CN104929558A - 定点取换套工艺方法 - Google Patents

定点取换套工艺方法 Download PDF

Info

Publication number
CN104929558A
CN104929558A CN201510351771.XA CN201510351771A CN104929558A CN 104929558 A CN104929558 A CN 104929558A CN 201510351771 A CN201510351771 A CN 201510351771A CN 104929558 A CN104929558 A CN 104929558A
Authority
CN
China
Prior art keywords
packer
sleeve
conducted
production string
string
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510351771.XA
Other languages
English (en)
Other versions
CN104929558B (zh
Inventor
黄德辉
罗一恒
胡永雄
霍战海
贾正发
王江
李龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Bohai Drilling Engineering Co Ltd
Original Assignee
CNPC Bohai Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNPC Bohai Drilling Engineering Co Ltd filed Critical CNPC Bohai Drilling Engineering Co Ltd
Priority to CN201510351771.XA priority Critical patent/CN104929558B/zh
Publication of CN104929558A publication Critical patent/CN104929558A/zh
Application granted granted Critical
Publication of CN104929558B publication Critical patent/CN104929558B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pipe Accessories (AREA)
  • Earth Drilling (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

本发明公开了一种定点取换套工艺方法,其包括如下步骤:1)下入桥塞并对井筒内油层套管进行下漏点确认;2)套铣油套环空,悬挂套铣管柱,下入双封隔器,在井口进行打捞油套倒扣作业;3)换套对扣试压合格;4)起出套铣管柱;5)捞出双封隔器管柱、钻塞、冲砂、捞桥塞、通井、下完井。本发明的工艺方法可排除丢鱼的风险,确保换套时的鱼顶深度在指定范围,而且换套后的密封完全能保证。另外本发明通过下入双封隔器管柱卡住油层套管并承受反扭矩,确保了油层套管卸扣时定点取套以下的套管自身不会发生卸扣的情况,以保证在上卡瓦封隔器以上进行卸扣。

Description

定点取换套工艺方法
技术领域
本发明涉及一种油田开发应用的大修工艺,尤其是一种定点取换套工艺方法。
背景技术
目前大港油田油水井经过长年开采后,浅层油层套管存在腐蚀破损情况较多,采用的工艺方法是进行套铣取换套施工。在套铣后进行取套工作一直不能准确保证取套深度,基本是通过悬重多少来判断计划取出套管的长度,几乎精确率为零。这样会造成多取出套管后,井内留余的套管可能会因为出套铣管后的鱼顶被地层的沙泥等杂志掩埋。冲洗对扣后的连接部位密封性不能百分之百保证。
发明内容
本发明要解决的技术问题是提供一种能够克服卸扣的随意性且能够达到精准取套目的的定点取换套工艺方法。
为了解决上述技术问题,本发明的工艺方法中所使用的定点取换套装置包括地面设备和井下工具,所述地面设备包括防喷器组和表套四通,所述井下工具包括用于油层封闭的桥塞、下卡瓦封隔器、反扣钻具管柱、上卡瓦封隔器和套铣管柱,所述套铣管柱处于表层套管和油层套管之间的环空内,所述上卡瓦封隔器和下卡瓦封隔器座卡在油层套管内壁上且上、下卡瓦封隔器之间通过反扣钻具管柱连接,其中反扣钻具管柱的长度大于200米,所述桥塞处于油层套管内且该桥塞位于下卡瓦封隔器和生产层段之间,所述桥塞上方还注入有填砂及注灰;
通过定点取换套装置实现的工艺方法,其包括如下步骤:
1)在生产层段以上50m,下入桥塞进行油层封闭,然后在桥塞上填砂50m后进行注灰封层,下入封隔器对灰面及以下封闭情况进行核实,确认油层已经完全封闭为合格,确保井控安全,下入找漏封隔器管串对井筒内油层套管进行下漏点确认;
2)首先更换取换套所用井口设备,在井口上安装表套四通及防喷器组,下入套铣管柱套铣油层套管外水泥环及外环空地层,直至确认漏点及以下20-50m,并将套铣管柱座在防喷器半封闸板上;
然后下入由下卡瓦封隔器、反扣钻具管柱和上卡瓦封隔器构成的双封隔器管柱以及上部管柱,将下卡瓦封隔器和上卡瓦封隔器先后座封于油层套管内,从上卡瓦封隔器上退出以上管柱;
再下入油层套管捞矛在井口附近深度捞住油层套管,确认捞实,计算好漏点以上油层套管的自重,附加5KN的上提力,进行倒扣作业,漏点破损油层套管必将从上卡瓦封隔器以上一根油层套管丝扣处卸开,达到定点取套的目的;
3)下入与取出套管一样长度的完好油层套管进行对扣、紧扣、试压,满足油层套管试压标准要求为合格;
4)通井至更换套管对扣点深度以下2m,确认通径合格、起出套铣管柱;
5)更换井口连接,安装油层表套四通、大修作业用防喷器组,实施以下作业:捞出双封隔器管柱、钻塞、冲砂、捞桥塞、通井、下完井。
本发明的有益效果是:本发明的工艺方法可排除丢鱼的风险,确保换套时的鱼顶深度在指定范围,而且换套后的密封完全能保证。另外本发明通过下入双封隔器管柱卡住油层套管并承受反扭矩,确保了油层套管卸扣时定点取套以下的套管自身不会发生卸扣的情况,以保证在上卡瓦封隔器以上进行卸扣。
附图说明
图1为本发明中定点取换套装置的结构示意图。
具体实施方式
下面结合附图和具体实施方式对本发明作进一步详细的说明:
图1为本发明中定点取换套装置的结构示意图;其中1、人工井底;2、生产层段;3、桥塞;4、填砂及注灰;5、下卡瓦封隔器;6、反扣钻具管柱;7、上卡瓦封隔器;8、套铣管柱;9、油层套管;10、表层套管;11、表套四通;12、防喷器组。
参见图1,本发明的工艺方法中所使用的定点取换套装置包括地面设备和井下工具,所述地面设备包括防喷器组12和表套四通11,所述井下工具包括用于油层封闭的桥塞3、下卡瓦封隔器5、反扣钻具管柱6、上卡瓦封隔器7和套铣管柱8,所述套铣管柱8处于表层套管10和油层套管9之间的环空内,所述上卡瓦封隔器7和下卡瓦封隔器5座卡在油层套管9内壁上且上、下卡瓦封隔器7、5之间通过反扣钻具管柱6连接,其中反扣钻具管柱6的长度大于200米,所述桥塞3处于油层套管9内且该桥塞3位于下卡瓦封隔器5和生产层段2之间,所述桥塞3上方还注入有填砂及注灰4。
一种定点取换套工艺方法,其包括如下步骤:
1)在生产层段2以上50m,下入桥塞3进行油层封闭,然后在桥塞3上填砂50m后进行注灰封层,下入封隔器对灰面及以下封闭情况进行核实,确认油层已经完全封闭为合格,确保井控安全,下入找漏封隔器管串对井筒内油层套管进行下漏点确认;
2)首先更换取换套所用井口设备,在井口上安装表套四通11及防喷器组12,下入套铣管柱8套铣油层套管9外水泥环及外环空地层,直至确认漏点及以下20-50m,并将套铣管柱8座在防喷器半封闸板上;
然后下入由下卡瓦封隔器5、反扣钻具管柱6和上卡瓦封隔器7构成的双封隔器管柱以及上部管柱,将下卡瓦封隔器5和上卡瓦封隔器7先后座封于油层套管9内,从上卡瓦封隔器7上退出以上管柱;
再下入油层套管捞矛在井口附近深度捞住油层套管9,确认捞实,计算好漏点以上油层套管9的自重,附加5KN的上提力,进行倒扣作业,漏点破损油层套管9必将从上卡瓦封隔器7以上一根油层套管丝扣处卸开,达到定点取套的目的;
3)下入与取出套管一样长度的完好油层套管进行对扣、紧扣、试压,满足油层套管试压标准要求为合格;
4)通井至更换套管对扣点深度以下2m,确认通径合格、起出套铣管柱8;
5)更换井口连接,安装油层表套四通11、大修作业用防喷器组12,实施以下作业:捞出双封隔器管柱、钻塞、冲砂、捞桥塞、通井、下完井。
本发明的工艺方法通过下入双封隔器管柱卡住油层套管并承受反扭矩,确保了油层套管卸扣时定点取套以下的套管自身不会发生卸扣的情况。
综上所述,本发明的内容并不局限在上述的实施例中,本领域的技术人员可以在本发明的技术指导思想之内提出其他的实施例,但这些实施例都包括在本发明的范围之内。

Claims (1)

1.一种定点取换套工艺方法,其中该工艺方法中所使用的定点取换套装置包括地面设备和井下工具,所述地面设备包括防喷器组(12)和表套四通(11),所述井下工具包括用于油层封闭的桥塞(3)、下卡瓦封隔器(5)、反扣钻具管柱(6)、上卡瓦封隔器(7)和套铣管柱(8),所述套铣管柱(8)处于表层套管(10)和油层套管(9)之间的环空内,所述上卡瓦封隔器(7)和下卡瓦封隔器(5)座卡在油层套管(9)内壁上且上、下卡瓦封隔器(7、5)之间通过反扣钻具管柱(6)连接,其中反扣钻具管柱(6)的长度大于200米,所述桥塞(3)处于油层套管(9)内且该桥塞(3)位于下卡瓦封隔器(5)和生产层段(2)之间,所述桥塞(3)上方还注入有填砂及注灰(4);
通过定点取换套装置实现的工艺方法,其包括如下步骤:
1)在生产层段(2)以上50m,下入桥塞(3)进行油层封闭,然后在桥塞(3)上填砂50m后进行注灰封层,下入封隔器对灰面及以下封闭情况进行核实,确认油层已经完全封闭为合格,确保井控安全,下入找漏封隔器管串对井筒内油层套管进行下漏点确认;
2)首先更换取换套所用井口设备,在井口上安装表套四通(11)及防喷器组(12),下入套铣管柱(8)套铣油层套管(9)外水泥环及外环空地层,直至确认漏点及以下20-50m,并将套铣管柱(8)座在防喷器半封闸板上;
然后下入由下卡瓦封隔器(5)、反扣钻具管柱(6)和上卡瓦封隔器(7)构成的双封隔器管柱以及上部管柱,将下卡瓦封隔器(5)和上卡瓦封隔器(7)先后座封于油层套管(9)内,从上卡瓦封隔器(7)上退出以上管柱;
再下入油层套管捞矛在井口附近深度捞住油层套管(9),确认捞实,计算好漏点以上油层套管(9)的自重,附加5KN的上提力,进行倒扣作业,漏点破损油层套管(9)必将从上卡瓦封隔器(7)以上一根油层套管丝扣处卸开,达到定点取套的目的;
3)下入与取出套管一样长度的完好油层套管进行对扣、紧扣、试压,满足油层套管试压标准要求为合格;
4)通井至更换套管对扣点深度以下2m,确认通径合格、起出套铣管柱(8);
5)更换井口连接,安装油层表套四通(11)、大修作业用防喷器组(12),实施以下作业:捞出双封隔器管柱、钻塞、冲砂、捞桥塞、通井、下完井。
CN201510351771.XA 2015-06-23 2015-06-23 定点取换套工艺方法 Active CN104929558B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510351771.XA CN104929558B (zh) 2015-06-23 2015-06-23 定点取换套工艺方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510351771.XA CN104929558B (zh) 2015-06-23 2015-06-23 定点取换套工艺方法

Publications (2)

Publication Number Publication Date
CN104929558A true CN104929558A (zh) 2015-09-23
CN104929558B CN104929558B (zh) 2017-10-20

Family

ID=54116951

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510351771.XA Active CN104929558B (zh) 2015-06-23 2015-06-23 定点取换套工艺方法

Country Status (1)

Country Link
CN (1) CN104929558B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107420052A (zh) * 2017-07-11 2017-12-01 中国石油集团川庆钻探工程有限公司长庆钻井总公司 一种螺纹套管头一体式引扣紧扣器及套管头安装方法
CN107587854A (zh) * 2017-08-09 2018-01-16 胜利油田华滨实业有限公司石油机械滨州分公司 水平井取换套管工艺
CN110725658A (zh) * 2019-10-14 2020-01-24 中国石油化工股份有限公司 一种径向锚定倒扣取换套管装置及方法
CN115324514A (zh) * 2022-09-13 2022-11-11 大庆井升伟业油田技术服务有限公司 一种用于浅层套外漏治理的多级增扭修井装置

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2184760A (en) * 1985-10-25 1987-07-01 Volker Stevin Offshore Well fishing tool
US5690170A (en) * 1996-02-22 1997-11-25 Hailey; Charles D. Hydraulic cutting overshot
CN201650179U (zh) * 2009-12-18 2010-11-24 贵州高峰石油机械股份有限公司 采用螺旋卡瓦的封隔器式套管补接器
CN203879437U (zh) * 2014-04-25 2014-10-15 中国石油集团渤海钻探工程有限公司 一种套铣打捞装置
CN104389543A (zh) * 2014-09-24 2015-03-04 新疆华油油气工程有限公司 一种套铣打捞一体化修井工具

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2184760A (en) * 1985-10-25 1987-07-01 Volker Stevin Offshore Well fishing tool
US5690170A (en) * 1996-02-22 1997-11-25 Hailey; Charles D. Hydraulic cutting overshot
CN201650179U (zh) * 2009-12-18 2010-11-24 贵州高峰石油机械股份有限公司 采用螺旋卡瓦的封隔器式套管补接器
CN203879437U (zh) * 2014-04-25 2014-10-15 中国石油集团渤海钻探工程有限公司 一种套铣打捞装置
CN104389543A (zh) * 2014-09-24 2015-03-04 新疆华油油气工程有限公司 一种套铣打捞一体化修井工具

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107420052A (zh) * 2017-07-11 2017-12-01 中国石油集团川庆钻探工程有限公司长庆钻井总公司 一种螺纹套管头一体式引扣紧扣器及套管头安装方法
CN107420052B (zh) * 2017-07-11 2019-03-15 中国石油集团川庆钻探工程有限公司长庆钻井总公司 一种螺纹套管头一体式引扣紧扣器及套管头安装方法
CN107587854A (zh) * 2017-08-09 2018-01-16 胜利油田华滨实业有限公司石油机械滨州分公司 水平井取换套管工艺
CN107587854B (zh) * 2017-08-09 2020-01-14 胜利油田华滨实业有限公司井下作业维修分公司 水平井取换套管工艺
CN110725658A (zh) * 2019-10-14 2020-01-24 中国石油化工股份有限公司 一种径向锚定倒扣取换套管装置及方法
CN110725658B (zh) * 2019-10-14 2022-05-03 中国石油化工股份有限公司 一种径向锚定倒扣取换套管装置及方法
CN115324514A (zh) * 2022-09-13 2022-11-11 大庆井升伟业油田技术服务有限公司 一种用于浅层套外漏治理的多级增扭修井装置
CN115324514B (zh) * 2022-09-13 2024-04-16 大庆井升伟业油田技术服务有限公司 一种用于浅层套外漏治理的多级增扭修井装置

Also Published As

Publication number Publication date
CN104929558B (zh) 2017-10-20

Similar Documents

Publication Publication Date Title
CN101586462B (zh) 一种井暂停、完井和修井的方法
RU2660704C2 (ru) Способ испытания барьера
CN106930713B (zh) 一种套管破损修复方法
US11339627B2 (en) Method of establishing a cement plug in an annular region between a first and a second casing
CN104929558A (zh) 定点取换套工艺方法
CN105612308A (zh) 无隔水管完井
CN103835677A (zh) 一种水平井双级密封碰压可捞式完井装置
CN106968650B (zh) 一种治理表层套管与气层套管环空气窜的方法
AU2014405908B2 (en) Tie-back seal assembly
RU2732167C1 (ru) Способ ремонта обсадной колонны в незацементированной части (варианты)
CN204716170U (zh) 定点取换套装置
Schnitzler et al. 100th Intelligent Completion Installation: A Milestone in Brazilian Pre-Salt Development
CN105569602A (zh) 一种油井管外封窜的方法
CN112081535A (zh) 一种超深高含硫气井完井管柱及其施工方法
CN109538148A (zh) 一种软金属膨胀管补贴煤层气井倒吸层方法
NO20191029A1 (en) Measuring Strain In A Work String During Completion Operations
CA3135415C (en) System and method for offline cementing in batch drilling
Arukhe et al. World's First Tandem 2.125-in. Coiled Tubing Tractor for ESP Open Hole Completions
CN112780176A (zh) 用于井下含有地层注入压力的控制压力套管钻井方法
RU2677721C1 (ru) Способ проведения геофизических работ через бурильную колонну в скважинах с открытым стволом, имеющим сложную траекторию
Makvandi et al. Technical analysis of the causes of blowout in BiBiHakimeh well No. 76
Henriksen Plug and abandonment on the Norwegian continental shelf
CN109209273A (zh) 一种更换套铣鞋的方法
CN203783525U (zh) 水平井双级密封碰压可捞式完井装置
Shan et al. Preliminary Study on Oil Test and Completion Technology of Over 9000 m Deep Wells—Taking Guole X Well as an Example

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210830

Address after: 100007 No. 9 North Main Street, Dongcheng District, Beijing, Dongzhimen

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Patentee after: CNPC Bohai Drilling Engineering Co.,Ltd.

Address before: 300457 Tianjin Binhai New Area Development Zone Huanghai Road 106 Bohai Drilling Engineering Co., Ltd. science and Technology Development Office

Patentee before: CNPC Bohai Drilling Engineering Co.,Ltd.

TR01 Transfer of patent right