CN104901221B - Goods-shelf type secondary device cabin - Google Patents

Goods-shelf type secondary device cabin Download PDF

Info

Publication number
CN104901221B
CN104901221B CN201510357903.XA CN201510357903A CN104901221B CN 104901221 B CN104901221 B CN 104901221B CN 201510357903 A CN201510357903 A CN 201510357903A CN 104901221 B CN104901221 B CN 104901221B
Authority
CN
China
Prior art keywords
equipment
shelf
area
secondary device
goods
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510357903.XA
Other languages
Chinese (zh)
Other versions
CN104901221A (en
Inventor
孟碧波
蔡勇
宋国贵
龚俊
杨俊�
姚华为
康巧萍
李俊
赵雁萍
张伟
孙浩
文正其
万淑娟
刘杰
张超
李文娟
张晓燕
王小波
魏庆平
王金荣
谢东
熊炜
王晋
宿磊
王冠
刘明芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Power Supply Design Institute Co Ltd
State Grid Corp of China SGCC
Wuhan NARI Ltd
State Grid Hubei Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Hubei Electric Power Co Ltd
Hubei Electric Power Transmission and Distribution Engineering Co Ltd
Original Assignee
Wuhan Power Supply Design Institute Co Ltd
State Grid Corp of China SGCC
Wuhan NARI Ltd
State Grid Hubei Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Hubei Electric Power Co Ltd
Hubei Electric Power Transmission and Distribution Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Power Supply Design Institute Co Ltd, State Grid Corp of China SGCC, Wuhan NARI Ltd, State Grid Hubei Electric Power Co Ltd, Economic and Technological Research Institute of State Grid Hubei Electric Power Co Ltd, Hubei Electric Power Transmission and Distribution Engineering Co Ltd filed Critical Wuhan Power Supply Design Institute Co Ltd
Priority to CN201510357903.XA priority Critical patent/CN104901221B/en
Publication of CN104901221A publication Critical patent/CN104901221A/en
Application granted granted Critical
Publication of CN104901221B publication Critical patent/CN104901221B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of goods-shelf type secondary device cabin, including operation instruction area, equipment shelf area and installation Wiring area.The function in the operation instruction area is the operation information and key data of each equipment in centralized displaying secondary device cabin, it is divided into centralized displaying unit and centralized operation unit, the centralized displaying unit is made up of large screen display and corresponding operation button, and it is corresponding with the difference in functionality region on the shelf in equipment compartment that the centralized operation unit is divided into different operating areas according to secondary device function.Install comprehensive self-protecting device and equipment, the arrangement of the use goods-shelf type of creativeness concentratedly in the equipment shelf area.The installation Wiring area, summarizes the external communication light of whole and controlling cable of equipment shelf area equipment.The present invention uses goods-shelf type structure, and optimization design equipment Each part significantly improves receiving quantity, structural stability, the degree of protection in secondary device cabin, easy to maintenance.

Description

Goods-shelf type secondary device cabin
【Technical field】
The present invention relates to substation equipment field, more particularly to a kind of secondary setting based on the structure-integrated design of goods-shelf type Standby cabin.
【Background technology】
New Generation of Intelligent transformer station according to " theory is advanced, advanced technology, equip advanced, technique it is advanced, fortune inspection it is advanced " Standard high-quality and high-efficiency is produced, and puts forth effort to explore cutting edge technology, promotes intelligent substation innovation and development.Conscientiously demonstration project technology is advanced Innovation.The concept for proposing secondary device prefabricated cabin is widely popularized in New Generation of Intelligent transformer station.Original secondary device is related Screen cabinet is typically disposed in frame structure or building with brick-concrete structure, and its ground builds complicated, and structure foundation processing requirement is higher, Long construction period, it is clear that do not adapt to the demand that current New Generation of Intelligent converting station electric power is built.Secondary device outdoor prefabricated cabin Construction occupation of land is saved, construction costs is few, efficiency of the practice is high, widely used in the construction of New Generation of Intelligent transformer station.
Application form of the secondary device cabin in New Generation of Intelligent transformer station is mainly the scheme of " nacelle+cabinet+device ". Secondary device cabin with the container of standard as carrier because of volumetric constraint, mostly using the screen cabinet of single arrangement.For ease of connecing Line and maintenance, part producer are changed to the mode of button fly front by cabinet is shielded.The current secondary device cabin using screen cabinet mode, is present Smooth, storing apparatus are not few, casing installation carrying is inconvenient, operation maintenance inconvenience not good degree of protection, cabinet repetition setting, radiating The problems such as.
【The content of the invention】
In view of this, to overcome the deficiencies in the prior art, a kind of goods-shelf type secondary device cabin of present invention offer significantly improves Receiving quantity, structural stability, the degree of protection in secondary device cabin, and device radiation and ventilation are solved the problems, such as, safeguard It is convenient.
To achieve the above object, the technical scheme is that,
Goods-shelf type secondary device cabin, including operation instruction area, equipment shelf area and installation Wiring area, the operation instruction area Live apart in advancing equipment shelf, the equipment in the both sides in the equipment shelf area, the equipment shelf area with Wiring area is installed Regional on shelf places corresponding function device respectively.
The operation instruction divides into centralized displaying unit and centralized operation unit, the centralized displaying unit centralized list The real-time status and operation information of each equipment in displaying operation equipment cabin, the centralized operation unit is according to secondary device function It is divided into different operating areas corresponding with the difference in functionality region of the equipment shelf.
The function in the operation instruction area is the operation information and key data of each equipment in centralized displaying secondary device cabin, The basic operations such as operation maintenance are completed, the operating personnel of operation maintenance just can complete daily behaviour without access arrangement shelf area Make, improve the protection level in equipment shelf area.
The installation Wiring area summarizes the external communication light of whole and controlling cable of equipment shelf area equipment, according to Different functions divides wire area, is attached with other equipment in transformer station or device by way of concentrating electric wire connecting junction. Wiring to equipment shelf area in factory is classified and is connected, and defines the standard interface with external device and device, In-site installation concentrates the electric wire connecting junction just can to quickly finish connection between equipment and device using only needing plug.
It is preferred that the operation instruction divides into centralized displaying unit and centralized operation unit, it is characterized in:
The centralized displaying unit is made up of large screen display and corresponding operation button, can be shown with centralized list and grasped Make the real-time status and operation information of each equipment equipment compartment Nei, specific some equipment can be linked to by selection operation Operation operation display interface, detailed reading information or the corresponding operation of completion.
The centralized operation unit is divided into the shelf in different operating areas and equipment compartment according to secondary device function On difference in functionality region correspondence.
Further, the device in the equipment shelf area is installed on using the connection type of front end outlet, by pre- on shelf The connecting groove for staying is pooled to the concentration electric wire connecting junction of the equipment shelf left and right sides.
The electric wire connecting junction of concentrating in the left side is the display of aggregating apparatus and operation cable, for connecting with operation instruction region Connect;Wherein right side concentrate electric wire connecting junction for aggregating apparatus external wiring terminal and communication cable, for install wire area Connection.
Two equipment shelf are set in the equipment shelf area, and comprehensive self-protecting device and equipment are put together at the equipment On shelf, the function according to equipment is placed in the different zones of equipment shelf, is fixed by the fixing device of bottom of device In on the base plate of shelf.The method has broken original pattern that original secondary device cabin is arranged according to functional unit group screen, creates The arrangement of the use goods-shelf type of property.
Display data communication interface is set on the equipment shelf, is needed the data of display to upload each unit and is converged Collect operation instruction area centralized displaying unit to show, the display screen of equipment before cancelling effectively reduces device volume, improves secondary The saturation of equipment compartment.
The operation button and indicator lamp being installed on traditional screen cabinet concentrate the centralized operation for collecting and being installed on operation instruction area In unit, optimization design effectively reduces equipment volume, improves the saturation in secondary device cabin.
Further, setting collection middle connecting terminal on the equipment shelf, middle connecting terminal is collected conveniently and installation by described Concentration electric wire connecting junction correspondence in Wiring area is connected.
The beneficial effects of the invention are as follows secondary device cabin uses goods-shelf type topology layout, has broken original secondary screen cabinet Traditional concept, design is optimized to equipment compartment Each part, effectively reduces equipment volume, can significantly improve secondary device The receiving quantity in cabin, structural stability and degree of protection.
【Brief description of the drawings】
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing The accompanying drawing to be used needed for having technology description is briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is the structural representation in secondary device cabin of the present invention.
Fig. 2 is the structural representation of equipment shelf arrangement.
Fig. 3 is the structural representation of device lead wire.
In figure, 1, operation instruction area, 11, centralized displaying unit, 12, centralized operation unit, 2, equipment shelf area, 21, One equipment shelf, the 22, second equipment shelf, 3, install Wiring area, 30, concentrate electric wire connecting junction, 31, concentrate electric wire connecting junction, the 4, the 3rd sets Stock frame, 5, secondary device unit, 6, collection middle connecting terminal, 7, display data communication interface.
【Specific embodiment】
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
Reference picture 1, a kind of goods-shelf type secondary device cabin, including operation instruction area 1, equipment shelf area 2 and installation Wiring area 3, it is respectively arranged the first equipment shelf 21 and the second equipment shelf 22 by container inner side in equipment shelf area 2.
Comprehensive self-protecting device and equipment are placed on first equipment shelf 21 and the second equipment shelf 22, according to the function of equipment It is placed in the different zones of the first equipment shelf 21 and the second equipment shelf 22, is fixed on by the fixing device of bottom of device On the base plate of shelf.The method has broken original pattern that original secondary device cabin is arranged according to functional unit group screen, creative Use goods-shelf type arrangement.
Operation instruction area 1 is divided into collection in the both sides in equipment shelf area 2, operation instruction area 1 respectively with Wiring area 3 is installed Middle display unit 11 and centralized operation unit 12, each equipment in the centralized list of centralized displaying unit 11 displaying operation equipment cabin Real-time status and operation information, centralized operation unit 12 are divided into different operating areas and are set with first according to secondary device function Stock frame 21 is corresponding with the difference in functionality region of the second equipment shelf 22.
Centralized displaying unit 11 is made up of large screen display and corresponding operation button, can be shown with centralized list and operated The real-time status and operation information of each equipment in equipment compartment, the fortune of specific some equipment can be linked to by selection operation Row operation display interface, detailed reading information or the corresponding operation of completion.Centralized operation unit 12 is drawn according to secondary device function It is divided into different operating areas corresponding with the difference in functionality region on the shelf in equipment compartment.
The function in operation instruction area 1 is the operation information and key data of each equipment in centralized displaying secondary device cabin, complete Into basic operations such as operation maintenance, the operating personnel of operation maintenance just can complete regular job without access arrangement shelf area, The protection level in raising equipment shelf area.
Wiring area 3 is installed and is located at opposite side, multiple is set in it and concentrates electric wire connecting junction 31, Wiring area 3 is installed and summarizes equipment The external communication light of the whole of the equipment of shelf area 2 and controlling cable, wire area is divided according to different functions, by concentrating The mode of electric wire connecting junction 31 is attached with other equipment in transformer station or device.Wiring to equipment shelf area 2 in factory is entered Row classification and connect, define the standard interface with external device and device, in-site installation concentrates wiring using only needing plug Device 31 just can quickly finish the connection between equipment and device.
Referring to Fig. 2, the neat secondary device unit 5 of multiple Boulezs, secondary device unit 5 are provided with the 3rd equipment shelf 4 It is each difference in functionality equipment in the 3rd equipment shelf 4.
Each secondary device unit 5 is pooled to using the connection type of front end outlet by the connecting groove reserved on shelf The concentration electric wire connecting junction 30,31 of the left and right sides of the 3rd equipment shelf 4.
The electric wire connecting junction 30 of concentrating in left side is the display of aggregating apparatus and operation cable, for being connected with operation instruction region; The electric wire connecting junction 31 of concentrating on wherein right side is the external wiring terminal and communication cable of aggregating apparatus, for connecting with installation wire area Connect.
Display data communication interface 7 and multiple collection middle connecting terminals 6 are set referring to Fig. 3, on secondary device unit, and concentration connects Line terminals 6 are disposed side by side on secondary device unit 5.
Each secondary device unit 5 is needed the data upload of display to be pooled to behaviour shown in Fig. 1 by display data communication interface 7 Make to indicate the centralized displaying unit 11 in area 1 to show, the display screen of equipment before cancelling effectively reduces device volume, improves secondary The saturation of equipment compartment.
Operation button and indicator lamp on secondary device unit 5 concentrate the operation instruction collected and be installed on shown in above-mentioned Fig. 1 In the centralized operation unit 12 in area 1, this kind of optimization design is conducive to reducing equipment volume, improves the saturation in secondary device cabin.
The present invention is made using above-mentioned goods-shelf type structure, each functional area connection and reasonable arrangement, optimization design equipment Each part It has more multi-functional, significantly improves receiving quantity, structural stability and the degree of protection in secondary device cabin, easy to maintenance.
Presently preferred embodiments of the present invention is the foregoing is only, is not intended to limit the invention, it is all in essence of the invention Within god and principle, any modification, equivalent substitution and improvements made etc. should be included within the scope of the present invention.

Claims (6)

1. goods-shelf type secondary device cabin, it is characterised in that including operation instruction area, equipment shelf area and install Wiring area, it is described Live apart in advancing equipment goods in the both sides in the equipment shelf area, the equipment shelf area with Wiring area is installed in operation instruction area Frame, the regional on the equipment shelf places corresponding function device respectively;
The operation instruction divides into centralized displaying unit and centralized operation unit, the centralized displaying unit centralized list displaying The real-time status and operation information of each equipment in operation equipment cabin, the centralized operation unit are divided according to secondary device function For different operating areas is corresponding with the difference in functionality region of the equipment shelf;
The installation Wiring area summarizes the external communication light of whole and controlling cable of equipment shelf area equipment, according to difference Function divide wire area, be attached with other equipment in transformer station or device by way of concentrating electric wire connecting junction.
2. goods-shelf type secondary device cabin as claimed in claim 1, it is characterised in that be installed on the device in the equipment shelf area Using the connection type of front end outlet, the concentration of the equipment shelf left and right sides is pooled to by the connecting groove reserved on shelf Electric wire connecting junction.
3. goods-shelf type secondary device cabin according to claim 2, it is characterised in that the concentration electric wire connecting junction in the left side is to converge The display of acquisition means and operation cable, for being connected with operation instruction region;Wherein the concentration electric wire connecting junction on right side is aggregating apparatus External wiring terminal and communication cable, for install wire area be connected.
4. goods-shelf type secondary device cabin according to claim 1, it is characterised in that two are set in the equipment shelf area Equipment shelf, comprehensive self-protecting device and equipment are put together on the equipment shelf, and the function according to equipment is placed in and sets Get ready the goods in the different zones of frame, be fixed on the base plate of shelf by the fixing device of bottom of device.
5. goods-shelf type secondary device cabin according to claim 1, it is characterised in that display number is set on the equipment shelf According to communication interface.
6. goods-shelf type secondary device cabin according to claim 1, it is characterised in that concentration is set on the equipment shelf and is connect Line terminals.
CN201510357903.XA 2015-06-25 2015-06-25 Goods-shelf type secondary device cabin Active CN104901221B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510357903.XA CN104901221B (en) 2015-06-25 2015-06-25 Goods-shelf type secondary device cabin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510357903.XA CN104901221B (en) 2015-06-25 2015-06-25 Goods-shelf type secondary device cabin

Publications (2)

Publication Number Publication Date
CN104901221A CN104901221A (en) 2015-09-09
CN104901221B true CN104901221B (en) 2017-06-09

Family

ID=54033716

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510357903.XA Active CN104901221B (en) 2015-06-25 2015-06-25 Goods-shelf type secondary device cabin

Country Status (1)

Country Link
CN (1) CN104901221B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108153946B (en) * 2017-12-12 2021-05-11 中国电建集团福建省电力勘测设计院有限公司 Automatic export method of prefabricated cabin cable list based on standard wiring

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2751799B1 (en) * 1996-07-25 1998-09-11 Gec Alsthom T & D Sa PREFABRICATED STATION FOR ELECTRICAL EQUIPMENT, PARTICULARLY FOR METAL-ENCLOSED EQUIPMENT
CN203445460U (en) * 2013-08-19 2014-02-19 国家电网公司 Prefabricated secondary combination equipment cabin
CN203690732U (en) * 2014-02-08 2014-07-02 湖北省电力勘测设计院 Integrated secondary equipment cabin
CN104143774B (en) * 2014-08-08 2016-08-24 国家电网公司 A kind of secondary equipment of intelligent converting station prefabricated cabin structure
CN104409989A (en) * 2014-12-02 2015-03-11 国家电网公司 Rack type modular secondary screen cabinet in prefabricated cabin

Also Published As

Publication number Publication date
CN104901221A (en) 2015-09-09

Similar Documents

Publication Publication Date Title
CN109038823A (en) Distributed wind-light storage integration intelligent control system for microgrid
CN103683503A (en) System for household power consumption management based on intelligent interaction device
CN104216358A (en) Two-stage energy management based intelligent community low-carbon energy management system
CN102064604A (en) Multifunctional electric energy information concentrator and working method thereof
CN106599034A (en) Power grid enterprise power balance data visualization system and method
CN203924771U (en) New forms of energy bus platform
CN207833300U (en) A kind of building site water power energy-saving monitoring and wireless remote control system
CN106160230A (en) A kind of power distribution station supply network path planning system
CN104901221B (en) Goods-shelf type secondary device cabin
CN102868437A (en) Wireless data transmission system of load control terminal for communication signal blind area
CN205017052U (en) System is used multipurposely at urban road street lamp power supply networking based on direct current facility that charges
CN201904652U (en) Concentrator for power consumption information of users
CN206021537U (en) The intelligent electric meter parallel wireless kilowatt meter reading-out system of multi-frequency
CN112653246A (en) New energy remote centralized control center communication channel system constructed based on power private network
CN206412986U (en) Photovoltaic conflux monitoring terminal
CN203165193U (en) Electric power information collecting system
CN203104520U (en) Intelligent main station system
CN205246729U (en) A device that is used for resident to take accuse table SMS notice collecting fee
CN206023374U (en) A kind of power distribution station supply network path planning system
CN203930450U (en) A kind of combined multipath user intelligent electric meter
CN203398607U (en) AC low voltage power distribution cabinet
CN203193662U (en) Floor terminal box used for four-network integration
CN208285279U (en) A kind of header box acquisition and emitter based on NBIOT
CN202584400U (en) Intelligent carrier wireless comprehensive meter reading system
CN206192407U (en) Based on station data acquisition device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Meng Bibo

Inventor after: Zhang Wei

Inventor after: Sun Hao

Inventor after: Wen Zhengqi

Inventor after: Wan Shujuan

Inventor after: Liu Jie

Inventor after: Zhang Chao

Inventor after: Li Wenjuan

Inventor after: Zhang Xiaoyan

Inventor after: Wang Xiaobo

Inventor after: Wei Qingping

Inventor after: Cai Yong

Inventor after: Wang Jinrong

Inventor after: Xie Dong

Inventor after: Xiong Wei

Inventor after: Wang Jin

Inventor after: Su Lei

Inventor after: Wang Guan

Inventor after: Liu Mingfang

Inventor after: Song Guogui

Inventor after: Gong Jun

Inventor after: Yang Jun

Inventor after: Yao Huawei

Inventor after: Kang Qiaoping

Inventor after: Li Jun

Inventor after: Zhao Yanping

Inventor before: Meng Bibo

Inventor before: Yao Huawei

Inventor before: Song Guogui

Inventor before: Li Wenjuan

Inventor before: Zhang Xiaoyan

Inventor before: Wang Xiaobo

Inventor before: Wei Qingping

Inventor before: Wang Jinrong

Inventor before: Wang Jin

Inventor before: Xie Dong

Inventor before: Xiong Wei

Inventor before: Cai Yong

Inventor before: Liu Jie

Inventor before: Wang Guan

Inventor before: Gong Jun

Inventor before: Zhang Wei

Inventor before: Yang Jun

Inventor before: Sun Hao

Inventor before: Wan Shujuan

Inventor before: Li Jun

Inventor before: Kang Qiaoping

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant