CN104912558A - 一种井圈 - Google Patents

一种井圈 Download PDF

Info

Publication number
CN104912558A
CN104912558A CN201510285854.3A CN201510285854A CN104912558A CN 104912558 A CN104912558 A CN 104912558A CN 201510285854 A CN201510285854 A CN 201510285854A CN 104912558 A CN104912558 A CN 104912558A
Authority
CN
China
Prior art keywords
channel
section steel
walling crib
push rod
channel steels
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510285854.3A
Other languages
English (en)
Inventor
蒋明峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Ruida Keheng Technology Co Ltd
Original Assignee
Chengdu Ruida Keheng Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Ruida Keheng Technology Co Ltd filed Critical Chengdu Ruida Keheng Technology Co Ltd
Priority to CN201510285854.3A priority Critical patent/CN104912558A/zh
Publication of CN104912558A publication Critical patent/CN104912558A/zh
Pending legal-status Critical Current

Links

Abstract

本发明公开了一种井圈,包括由多块槽钢拼接而成的井圈,井圈底部内设置有内撑部件;所述内撑部件包括旋钮盘、连接在旋钮盘上的顶杆、连接在顶杆一端的紧固件;所述顶杆为四根,均布在井圈内;所述槽钢内设置有插槽,槽钢端口处设置有限位件,槽钢通过卡带两两相互连接。采用本发明有效利用井圈对井壁进行撑顶,避免井壁崩塌。

Description

一种井圈
技术领域
本发明涉及井洞附属设备的范畴,具体是一种井圈。
背景技术
在矿井生产过程中,均会建立井筒作为联系地表与地下的重要通道,在井筒的建设过程中,常会遭遇含水岩层,为了防止渗水,需进行壁后注浆,在井壁外层和岩层的缝隙中注入封水材料,而注浆后还需采用高压来使浆液进入井壁外层,此时需要利用井圈对井壁进行撑顶,避免井壁崩塌。
发明内容
本发明旨在提供一种井圈,以解决上述问题。
为实现上述目的,本发明的技术方案如下:
一种井圈,其特征在于:包括由多块槽钢拼接而成的井圈,井圈底部内设置有内撑部件;所述内撑部件包括旋钮盘、连接在旋钮盘上的顶杆、连接在顶杆一端的紧固件;所述顶杆为四根,均布在井圈内;所述槽钢内设置有插槽,槽钢端口处设置有限位件,槽钢通过卡带两两相互连接。
进一步地,所述紧固件朝向槽钢一端设置有弧形面,弧形面的弧度与槽钢弯曲的弧度适配。
本发明的有益效果在于:
一、井圈采用多块槽钢拼接而成,槽钢内设置有插槽,槽钢端口处设置有限位件,槽钢通过连接卡带两两相互固定,槽钢连接方式可以通过卡带的位置进行调节,当作为一般井盖实用时,卡带完全收缩在槽钢内的插槽里,槽钢之间拼接完整,但压力较大时,可以松开卡带,使槽钢连接处留有一定的空隙,能够使得井圈在高压环境中承受更高的压力,避免应力集中。
二、在井圈底部内设置有内撑部件,通过旋转旋钮盘将设置在顶杆上的紧固件推送至与槽钢贴合,进行加固,调节各槽钢的受力程度,避免槽钢产生形变报废。
附图说明
图1是本发明提供的井圈结构示意图。
图2是图1中A-A向剖视图。
图中标记:1为槽钢、2为旋钮盘、3为紧固件、4为顶杆、5为卡带、6为限位件。
具体实施方式
下面结合附图与具体实施例对本发明做进一步说明。
如图1、图2所示,一种井圈,包括由多块槽钢1拼接而成的井圈,井圈底部内设置有内撑部件;所述内撑部件包括旋钮盘2、连接在旋钮盘上的顶杆4、连接在顶杆4一端的紧固件3;所述顶杆4为四根,均布在井圈内;所述槽钢1内设置有插槽,槽钢1端口处设置有限位件6,槽钢1通过卡带5两两相互连接。所述紧固件3朝向槽钢一端设置有弧形面,弧形面的弧度与槽钢1弯曲的弧度适配。
井圈采用多块槽钢1拼接而成,槽钢1内设置有插槽,槽钢1端口处设置有限位件6,槽钢通过连接卡带5两两相互固定,槽钢1连接方式可以通过卡带5的位置进行调节,当作为一般井盖实用时,卡带5完全收缩在槽钢1内的插槽里,槽钢1之间拼接完整,但压力较大时,可以松开卡带5,使槽钢1连接处留有一定的空隙,能够使得井圈在高压环境中承受更高的压力,避免应力集中。在松开卡带5后,为避免槽钢1之间连接不够稳定的问题,需要扭动旋钮盘,推动顶杆朝向槽钢1移动,直至将紧固件贴合在槽钢1上。
以上所述仅为本发明的优选实施例而已,并不用于限制本发明,对于本领域的技术人员来说,本发明可以有各种更改和变化。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。

Claims (2)

1.一种井圈,其特征在于:包括由多块槽钢拼接而成的井圈,井圈底部内设置有内撑部件;所述内撑部件包括旋钮盘、连接在旋钮盘上的顶杆、连接在顶杆一端的紧固件;所述顶杆为四根,均布在井圈内;所述槽钢内设置有插槽,槽钢端口处设置有限位件,槽钢通过卡带两两相互连接。
2.根据权利要求1所述井圈,其特征在于:所述紧固件朝向槽钢一端设置有弧形面,弧形面的弧度与槽钢弯曲的弧度适配。
CN201510285854.3A 2015-05-29 2015-05-29 一种井圈 Pending CN104912558A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510285854.3A CN104912558A (zh) 2015-05-29 2015-05-29 一种井圈

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510285854.3A CN104912558A (zh) 2015-05-29 2015-05-29 一种井圈

Publications (1)

Publication Number Publication Date
CN104912558A true CN104912558A (zh) 2015-09-16

Family

ID=54081951

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510285854.3A Pending CN104912558A (zh) 2015-05-29 2015-05-29 一种井圈

Country Status (1)

Country Link
CN (1) CN104912558A (zh)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120009023A1 (en) * 2010-07-09 2012-01-12 Bower Joseph P Pumpable crib bag assembly and method of installation
AU2006202538B2 (en) * 2006-06-15 2012-07-19 Norsenet (Pty) Limited Grout pack restraining system
CN202627493U (zh) * 2012-06-14 2012-12-26 江苏建筑职业技术学院 用于电梯井施工的组合模板
CN203475830U (zh) * 2013-09-24 2014-03-12 中国新兴保信建设总公司 一种配电箱安装组合支撑模具
CN104329050A (zh) * 2014-09-29 2015-02-04 平顶山天安煤业股份有限公司 壁后注浆井壁可移动式内撑井圈
CN104533425A (zh) * 2015-01-04 2015-04-22 中煤能源黑龙江煤化工有限公司 一种立井整体浇筑段壁座及立井整体浇筑段壁座施工方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2006202538B2 (en) * 2006-06-15 2012-07-19 Norsenet (Pty) Limited Grout pack restraining system
US20120009023A1 (en) * 2010-07-09 2012-01-12 Bower Joseph P Pumpable crib bag assembly and method of installation
CN202627493U (zh) * 2012-06-14 2012-12-26 江苏建筑职业技术学院 用于电梯井施工的组合模板
CN203475830U (zh) * 2013-09-24 2014-03-12 中国新兴保信建设总公司 一种配电箱安装组合支撑模具
CN104329050A (zh) * 2014-09-29 2015-02-04 平顶山天安煤业股份有限公司 壁后注浆井壁可移动式内撑井圈
CN104533425A (zh) * 2015-01-04 2015-04-22 中煤能源黑龙江煤化工有限公司 一种立井整体浇筑段壁座及立井整体浇筑段壁座施工方法

Similar Documents

Publication Publication Date Title
PH12018500543A1 (en) Tunnel construction method using pre-support and post-support and apparatus suitable for same
CN205225271U (zh) 一种适用于盾构端头无加固体的盾构洞门圈梁结构
CN104806276B (zh) 一种预装退锚环的敲打式锚索退锚装置及方法
CN204002832U (zh) 一种盾构隧道洞门结构
CN203925513U (zh) 边仰坡陡峻地段的隧道洞口衬砌结构
CN204327112U (zh) 隧道出洞超前支护系统
CN204492855U (zh) 可拆卸式自适应多级增阻高强中空注浆锚管
CN104912558A (zh) 一种井圈
CN104775823A (zh) 双线矿山法地铁隧道斜井进正洞结构及其工艺方法
CN102691510B (zh) 盾构隧道中对接段衬砌结构
CN204456024U (zh) 用于水电站输水隧洞钢衬段的接地设备
CN203809010U (zh) 一种提高洞室稳定性的结构
CN203769789U (zh) 一种盾构机洞内始发反力装置
CN104405412B (zh) 地铁暗挖隧道横通道施工构件
CN204386617U (zh) 一种低水头引水隧洞的固结灌浆结构
CN205778953U (zh) 一种深埋高地应力大型加固硐室
CN206385709U (zh) 一种淤泥保温砖
CN202327509U (zh) 在线管线修复装置
CN205154181U (zh) 一种用于隧道内预切槽法施工的支护结构
CN104612731A (zh) 可拆卸式自适应多级增阻高强中空注浆锚管及其施工方法
CN205422759U (zh) 一种预装交错相扣式退锚环的锚索退锚装置
CN204152526U (zh) 连拱隧道洞身管棚复合式导向墙结构
CN103276706A (zh) 引水隧洞斜(竖)井段防渗结构的施工方法
CN202768010U (zh) 盾构法斜井应对大变形地层的施工用衬砌管片
CN204627525U (zh) 封堵装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150916