CN104929617A - 一种注浆管路通水试压的方法 - Google Patents
一种注浆管路通水试压的方法 Download PDFInfo
- Publication number
- CN104929617A CN104929617A CN201410852918.9A CN201410852918A CN104929617A CN 104929617 A CN104929617 A CN 104929617A CN 201410852918 A CN201410852918 A CN 201410852918A CN 104929617 A CN104929617 A CN 104929617A
- Authority
- CN
- China
- Prior art keywords
- pressures
- water
- pressure
- pipelines
- test method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Examining Or Testing Airtightness (AREA)
Abstract
本发明公开了一种注浆管路通水试压的方法,管路闸阀打开;逐段检查处理堵塞或漏水;管路闸阀打开后地面开泵通水,检查泵压是否稳定正常,如否,返回上一步检查;如泵压稳定正常,则检查水流是否畅通,如不畅通则返回;如水流畅通,则停泵,并关闭闸门,升档试压;查看管路上的压力表是否持续升压,如不是,返回;压力表持续升压稳定至10MPa,持续至少30min即可。本发明能够确保整个注浆管路的耐压值不小于8MPa,稳压时间不少于30min,确保后续注浆施工的安全,同时工艺简单,使用方便。
Description
技术领域
本发明涉及一种注浆孔口管的埋设工艺,尤其涉及的是一种注浆管路通水试压的方法。
背景技术
注浆治水技术作为解放受水威胁煤层的重要途径,具有技术可行、经济合理、安全可靠的特点,其使用范围很广,可以封堵由各种地质构造破坏造成的导水裂隙带及导水通道;可以改造含水层,使之成为弱含水层;可以加固隔水层原生与次生空隙、裂隙,使之成为不透水的阻水岩体。
注浆改造作为一种按人的意志改变岩体(层)水文地质条件的方法与手段,基本原理是浆液在一定压力、一定时间作用下在受注层原来被水占据的空隙或通道内脱水、固结或胶凝,使结石体或胶凝体与围岩岩体形成阻水整体,从而改变不利于采矿的水文地质条件。对薄层灰岩注浆能起到含水层改造、导水裂隙封堵和隔水层加固的作用:
(1)向薄层灰岩大量灌注浆液,浆液在薄层灰岩沿岩溶裂隙扩散、结石、充填,把含水层中的水“置换”出来,使之不含水或弱含水。
(2)浆液在注浆压力作用下,通过薄层灰岩沿奥灰水补给薄层灰岩通道运移、扩散、结石,堵塞或缩小导水通道,减少奥灰水的补给量。
(3)浆液在注浆压力作用下,通过薄层灰岩沿着煤层底板裂隙运移、扩散、结石,充填隔水层导水裂隙,强化、加厚煤层底板。
高承压底板水上煤层开采水害防治主要有两种方法,即:疏水降压与带压开采。但疏降开采是有条件的,对于含水丰富、补给条件好,水头高的承压含水层,如采取疏水降压措施,一是排水电费高,二是煤层采完后,仍需长期排水,经济极不合理。同时,对于某些含水层可以疏降,但疏降规模还受矿井排水能力的限制。不仅浪费水资源,而且影响生产接替,严重制约生产进度。目前煤矿开采主要采用工作面底板注浆加固及改造技术,增加煤层底板有效隔水层厚度,治理底板高承压的太灰水害危胁,确保煤矿安全生产
工作面底板灰岩水害防治工作流程为:工作面水文地质条件预评价→物探工程→防治水工程设计→钻探注浆(疏放水)工程施工→质量检查(检查孔、物探)→安全评估。
防治水工程设计是做好防治水工程的基础,防治水工程设计的质量优劣直接影响着防治水工程的施工安全、施工措施和施工质量及施工效果。因此防治水工程设计要求要有较高防治水理论水平和有丰富的现场施工经验的技术人员来完成,并且完全了解现场施工条件,掌握施工人员的技术水平和使用的设备性能。防治水工程设计不仅在宏观方面要求工程设计的合理性、科学性和可操作性,而且要求在每一个环节和细节都要完整、安全、科学、合理和可操作。
往孔里注浆之前,在孔口预埋一根孔口管,用来连接注浆管路。将单根套管及固井所需附件逐一连接下入井内的作业称为下套管,常见的单根套管通常由两部分组成,即套管本体和接箍。钻台上有吊卡,下完一个套管后,套管卡在吊卡下,这时将另外一根套管下至吊卡内,旋转紧套管螺纹,松开吊卡,再下套管,以此类推,下到设计的层位即可。注浆管路铺设好之后,在正式注浆之前,需要对整个管路及以后需要延伸的注浆管路进行试压试验。
发明内容
本发明的目的在于克服现有技术的不足,提供了一种注浆管路通水试压的方法,能够有效的实现对整个注浆管路进行有效检查。
本发明是通过以下技术方案实现的,本发明包括以下步骤:
(1)管路闸阀打开;
(2)逐段检查处理堵塞或漏水;
(3)管路闸阀打开后地面开泵通水,检查泵压是否稳定正常,如否,返回上一步检查;
(4)如泵压稳定正常,则检查水流是否畅通,如不畅通则返回步骤(2);
(5)如水流畅通,则停泵,并关闭闸门,升档试压;
(6)查看管路上的压力表是否持续升压,如不是,返回步骤(2);
(7)压力表持续升压稳定至10MPa,持续至少30min即可。
作为本发明的优选方式之一,所述升档试压的方法为用清水灌注试压,压力调节到至少10MPa。
作为本发明的优选方式之一,所述管路闸阀打开之前,所有的注浆软管两端用U型卡卡牢,再用双股8#铁丝或细钢丝绳及绳卡将注浆软管与铁管连接在一起。
本发明相比现有技术具有以下优点:本发明能够确保整个注浆管路的耐压值不小于8MPa,稳压时间不少于30min,确保后续注浆施工的安全,同时工艺简单,使用方便。
附图说明
图1是本发明的工艺流程示意图。
具体实施方式
下面对本发明的实施例作详细说明,本实施例在以本发明技术方案为前提下进行实施,给出了详细的实施方式和具体的操作过程,但本发明的保护范围不限于下述的实施例。
如图1所示,本实施例
包括以下步骤:
(1)管路闸阀打开之前,所有的注浆软管两端用U型卡卡牢,再用双股8#铁丝或细钢丝绳及绳卡将注浆软管与铁管连接在一起,然后管路闸阀打开;
(2)逐段检查处理堵塞或漏水;
(3)管路闸阀打开后地面开泵通水,检查泵压是否稳定正常,如否,返回上一步检查;
(4)如泵压稳定正常,则检查水流是否畅通,如不畅通则返回步骤(2);
(5)如水流畅通,则停泵,并关闭闸门,升档试压,用清水灌注试压,压力调节到至少10MPa;
(6)查看管路上的压力表是否持续升压,如不是,返回步骤(2);
(7)压力表持续升压稳定至10MPa,持续至少30min即可。
能够确保整个注浆管路的耐压值不小于8MPa,稳压时间不少于30min,确保后续注浆施工的安全,同时工艺简单,使用方便。
Claims (3)
1.一种注浆管路通水试压的方法,其特征在于,包括以下步骤:
(1)管路闸阀打开;
(2)逐段检查处理堵塞或漏水;
(3)管路闸阀打开后地面开泵通水,检查泵压是否稳定正常,如否,返回上一步检查;
(4)如泵压稳定正常,则检查水流是否畅通,如不畅通则返回步骤(2);
(5)如水流畅通,则停泵,并关闭闸门,升档试压;
(6)查看管路上的压力表是否持续升压,如不是,返回步骤(2);
(7)压力表持续升压稳定至10MPa,持续至少30min即可。
2.根据权利要求1所述的一种注浆管路通水试压的方法,其特征在于,所述升档试压的方法为用清水灌注试压,压力调节到至少10MPa。
3.根据权利要求1所述的一种注浆管路通水试压的方法,其特征在于,所述管路闸阀打开之前,所有的注浆软管两端用U型卡卡牢,再用双股8#铁丝或细钢丝绳及绳卡将注浆软管与铁管连接在一起。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410852918.9A CN104929617A (zh) | 2014-12-18 | 2014-12-18 | 一种注浆管路通水试压的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410852918.9A CN104929617A (zh) | 2014-12-18 | 2014-12-18 | 一种注浆管路通水试压的方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104929617A true CN104929617A (zh) | 2015-09-23 |
Family
ID=54117010
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410852918.9A Pending CN104929617A (zh) | 2014-12-18 | 2014-12-18 | 一种注浆管路通水试压的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104929617A (zh) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6080618A (ja) * | 1983-10-07 | 1985-05-08 | Chem Kurauto Kk | 透水試験装置 |
SU1183673A1 (ru) * | 1984-01-04 | 1985-10-07 | Научно-производственное объединение по термическим методам добычи нефти "Союзтермнефть" | Способ определени места порыва обсадной колонны в скважине |
CN101666234A (zh) * | 2009-10-09 | 2010-03-10 | 中铁二局股份有限公司 | 破碎岩体无止浆墙复合式注浆施工方法 |
CN102587859A (zh) * | 2012-04-17 | 2012-07-18 | 中国矿业大学(北京) | 返流注浆封堵矿井突水技术 |
CN102877884A (zh) * | 2012-09-13 | 2013-01-16 | 山东能源集团有限公司 | 一种基于千米定向钻探技术的矿井奥灰顶部改造及施工方法 |
CN103291325A (zh) * | 2013-06-25 | 2013-09-11 | 山东科技大学 | 承压水体上采煤底板岩层突水的防控方法 |
-
2014
- 2014-12-18 CN CN201410852918.9A patent/CN104929617A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6080618A (ja) * | 1983-10-07 | 1985-05-08 | Chem Kurauto Kk | 透水試験装置 |
SU1183673A1 (ru) * | 1984-01-04 | 1985-10-07 | Научно-производственное объединение по термическим методам добычи нефти "Союзтермнефть" | Способ определени места порыва обсадной колонны в скважине |
CN101666234A (zh) * | 2009-10-09 | 2010-03-10 | 中铁二局股份有限公司 | 破碎岩体无止浆墙复合式注浆施工方法 |
CN102587859A (zh) * | 2012-04-17 | 2012-07-18 | 中国矿业大学(北京) | 返流注浆封堵矿井突水技术 |
CN102877884A (zh) * | 2012-09-13 | 2013-01-16 | 山东能源集团有限公司 | 一种基于千米定向钻探技术的矿井奥灰顶部改造及施工方法 |
CN103291325A (zh) * | 2013-06-25 | 2013-09-11 | 山东科技大学 | 承压水体上采煤底板岩层突水的防控方法 |
Non-Patent Citations (1)
Title |
---|
李飞: "《煤矿防治水精细化管理标准》", 31 May 2012 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103821544B (zh) | 隧道与地下工程高压大流量突涌水治理方法 | |
CN105041345B (zh) | 一种隧道突涌水全寿命周期治理方法 | |
CN105952475B (zh) | 一种煤矿残采区冒落废巷注浆加固工艺与方法 | |
CN105887886B (zh) | 一种强岩溶发育地层帷幕灌浆施工方法 | |
CN102561977B (zh) | 高压大流量涌水钻孔安全系统及其安装工艺、使用工艺 | |
CN102587873B (zh) | 一种水平井二氧化碳吞吐控水增油方法 | |
CN103277120A (zh) | 一种非全深冻结立井解冻后的涌水防治方法 | |
CN105201448A (zh) | 一种高压大流量涌水通道内阻水注浆封堵方法 | |
CN106014201A (zh) | 一种隧道注浆帷幕外泄水钻孔安全施工工艺 | |
CN105155563A (zh) | 一种基坑软流塑地层涌水加固治理方法 | |
CN105239984A (zh) | 一种煤矿井下压裂裂缝扩展控制方法 | |
CN106120797B (zh) | 富水区连续钢构渡槽墩地基灌浆施工方法 | |
CN204457590U (zh) | 一种封孔注浆装置 | |
CN105909265B (zh) | 穿越既有盾构隧道防隆起后退式深孔注浆系统及方法 | |
CN104790419A (zh) | 一种适用于富水流沙地层隧道的降水施工方法 | |
CN102758639A (zh) | 一种有限空间隧道防喷涌长管注浆工法 | |
CN104929565A (zh) | 一种双层注浆导管 | |
CN103114553B (zh) | 一种土石坝管涌溃决现场试验方法 | |
CN110374540A (zh) | 一种矿山超前探水孔口防突防喷联合控水装置及控水工艺 | |
CN204627527U (zh) | 一种双层注浆导管 | |
CN104929564A (zh) | 一种高压跑水孔注浆下料装置 | |
CN204591208U (zh) | 一种双层注浆导管 | |
CN105089551A (zh) | 一种注浆孔口管的下套管加固工艺 | |
CN104929617A (zh) | 一种注浆管路通水试压的方法 | |
CN109736779A (zh) | 一种本煤层水力致裂的压裂半径测量方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150923 |
|
RJ01 | Rejection of invention patent application after publication |