CN104901484B - Jump ring installs equipment - Google Patents

Jump ring installs equipment Download PDF

Info

Publication number
CN104901484B
CN104901484B CN201410084382.0A CN201410084382A CN104901484B CN 104901484 B CN104901484 B CN 104901484B CN 201410084382 A CN201410084382 A CN 201410084382A CN 104901484 B CN104901484 B CN 104901484B
Authority
CN
China
Prior art keywords
jump ring
rotating shaft
bearing
propeller
installs equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410084382.0A
Other languages
Chinese (zh)
Other versions
CN104901484A (en
Inventor
叶银春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Zhuhai Kaibang Motor Manufacture Co Ltd
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Zhuhai Kaibang Motor Manufacture Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai, Zhuhai Kaibang Motor Manufacture Co Ltd filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201410084382.0A priority Critical patent/CN104901484B/en
Publication of CN104901484A publication Critical patent/CN104901484A/en
Application granted granted Critical
Publication of CN104901484B publication Critical patent/CN104901484B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention provides a kind of jump ring to install equipment, including:Fixed seat(10), there is the rotating shaft support portion for being used for supporting rotating shaft;Propulsion plant(20), including the first propeller(21), connecting portion(22)With the jump ring promotion part for promoting jump ring(23), jump ring promotion part(23)Connecting portion is arranged in a manner of it can move along the first direction the first guide frame(22)On, connecting portion(22)It is arranged on the first propeller(21)On, connecting portion(22)In the first propeller(21)In the presence of can be moved along the direction perpendicular to first direction;Rotating shaft stopper section, is arranged on fixed seat(10)Go up and be used for stop rotating shaft and be directed away from the first propeller(21)Direction movement.The jump ring installation equipment of the present invention easily can install jump ring in the jump-ring slot of the diverse location of rotating shaft.

Description

Jump ring installs equipment
Technical field
The present invention relates to the technical field of rotor assembling, and equipment is installed in particular to a kind of jump ring.
Background technology
Rotor, it is necessary to install jump ring on the jump-ring slot of the rotating shaft of rotor, and is turning in actual use Bearing is installed on axle.Originally, the installation of jump ring and bearing is manually completed by staff, not only staff labor intensity High and efficiency is low.Then, there is being used for the automation equipment that jump ring and bearing are installed on rotor in the market, but It is that the equipment can not promote jump ring to cause installation card to adapt to the jump-ring slot of diverse location from the diverse location of rotating shaft axial direction The process of spring is comparatively laborious.
The content of the invention
A kind of the present invention is intended to provide jump ring installation that jump ring is easily installed in the jump-ring slot of the diverse location of rotating shaft Equipment.
To achieve these goals, the invention provides a kind of jump ring to install equipment, including:Fixed seat, have and be used for branch Support the rotating shaft support portion of rotating shaft;Propulsion plant, including the first propeller, connecting portion and the jump ring promotion part for promoting jump ring, Jump ring promotion part is arranged on connecting portion the first guide frame in a manner of it can move along the first direction, and connecting portion is arranged on On first propeller, connecting portion can move in the presence of the first propeller along the direction perpendicular to first direction;Rotating shaft backstop Portion, it is arranged in fixed seat and the direction movement of the first propeller is directed away from for stop rotating shaft.
Further, the first guide frame includes the chute being arranged on connecting portion and is adapted with the structure of the chute And the sliding block that is arranged on jump ring promotion part.
Further, jump ring of the invention installation equipment also includes:Jump ring guide rail, is arranged in fixed seat, jump ring guide rail End is skidded off with jump ring upstream end and jump ring, the position of jump ring upstream end skids off the position at end higher than jump ring.
Further, the cross section of jump ring guide rail is T-shaped.
Further, rotating shaft support portion is accommodates rotating shaft and the brace groove that extends in a first direction, brace groove The cell wall away from the first propeller forms rotating shaft stopper section in two cell walls being spaced on the direction of first direction.
Further, fixed seat includes:Two fixed blocks, two fixed blocks are arranged at intervals in a first direction, each fixation Block is respectively provided with rotating shaft support portion, and jump ring promotion part corresponds to the gap between two fixed blocks.
Further, fixed seat also includes:Bottom plate, two fixed blocks are by the second guide frame with can be in the first direction Mobile mode is arranged on bottom plate.
Further, limited block is provided with each fixed block, limited block includes:Move portion, pass through the 3rd guide frame It is arranged in a manner of it can move along the first direction on fixed block;Limiting section, it is fixed in corresponding move portion and for limiting The movement of rotating shaft in a first direction.
Further, the 3rd guide frame includes:It is arranged on the waist hole in move portion and extended in a first direction;It is arranged on On fixed block and stretch into the lead of waist hole.
Further, jump ring of the invention installation equipment also includes:Bearing Mounting device, including bearing block, the second propulsion Device and the hinge brackets for supporting rotating shaft, bearing block, which has, is used to placing the bearing housing portion of bearing, and bearing block is arranged on the It can be moved along the first direction on two propellers and in the presence of second propeller;Drawing mechanism, for by rotating shaft by rotating shaft Supporting part is moved on hinge brackets.
Further, bearing block includes:Bearing bracket, bearing housing portion are arranged on bearing bracket;Bearing mounting base, axle Support bracket is arranged on bearing mounting base elastic mechanism in a manner of it can be moved in the plane perpendicular to first direction.
Further, elastic mechanism includes:Four elastic components, are evenly spaced apart to enclose in the plane perpendicular to first direction It is wound on bearing bracket.
Further, the second propeller includes servomotor.
Further, bearing Mounting device also includes:Bearing guide, there is bearing to slip into end and bearing and skid off end, bearing Skid off end corresponding shaft bearing receiving portion;Baffle plate, there is catch bearing to skid off the first position at end and deviate bearing and skid off the second of end Position;Actuator, driving baffle plate are changed between the first position and the second position.
Further, hinge brackets are two, and two hinge brackets are arranged at intervals in a first direction, bearing Mounting device Also include:The carriage rail extended in a first direction, two hinge brackets are arranged on support in a manner of it can move along the first direction On frame guide rail.
Further, hinge brackets include:Rotating shaft slideway, extend along perpendicular to the direction of first direction;Rotating shaft location division, It is arranged on rotating shaft slideway and is moved to prevent rotation stop axle edge perpendicular to the direction of first direction.
Apply the technical scheme of the present invention, rotating shaft is placed on fixed seat in a manner of it is axially parallel to first direction In rotating shaft support portion, start the first propeller and promote jump ring promotion part towards the jump-ring slot movement in rotating shaft, at the same time, jump ring Moved in the presence of jump ring promotion part towards jump-ring slot, because there is provided rotating shaft stopper section, therefore, jump ring and shaft contacts Afterwards, rotating shaft will not be directed away from the direction movement of jump ring, namely rotating shaft will not move towards the direction of the first propeller, jump ring energy It is enough to be successfully caught in jump-ring slot, realize the installation of jump ring.Because connecting portion is arranged on the first propeller, also, jump ring Promotion part is arranged on connecting portion the first guide frame in a manner of it can move along the first direction, therefore, jump ring promotion part It can be moved up in the axle of rotating shaft 3, jump ring can be promoted from the diverse location of rotating shaft axial direction by mobile jump ring promotion part To adapt to the jump-ring slot of diverse location.As the above analysis, jump ring of the invention installation equipment can be easily in rotating shaft Installation jump ring in the jump-ring slot of diverse location.
Brief description of the drawings
The Figure of description for forming the part of the application is used for providing a further understanding of the present invention, and of the invention shows Meaning property embodiment and its illustrate be used for explain the present invention, do not form inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 shows the part-structure schematic diagram of the embodiment of the jump ring installation equipment according to the present invention(Bearing is not shown Erecting device);
Fig. 2 shows the internal structure schematic diagram of Fig. 1 jump ring installation equipment;
Fig. 3 shows enlarged diagram at the A of Fig. 2 jump ring installation equipment;
Fig. 4 shows the external structure schematic diagram of Fig. 1 jump ring installation equipment;
Fig. 5 shows enlarged diagram at the B of Fig. 4 jump ring installation equipment.
Wherein, the reference in above-mentioned figure is as follows:
1st, squirrel-cage motor rotator;2nd, cage body;3rd, rotating shaft;10th, fixed seat;11st, fixed block;12nd, bottom plate;13rd, discharging dress Put;14th, locating piece;20th, propulsion plant;21st, the first propeller;22nd, connecting portion;23rd, jump ring promotion part;24th, chute;30th, block Spring guide rail;40th, limited block;41st, move portion;42nd, limiting section;43rd, waist hole;50th, bearing block;51st, bearing bracket;52nd, bearing is pacified Fill seat;60th, the second propeller;61st, servomotor;62nd, shaft coupling;63rd, ball screw is promoted;64th, ball screw support base; 65th, protective cover;70th, hinge brackets;71st, rotating shaft slideway;72nd, rotating shaft location division;81st, bearing guide;82nd, baffle plate;83rd, drive Part;84th, bearing electric machine is sorted;85th, frame;86th, pusher cylinder;87th, carriage rail;88th, regulating block;89th, bearing hopper is sent.
Embodiment
It should be noted that in the case where not conflicting, the feature in embodiment and embodiment in the application can phase Mutually combination.Describe the present invention in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
As shown in figure 1, the jump ring installation equipment of the present embodiment includes fixed seat 10, propulsion plant 20 and rotating shaft stopper section. Fixed seat 10 has the rotating shaft support portion for being used for supporting rotating shaft 3.Propulsion plant 20 includes the first propeller 21, connecting portion 22 and used In promotion jump ring(Do not marked in figure)Jump ring promotion part 23, jump ring promotion part 23 is by the first guide frame with can be along first party It is arranged on to mobile mode on connecting portion 22, connecting portion 22 is arranged on the first propeller 21, and connecting portion 22 promotes first It can be moved in the presence of device 21 along the direction perpendicular to first direction.Rotating shaft stopper section is arranged in fixed seat 10 and is used for backstop Rotating shaft is directed away from the direction movement of the first propeller 21.Rotating shaft 3 is the rotating shaft of squirrel-cage motor rotator 1, and squirrel-cage is electric Machine rotor also includes the cage body 2 positioned at the middle part of rotating shaft 3.First propeller 21 is preferably cylinder, and connecting portion 22 is preferably contiguous block, Jump ring promotion part 23 is preferably jump ring forward block.
Equipment is installed using the jump ring of the present embodiment, rotating shaft 3 is placed in a manner of it is axially parallel to first direction In the rotating shaft support portion of fixed seat 10, start the first propeller 21 and promote jump ring promotion part 23 to be moved towards the jump-ring slot in rotating shaft 3 Dynamic, at the same time, jump ring moves in the presence of jump ring promotion part 23 towards jump-ring slot, due to there is provided rotating shaft stopper section, because This, after jump ring contacts with rotating shaft 3, rotating shaft 3 will not be directed away from the direction movement of jump ring, namely rotating shaft 3 will not push away towards first Enter the direction movement of device 21, jump ring successfully can be caught in jump-ring slot, realize the installation of jump ring.Because connecting portion 22 is set On the first propeller 21, also, jump ring promotion part 23 is pacified the first guide frame in a manner of it can move along the first direction On connecting portion 22, therefore, jump ring promotion part 23 can move up in the axle of rotating shaft 3, pass through mobile jump ring promotion part 23 Jump ring can be promoted from the diverse location of the axial direction of rotating shaft 3 to adapt to the jump-ring slot of diverse location.As the above analysis, this reality Apply the jump ring installation equipment of example easily can install jump ring in the jump-ring slot of the diverse location of rotating shaft 3.So, the present embodiment Jump ring installation equipment it is not only simple to operate, and installation rate is fast, efficiency high.
As shown in figure 1, in the present embodiment, the first guide frame include the chute 24 being arranged on connecting portion 22 and with Sliding block that is that the structure of the chute 24 is adapted and being arranged on jump ring promotion part 23(Not shown in figure).Sliding block is located at chute 24 Inside, above-mentioned first guide frame is more stable and easy to process.Preferably, jump ring promotion part 23 is oriented to by first Structure is arranged on connecting portion 22 in a manner of only moving along the first direction, and chute 24 is preferably T-slot or dovetail groove.
As shown in figure 1, the jump ring installation equipment of the present embodiment also includes jump ring guide rail 30, jump ring guide rail 30 is arranged on fixation On seat 10, jump ring guide rail 30 plays guiding function to jump ring.There is jump ring guide rail 30 jump ring upstream end and jump ring to skid off end, jump ring The position of upstream end skids off the position at end higher than jump ring.After jump ring is placed on jump ring guide rail 30 by jump ring upstream end, jump ring exists Jump ring can be moved to by jump ring upstream end under Action of Gravity Field and skid off end, so, the jump ring installation equipment cancellation of the present embodiment is existing Usually used sub-material frock and vacsorb or manipulator decompose the compound actions such as device for taking in equipment, the present embodiment Jump ring installation equipment operation is simple, good operating stability.Preferably, jump ring guide rail 30 has horizontal segment and vertical section, and jump ring enters Enter end in vertical section, jump ring skids off end on horizontal segment, after multiple jump rings are placed on jump ring guide rail 30, often pacifies Fill a jump ring, remaining jump ring on jump ring guide rail 30 will skid off the mobile position to fill a vacancy in end towards jump ring.
As shown in figure 1, in the present embodiment, the cross section of jump ring guide rail 30 is T-shaped.The energy of jump ring guide rail 30 of T-type structure Enough make jump ring is more stable to slide on, prevent jump ring from departing from jump ring guide rail 30.
In the present embodiment, rotating shaft support portion is brace groove that is accommodating rotating shaft and extending in a first direction(In figure not Mark), the groove away from the first propeller 21 in be spaced in a direction perpendicular to the first direction two cell walls of brace groove Wall forms rotating shaft stopper section.Two cell walls can play backstop action with countershaft 3, rotating shaft 3 is more stably placed on and turn On shaft supporting part.Preferably, jump ring escape groove, bearing of trend and the jump ring guide rail 30 of jump ring escape groove are provided with fixed seat 10 Horizontal segment bearing of trend it is identical, so, jump ring can move along jump ring escape groove on jump ring guide rail 30, and finally move The position of jump-ring slot on to corresponding rotating shaft 3.The setting of jump ring escape groove can make the position reduction adaptation of jump ring be placed on branch Support the position of the jump-ring slot of the rotating shaft 3 in groove.Preferably, the cross section of jump ring escape groove is L-type.
As shown in figure 1, in the present embodiment, fixed seat 10 includes two fixed blocks 11, and two fixed blocks 11 are in first party It is arranged at intervals upwards, each fixed block 11 is respectively provided with rotating shaft support portion, between jump ring promotion part 23 is corresponded between two fixed blocks 11 Gap.The fixed seat 10 of said structure more adapts to squirrel-cage motor rotator 1, and the gap of two fixed blocks 11 is used to place squirrel-cage electricity The cage body 2 of machine rotor 1.Preferably, fixed block 11 has the avoidance gap of corresponding jump ring promotion part 23, and mounted jump ring is at this Avoid in gap and supported by fixed block 11, can so facilitate jump ring promotion part 23 that jump ring is pushed into the jump-ring slot of rotating shaft 3 It is interior.It is of course also possible to by by jump ring promotion part 23 be designed to can either backstop and can enough support the structure of jump ring.Certainly, on Stating avoidance gap can also be formed by following manner, locating piece 14 be installed on each fixed block 11, locating piece 14 is led with jump ring Rail 30 and jump ring form the avoidance gap for accommodating jump ring and avoiding jump ring promotion part 23 between skidding off end.Preferably, jump ring guide rail 30 be two, and two jump ring guide rails 30 are installed correspondingly with two fixed blocks 11, and jump ring promotion part 23 is two, this Sample, two jump rings can be caught in the jump-ring slot of two diverse locations of rotating shaft 3 simultaneously, improve installation effectiveness.
As shown in figure 1, in the present embodiment, fixed seat 10 also includes bottom plate 12, two fixed blocks 11 are led by second It is arranged on to structure in a manner of it can move along the first direction on bottom plate 12.By moving fixed block 11, energy in a first direction The fixed seat 10 of said structure is adapted to the rotating shaft 3 of axially different size, further facilitate the installation of jump ring.
As shown in figure 1, in the present embodiment, limited block 40 is provided with each fixed block 11, limited block 40 includes movement Portion 41 and limiting section 42.Move portion 41 is arranged on fixed block 11 the 3rd guide frame in a manner of it can move along the first direction On;Limiting section 42 is fixed in corresponding move portion 41 and for limiting the movement of rotating shaft 3 in a first direction.Pass through move portion 41 can be able to change the distance between two limiting sections 42, and then can be fixed on the rotating shaft 3 with axially different size Between two limiting sections 42, preventing the axial movement of rotating shaft 3 causes the position of jump-ring slot thereon to change.For above-mentioned tool There is the structure of brace groove, also there is the holding tank for accommodating limiting section 42 on each fixed block 11.Move portion 41 is preferably movable plate, Limiting section 42 is preferably limiting plate.
As shown in figure 1, in the present embodiment, the 3rd guide frame includes being arranged in move portion 41 and in the first direction prolonging The waist hole 43 stretched and it is arranged on fixed block 11 and stretches into the lead of waist hole 43.Said structure facilitates tearing open for limited block 40 Dress.Preferably, lead is multiple and is arranged at intervals in the first direction.
As shown in Figure 2 and Figure 4, the jump ring installation equipment of the present embodiment also includes bearing Mounting device and drawing mechanism 13. Bearing Mounting device, which includes bearing block 50, the second propeller 60 and the hinge brackets 70 for supporting rotating shaft, bearing block 50, to be had For placing the bearing housing portion of bearing(It is mark in figure), bearing block 50 is arranged on the second propeller 60 and second pushed away at this Entering in the presence of device 60 to move along the first direction.Rotating shaft 3 is placed on rotating shaft in a manner of it is axially parallel with first direction On bracket 70, starting the second propeller 60 can promote bearing block 50 to be moved towards rotating shaft 3, at the same time, be accommodated positioned at bearing Bearing in portion(Do not marked in figure)Also can be moved towards rotating shaft 3, and most bearing is installed in rotating shaft 3 at last.Drawing mechanism 13 For rotating shaft to be moved into hinge brackets 70 by rotating shaft support portion.Jump ring installation equipment with said structure installs jump ring It is combined with bearing installation, rotating shaft 3 need to only be placed in rotating shaft support portion, can just complete jump ring installation and bearing peace by employee The whole process of dress, the jump ring installation equipment operation of the present embodiment is simple, and good operating stability, product type changes easy, effect Rate is even more to be more than doubled than manual rate.Preferably, drawing mechanism 13 is cylinder, also, corresponding two of the cylinder is solid Determine the gap between block 11, bottom plate 12 has the avoidance through hole for the piston rod for avoiding the cylinder, wedge, wedge are provided with cylinder Gap between inclined-plane two fixed blocks 11 of direction of shape block.Preferably, bearing housing portion is U-shaped groove.The card of the present embodiment Spring installation equipment also includes frame 85, and bearing Mounting device, drawing mechanism 13 and fixed seat 10 and propulsion plant 20 are respectively mounted In frame 85.Preferably, it is covered with protective cover 65 on the second propeller 60.
As shown in Fig. 2 in the present embodiment, bearing block 50 includes bearing bracket 51 and bearing mounting base 52.Bearing accommodates Portion is arranged on bearing bracket 51.Bearing bracket 51 is by elastic mechanism can be moved in the plane perpendicular to first direction Mode is arranged on bearing mounting base 52.So, bearing bracket 51 plays automatic corrective action when installing bearing, reduces peace Noise is big when filling bearing and easy out of order defect, greatly improves the quality of the rotating shaft 3 after installation bearing.
In the present embodiment, elastic mechanism includes four elastic components, and four elastic components are in the plane perpendicular to first direction On be evenly spaced apart to be centered around on bearing bracket 51.Elastic component is preferably spring.It is of course also possible to use two elastic components, and Bearing bracket 51 is located between two elastic components.
As shown in Fig. 2 in the present embodiment, the second propeller 60 includes servomotor 61.Servomotor 61 can pacify Precise positioning is carried out when filling bearing, bearing can be made to enter the depth of rotating shaft 3 and be consistent the rotating shaft 3 that bearing is provided with to guarantee Quality greatly improve.Servomotor 61, with promoting ball screw 63 to be connected, promotes ball screw 63 and axle by shaft coupling 62 Bearing 50 is connected, also, ball screw support base 64 is played a supporting role to the propulsion ball screw, improves propulsion ball wire Stability when bar works.
As shown in Fig. 2 in the present embodiment, bearing Mounting device also includes bearing guide 81, baffle plate 82 and actuator 83. Bearing guide 81 slips into end with bearing and bearing skids off end, and bearing, which skids off, holds corresponding shaft bearing receiving portion, on bearing guide 81 Bearing can be fallen into bearing housing portion, without manually bearing is placed in bearing housing portion, reduce labor intensity.Baffle plate 82 The first position at end is skidded off with catch bearing and deviates the second place that bearing skids off end.When baffle plate 82 is in first position When, remaining bearing on bearing guide 81 can not be fallen into bearing housing portion, in this manner it is possible to which it is real to start the second propeller 60 The installation of existing bearing;When baffle plate 82 is in the second place, the bearing on bearing guide 81 can not be fallen into bearing housing portion.Drive Moving part 83 drives baffle plate 82 to change between the first position and the second position.Actuator 83 is preferably cylinder.Preferably, bearing is led The bearing of rail 81 slips into end and send bearing hopper 89 to be connected, and send and sorting bearing electric machine 84 is provided with bearing hopper 89.Preferably, Bearing block 50 is two, and hinge brackets 70, between two bearing blocks 50, bearing guide 81 is two, and two bearings are led Rail 81 corresponds with two bearing blocks 50.In such manner, it is possible to install two bearings simultaneously, installation effectiveness is improved.It is further excellent Selection of land, the second propeller 60 only coordinate with a driving in two bearing blocks 50, and another bearing block 50 plays limitation rotating shaft 3 Radial position effect.
As shown in Figure 2 and Figure 4, in the present embodiment, hinge brackets 70 are two, and two hinge brackets 70 are in a first direction Upper interval setting, as shown in figure 5, bearing Mounting device also includes the carriage rail 87 extended in a first direction, two rotating shaft supports Frame 70 is arranged on carriage rail 87 in a manner of it can move along the first direction.Gap between two hinge brackets 70 is used to put Put the cage body 2 of squirrel-cage motor rotator 1.Due to the Variable of two hinge brackets 70, therefore, it is possible to adapt to different model Squirrel-cage motor rotator 1.Hinge brackets 70 play backstop action to cage body 2, prevent rotating shaft 3 from moving along the first direction.
As shown in Figures 2 and 3, in the present embodiment, hinge brackets 70 include rotating shaft slideway 71 and rotating shaft location division 72, turn Axle slideway 71 extends along perpendicular to the direction of first direction.Rotating shaft location division 72 is arranged on rotating shaft slideway 71 to prevent rotation stop axle edge Moved perpendicular to the direction of first direction.Said structure for bearing block 50 and fixed seat 10 there is suitable distance to provide base Plinth, rotating shaft 3 is moved on rotating shaft slideway 71 in the effect of drawing mechanism 13, and slides to rotating shaft location division 72 through rotating shaft slideway 71 On.As shown in Figure 4 and Figure 5, in the present embodiment, regulating block 88 is provided with each hinge brackets 70, each regulating block 88 is pacified On carriage rail 87.Pusher cylinder 86 is provided with frame 85, pusher cylinder 86 is used for rotating shaft 3 by hinge brackets 70 Release.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made any repaiies Change, equivalent substitution, improvement etc., should be included in the scope of the protection.

Claims (13)

1. a kind of jump ring installs equipment, it is characterised in that including:
Fixed seat (10), there is the rotating shaft support portion for being used for supporting rotating shaft;
Propulsion plant (20), including the first propeller (21), connecting portion (22) and the jump ring promotion part (23) for promoting jump ring, The jump ring promotion part (23) is arranged on the connecting portion the first guide frame in a manner of it can move along the first direction (22) on, the connecting portion (22) is arranged on first propeller (21), and the connecting portion (22) promotes described first It can be moved in the presence of device (21) along perpendicular to the direction of the first direction;
Rotating shaft stopper section, it is arranged in the fixed seat (10) and is directed away from first propeller for rotating shaft described in backstop (21) direction movement;
The fixed seat (10) includes:
Two fixed blocks (11), described two fixed blocks (11) are arranged at intervals in said first direction, each fixed block (11) the rotating shaft support portion is respectively provided with, the jump ring promotion part (23) corresponds to the gap between described two fixed blocks (11);
Limited block (40) is provided with each fixed block (11), the limited block (40) includes:
Move portion (41), the fixed block is arranged in a manner of it can be moved along the first direction the 3rd guide frame (11) on;
Limiting section (42), it is fixed on the corresponding move portion (41) and for limiting the shifting of the rotating shaft in a first direction It is dynamic;
Jump ring installs equipment, in addition to:
Jump ring guide rail (30), it is arranged in the fixed seat (10), the jump ring guide rail (30) has jump ring upstream end and jump ring End is skidded off, the position of the jump ring upstream end skids off the position at end higher than the jump ring.
2. jump ring according to claim 1 installs equipment, it is characterised in that first guide frame includes being arranged on institute State the chute (24) on connecting portion (22) and be adapted with the structure of the chute (24) and be arranged on the jump ring promotion part (23) sliding block on.
3. jump ring according to claim 1 installs equipment, it is characterised in that the cross section of the jump ring guide rail (30) is T Type.
4. jump ring according to claim 1 installs equipment, it is characterised in that the rotating shaft support portion is the receiving rotating shaft And the brace groove extended along the first direction, the brace groove are spaced on the direction of the first direction Two cell walls in away from the cell wall of first propeller (21) form the rotating shaft stopper section.
5. jump ring according to claim 1 installs equipment, it is characterised in that the fixed seat (10) also includes:
Bottom plate (12), described two fixed blocks (11) are the second guide frame in a manner of it can be moved along the first direction On the bottom plate (12).
6. jump ring according to claim 1 installs equipment, it is characterised in that the 3rd guide frame includes:
The waist hole (43) for being arranged in the move portion (41) and extending along the first direction;
It is arranged on the fixed block (11) and stretches into the lead of the waist hole (43).
7. jump ring according to claim 1 installs equipment, it is characterised in that also includes:
Bearing Mounting device, including bearing block (50), the second propeller (60) and the hinge brackets for supporting the rotating shaft (70), the bearing block (50) has the bearing housing portion for being used for placing bearing, and the bearing block (50) is arranged on described second It can be moved on propeller (60) and in the presence of second propeller (60) along the first direction;
Drawing mechanism (13), for the rotating shaft to be moved into the hinge brackets (70) by the rotating shaft support portion.
8. jump ring according to claim 7 installs equipment, it is characterised in that the bearing block (50) includes:
Bearing bracket (51), the bearing housing portion are arranged on the bearing bracket (51);
Bearing mounting base (52), the bearing bracket (51) is by elastic mechanism with can be in the plane perpendicular to the first direction The mode of upper movement is arranged on the bearing mounting base (52).
9. jump ring according to claim 8 installs equipment, it is characterised in that the elastic mechanism includes:
Four elastic components, it is evenly spaced apart to be centered around the bearing bracket (51) in the plane perpendicular to the first direction On.
10. jump ring according to claim 7 installs equipment, it is characterised in that second propeller (60) includes servo Motor (61).
11. jump ring according to claim 7 installs equipment, it is characterised in that the bearing Mounting device also includes:
Bearing guide (81), there is bearing to slip into end and bearing and skid off end, the bearing skids off the corresponding bearing housing portion in end;
Baffle plate (82), there is bearing described in backstop to skid off the first position at end and deviate the second place that the bearing skids off end;
Actuator (83), the baffle plate (82) is driven to be changed between the first position and the second place.
12. jump ring according to claim 7 installs equipment, it is characterised in that the hinge brackets (70) are two, described Two hinge brackets (70) are arranged at intervals in a first direction, and the bearing Mounting device also includes:
The carriage rail (87) extended along the first direction, described two hinge brackets (70) along the first direction can move Dynamic mode is arranged on the carriage rail (87).
13. jump ring according to claim 7 installs equipment, it is characterised in that the hinge brackets (70) include:
Rotating shaft slideway (71), extend along described perpendicular to the direction of the first direction;
Rotating shaft location division (72), it is arranged on the rotating shaft slideway (71) to prevent the rotating shaft along perpendicular to the first direction Direction movement.
CN201410084382.0A 2014-03-07 2014-03-07 Jump ring installs equipment Active CN104901484B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410084382.0A CN104901484B (en) 2014-03-07 2014-03-07 Jump ring installs equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410084382.0A CN104901484B (en) 2014-03-07 2014-03-07 Jump ring installs equipment

Publications (2)

Publication Number Publication Date
CN104901484A CN104901484A (en) 2015-09-09
CN104901484B true CN104901484B (en) 2017-11-14

Family

ID=54033954

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410084382.0A Active CN104901484B (en) 2014-03-07 2014-03-07 Jump ring installs equipment

Country Status (1)

Country Link
CN (1) CN104901484B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113162337B (en) * 2021-04-16 2022-06-17 杭州德创能源设备有限公司 Automatic loop wire of submersible motor

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102371478A (en) * 2010-08-10 2012-03-14 杭州山博自动化设备有限公司 E-shaped collar pressing machine
CN203045256U (en) * 2012-12-14 2013-07-10 苏州菱欧自动化设备有限公司 Assembling device of rotor stopping ring
CN203245564U (en) * 2013-03-18 2013-10-23 常州新区金康精工机械有限公司 Gasket taking and putting device of automatic motor assembly line
CN103441618A (en) * 2013-08-29 2013-12-11 湖州永昌贝诗讬电器实业有限公司 Motor rotor automatic snap spring and bearing pressing machine
CN203800775U (en) * 2014-03-07 2014-08-27 珠海凯邦电机制造有限公司 Clamp spring installation device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102371478A (en) * 2010-08-10 2012-03-14 杭州山博自动化设备有限公司 E-shaped collar pressing machine
CN203045256U (en) * 2012-12-14 2013-07-10 苏州菱欧自动化设备有限公司 Assembling device of rotor stopping ring
CN203245564U (en) * 2013-03-18 2013-10-23 常州新区金康精工机械有限公司 Gasket taking and putting device of automatic motor assembly line
CN103441618A (en) * 2013-08-29 2013-12-11 湖州永昌贝诗讬电器实业有限公司 Motor rotor automatic snap spring and bearing pressing machine
CN203800775U (en) * 2014-03-07 2014-08-27 珠海凯邦电机制造有限公司 Clamp spring installation device

Also Published As

Publication number Publication date
CN104901484A (en) 2015-09-09

Similar Documents

Publication Publication Date Title
CN204843079U (en) PCB board divides trigger
CN106926321A (en) A kind of timber is sized hi-precision cutting and waste recovery integration apparatus
CN102357917B (en) Pipe cutting machine
CN103395621B (en) A kind of small workpiece automatic collating unit with central aperture
CN203800775U (en) Clamp spring installation device
CN204846468U (en) Low -speed cartoning machine pushing equipment
CN105236130A (en) Automatic feeding and discharging device for panels
CN104670879B (en) Feeding-distribution device
CN104901484B (en) Jump ring installs equipment
CN205131769U (en) Automatic package system of silk socks
KR102068502B1 (en) Lift assembly for egg processing and related methods
CN105108487B (en) A kind of blade assemble mechanism of blade lock
CN205196939U (en) Hawthorn coring machine
CN205888540U (en) Automatic tooth machine is attacked in disc type drilling
CN205780656U (en) A kind of belt pulley clamping system
CN105480707B (en) Transport coil inserting apparatus and there is its automatic offline production line
CN204907844U (en) Vertical wax gourd chestnut peeling machine's positioning mechanism
RU2389122C1 (en) Bench for disassembly of magnetic system in electric machines
CN105598110A (en) Automatic cleaning method with solid-liquid separation
CN204413199U (en) A kind of novel efficient drilling machine for agricultural machinery processing
CN208736313U (en) A kind of full-automatic bearing inner diameter measurement machine
CN203747764U (en) Automatic taking-off device for tuning fork wafer
EP3093154A1 (en) Coil binding machine with transmission mechanism
CN108792579B (en) Iron core conveying device
CN209550657U (en) A kind of bus bar automated hole generation equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant