CN104933503B - Demand plan for adjustment drafts system and demand plan for adjustment drafts method - Google Patents

Demand plan for adjustment drafts system and demand plan for adjustment drafts method Download PDF

Info

Publication number
CN104933503B
CN104933503B CN201510114605.8A CN201510114605A CN104933503B CN 104933503 B CN104933503 B CN 104933503B CN 201510114605 A CN201510114605 A CN 201510114605A CN 104933503 B CN104933503 B CN 104933503B
Authority
CN
China
Prior art keywords
electric power
adjustment
demander
setting value
power control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510114605.8A
Other languages
Chinese (zh)
Other versions
CN104933503A (en
Inventor
三浦真由美
田中雅人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Azbil Corp
Original Assignee
Azbil Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Azbil Corp filed Critical Azbil Corp
Publication of CN104933503A publication Critical patent/CN104933503A/en
Application granted granted Critical
Publication of CN104933503B publication Critical patent/CN104933503B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/80Management or planning
    • Y02P90/82Energy audits or management systems therefor
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Abstract

A kind of demand plan for adjustment of present invention offer drafts system and demand plan for adjustment drafts method.Demand plan for adjustment, which drafts system, to be had:Environmental evaluation portion calculates the unhappy time rate of the demander in the evaluation object time as unfavorable degree;The relationship of control setting value and unfavorable degree when the control setting value of the equipment machine of demander is mitigated to one side of electric power control is stored as setting value adjustment rule by the regular storage part of setting value adjustment;Setting value determination section obtains control setting value corresponding with unfavorable degree when that will control setting value and mitigate to one side of electric power control with reference to setting value adjustment rule;Electric power evaluation section obtains the presumed value for the electric power control amount that can be realized when the control setting value for being determined setting value determination section is applied to the control unit controlled the equipment machine of demander;Control setting value that setting value determination section is determined and the electric power control amount presumed value obtained from electric power evaluation section are prompted to electricity needs and adjust company by setting value prompting part.

Description

Demand plan for adjustment drafts system and demand plan for adjustment drafts method
Technical field
Being evaluated and being reflected in the present invention relates to a kind of unfavorable degree born in the past to each demander needs Ask that the demand plan for adjustment of plan for adjustment drafts system and demand plan for adjustment drafts method.
Background technology
Proposed a kind of request control device in the past, carry out high-precision and early stage request (demand electric power) prediction, The equipment machine to be determined to be request control object is predicted based on the request and notifies to occupy by the control content of the equipment machine Firmly or after tenant, by controlling equipment machine, to inhibit the influence brought to occupant or tenant to go forward side by side The reliable request control (patent document 1) of row.
In addition, it is proposed that a kind of electricity needs managing device keeps sensitivity, the sensitivity to indicate to need each demander The person of asking agrees to the probability of the requirement of electric power control, in the case where predicting that electricity needs is more than the scheduled desired value of institute, based on sense Response selects the demander (patent document 2) of carry out demand adjustment.
Patent document 1:Japanese Patent Laid-Open 2011-193639 bulletins
Patent document 2:Japanese Patent Laid-Open 2011-254582 bulletins
Integrated company's (Japanese that multiple demanders are managed:ア グ リ ゲ ー タ thing dealers, electricity needs adjustment are public Department), it needs to make the electric power control cooperation from demander in order to ensure disposing power (demand adjustment prepares power) when power tense It is easy to get.But in the technology disclosed in patent document 1,2, the electric power control of equipment machine is controlled although can realize Content (stopping and change of action) notice to demander, or selection carry out demand adjustment demander, but be difficult to realize make The means that electric power control cooperation from demander is easy to get.
Invention content
Problems to be solved by the invention
The present invention makes in order to solve the above problem, it is intended that realize it is a kind of by demander in the past The unfavorable degree born is evaluated and the means of the cooperation that is easy to get demander.
Means for solving the problems
The demand plan for adjustment of the present invention drafts system and is characterized in that having:Environmental evaluation unit, the environmental evaluation list Environmental information of the member based on demander calculates the unhappy time rate of the demander in the evaluation object time as unfavorable degree;Adjustment rule Then storage unit, the adjustment rule storage unit by the control setting value of the equipment machine of demander mitigating to electric power control Correspondence when one side between required relaxation action information and unfavorable degree stores in advance as adjustment rule;It determines single Member, the determining means mitigate the control setting value of the equipment machine of demander to one side of electric power control for electric power control When, with reference to the adjustment rule for being stored in the adjustment rule storage unit, obtains and calculated not with the environmental evaluation unit The sharp corresponding relaxation action information of degree;Electric power evaluation unit, electric power evaluation unit acquirement will determined by the determining means The electric power control that fixed relaxation action Information application can be realized when the control unit that the equipment machine to demander is controlled The presumed value of amount;And prompt unit, the prompt unit is by the relaxation action information determined by the determining means and from described The electric power control amount presumed value that electric power evaluation unit obtains is prompted to electricity needs adjustment company.
In addition, the present invention demand plan for adjustment draft system one constitute example its main feature is that, in acquired electric power When amount of suppression is less than electric power control necessary amount and prediction electric power control amount deficiency, the electric power evaluation unit also indicates described determine Order member adjusts the relaxation action information again, and the adjustment rule storage unit is previously stored with according to the degree of electric power control Multigroup adjustment rule, the determining means use the tune when receiving the instruction from the electric power evaluation unit In the adjustment rule that whole rule storage unit is stored is that one side of electric power control sets compared to the adjustment rule just used before Fixed adjustment rule, to determine relaxation action information.
In addition, in the demand plan for adjustment of the present invention drafts a composition example of system, the relaxation action information is It is set in the control setting value of one side of electric power control.
In addition, in the demand plan for adjustment of the present invention drafts a composition example of system, the relaxation action information is In the implementation time that one side of electric power control mitigates control setting value.
In addition, in the demand plan for adjustment of the present invention drafts a composition example of system, its main feature is that, the environment is commented Valence unit calculates expression demand at regular intervals according to the environmental information of the demander within the evaluation object time Index, that is, PMV of the environmental amenity degree of person calculates for maintaining the PMV each PMV every the certain time The unfavorable degree is calculated at the room temperature of defined appropriate state, and according to the calculating result of the room temperature.
In addition, in the demand plan for adjustment of the present invention drafts a composition example of system, its main feature is that, the environment is commented Valence unit calculates expression demand at regular intervals according to the environmental information of the demander within the evaluation object time Index, that is, PMV of the environmental amenity degree of person, and the unfavorable degree is calculated according to the calculating result of the PMV.
In addition, the present invention demand plan for adjustment draft system one constitute example its main feature is that, also have mitigate information Output unit, the mitigation information output unit export the relaxation action information that the determining means is determined to each corresponding Demander.
In addition, the present invention demand plan for adjustment draft system one constitute example its main feature is that, also have setup unit, The relaxation action information setting that the setup unit is determined the determining means is to the equipment machine to corresponding demander In the control administrative unit controlled.
In addition, the demand plan for adjustment of the present invention drafts method, its main feature is that, it comprises the following steps:Environmental evaluation step, Environmental information based on demander calculates the unhappy time rate of the demander in the evaluation object time as unfavorable degree;Determine step Suddenly, with reference to adjustment rule storage unit, relaxation action corresponding with the unfavorable degree that the environmental evaluation step is calculated is obtained Information, the adjustment rule storage unit by the control setting value of the equipment machine of demander mitigating to one side of electric power control Correspondence between the relaxation action information and unfavorable degree of Shi Suoxu is stored in advance as adjustment rule;Electric power evaluation step Suddenly, acquirement is controlled in the relaxation action Information application that will be determined by the deciding step in the equipment machine to demander The presumed value for the electric power control amount that can be realized when control unit;And prompt step, the mitigation that will be determined by the deciding step Action message and the electric power control amount presumed value obtained by the electric power evaluation procedure are prompted to electricity needs and adjust company.
The effect of invention
Using the present invention, the environmental information based on demander calculates the unhappy time of the demander in the evaluation object time Rate mitigates the control setting value of the equipment machine of demander to one side of electric power control for electric power control as unfavorable degree When, with reference to the adjustment rule being stored in the regular storage means of adjustment, acquirement and the unfavorable degree phase calculated by environmental evaluation means Corresponding relaxation action information, and the relaxation action information alert is adjusted into company to electricity needs, electricity needs adjusts as a result, The unfavorable degree that demander was born in the past can be evaluated to draft demand plan for adjustment in company, and demander one can be improved Acceptance sense of the side relative to demand plan for adjustment.As a result, it can be expected that being easy to get demander cooperation.
In addition, in the present invention, by the way that adjustment means are arranged, in the relaxation action Information application that will be determined by determining means The electric power control amount that can be realized when the control means that the equipment machine to each demander is controlled is necessary less than electric power control When amount and prediction electric power control amount deficiency, indicate that pairs of decision means adjust relaxation action information again, to which adjustable electric power presses down Amount processed.
Description of the drawings
Fig. 1 is to indicate that the demand plan for adjustment of first embodiment of the present invention drafts the block diagram of the structure of system.
Fig. 2 is to indicate that the demand plan for adjustment of first embodiment of the present invention drafts the flow chart of the action of system.
Fig. 3 is to indicate that the demand plan for adjustment of first embodiment of the present invention drafts the block diagram of the installation example of system.
Fig. 4 is the diagram of an example of the presumption refrigeration room temperature variation for indicating the demander in the evaluation object time.
Fig. 5 is to indicate that the demand plan for adjustment of second embodiment of the present invention drafts the block diagram of the structure of system.
Fig. 6 is to indicate that the demand plan for adjustment of second embodiment of the present invention drafts the flow chart of the action of system.
Fig. 7 is the diagram of an example of the PMV variations for indicating the demander in the evaluation object time.
Specific implementation mode
[inventive principle]
The present invention relates in a kind of integrated cause demander management (for multiple demanders electric power control strategy certainly It is fixed to support) method.Integrated cause is to be related to the cause of electricity needs adjustment, is supplied from electric power in integrated company (demand adjusts company) In the case of electric power control instruction being received to company etc., the multiple demanders managed from company, to determine to press down as electric power The demander of object processed and the inhibition strategy implemented respectively, and execute.The electric power control strategy being carried out, there is following occasion Etc. various situations:Temporarily strategy will be inhibited to be prompted to the demander as object, the implementation meaning for obtaining demander confirms and holds Promise and the occasion implemented;With before prior contract by Contract Risk and policy selection be prompted to demander and accordingly and Implement the occasion etc. of the strategy determined in advance with each demander.Therefore, in the present invention, sharp such as when being negotiated with demander The evaluation of unfavorable degree is carried out with past building maintenance data, (mitigation is set to the electric power control plan that reflects the unfavorable degree Definite value, relaxation time) it is drafted and is prompted to demand adjustment company.The present invention relates to the unexistent considerations of conventional art To the decision support method of the demander electric power control strategy of " one side's of demander is unfavorable ", readily available demander as a result, Cooperation, and can obtain making agreement rate and prior contract signing rate for inhibiting to require to improve such effect.
In the case where inhibiting to electricity needs to obtain balance between supply and demand, it is most likely that generate one side of demander Living environment deteriorate caused by the discontented increase or productivity of demander the need caused by environment in building such as decline Unfavorable (hereinafter referred to as environment is unfavorable) of one side of the person's of asking cause.Also, inventor is conceived to such situation:Even applying The setting value of such as cryogenic temperature is set as 28 DEG C of this setting values at first sight thinking fair air-conditioning without exception and mitigates strategy In the case of, since the heat-proof quality and opening area of building, orientation, humidity and inner heat will be because of (equipment machine or inhabitations Person) etc. each different condition can influence the comfort level (uncomfortable index, PMV etc.) in building, therefore, in actual building It inside will produce the situation that can not be said to be fair.
That is, when implementing electric power control strategy in the building in demander, the unfavorable degree of the environment that can allow according to Each building physical performance, surrounding enviroment and demander cause property and have relatively big difference.Also, as a result, due to from The demander there for having exceeded the unfavorable permissibility of environment is difficult to obtain the cooperation of electric power control, it is therefore contemplated that such feelings Condition:If using evaluation results such as demander environmental amenity degree as index, and on the direction for being easy to get demander conviction If determining electric power control strategy, then conviction sense can be improved.
As specific 1st method, it is contemplated that following method:According to based in relation to environment measured value and presumed value comment Valence result and so that setting value is mitigated interim variation, and be adjusted so that environment it is unfavorable degree it is more big more will carry out Setting value when setting value mitigates is maintained at a comfortable side (the few side of electric power control amount), on the contrary, the unfavorable degree of environment is got over It is small that setting value when carrying out setting value mitigation is more maintained to the side (the big side of electric power control amount) for leaving a comfortable side.
In addition, as the 2nd other method, it is contemplated that following method:Make according to evaluation result and by power supply company Setting value in the evaluation object time of instruction mitigates interim variation, and is adjusted, so that the degree that environment is unfavorable Implementation time shortening more big more when will carry out setting value mitigation, on the contrary, the unfavorable degree of environment smaller will more carry out setting value Implementation time lengthening when mitigation.In addition, so-called demander mentioned in the present invention, refers to enterprise, cause institute, shop, family Front yard and individual etc..In addition, the evaluation object time has been conceived following such situation:By power supply company and integrated company The contract of (electricity needs adjust company) it is determined that situation;When receiving electric power control instruction simultaneously by power supply company Specified situation.
[the 1st embodiment]
In the following, illustrating embodiments of the present invention with reference to Figure of description.Present embodiment is, in foregoing invention principle It is corresponding with the 1st method being adjusted to setting value when carrying out setting value mitigation in recorded specific method.In addition, with The example for mitigating refrigeration setting value illustrates, for demander environmental evaluation, using presumption refrigeration room temperature PT (aftermentioned).Into one Step ground, in the present embodiment, uses PMV (Predicted Mean Vote:The average votes of prediction) as expression demander The index of environmental amenity degree, however, it is possible to which appropriate temperature in use and uncomfortable index etc. represent the measured value of environment and use it Carry out the index of operation.
[basic structure]
Fig. 1 is to indicate that the demand plan for adjustment of some embodiments drafts the block diagram of the structure of system.Demand plan for adjustment The system of drafting has:Environmental evaluation portion 1;Setting value adjustment rule storage part 2;Setting value determination section 3;Electric power evaluation section 4;Setting It is worth prompting part 5;And setting value output section 6.
Environmental evaluation portion 1 calculates the comfortable of the thermal environment for indicating demander at regular intervals within the evaluation object time Index, that is, PMV of degree calculates for the PMV to be remained certain proper at what is be prescribed each PMV at regular intervals When the presumption of state (near 0 or 0) is freezed room temperature PT, by setting value at room temperature ST that presumption refrigeration room temperature PT is standard (such as 26 DEG C) more than time-bands be set as comfortable time-bands (the setting value at room temperature ST of standard is in the time-bands of a comfortable side), will push away Time-bands of the customization cold house temperature PT less than setting value at room temperature ST are set as unhappy time-bands, and (the setting value at room temperature ST of standard is not comfortable The time-bands of one side), be by unhappy time rate (ratio of the unhappy time in the predefined evaluation object time) calculating Unfavorable degree DB.Environmental evaluation portion 1 calculates this unfavorable degree DB to each demander.
Setting value adjustment rule storage part 2 moves the mitigation required when that will control setting value and mitigate to one side of electric power control Make the correspondence that information controls between setting value KT and unfavorable degree DB to prestore as setting value adjustment rule.In this implementation In the example of mode, control setting value KT is setting value at room temperature.In addition, setting value adjustment rule storage part 2 is preferably, such as with electricity The setting value for becoming relatively comfortable side setting in setting value adjustment rule for the purpose of power inhibition adjusts rule and becomes electric power Inhibit the setting value adjustment rule that a side sets like that, multigroup rule is previously stored with according to the degree of electric power control.
For setting value determination section 3 when for electric power control and when being mitigated to control setting value, reference is stored in setting The setting value adjustment rule of value adjustment rule storage part 2, obtains with environmental evaluation portion 1 to the calculation of each demander each demander The corresponding control setting value KT of unfavorable degree DB gone out.In addition, setting value determination section 3 when initially carrying out setting value mitigation, is joined Rule is adjusted according to the setting value set for a comfortable side.
Electric power evaluation section 4, which is obtained, to be applied in the control setting value KT that will be determined by setting value determination section 3 to demander The electric power control amount that can be realized when control management department 7-1~7-n that equipment machine is controlled, and send it to setting and determine Portion 3.At this point, when the total of the electric power control amount of each demander is that total electricity inhibits less than the electric power required by power supply company When inhibiting necessary amount and prediction electric power control amount deficiency, electric power evaluation section 4 would indicate that into, and setting value KT is controlled with reference to decision When the different setting value adjustment rule of used setting value adjustment rule, control setting value is adjusted again to setting value determination section 3 KT。
The control setting value KT that setting value determination section 3 is determined and electric power control amount are prompted to and need by setting value prompting part 5 Ask adjustment company.As reminding method, such as with the control for prompting each demander to the terminal installation of demand adjustment company Setting value KT and it can identify that the total of the electric power control amount of each demander is total electricity amount of suppression and electric power control necessary amount The methods of information of difference.Certainly, the electric power control amount of each demander can also be prompted together at this time.
Each demander Xi (i=1~n) is arranged in control management department 7-1~7-n, by demand corresponding respectively The controlled quentity controlled variable (room temperature) of the equipment machine (being air conditioner in the example of present embodiment) of the facility of person and the (rooms control setting value KT Warm setting value) it notifies to demander, controlled quentity controlled variable is consistent with control setting value KT to be controlled such that equipment machine.As control Algorithm, it is known to such as PID.As previously mentioned, temporarily inhibiting strategy to the demander prompt as object, obtaining demander Implement to promise to undertake and implement in the case of controlling, utilizes notice or phone, the fax and Email of control management department 7-1~7-n Etc. means of communication come carry out demander implementation look like confirm.In addition, usually control management department 7-1~7-n is demander building The structural element of the air-conditioning system and BAS (building automation system) of object etc..
[process flow]
In the following, illustrating that the demand plan for adjustment of present embodiment drafts the action of system with reference to Fig. 2.Environmental evaluation portion 1 To calculating the unhappy time rate in the evaluation object time as each demander Xi (i=1~n) of object, i.e., unfavorable degree DB (figures 2 step S100).The calculation method of presumption refrigeration room temperature PT about the calculating basis as unfavorable degree DB will be aftermentioned.
Setting value determination section 3 adjusts company in the electricity needs being managed for example, by the electric power to multiple demander Xi It is when receiving the instruction of setting value adjustment, then right with reference to the setting value adjustment rule for being stored in setting value adjustment rule storage part 2 Each demander Xi adjusts the regular acquirement of storage part 2 from setting value and is calculated not to each demander Xi with environmental evaluation portion 1 The sharp corresponding control setting value KT (the step S101 of Fig. 2) of degree DB.At this point, the acquirement of electric power evaluation section 4 will determined by setting value The control setting value KT for determining the decision of portion 3 is applied to the electric power control amount (electric power control that can be realized when control management department 7-1~7-n Measure presumed value), and notify to setting value determination section 3.Also, prompting part 5 is set by setting value determination section 3 to each demand Control setting value KT acquired by person Xi and at least total in the case where controlling management department 7-1~7-n and implementing these values Electric power control amount or can be to information alert that it confirms to demand adjustment company (the step S102 of Fig. 2).In addition, about related The presumption of the prediction of electric power control amount both can be used for example based on the past estimated amount with real data and utilization building The technology disclosed in Japanese Patent Laid-Open 2013-78201 bulletins etc. can also be used in the estimated amount of object energy model.
Then, when the control setting value KT that will be determined by setting value determination section 3 is applied to control management department 7-1~7-n The electric power control amount for the total that can be realized is less than the electric power control necessary amount required by power supply company and prediction electric power control When amount is insufficient (in the step S103 of Fig. 2 be), electric power evaluation section 4 indicates that setting value determination section 3 is set with reference to control is determined The different setting value adjustment rule of used setting value adjustment rule when KT is set, then adjusts control setting value KT (the step of Fig. 2 S104)。
Setting value determination section 3 adjusts regular storage part when receiving the instruction from electric power evaluation section 4, using setting value In the 2 setting value adjustment rules stored is setting for one side of electric power control compared to the setting value adjustment rule just used before Fixed setting value adjustment rule, control setting value KT (step S101) is determined to each demander Xi.It setting value prompting part 5 will Setting value determination section is prompted to demand to each demander Xi control setting value KT determined and electric power control amount and adjusts company (step S102).Here, about the electric power control amount of prompt, as long as demand adjustment company can identify the electric power suppression at least amounted to Amount processed can also prompt the electric power control amount of each demander certainly.
In this way, the processing of step S101~S104 is executed repeatedly, until being set by the control determined by setting value determination section 3 The electric power control amount of total that definite value KT is applied to realize when control management department 7-1~7-n be electric power control necessary amount or more, And prediction electric power control amount is without insufficient (no in step S103).Even if being deposited adjusting regular storage part 2 using setting value It is that the setting value set near one side of electric power control adjusts rule in the setting value adjustment rule of storage, the electric power suppression that can be realized In the case that amount processed is also below electric power control necessary amount, it can also terminate the processing of Fig. 2 at the moment.At this time, it is preferable that into enforcement Electricity needs adjustment company can identify such information alert in shortage of electric power control.
In addition, when the electric power control amount of total is less than electric power control necessary amount and prediction electric power control amount deficiency, instruction The step of adjusting control setting value KT again (S104) is not necessary in the present embodiment.For example, being adjusted from electricity needs public The position of department is seen, if (stopping influences indoor environment small the available method different from the setting value adjustment in present embodiment The methods of the equipment machine in region) implement the final adjustment of electric power control amount, then, even if setting value adjustment rule is only one Group also has utility value.In the occasion, electric power evaluation section 4 need not implementation steps S104.
In addition, in the present embodiment, when setting value determination section 3 determines control setting value KT every time, all control is set Value KT and electric power control amount are prompted to demand adjustment company, and but it is not limited to this, when predicting that electric power control amount does not have insufficient It carves (no in step S103), also can control setting value KT be prompted to demand adjusts company.
[example of the calculation method of presumption refrigeration room temperature PT]
Fig. 3 indicates that the demand plan for adjustment of present embodiment drafts the practical example of system.In environmental information maintaining part 8, Maintain the environmental information measured respectively for each demander.As environmental information, such as there are indoor temperature, humidity and wind speed Deng.In the building of one side of demander, it is provided with the sensor measured to environmental information, by the ring of one side of demander Border information collection apparatus (not shown) and obtain environmental information.As environmental information collection device, using central monitoring device It is arranged in demander building Deng, the central monitoring device to carry out the environmental management of airconditioning control and building.From In the environmental information that one side of demander obtains, it is attached with and specific information (ID) is carried out to demander.In this way, environmental information is every Every the measured value for the time series that certain time is measured.Environmental information maintaining part 8 be stored with environmental information and to demander into The specific information (ID) of row.
Inhibit in energy information maintaining part 9, maintained respectively according to each demander for obtain control management department 7-1~ The building energy model of relationship between the control setting value KT and energy consumption of 7-n past uses real data.The inhibition energy In information, it is attached with and specific information (ID) is carried out to demander.Energy information is inhibited for example to be adjusted in advance by electricity needs public Department's setting.
Environmental evaluation portion 1 uses the environmental information (room temperature and humidity etc.) for the demander for being held in environmental information maintaining part 8, So that room temperature is changed 0.1 DEG C of ground every time and be for example changed to 30 DEG C from 23 DEG C, and PMV is calculated to each room temperature, by pmv value be 0 (or Near 0) room temperature be set as presumption refrigeration room temperature PT.Environmental evaluation portion 1 calculates such presumption refrigeration room temperature to each demander PT.Also, environmental evaluation portion 1 also can as described above calculate each demander the ratio of the unhappy time in the evaluation object time Example, as unfavorable degree DB.
In addition, PMV is calculated, other than needing room temperature and humidity, it is also necessary to which such as mean radiant temperature, is worn the clothes at wind speed Information as amount, metabolism amount etc., still, for the information not measured in these information, it is possible to use specified value or presumption Value.Due to being by ISO specifications (ISO-7730) and by the index of International standardization, calculation method can also advise PMV according to ISO Lattice.It calculates program and is also disclosed in " ANSI/ASHRAE Standard:55-2010 (American National Standards Institute (ANSI)/U.S. heating, system Cold and air-conditioning man's teachers learn standard:In 55-2010) " etc..
[processing example]
Then, illustrate that the demand plan for adjustment of present embodiment drafts the processing example of system.In order to make interest of clarity, store The setting value adjustment rule that regular storage part 2 is adjusted in setting value is set as two groups.Specifically, table 1 indicate with electric power control be It is the setting value adjustment rule of relatively comfortable side setting in the setting value adjustment rule of purpose, table 2 is indicated compared to the setting value Adjustment rule is the setting value adjustment rule of one side of electric power control setting.
Table 1
Unfavorable degree DB Control setting value KT
0%-10% 28.0℃
10%-20% 27.8℃
20%-30% 27.6℃
30%-40% 27.4℃
40%-50% 27.2℃
50%-60% 27.0℃
60%-70% 26.8℃
70%-80% 26.6℃
80%-90% 26.4℃
90%-100% 26.2℃
Table 2
Unfavorable degree DB Control setting value KT
0%-10% 28.0℃
10%-20% 27.9℃
20%-30% 27.8℃
30%-40% 27.7℃
40%-50% 27.6℃
50%-60% 27.5℃
60%-70% 27.4℃
70%-80% 27.3℃
80%-90% 27.2℃
90%-100% 27.1℃
In addition, in order to equally make interest of clarity, by demander be set as X1, X2 the two.Fig. 4 is to indicate the evaluation object time One example of the presumption refrigeration room temperature PT variations of interior demander X1, X2.PT1 indicates the presumption refrigeration room temperature PT of demander X1, PT2 indicates the presumption refrigeration room temperature PT of demander X2.In the example in fig. 4, the presumption refrigeration room temperature PT of demander X1 is being evaluated The setting value at room temperature ST of 15% time internal ratio standard in the object time is low, and the presumption refrigeration room temperature PT of demander X2 is being evaluated 65% time internal ratio setting value at room temperature ST in the object time is low.That is, environmental evaluation portion 1
It is 15% that the unfavorable degree DB of demander X1, which is calculated, and it is 65% that the unfavorable degree DB of demander X2, which is calculated,.
Setting value determination section 3 will be initially comfortable when receiving setting value adjustment instruction from electricity needs adjustment company For the setting value adjustment rule of one side setting as reference object, the setting value adjustment rule with reference to shown in table 1 determines control setting Value KT.Because the unfavorable degree DB of demander X1 is 15%, therefore it is 27.8 DEG C to control setting value KT, because the unfavorable degree DB of demander X2 is 65%, therefore it is 26.8 DEG C to control setting value KT.That is, environment it is unfavorable degree it is bigger, more will control setting value KT maintain comfortably One side, on the contrary, environment it is unfavorable degree it is smaller, will more control setting value KT and maintain and leave the side of a comfortable side.
Electric power evaluation section 4 is obtained with reference to energy information is inhibited in the control setting value that will be determined by setting value determination section 3 KT is applied to the electric power control amount that can be realized when control management department 7-1~7-n, in addition, the electric power control amount in total is less than electricity Electric power control necessary amount specified by power supply company and prediction electric power control amount it is insufficient in the case of, instruction setting value determines Portion 3 adjusts control setting value KT again.
Setting value determination section 3 is set when receiving the instruction from electric power evaluation section 4 by what is set for one side of electric power control For definite value adjustment rule as reference object, the setting value adjustment rule with reference to shown in table 2 determines control setting value KT.Because of demand The unfavorable degree DB of person X1 is 15%, therefore it is 27.9 DEG C to control setting value KT, because the unfavorable degree DB of demander X2 is 65%, therefore is controlled Setting value KT is 27.4 DEG C.That is, control setting value KT is adjusted again can realize the electric power control required by inhibiting energy information.
In this way, in the present embodiment, the environmental information based on demander and by the demander in the evaluation object time It is unfavorable degree DB that unhappy time rate, which calculates, arrives the mitigation of the control setting value of the equipment machine of demander when for electric power control When one side of electric power control, then with reference to the setting value adjustment rule for being stored in setting value adjustment rule storage part 2, acquirement is commented with environment The corresponding control setting value KT of unfavorable degree DB that valence portion 1 is calculated, and by by the control setting value KT and electric power control amount It is prompted to demand adjustment company, the unfavorable degree so as to be born in the past to demander evaluate and reflected In demand plan for adjustment, the conviction sense of one side of demander can be improved.As a result, it can be expected that being easy to get demander cooperation.
In addition, in the present embodiment, although control setting value KT and electric power control amount, which are prompted to demand, adjusts company, But the contract of demand adjustment company and demander is may be based on, setting value output section 6 (setup unit) is right by setting value determination section 3 The control setting value KT that each demander is determined is set in the control management department of corresponding demander by communication line In 7-1~7-n.In addition, setting value output section 6 (mitigating information output unit), it also can be by setting value determination section 3 to each demand The control setting value KT that person is determined is prompted to corresponding demander by communication line.
[the 2nd embodiment]
In the following, illustrating the 2nd embodiment of the present invention.Present embodiment and the specific side recorded in foregoing invention principle The 2nd method that relaxation time when being mitigated to setting value in method is adjusted is corresponding.In the present embodiment, real with the 1st It applies that mode is identical, is illustrated with the example mitigated to refrigeration setting value, use PMV as indicating the easypro of demander environment The index of appropriateness, but the index for indicating the comfort level, also can be suitably used and represent environment with temperature and uncomfortable index etc. Measured value and the index that operation is carried out using them.
[basic structure]
Fig. 5 is to indicate that the demand plan for adjustment of present embodiment drafts the block diagram of the structure of system, for identical with Fig. 1 Structure puts on identical symbol.Demand plan for adjustment, which drafts system, to be had:Environmental evaluation portion 1a, relaxation time adjustment rule are deposited Storage portion 10, relaxation time determination section 11, electric power evaluation section 4a, relaxation time prompting part 13 and relaxation time output section 14.
Environmental evaluation portion 1a is for calculating indicates the thermal environment of demander at regular intervals in the evaluation object time The PMV is set as by index, that is, PMV of comfort level in the boundary value, that is, PMV threshold values TH time-bands below for the side's comfort that freezes Comfortable time-bands (PMV is in the time-bands of a comfortable side compared to threshold value TH), the big time-bands of PMV ratio PMV threshold values TH are set For unhappy time-bands (PMV is in compared to threshold value TH the time-bands of a unhappy side), and unhappy time rate (is prescribed in advance The ratio of unhappy time in the evaluation object time) it calculates as unfavorable degree DB.Environmental evaluation portion 1a calculates this to each demander The unfavorable degree DB of kind.PMV threshold values TH is preset based on general knowledge.
The regular storage part 10 of relaxation time adjustment delays required when that will control setting value and mitigate to one side of electric power control It is to prestore implementation time TJ to adjust rule for the relaxation time with the unfavorable correspondence for spending DB with action message.In addition, slow Adjusting regular storage part 10 with the time is preferably, and becomes relatively comfortable in the setting value adjustment rule such as the purpose of electric power control The setting value adjustment rule of one side setting and the setting value set as one side of electric power control adjust rule like that, according to electric power The degree of inhibition is previously stored with multigroup rule.
For relaxation time determination section 11 when being mitigated to control setting value for electric power control, reference is stored in mitigation The relaxation time adjustment rule of time adjustment rule storage part 10, obtains with environmental evaluation portion 1a to each need each demander The corresponding implementation time TJ of unfavorable degree DB that the person of asking is calculated.In addition, relaxation time determination section 11 is initially carrying out setting value When mitigation, with reference to the relaxation time adjustment rule for becoming comfortable side setting.
Electric power evaluation section 4a, which is obtained, to be applied in the implementation time TJ that will be determined by relaxation time determination section 11 to demander Equipment machine controlled control management department 7a-1~7a-n when the electric power control amount that can realize, and send it to mitigation Time determination section 11.At this point, when total, that is, total electricity amount of suppression of the electric power control amount of each demander is less than power supply company When required electric power control necessary amount and prediction electric power control amount deficiency, electric power evaluation section 4a just refers to relaxation time determination section 11 show that reference adjusts regular different reference relaxation times adjustment rule from used relaxation times when determining to implement time TJ, It adjusts again and implements time TJ.
The electricity for implementation the time TJ and each demander that relaxation time prompting part 13 is determined relaxation time determination section 11 Power amount of suppression is prompted to demand adjustment company.As reminding method, such as with the terminal installation prompt for adjusting company to demand The implementation time TJ of each demander and the total, that is, total electricity amount of suppression for the electric power control amount that can identify each demander and electricity Power inhibits the methods of the information of difference of necessary amount.Certainly, the electric power control amount of each demander can also be prompted together at this time.
Each demander Xi (i=1~n) is arranged in control management department 7a-1~7a-n, by need corresponding respectively The controlled quentity controlled variable (room temperature) of the equipment machine (being air conditioner in the example of present embodiment) of the facility for the person of asking and control setting value (room Warm setting value) it notifies to demander, controlled quentity controlled variable is consistent with control setting value to be controlled such that equipment machine, but if setting If implementing time TJ, then control setting value is only altered to one side of electric power control (in the feelings of refrigeration during implementing time TJ Setting value at room temperature is improved under condition), after implementing time TJ, control setting value is reduced into numerical value before changing.Each control Management department 7-1~7-n will control setting value mitigate to one side of electric power control when, both can will control setting value be altered to as defined in Setting value (being, for example, 28.0 DEG C in the occasion of refrigeration) is mitigated, also can be altered to electricity by setting value is controlled by defined change amplitude Power inhibits a side.Setting value and change amplitude are mitigated, it is for example pre- by electricity needs adjustment company based on the contract with demander First set.
[process flow]
In the following, illustrating that the demand plan for adjustment of present embodiment drafts the action of system with reference to Fig. 6.Environmental evaluation portion 1a To calculating the unhappy time rate in the evaluation object time as each demander Xi (i=1~n) of object, i.e., unfavorable degree DB (figures 6 step S200).
Relaxation time determination section 11 for example ought adjust company to the electricity needs that the electric power of multiple demander Xi is managed When receiving relaxation time adjustment instruction, with reference to the relaxation time adjustment rule for being stored in relaxation time adjustment rule storage part 10 Then, regular storage part 10 is adjusted from the relaxation time to obtain with environmental evaluation portion 1a to each demander Xi institutes each demander Xi Corresponding implementation times TJ (the step S201 of Fig. 6) of unfavorable degree DB calculated.At this point, electric power evaluation section 4a is obtained will be by delaying Implementation time TJ determined with time determination section 11 is applied to the electric power control amount that can be realized when control management department 7a-1~7a-n (electric power control amount presumed value), and notify to relaxation time determination section 11.Also, when relaxation time prompting part 13 will be mitigated Between determination section 11 to acquired by each demander Xi implementation time TJ and by control management department 7a-1~7a-n it is implemented In the case of the electric power control amount at least amounted to be prompted to demand adjustment company (the step S202 of Fig. 6).
When the implementation time TJ that will be determined by relaxation time determination section 11 is applied to control management department 7a-1~7a-n The electric power control amount for the total that can be realized is less than the electric power control necessary amount required by power supply company and prediction electric power control When amount is insufficient (in the step S203 of Fig. 6 be), then electric power evaluation section 4a indicate relaxation time determination section 11 with reference to determine it is real The different relaxation time adjustment rules crossed of used relaxation time adjustment rule when time TJ are applied, then adjusts and implements time TJ.
Relaxation time determination section 11 adjusts rule when receiving the instruction from electric power evaluation section 4a, using the relaxation time In the relaxation time adjustment rule that storage part 10 is stored is electric power compared to the relaxation time adjustment rule just used before Inhibit the relaxation time adjustment rule that a side sets, each demander Xi is determined to implement time TJ (step S201).When mitigation Between prompting part 13 relaxation time determination section 11 prompts each demander Xi implementation time TJ determined and electric power control amount To demand adjustment company (step S202).Here, the electric power control amount of the electric power control amount of prompt at least amounted to also can be by needing It asks adjustment company to identify, but can also prompt the electric power control amount of each demander certainly.
In this way, the processing of step S201~S204 is executed repeatedly, until in the reality that will be determined by relaxation time determination section 11 It is electric power control necessary amount to apply time TJ to be applied to the electric power control amount for the total that can be realized when control management department 7a-1~7a-n Above and prediction electric power control amount is without insufficient (no in step S203).Even if adjusting rule storage using the relaxation time The relaxation time for becoming the setting near one side of electric power control in the relaxation time adjustment rule that portion 10 is stored adjusts rule Then, in the case that the electric power control amount that can be realized is also below electric power control necessary amount, the processing of Fig. 6 can also be terminated at the moment. At this time, it is preferable that can identify such information alert in shortage of electric power control into electricity needs adjustment company is exercised.
It is identical as the 1st embodiment, when the electric power control amount of total is less than electric power control necessary amount and prediction electric power control When amount is insufficient, instruction adjusts the step of controlling setting value KT (S204) and is not necessary again.For example, adjusting company from electricity needs Position see, if with the method different from the relaxation time adjustment in present embodiment the final tune of electric power control amount can be implemented It is whole, then, relaxation time adjustment rule has utility value being only one group.In this case, electric power evaluation section 4a is not It must implementation steps S204.
In addition, in the present embodiment, when relaxation time determination section 11 determines to implement time TJ every time, time TJ will be implemented It is prompted to demand with electric power control amount and adjusts company, but it is not limited to this, (step at the time of predicting electric power control amount without deficiency It is no in rapid S203), it can will also implement time TJ and be prompted to demand adjustment company.
The demand plan for adjustment of present embodiment drafts the practical example of system, is the 1st embodiment as shown in figure 3 Practical example is identical.That is, also can be instead of the environmental evaluation portion 1 of Fig. 3, the regular storage part 2 of setting value adjustment, setting value determination section 3, electric power evaluation section 4 and setting value prompting part 5, and environmental evaluation portion 1a is set, the regular storage part 10 of relaxation time adjustment, is mitigated Time determination section 11, electric power evaluation section 4a and mitigation time prompting portion 13.
[processing example]
In the following, illustrating that the demand plan for adjustment of present embodiment drafts the processing example of system.In order to make interest of clarity, mitigate The relaxation time adjustment rule that time adjustment rule storage part 10 is stored is set as two groups.Specifically, the expression of table 2 is pressed down with electric power It is made as becoming the relaxation time adjustment rule of relatively comfortable side setting in the relaxation time adjustment rule of purpose, the expression of table 4 is compared The relaxation time for adjusting rule in the relaxation time and being set as one side of electric power control adjusts rule.
Table 3
Unfavorable degree DB Implement time TJ
0%-10% 5 hours
10%-20% 4.5 hour
20%-30% 4 hours
30%-40% 3.5 hour
40%-50% 3 hours
50%-60% 2.5 hour
60%-70% 2 hours
70%-80% 1.5 hour
80%-90% 1 hour
90%-100% 0.5 hour
Table 4
Unfavorable degree DB Implement time TJ
0%-10% 5 hours
10%-20% 4.75 hour
20%-30% 4.5 hour
30%-40% 4.25 hour
40%-50% 4 hours
50%-60% 3.75 hour
60%-70% 3.5 hour
70%-80% 3.25 hour
80%-90% 3 hours
90%-100% 2.75 hour
In addition, in order to equally make interest of clarity, demander is set as both X1, X2.Fig. 7 is to indicate the evaluation object time The diagram of one example of the PMV variations of interior demander X1, X2.PMV1 indicates that the PMV of demander X1, PMV2 indicate demander X2 PMV.In the example of fig. 7, the PMV of demander X1 is in 85% time within the evaluation object time, and than refrigeration, one side is relaxed The PMV of the boundary value of adaptive, that is, PMV threshold value TH high, demander X2 is in 35% time within the evaluation object time, than PMV threshold Value TH high.That is, it is 85% that environmental evaluation portion 1a, which calculates the unfavorable degree DB of demander X12, the unfavorable degree DB of demander X2 is calculated Go out is 35%.
Relaxation time determination section 11, initially will be at when receiving relaxation time adjustment instruction from electricity needs adjustment company It is used as reference object for the relaxation time adjustment rule of comfortable side setting, the relaxation time adjustment rule with reference to shown in table 3, certainly Surely implement time TJ.In addition, the control setting value (setting value at room temperature) during setting value mitigates is set as 28.0 DEG C without exception.Because of demander The unfavorable degree DB of X1 is 85%, therefore implementation time TJ is 1 hour, because the unfavorable degree DB of demander X2 is 35%, therefore implements the time TJ is 3.5 hours.That is, environment it is unfavorable degree it is bigger, implementation time TJ when more mitigating setting value maintains a comfortable side, On the contrary, environment it is unfavorable degree it is smaller, will more implement time TJ and maintain to leave the side of a comfortable side.
Electric power evaluation section 4a is obtained with reference to energy information is inhibited in the implementation that will be determined by relaxation time determination section 11 Between TJ be applied to the electric power control amount that can realize when control management department 7a-1~7a-n, in addition, the electric power control amount in total is low Electric power control necessary amount specified by power supply company and prediction electric power control amount it is insufficient in the case of, when instruction mitigates Between determination section 11 adjust again implement time TJ.
Relaxation time determination section 11 will be set when receiving the instruction from electric power evaluation section 4a as one side of electric power control Fixed relaxation time adjustment rule is used as reference object, and the relaxation time adjustment rule with reference to shown in table 4 determines to implement the time TJ.Because the unfavorable degree DB of demander X1 is 85%, therefore implementation time TJ is 3 hours, because the unfavorable degree DB of demander X2 is 35%, Therefore implementation time TJ is 4.25 hours.It is adjusted again that is, implementing time TJ can realize the electric power required by inhibiting energy information Inhibit.
In this way, in the present embodiment, also can get effect identical with the 1st embodiment.
In addition, in the present embodiment, although time TJ will be implemented and electric power control amount is prompted to demand adjustment company, The contract of demand adjustment company and demander is may be based on, relaxation time output section 14 (setup unit) is by relaxation time determination section The implementation time TJ that 11 pairs of each demanders are determined is set in the control management of corresponding demander by communication line In portion 7a-1~7a-n.In addition, relaxation time output section 14 (mitigating information output unit), it also can be by relaxation time determination section 11 The implementation time TJ determined to each demander is prompted to corresponding demander by communication line.
In the 1st, the 2nd embodiment, illustrated with the example mitigated to refrigeration setting value, but not limited to this, It can also be applied to the occasion mitigated to heating setting value.In the 1st embodiment, what is mitigated to heating setting value Occasion can also be calculated with method identical with the occasion for calculating presumption refrigeration room temperature PT for maintaining PMV at one be prescribed The presumption of fixed appropriate state (near 0 or 0) heats room temperature, by setting value at room temperature that presumption heating room temperature is standard (such as 22 DEG C) time-bands below are set as comfortable time-bands, presumption heating room temperature set higher than the time-bands of the setting value at room temperature of standard For unhappy time-bands, and calculate unfavorable degree DB.
Also can be that one side of heating is relaxed by PMV in the case where being mitigated to heating setting value in the 2nd embodiment The boundary value of adaptive, that is, PMV threshold values time-bands below are set as comfortable time-bands, and the time-bands that PMV is more than to PMV threshold values are set as Unhappy time-bands, and calculate unfavorable degree DB.
1st, the demand plan for adjustment illustrated in the 2nd embodiment drafts system, using have CPU, storage device and The computer of interface and the program that is controlled these hardware resource are realized.CPU is according to being stored in storage device Program and execute the processing illustrated in the 1st, the 2nd embodiment.It is assigned to multiple dresses in Fig. 1, Fig. 3 and structure shown in fig. 5 In the case of setting configuration, the CPU of each device executes the 1st, the 2nd according to the program for the storage device for being stored in each device in fact Apply the processing illustrated in mode.
[practicability in industry]
Present invention can apply to the technologies that the electricity needs to demander is managed.
Symbol description
1,1a ... environmental evaluations portion, the regular storage part of 2 ... setting values adjustment, 3 ... setting value determination sections, 4,4a ... electric power comments Valence portion, 5 ... setting value prompting parts, 6 ... setting value output sections, 7,7a ... control management department, 8 ... environmental information maintaining parts, 9 ... stop Only energy information maintaining part, the regular storage part of 10 ... relaxation times adjustment, 11 ... relaxation time determination sections, 13 ... relaxation times carry Show portion, 14 ... relaxation time output sections.

Claims (16)

1. a kind of demand plan for adjustment drafts system, which is characterized in that have:
Environmental evaluation unit, environmental information of the environmental evaluation unit based on demander calculate the demander in the evaluation object time Unhappy time rate as unfavorable degree, the unhappy time rate is in the evaluation object time, the equipment machine of demander Standard control setting value not in the ratio of the time of a comfortable side;
Adjust rule storage unit, the adjustment rule storage unit by the control setting value of the equipment machine of demander mitigating Correspondence when to one side of electric power control between required relaxation action information and unfavorable degree carries out in advance as adjustment rule Storage;
Determining means, the determining means mitigate the control setting value of the equipment machine of demander to electricity for electric power control When power inhibits a side, with reference to the adjustment rule for being stored in the adjustment rule storage unit, obtain and the environmental evaluation unit The corresponding relaxation action information of unfavorable degree calculated;
Electric power evaluation unit, the electric power evaluation unit obtain the relaxation action Information application that will be determined by the determining means in The presumed value for the electric power control amount that can be realized when the control unit controlled to the equipment machine of demander;And
Prompt unit, the prompt unit is by the relaxation action information determined by the determining means and from the electric power evaluation unit The electric power control amount presumed value of acquirement is prompted to electricity needs adjustment company.
2. demand plan for adjustment as described in claim 1 drafts system, which is characterized in that
When acquired electric power control amount is less than electric power control necessary amount and prediction electric power control amount deficiency, the electric power is commented Valence unit also indicates the determining means and adjusts the relaxation action information again,
The adjustment rule storage unit is previously stored with multigroup adjustment rule according to the degree of electric power control,
The determining means uses the adjustment rule storage unit when receiving the instruction from the electric power evaluation unit In the adjustment rule stored is the adjustment rule of one side of electric power control setting compared to the adjustment rule just used before, is come Determine relaxation action information.
3. demand plan for adjustment as claimed in claim 1 or 2 drafts system, which is characterized in that
The relaxation action information is to be set in the control setting value of one side of electric power control.
4. demand plan for adjustment as claimed in claim 1 or 2 drafts system, which is characterized in that
The relaxation action information is the implementation time mitigated to control setting value in one side of electric power control.
5. demand plan for adjustment as claimed in claim 1 or 2 drafts system, which is characterized in that
The environmental evaluation unit is according to the environmental information of the demander, within the evaluation object time at regular intervals Ground calculates the index, that is, PMV for the environmental amenity degree for indicating demander, is used for being calculated every each PMV of the certain time In the room temperature by PMV maintenances at defined appropriate state, and the unfavorable degree is calculated according to the calculating result of the room temperature.
6. demand plan for adjustment as claimed in claim 1 or 2 drafts system, which is characterized in that
The environmental evaluation unit is according to the environmental information of the demander, within the evaluation object time at regular intervals Ground calculates the index, that is, PMV for the environmental amenity degree for indicating demander, and described unfavorable according to the calculating of the calculating result of the PMV Degree.
7. demand plan for adjustment as claimed in claim 1 or 2 drafts system, which is characterized in that
Also have and mitigate information output unit, the relaxation action which is determined the determining means is believed Breath output is to each corresponding demander.
8. demand plan for adjustment as claimed in claim 1 or 2 drafts system, which is characterized in that
Also there is setup unit, the relaxation action information setting which is determined the determining means is to corresponding Demander the control administrative unit that is controlled of equipment machine in.
9. a kind of demand plan for adjustment drafts method, which is characterized in that comprise the following steps:
Environmental evaluation step, the environmental information based on demander calculate the unhappy time rate of the demander in the evaluation object time As unfavorable degree, the unhappy time rate is in the evaluation object time, the control of the standard of the equipment machine of demander Setting value is not in the ratio of the time of a comfortable side;
Deciding step obtains corresponding with the unfavorable degree that the environmental evaluation step is calculated with reference to adjustment rule storage unit Relaxation action information, the adjustment rule storage unit by the control setting value of the equipment machine of demander mitigating to electricity Correspondence when power inhibits a side between required relaxation action information and unfavorable degree stores in advance as adjustment rule;
Electric power evaluation procedure is obtained in the relaxation action Information application that will be determined by the deciding step in the equipment to demander The presumed value for the electric power control amount that can be realized when the control unit that machine is controlled;And
Prompt step, by the relaxation action information determined by the deciding step and the electric power obtained by the electric power evaluation procedure Amount of suppression presumed value is prompted to electricity needs adjustment company.
10. demand plan for adjustment as claimed in claim 9 drafts method, which is characterized in that
The electric power evaluation procedure also includes such step:Acquired electric power control amount less than electric power control necessary amount, And when prediction electric power control amount deficiency, instruction adjusts the relaxation action information again,
The adjustment rule storage unit prestores multigroup adjustment rule according to the degree of electric power control,
The deciding step is, when receiving the instruction adjusted again, to be stored using the adjustment rule storage unit Adjustment rule in compared to just used before adjustment rule be one side of electric power control setting adjustment rule, to determine to delay And action message.
11. the demand plan for adjustment as described in claim 9 or 10 drafts method, which is characterized in that
The relaxation action information is to be set in the control setting value of one side of electric power control.
12. the demand plan for adjustment as described in claim 9 or 10 drafts method, which is characterized in that
The relaxation action information is the implementation time mitigated to control setting value in one side of electric power control.
13. the demand plan for adjustment as described in claim 9 or 10 drafts method, which is characterized in that
The environmental evaluation step includes such step:According to the environmental information of the demander, in the evaluation object The interior index i.e. PMV for calculating the environmental degree of comfort for indicating demander at regular intervals, for every the certain time Each PMV calculate for by the PMV maintain at defined appropriate state room temperature, and according to the calculating result of the room temperature calculate The unfavorable degree.
14. the demand plan for adjustment as described in claim 9 or 10 drafts method, which is characterized in that
The environmental evaluation step includes such step:According to the environmental information of the demander, in the evaluation object The interior index i.e. PMV for calculating the environmental amenity degree for indicating demander at regular intervals, and according to the calculating knot of the PMV Fruit calculates the unfavorable degree.
15. the demand plan for adjustment as described in claim 9 or 10 drafts method, which is characterized in that
Also include to mitigate information to export step, the relaxation action information determined by the deciding step is output to each pair The demander answered.
16. the demand plan for adjustment as described in claim 9 or 10 drafts method, which is characterized in that
Include also setting procedure, by the relaxation action information setting determined by the deciding step to corresponding demander The control administrative unit that is controlled of equipment machine in.
CN201510114605.8A 2014-03-17 2015-03-16 Demand plan for adjustment drafts system and demand plan for adjustment drafts method Active CN104933503B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2014-053586 2014-03-17
JP2014053586A JP6063407B2 (en) 2014-03-17 2014-03-17 Demand adjustment planning system and demand adjustment planning method

Publications (2)

Publication Number Publication Date
CN104933503A CN104933503A (en) 2015-09-23
CN104933503B true CN104933503B (en) 2018-09-04

Family

ID=54120663

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510114605.8A Active CN104933503B (en) 2014-03-17 2015-03-16 Demand plan for adjustment drafts system and demand plan for adjustment drafts method

Country Status (2)

Country Link
JP (1) JP6063407B2 (en)
CN (1) CN104933503B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6298346B2 (en) * 2014-04-11 2018-03-20 アズビル株式会社 Demand adjustment planning system and demand adjustment planning method
JP6720962B2 (en) 2015-09-09 2020-07-08 住友電気工業株式会社 Annealing apparatus for trench of vertical silicon carbide semiconductor device, method of manufacturing vertical silicon carbide semiconductor device, and vertical silicon carbide semiconductor device
JP6649913B2 (en) * 2017-04-07 2020-02-19 ミサワホーム株式会社 Index calculation system
JP6780099B2 (en) * 2017-05-08 2020-11-04 株式会社日立製作所 Aggregator side system, prosumer side system, and aggregation system, and aggregation method
JP2020103494A (en) * 2018-12-27 2020-07-09 パナソニックIpマネジメント株式会社 System for reducing jet-lag syndrome and method for reducing jet-lag syndrome

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101995072A (en) * 2009-08-05 2011-03-30 株式会社日立制作所 Customer energy management system
JP2011193639A (en) * 2010-03-15 2011-09-29 Toshiba Corp Demand controller and demand control method

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10300162A (en) * 1997-04-25 1998-11-13 Matsushita Electric Ind Co Ltd Air-conditioning controller
JP2004116972A (en) * 2002-09-30 2004-04-15 Daikin Ind Ltd Energy-conservation control system for air conditioner, energy-conservation controller, energy-conservation control program, and energy-conservation control method
JP2007155173A (en) * 2005-12-02 2007-06-21 Osaka Prefecture Univ Heating/cooling apparatus control system
JP2011069577A (en) * 2009-09-28 2011-04-07 Oki Electric Industry Co Ltd Air conditioning control system, air conditioning control method, air conditioning control device and air conditioning control program
JP5016704B2 (en) * 2010-05-31 2012-09-05 株式会社エナリス Power demand management apparatus and power demand management system
JP5533809B2 (en) * 2011-07-20 2014-06-25 ダイキン工業株式会社 Equipment control equipment
JP6004709B2 (en) * 2012-04-06 2016-10-12 三菱電機株式会社 Energy saving support system, server device, energy saving support method and program
JP6021435B2 (en) * 2012-05-23 2016-11-09 株式会社東芝 Power control apparatus, power control method, power control program

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101995072A (en) * 2009-08-05 2011-03-30 株式会社日立制作所 Customer energy management system
JP2011193639A (en) * 2010-03-15 2011-09-29 Toshiba Corp Demand controller and demand control method

Also Published As

Publication number Publication date
JP6063407B2 (en) 2017-01-18
JP2015177685A (en) 2015-10-05
CN104933503A (en) 2015-09-23

Similar Documents

Publication Publication Date Title
CN104933503B (en) Demand plan for adjustment drafts system and demand plan for adjustment drafts method
Cui et al. Evaluation and sequential dispatch of operating reserve provided by air conditioners considering lead–lag rebound effect
JP6193400B2 (en) Electric power demand prediction system, electric power demand prediction method, customer profiling system, and customer profiling method
US10180672B2 (en) Demand control device and computer readable medium
US9582009B2 (en) System and method for optimizing and reducing the energy usage of an automatically controlled HVAC system
Zhang et al. Parameter selection for a centralized thermostatically controlled appliances load controller used for intra-hour load balancing
JP6194522B2 (en) Management apparatus and management method
JP6234264B2 (en) Electric power demand adjustment system, electric power demand adjustment method, and electric power demand adjustment device
US20180287382A1 (en) Power system load flexibility forecasting
CN108709287B (en) Air conditioning system cold load prediction method and water chilling unit group control strategy
JP2011242101A (en) Setting value controlling method and device
US20160091218A1 (en) Preference determination apparatus, air conditioning control system, preference determination method and air conditioning control method
KR20110100895A (en) The building mutual assistance control method which uses an optimization energy management system
US9920945B2 (en) Air-conditioning control apparatus, air-conditioning control system, and air-conditioning control method
US20130060390A1 (en) Energy-saving diagnostic system
JP2008241151A (en) Air conditioning control system
JP6298346B2 (en) Demand adjustment planning system and demand adjustment planning method
KR20190023903A (en) Building energy management system and method based on multi dimension building energy load prediction per unit using various factors
JP5751742B2 (en) Air conditioning equipment remote management system, remote management device, control device
CN111342446B (en) Three-dimensional household intelligent energy ubiquitous dispatching control method and system
JP5975276B2 (en) Operation management device, correction method of actual measured power when demand response control is activated
JP2012225609A (en) Air-conditioning control system
JP4816536B2 (en) Air conditioning control system
CN112066524B (en) Non-residential building demand flexibility quantification method based on electric heat storage and comfort
Korkas et al. Adaptive optimization for smart operation of cyber-physical systems: A thermostatic zoning test case

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant