly wider cuboid in top, point inside and outside two layers, and outer layer is capsule overcoat, Internal layer is to store gas inner bag, and capsule overcoat is consistent with storing gas inner bag shape, stores gas inner bag surface area and is slightly larger than capsule overcoat;? The pressure wind gas tube with pressure air valve is installed in the upper end of protective air-bag, and the inner of pressure wind gas tube communicates with storing gas inner bag;Anti- The hanging rope hook being separately installed with four drift angles of shield air bag, described hanging rope hook hangs on the anchor-rod tray of article points roofbolt On, it is separately installed with the regulation drawstring for adjusting balloon positions at lower end four base angle of protective air-bag;Wind gas tube will be pressed Outer end is connected with pipeline of calming the anger, and opens the pressure air valve on pressure wind gas tube, intrinsic pressure using stope rock drilling pressure wind direction protective air-bag Gas;Air bag is full of calms the anger, and after scraper prune job area is formed with effective protection, carries out including scraper ore removal and bottom reinforced-bar binding In interior stope prune job.
The lower end of protective air-bag is provided with the drain pipe of drain valve;Into protective air-bag, the inflation initial stage opens on drain pipe Drain valve, close this drain valve after water base emptying.
When carrying out stope prune job, pressure air valve is in normally open.
Storing, flexible limit for length's drawstring is installed inside gas inner bag along its length, in order to for ensureing that protective air-bag is shaped as approximately Cuboid.
The positive effect of the present invention is:
Firstth, Stope roof Pumex falls after coming off on protective air-bag without falling into scraper prune job area, prevents simultaneously Shield air bag both sides contact squeeze is on Inclined strips upper lower burrs wall, it is to avoid what Pumex helped by upper disk and two comes off it is ensured that scraper The safety of the stope prune job such as ore removal and bottom reinforced-bar binding.
Secondth, do not need, by expensive remote-controlled scraper ore removal, therefore significantly to drop using the method for the present invention Low Ore puts into and mining cost.
3rd, the protective air-bag mounting process of the present invention is simple, can play protection using after stope rock drilling pressure wind inflation Effect, and only need to consume part rock drilling pressure wind, protection expense is extremely low.Protective air-bag can reclaim reuse.
Brief description:
Fig. 1 is mounting structure and the using method schematic diagram of the present invention.
Specific embodiment
Further illustrate the present invention with reference to the accompanying drawings and examples.
First, adopt, cut journey:
As Fig. 1, when carrying out whole piece (or certain section) mineral ore and adopting quasi- work arrangement, the vertical orebody trend of stope is arranged.
Adopt connection (enter ore body section and referred to as cut through arteries and veins) cutting of constructing in the arrangement cutting of stope both wings vertical orebody trend Return air raise 12 is to top tailgate.
Lay out ore mining connection (enter ore body section referred to as ore removal and wear arteries and veins) in stope central vertical orebody trend, wear arteries and veins along ore removal Along the pulse cut return air raise 12 insertion to both sides construction ore removal and with both wings.
Stoping sequence is from two flapwise central authorities ore removals, adopts connection drawing back.
Connection is adopted in cutting and cutting is adopted after connection internal cutting return air raise 12 engineering terminates, and cutting is adopted with connection carries out wall caving to bear down on one and be in Trapezoidal, after end of bearing down on one, carry out the cementing slurry placement of high mixture ratio and connect the trapezoidal article points ore removal dam body 11 of top formation.
Along ore removal wear arteries and veins to both sides construct one or several ore removal along the pulse to trapezoidal article points ore removal dam body 11 and with cut return air Courtyard 12 insertion.
Lane is cut in the rock drilling of constructing respectively in trapezoidal article points 13 ore removal dam body 11 both sides, and carries out the back production of trapezoidal article points 13 and prepare And stoping operation.The stoping operation order of trapezoidal article points 13 is: rock drilling is cut lane construction, concentrated rock drilling, blasting in groups ore removal and top Slab supporting, stope cleaning etc., finally carry out stope closing filling.
Wherein, during central stripping recovery, drift section is trapezoidal, and tunnel and cutting return air raise are constructed after terminating, and carry out Top tight filling, during the ore body back production of top Ore along trapezoidal obturator two sides landing it is achieved that fixed point, safe ore removal.Trapezoidal filling Body as ore removal dam body 11 or referred to as ore removal barricade.
The back production of trapezoidal article points 13 carries out filling after terminating, and then carries out continuous stoping (article points inclination angle, the width of Inclined strips 14 Degree determines according to factors such as ore-rock situation, strength of filling mass, filling cost, the requirements of Secondary ore dilution rate).
2nd, after adopting, cutting engineering construction, goaf across pitch section is parallelogram, and a width of article points thickness is (general If
It is calculated as 5m), a height of article points height (being typically designed as 15m), goaf capwise section is parallelogram, wide For orebody thickness (being typically designed as > 10m), a height of article points height (being typically designed as 15m).
Now, goaf top plate (having carried out suspension roof support), disk and stripping recovery scar (non-supporting) all have on ore body Loosen
Lump, there is inbreak hidden danger, therefore, carrying out the stope including scraper ore removal and bottom reinforced-bar binding Need before prune job to take following anti-inbreak measure.
The 3rd, protective air-bag is set, described protective air-bag and Inclined strips 14 upper lower burrs be fully contacted (i.e. bag width >= 5m),
, close to ore body width (need to retain return air channel), protective air-bag height and the width are equivalently-sized for protective air-bag length, For ease of installing and reclaiming, protective air-bag is divided into multiple.
Described protective air-bag is shaped as the slightly wider cuboid in top, point inside and outside two layers, and outer layer is high tensile strength fibrous material Make
Capsule overcoat 5, the storage gas inner bag 7 that internal layer is made for macromolecule vinyl material, capsule overcoat 5 and storage gas inner bag 7 shapes are consistent, store gas inner bag 7 surface area and are slightly larger than capsule overcoat 5, store simultaneously gas inner bag 7 can just with taking-up, can change With maintenance.For ensureing that protective air-bag is shaped as approximate cuboid, flexible limit for length is installed inside gas inner bag 7 along its length draws storing Rope.
In the upper end of protective air-bag, the pressure wind gas tube 3 with pressure air valve is installed, presses the inner of wind gas tube 3 and store gas Inner bag 7 communicates, and calms the anger pipeline for connection in outer end.The hanging rope hook 2 being separately installed with four drift angles of protective air-bag, described Hanging rope hook 2 hangs on (installs hanging when carrying out article points roofbolt 1 supporting on the anchor-rod tray of article points roofbolt 1 in advance Rope hook 2).The lower end of protective air-bag is provided with the drain pipe 8 of drain valve, is respectively mounted at lower end four base angle of protective air-bag There is regulation drawstring 9.
Protective air-bag is pressure-bearing utensil, and bearing strength >=1mpa is it is allowed to small amounts of gases leaks.
Required according to setting height(from bottom), adjust the lifting rope length of hanging rope hook 2.Adjust drawstring 9 adjustment air bag position by pulling Put.
Pressure wind gas tube 3 outer end is connected with pipeline of calming the anger, and opens the pressure air valve on pressure wind gas tube 3, using stope chisel Calm the anger in rock pressure wind direction protective air-bag.Air bag is full of calms the anger, after scraper prune job area 10 is formed with effective protection, you can carry out The operations such as stope scraper cleaning.
During calming the anger into protective air-bag, the water remaining in stope rock drilling compressed-air system can enter air bag, therefore exists The inflation initial stage opens the drain valve on drain pipe 8, closes drain valve after water base emptying.
When carrying out stope prune job, for the potential safety hazard avoiding gasbag pressure decline to lead to, air valve is pressed to be in often Open state.
After the completion of stope prune job, close the pressure air valve on pressure wind gas tube 3, open the drain valve on drain pipe 8 Draining, removes pipeline, takes hanging rope hook 2, protective air-bag is packed up, preserves nearby, recycle.
Stope roof Pumex 4 falls after coming off on protective air-bag without falling into scraper prune job area 10, protects simultaneously Air bag both sides withstand on Inclined strips upper lower burrs wall, it is to avoid upper disk and two help Pumex 6 come off it is ensured that in stope stope clear The safety of reason operation operation.

Claims (4)

1. Medium-long hole mining method Stope roof and two help Pumex inbreak prevention method and control method it is characterised in that: cutting adopt Connection and cutting are adopted after connection internal cutting return air raise (12) engineering terminates, and cutting is adopted with connection carry out wall caving and bear down on one trapezoidal, bear down on one knot Shu Hou, carries out cementing slurry placement and connects trapezoidal article points ore removal dam body (11) of top formation;Wear arteries and veins along ore removal to construct one to both sides Or several ore removals along the pulse to trapezoidal article points ore removal dam body (11) and with cut return air raise (12) insertion;Lane is cut in construction rock drilling, goes forward side by side The back production preparation of the trapezoidal article points of row (13) and stoping operation;The back production of trapezoidal article points (13) carries out filling after terminating, and is then inclined The tiltedly continuous stoping of article points (14);After adopting, cutting engineering construction, goaf across pitch section is parallelogram, Kuan Weiti Shape article points (13) thickness, highly, goaf capwise section is parallelogram to a height of trapezoidal article points (13), a width of ore body thickness Degree, a height of trapezoidal article points (13) are highly;Protective air-bag is now set;Described protective air-bag is abundant with Inclined strips (14) upper lower burrs Contact, close to ore body width, protective air-bag height and the width are equivalently-sized for protective air-bag length;Described protective air-bag is shaped as The slightly wider cuboid in top, point inside and outside two layers, outer layer is capsule overcoat (5), and internal layer is to store gas inner bag (7), capsule overcoat (5) consistent with storing gas inner bag (7) shape, store gas inner bag (7) surface area and be slightly larger than capsule overcoat (5);Upper in protective air-bag Pressure wind gas tube (3) with pressure air valve is installed at end, and the inner of pressure wind gas tube (3) communicates with storing gas inner bag (7);Protection gas The hanging rope hook (2) being separately installed with four drift angles of capsule, described hanging rope hook (2) hangs on article points roofbolt (1) On anchor-rod tray, at lower end four base angle of protective air-bag, it is separately installed with the regulation drawstring (9) for adjusting balloon positions;To press Wind gas tube (3) outer end is connected with pipeline of calming the anger, and opens the pressure air valve in pressure wind gas tube (3), presses wind using stope rock drilling Calm the anger into protective air-bag;Air bag is full of calms the anger, and scraper prune job area (10) is formed after effectively protecting, carries out including scraper Ore removal and bottom reinforced-bar binding are in interior stope prune job.
2. Medium-long hole mining method Stope roof according to claim 1 and two helps Pumex inbreak prevention method and controlling party Method it is characterised in that: the lower end of protective air-bag is provided with the drain pipe of drain valve (8);Into protective air-bag, the inflation initial stage beats The drain valve beginning to rehearse on water pipe (8), closes this drain valve after water base emptying.
3. Medium-long hole mining method Stope roof according to claim 1 or claim 2 and two helps Pumex inbreak prevention method and controlling party Method it is characterised in that: when carrying out stope prune job, pressure air valve be in normally open.
4. Medium-long hole mining method Stope roof according to claim 1 or claim 2 and two helps Pumex inbreak prevention method and controlling party Method it is characterised in that: gas inner bag (7) is internal to install flexible limit for length's drawstring along its length storing, in order to for ensureing protective air-bag It is shaped as approximate cuboid.
CN201510302693.4A 2015-06-06 2015-06-06 Prevention and control method for falling of pumice at roof and two slopes of stope in medium-long hole mining Active CN104963688B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510302693.4A CN104963688B (en) 2015-06-06 2015-06-06 Prevention and control method for falling of pumice at roof and two slopes of stope in medium-long hole mining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510302693.4A CN104963688B (en) 2015-06-06 2015-06-06 Prevention and control method for falling of pumice at roof and two slopes of stope in medium-long hole mining

Publications (2)

Publication Number Publication Date
CN104963688A CN104963688A (en) 2015-10-07
CN104963688B true CN104963688B (en) 2017-01-18

Family

ID=54217749

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510302693.4A Active CN104963688B (en) 2015-06-06 2015-06-06 Prevention and control method for falling of pumice at roof and two slopes of stope in medium-long hole mining

Country Status (1)

Country Link
CN (1) CN104963688B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106884674B (en) * 2017-03-09 2019-10-11 山东黄金矿业(莱州)有限公司焦家金矿 False lane construction systems and construction method
CN108798768A (en) * 2018-05-21 2018-11-13 金川集团股份有限公司 A method of using recyclable air bag come reservation of filling small well
CN109026003B (en) * 2018-07-09 2021-04-20 中南大学 Continuous mining method of spiral auger mining machine for gently inclined extremely-thin vein soft rock ore body
CN109519191A (en) * 2018-10-19 2019-03-26 太原理工大学 A method of prevent fully-mechanized mining working from withdrawing stage adjusting lane excessive deformation
CN113530540A (en) * 2021-08-03 2021-10-22 北京科技大学 Method for reducing dilution in ore body exploitation

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101082282A (en) * 2007-06-24 2007-12-05 金川 Movable coal mine fully-mechanized mining working faces end head plugging air bag for safety
CN201090249Y (en) * 2007-07-27 2008-07-23 安徽省皖北煤电集团有限责任公司祁东煤矿 Corner plugging air-bag of high firedamp coal face
CN103321654A (en) * 2013-07-04 2013-09-25 中国矿业大学 Method for managing roof collapse of coal mine roadway by aid of flexible air bags
CN103500528A (en) * 2013-09-22 2014-01-08 安徽理工大学 Simulation system model for demonstrating coal mining and roof dynamic changes
CN104481583A (en) * 2014-12-09 2015-04-01 河南理工大学 Coal mine safety airbag

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101082282A (en) * 2007-06-24 2007-12-05 金川 Movable coal mine fully-mechanized mining working faces end head plugging air bag for safety
CN201090249Y (en) * 2007-07-27 2008-07-23 安徽省皖北煤电集团有限责任公司祁东煤矿 Corner plugging air-bag of high firedamp coal face
CN103321654A (en) * 2013-07-04 2013-09-25 中国矿业大学 Method for managing roof collapse of coal mine roadway by aid of flexible air bags
CN103500528A (en) * 2013-09-22 2014-01-08 安徽理工大学 Simulation system model for demonstrating coal mining and roof dynamic changes
CN104481583A (en) * 2014-12-09 2015-04-01 河南理工大学 Coal mine safety airbag

Also Published As

Publication number Publication date
CN104963688A (en) 2015-10-07

Similar Documents

Publication Publication Date Title
CN104963688B (en) Prevention and control method for falling of pumice at roof and two slopes of stope in medium-long hole mining
CN110952982B (en) Medium-length hole presplitting blasting mining method for steeply inclined thin-vein to extremely thin-vein ore body
CN103742148B (en) The soft coal-mining method covering the descending waste filling of supporting of a kind of half-edge coal seam
CN103953344B (en) To route layering cemented filling method under one
US20160369629A1 (en) Center-pillared Full-Face Shaft Drilling Machine
CN111878080B (en) Method for equipment withdrawal and self-lane-forming of withdrawal channel of fully mechanized coal mining face of coal mine
CN103410545B (en) The hydraulic support of Sub-Level Caving and packing job can be realized
CN104806244A (en) Filling mining method for slant middle-thick ore body
CN208236413U (en) A kind of shaft construction device
CN104632220A (en) Mining method with adjustable and controllable structure size of gentle dip medium-thickness ore body strip column reconstructed stope
CN103061764A (en) Goaf waste rock filling coal mining method of flexible shield support in half-edge coal seam
CN105927269A (en) Gas control method of outburst coal seam
CN102704935A (en) Extra-long working surface fully mechanized coal mining process
CN205638458U (en) Accelerate construction structures of broken system construction speed of underground swift current
CN102418525A (en) Soft coal seam long-wall high-mining-height comprehensive mechanized coal mining end mining method
CN110925017A (en) Reserving and supporting method for long-wall mining special-shaped gob-side roadway in large-dip-angle medium-thickness coal seam trend
CN210509191U (en) Stope face support-unloading combined gob-side entry retaining roadway
CN106014479A (en) Bracket reducing method for mining lower-layer working surface of ultra-close coal seam
CN111271061A (en) Fully mechanized mining end mining rack removing method
CN105240012A (en) F-type section coal-mining method allowing commingled mining of coal pillars
CN105937400B (en) It is a kind of once to tunnel Liu Sheshuan lanes digging operation production line
CN217001927U (en) Gangue rolling prevention device for coal mine large-dip-angle fully-mechanized coal mining face
CN103670415B (en) A kind of underground coal mine big gun is adopted and is adopted unitized production method with general
CN110273686A (en) High inclination-angle structure is complicated thick seam large mining high comprehensive mining process for stoping
CN109882172A (en) A kind of cut falls the gob-side entry retaining method that roadside support wall is done on directly top

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Chen Yumin

Inventor after: Ma Yunqing

Inventor after: Wang Ruixing

Inventor after: Wang Hui

Inventor after: He Shunbin

Inventor after: Li Wei

Inventor after: Du Fei

Inventor before: Ma Yunqing

Inventor before: Wang Ruixing

Inventor before: Wang Hui

Inventor before: He Shunbin

Inventor before: Li Wei

Inventor before: Du Fei

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170330

Address after: 250101 Shandong Province, Ji'nan City Shun Road No. 2000 Shun Tai Plaza No. 3

Patentee after: Shandong Gold Group Co., Ltd.

Patentee after: Sanshandao Gold Mine, Shandong Gold Mining (Laizhou) Co., Ltd.

Address before: Laizhou Sanshandao streets in Sanshandao Gold Mine 261442 Shandong city of Yantai Province

Patentee before: Sanshandao Gold Mine, Shandong Gold Mining (Laizhou) Co., Ltd.