CN205246729U CN201521096611.7U CN201521096611U CN205246729U CN 205246729 U CN205246729 U CN 205246729U CN 201521096611 U CN201521096611 U CN 201521096611U CN 205246729 U CN205246729 U CN 205246729U
Authority
CN
China
Prior art keywords
unit
main control
meter
control unit
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201521096611.7U
Other languages
Chinese (zh)
Inventor
刘永祥
雷渊
郭建荣
陈永平
李宁
李志敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201521096611.7U priority Critical patent/CN205246729U/en
Application granted granted Critical
Publication of CN205246729U publication Critical patent/CN205246729U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Arrangements For Transmission Of Measured Signals (AREA)

Abstract

本实用新型公开了一种用于居民费控表短信通知缴费的装置,包括CPU主控单元,以及均与CPU主控单元相交互的数据采集单元、无线通讯单元、存储单元以及电源管理单元,电源管理单元的输入端与费控表前端AC-220V电源相连,输出端转换为供CPU主控单元、数据采集单元、无线通讯单元以及存储单元的工作电压;本实用新型通过数据采集单元实时采集用户费控表的费用及电量数据,通过CPU主控单元处理后发送给用户终端,能够在电表剩余金额、剩余电量不足时能够及时以短信方式通知用户缴费,大大减少了人工催费所带来的人力、财力及时间上的浪费。

The utility model discloses a device for notifying payment by short message of a resident fee control meter, which comprises a CPU main control unit, a data acquisition unit, a wireless communication unit, a storage unit and a power supply management unit all interacting with the CPU main control unit. The input end of the power management unit is connected to the AC-220V power supply at the front end of the fee control meter, and the output end is converted into the working voltage for the CPU main control unit, data acquisition unit, wireless communication unit and storage unit; the utility model collects in real time through the data acquisition unit The cost and power data of the user fee control meter are processed by the CPU main control unit and sent to the user terminal. When the remaining amount of the meter and the remaining power are insufficient, the user can be notified to pay the bill in time by SMS, which greatly reduces the cost caused by manual reminders. waste of human, financial and time.

Description

一种用于居民费控表短信通知缴费的装置A device for notifying payment by short message of resident fee control meter

【技术领域】【Technical field】

本实用新型涉及一种用于居民费控表短信通知缴费的装置,具体涉及一种能够实现同时对多个费控电能表的剩余金额、剩余电量等指标进行在线实时监测并在达到报警门限值的情况下向居民用户发送充值短信提醒的终端装置。The utility model relates to a device for notifying payment by short message of a resident fee control meter, in particular to a device capable of realizing online real-time monitoring of indicators such as the remaining amount and remaining power of multiple fee control electric energy meters at the same time and when the alarm threshold is reached A terminal device that sends SMS reminders for recharge to resident users when the value is exceeded.

【背景技术】【Background technique】

随着近几年我国电力体制改革的深入和大中城市配网改造工程的成功实施,供电体系必须进行一系列的自动化和智能化改造,以保证配输电系统能够高效、公平、便捷的为电能使用者提供优质服务。但目前基层单位的电能表由于采用表箱集中式安装,在电能表剩余金额达到报警门限时,电能表背光报警无法及时有效的通知到居民用户。With the deepening of my country's power system reform in recent years and the successful implementation of distribution network transformation projects in large and medium-sized cities, the power supply system must undergo a series of automation and intelligent transformation to ensure that the power distribution and transmission system can provide electricity efficiently, fairly and conveniently. Provide users with high-quality services. However, due to the centralized installation of the electric energy meters in the grass-roots units, when the remaining amount of the electric energy meter reaches the alarm threshold, the backlight alarm of the electric energy meter cannot notify the residential users in a timely and effective manner.

上述问题会导致:一、用户在不知道自己的电费余额不足的情况下,被电力公司强行切断电力供应;二、电力公司需要派专人前往小区催费。强行切断电力,容易使电力公司和用户产生民事纠纷。而对于那些电表安装位置比较分散的地区进行人工催费则会浪费大量的人力资源,并且实时性也较差。The above-mentioned problems will lead to: 1. The power company forcibly cuts off the power supply of the user without knowing that his electricity bill balance is insufficient; 2. The power company needs to send a special person to the community to urge the bill. Forcibly cutting off the power will easily cause civil disputes between the power company and the user. However, for those areas where the installation locations of electric meters are relatively scattered, manual reminders will waste a lot of human resources, and the real-time performance is also poor.

【实用新型内容】【Content of utility model】

本实用新型的目的在于解决上述问题,提供一种用于居民费控表短信通知缴费的装置,该装置能够在电表剩余金额、剩余电量不足时给用户及时发送充值短信提醒,而不再需要人工催费,从而降低表计的维护成本。The purpose of this utility model is to solve the above problems, and to provide a device for notifying payment by short message of the residential fee control meter. Reminder, thereby reducing the maintenance cost of the meter.

为达到上述目的,本实用新型采用以下技术方案予以实现:In order to achieve the above object, the utility model adopts the following technical solutions to achieve:

一种用于居民费控表短信通知缴费的装置,包括壳体,以及设置于壳体内的主控电路板,主控电路板上设置有CPU主控单元,以及均与CPU主控单元相交互的数据采集单元、无线通讯单元、存储单元以及电源管理单元,输出端转换为供CPU主控单元、数据采集单元、无线通讯单元以及存储单元的工作电压;壳体的下端设置电源接口和数据接口,并安装有与无线通讯单元相连的天线,电源管理单元通过电源接口与费控表前端AC-220V电源相连,数据采集单元通过数据接口与费控表相连,壳体的正面设置有运行状态显示面板;其中,A device for notifying payment by short message of a residential fee control meter, including a housing, and a main control circuit board arranged in the housing, the main control circuit board is provided with a CPU main control unit, and both interact with the CPU main control unit The data acquisition unit, wireless communication unit, storage unit and power management unit, the output end is converted to the working voltage for the CPU main control unit, data acquisition unit, wireless communication unit and storage unit; the lower end of the housing is provided with a power interface and a data interface , and an antenna connected to the wireless communication unit is installed, the power management unit is connected to the AC-220V power supply at the front end of the fee control meter through the power interface, the data acquisition unit is connected to the fee control meter through the data interface, and the front of the housing is equipped with a running status display panel; where,

数据采集单元用于采集至少一个费控表的费用及电量数据,并将采集到的数据发送给CPU主控单元;The data acquisition unit is used to collect the cost and electricity data of at least one cost control meter, and send the collected data to the CPU main control unit;

CPU主控单元对数据采集单元采集的数据进行处理,将其转换为费用及电量信息,在电表剩余金额或剩余电量不足时,通过无线通讯单元通知终端用户;The CPU main control unit processes the data collected by the data acquisition unit, converts it into cost and power information, and notifies the end user through the wireless communication unit when the remaining amount of the meter or the remaining power is insufficient;

存储单元包括Flash数据存储单元和EEPROM参数存储单元,Flash数据存储单元用于存储电能表的历史数据,EEPROM参数存储单元用于存储电能表的参数。The storage unit includes a Flash data storage unit and an EEPROM parameter storage unit. The Flash data storage unit is used to store the historical data of the electric energy meter, and the EEPROM parameter storage unit is used to store the parameters of the electric energy meter.

本实用新型进一步的改进在于:The further improvement of the utility model is:

所述数据采集单元采用有极性RS-485采集单元,用于采集四块电能表的数据;数据接口包括RS-485正极接口和RS-485负极接口。The data acquisition unit adopts a polarized RS-485 acquisition unit for collecting data of four electric energy meters; the data interface includes an RS-485 positive interface and an RS-485 negative interface.

所述CPU主控单元上连接有用于查询和设置通信参数、主站号码以及用户号码的红外维护单元,红外维护单元和无线通讯单元均通过串行总线与CPU主控单元相交互;The CPU main control unit is connected with an infrared maintenance unit for querying and setting communication parameters, master station number and user number, and the infrared maintenance unit and the wireless communication unit interact with the CPU main control unit through a serial bus;

所述红外维护单元包括38K红外发送调制电路以及红外发射和接收单元,红外发射和接收单元的发射和接收端设置于运行状态显示面板上。The infrared maintenance unit includes a 38K infrared transmission modulation circuit and an infrared transmission and reception unit, and the transmission and reception ends of the infrared transmission and reception unit are set on the running status display panel.

所述Flash数据存储单元通过SPI总线与CPU主控单元相交互,EEPROM参数存储单元通过I2C总线与CPU主控单元相交互。The Flash data storage unit interacts with the CPU main control unit through the SPI bus, and the EEPROM parameter storage unit interacts with the CPU main control unit through the I 2 C bus.

所述CPU主控单元通过I/O接口连接用于在CPU主控单元由于异常导致宕机时进行强行复位的看门狗复位单元;CPU主控单元和无线通讯单元均与用于在AC-220V电源断电时,向CPU主控单元和无线通讯单元放电,使CPU主控单元存储数据,无线通讯单元完成数据发送工作的法拉电容充放电单元。The CPU main control unit is connected to a watchdog reset unit for forced reset when the CPU main control unit is down due to an abnormality through an I/O interface; the CPU main control unit and the wireless communication unit are all connected to the AC- When the 220V power supply is cut off, it discharges to the CPU main control unit and the wireless communication unit, so that the CPU main control unit stores data, and the wireless communication unit completes the data transmission.

所述无线通讯单元采用GPRS网络处理单元,天线为GPRS天线,壳体的底部还设置有SIM卡槽;CPU主控单元采用型号为STM32F103的32位高速处理器。The wireless communication unit adopts a GPRS network processing unit, the antenna is a GPRS antenna, and the bottom of the casing is also provided with a SIM card slot; the CPU main control unit adopts a 32-bit high-speed processor modeled as STM32F103.

所述壳体分为上下扣合的两部分,通过至少四个螺栓固定。The housing is divided into two parts that are buckled up and down, and are fixed by at least four bolts.

所述壳体背部上端设置用于悬挂整个装置的挂钩,通过挂钩将整个装置安装与表箱中。The upper end of the back of the housing is provided with a hook for hanging the whole device, and the whole device is installed in the watch box through the hook.

所述壳体中部相对设置有上卡槽和下卡槽,上卡槽和下卡槽卡装在表箱的导轨中,将整个装置安装于表箱内。The middle part of the housing is relatively provided with an upper draw-in slot and a lower draw-in slot, and the upper draw-in slot and the lower draw-in slot are clamped in the guide rails of the watch box, and the whole device is installed in the watch box.

与现有技术相比,本实用新型具有以下有益效果:Compared with the prior art, the utility model has the following beneficial effects:

本实用新型通过数据采集单元实时采集用户费控表的费用及电量数据,通过CPU主控单元处理后发送给用户终端,能够在电表剩余金额、剩余电量不足时能够及时以短信方式通知用户缴费,大大减少了人工催费所带来的人力、财力及时间上的浪费。The utility model collects the fee and power data of the user fee control meter in real time through the data acquisition unit, and sends it to the user terminal after being processed by the CPU main control unit. When the remaining amount of the meter and the remaining power of the meter are insufficient, the user can be notified in time to pay by SMS. It greatly reduces the waste of manpower, financial resources and time brought by manual reminders.

进一步的,本实用新型上行通信为376.1规约可登陆GPRS主站,下行通过RS485采集电能表,对于载波通讯效果较差等原因导致抄表成功率偏低的地区采用本装置,可彻底的解决现场表计数据上传不及时、抄收率低的情况,能够进一步完善用电信息采集系统的数据完整性。Further, the uplink communication of the utility model is 376.1 protocol, which can log in to the GPRS master station, and the downlink collects electric energy meters through RS485. This device can be used in areas where the success rate of meter reading is low due to reasons such as poor carrier communication effects, which can completely solve the on-site problems. If the meter data is not uploaded in time and the copying rate is low, the data integrity of the electricity consumption information collection system can be further improved.

进一步的,本实用新型只需要对通信参数、主站电话号码、用户电话号码等常规参数进行配置,而无需更多的配置工作,在不增加设计成本的情况下,提高了设备的灵活性,并大大减少了参数配置的工作量,进而降低了设备的维护成本。Further, the utility model only needs to configure conventional parameters such as communication parameters, main station telephone number, user telephone number, etc. without more configuration work, and improves the flexibility of the equipment without increasing the design cost. And the workload of parameter configuration is greatly reduced, thereby reducing the maintenance cost of the equipment.

进一步的,本实用新型工作电压可直接从电表前端取电,具有体积小、功耗低、安装便捷的优点,同时具备导轨式、挂钩式两种安装方式,能够有效应对现场复杂的环境,施工方便可靠。Further, the working voltage of the utility model can be directly taken from the front end of the meter, which has the advantages of small size, low power consumption, and convenient installation. It also has two installation methods of guide rail type and hook type, which can effectively cope with the complex environment on site. Construction Convenient and reliable.

【附图说明】【Description of drawings】

图1是本实用新型的电气结构示意图;Fig. 1 is the electrical structure schematic diagram of the present utility model;

图2是本实用新型的电源管理电路图;Fig. 2 is a power management circuit diagram of the utility model;

图3是本实用新型的GPRS网络处理单元电路图;Fig. 3 is a circuit diagram of the GPRS network processing unit of the present utility model;

图4为本实用新型整体结构的主视图;Fig. 4 is the front view of the overall structure of the utility model;

图5为本实用新型的左视图;Fig. 5 is the left view of the utility model;

图6为本实用新型的后视图;Fig. 6 is the rear view of the utility model;

图7为本实用新型的仰视图;Fig. 7 is the bottom view of the utility model;

图8为本实用新型卡装于表箱中的示意图。Fig. 8 is a schematic diagram of the utility model clamped in the meter box.

【具体实施方式】【detailed description】

下面结合附图对本实用新型做进一步详细描述:Below in conjunction with accompanying drawing, the utility model is described in further detail:

参见图1至图8,本实用新型包括壳体1,以及设置于壳体1内的主控电路板,主控电路板上设置有CPU主控单元,以及均与CPU主控单元相交互的数据采集单元、无线通讯单元、存储单元以及电源管理单元,输出端转换为供CPU主控单元、数据采集单元、无线通讯单元以及存储单元的工作电压;如图7所示,壳体1的下端设置电源接口和数据接口,并安装有与无线通讯单元相连的天线,电源管理单元通过电源接口与费控表前端AC-220V电源相连,数据采集单元通过数据接口与费控表相连,壳体1的正面设置有运行状态显示面板3;其中,Referring to Fig. 1 to Fig. 8, the utility model comprises a casing 1, and a main control circuit board arranged in the casing 1, a CPU main control unit is arranged on the main control circuit board, and all interact with the CPU main control unit Data acquisition unit, wireless communication unit, storage unit and power management unit, the output end is converted into the operating voltage for the CPU main control unit, data acquisition unit, wireless communication unit and storage unit; As shown in Figure 7, the lower end of the housing 1 Set the power interface and data interface, and install the antenna connected to the wireless communication unit. The power management unit is connected to the AC-220V power supply at the front end of the fee control meter through the power interface. The data acquisition unit is connected to the fee control meter through the data interface. The shell 1 The front of the is provided with a running status display panel 3; wherein,

数据采集单元用于采集至少一个费控表的费用及电量数据,并将采集到的数据发送给CPU主控单元;数据采集单元采用有极性RS-485采集单元,用于采集四块电能表的数据;数据接口包括RS-485正极接口和RS-485负极接口。The data acquisition unit is used to collect the cost and electricity data of at least one fee control meter, and send the collected data to the CPU main control unit; the data acquisition unit adopts a polarized RS-485 acquisition unit, which is used to collect four electric energy meters The data; the data interface includes RS-485 positive interface and RS-485 negative interface.

无线通讯单元采用GPRS网络处理单元,天线为GPRS天线6,壳体1的底部还设置有SIM卡槽8;CPU主控单元采用型号为STM32F103的32位高速处理器。The wireless communication unit adopts a GPRS network processing unit, the antenna is a GPRS antenna 6, and the bottom of the housing 1 is also provided with a SIM card slot 8; the CPU main control unit adopts a 32-bit high-speed processor whose model is STM32F103.

存储单元包括Flash数据存储单元和EEPROM参数存储单元,Flash数据存储单元用于存储电能表的历史数据,EEPROM参数存储单元用于存储电能表的参数。Flash数据存储单元通过SPI总线与CPU主控单元相交互,EEPROM参数存储单元通过I2C总线与CPU主控单元相交互。The storage unit includes a Flash data storage unit and an EEPROM parameter storage unit. The Flash data storage unit is used to store the historical data of the electric energy meter, and the EEPROM parameter storage unit is used to store the parameters of the electric energy meter. The Flash data storage unit interacts with the CPU main control unit through the SPI bus, and the EEPROM parameter storage unit interacts with the CPU main control unit through the I 2 C bus.

CPU主控单元对数据采集单元采集的数据进行处理,将其转换为费用及电量信息,在电表剩余金额或剩余电量不足时,通过无线通讯单元通知终端用户;The CPU main control unit processes the data collected by the data acquisition unit, converts it into cost and power information, and notifies the end user through the wireless communication unit when the remaining amount of the meter or the remaining power is insufficient;

CPU主控单元上连接有用于查询和设置通信参数、主站号码以及用户号码的红外维护单元,红外维护单元和无线通讯单元均通过串行总线与CPU主控单元相交互;红外维护单元包括38K红外发送调制电路以及红外发射和接收单元,红外发射和接收单元的发射和接收端设置于运行状态显示面板3上。CPU主控单元通过I/O接口连接用于在CPU主控单元由于异常导致宕机时进行强行复位的看门狗复位单元;CPU主控单元和无线通讯单元均与用于在AC-220V电源断电时,向CPU主控单元和无线通讯单元放电,使CPU主控单元存储数据,无线通讯单元完成数据发送工作的法拉电容充放电单元。The CPU main control unit is connected with an infrared maintenance unit for querying and setting communication parameters, master station number and user number. Both the infrared maintenance unit and the wireless communication unit interact with the CPU main control unit through the serial bus; the infrared maintenance unit includes 38K Infrared sending and modulating circuit and infrared sending and receiving unit, the sending and receiving end of the infrared sending and receiving unit are set on the running state display panel 3 . The CPU main control unit is connected to the watchdog reset unit for forced reset when the CPU main control unit is down due to an abnormality through the I/O interface; both the CPU main control unit and the wireless communication unit are connected with the AC-220V power supply When the power is off, discharge to the CPU main control unit and the wireless communication unit, so that the CPU main control unit stores data, and the wireless communication unit completes the data transmission work of the farad capacitor charging and discharging unit.

壳体1分为上下扣合的两部分,通过至少四个螺栓7固定。本实用新型能够通过两种方式将整个装置安装于表箱中:The housing 1 is divided into two parts that are buckled up and down, and are fixed by at least four bolts 7 . The utility model can install the whole device in the meter box in two ways:

一、壳体1背部上端设置用于悬挂整个装置的挂钩2,通过挂钩2将整个装置安装与表箱中。1. The upper end of the back of the housing 1 is provided with a hook 2 for hanging the whole device, and the whole device is installed in the watch box through the hook 2 .

二、如图5、6和7所示,壳体1中部相对设置有上卡槽4和下卡槽5,上卡槽4和下卡槽5卡装在表箱的导轨9中,将整个装置安装于表箱内。2. As shown in Figures 5, 6 and 7, the middle part of the housing 1 is provided with an upper card slot 4 and a lower card slot 5, and the upper card slot 4 and the lower card slot 5 are clamped in the guide rail 9 of the meter box, and the entire The device is installed in the meter box.

本实用新型的电路结构原理:Circuit structure principle of the present utility model:

本实用新型主控电路包括电源管理单元、GPRS网络处理单元、RS-485采集单元、红外维护单元、法拉电容充放电单元、存储空间为4M的Flash数据存储单元和存储空间为32K的EEPROM参数存储单元,Flash数据存储单元和EEPROM参数存储单元分别通过SPI总线和I2C总线连接到CPU主控单元上,CPU主控单元采用型号为STM32F103的32位高速处理器。电源管理单元包括78L05芯片、差模电感、集成电源芯片以及整流桥,输入端接AC-220V电源。GPRS网络处理单元包括一块M590E-R2通信芯片以及通过物理隔离的C707SIM卡座。The main control circuit of the utility model includes a power management unit, a GPRS network processing unit, an RS-485 acquisition unit, an infrared maintenance unit, a farad capacitor charging and discharging unit, a Flash data storage unit with a storage space of 4M, and an EEPROM parameter storage unit with a storage space of 32K Unit, Flash data storage unit and EEPROM parameter storage unit are respectively connected to the CPU main control unit through SPI bus and I 2 C bus. The CPU main control unit adopts a 32-bit high-speed processor modeled as STM32F103. The power management unit includes 78L05 chip, differential mode inductor, integrated power chip and rectifier bridge, and the input terminal is connected to AC-220V power supply. The GPRS network processing unit includes a M590E-R2 communication chip and a C707 SIM card holder through physical isolation.

CPU主控单元通过串行总线与GPRS网络处理单元和红外维护单元相连。红外维护单元自带38K红外发送调制电路和接收电路。Flash数据存储单元通过SPI总线与CPU主控单元相连,用于智能电能表历史数据的存储。EEPROM参数存储单元通过I2C总线与CPU主控单元相连,用于智能电能表重要参数的存储。The CPU main control unit is connected with the GPRS network processing unit and the infrared maintenance unit through the serial bus. The infrared maintenance unit comes with a 38K infrared sending modulation circuit and receiving circuit. The Flash data storage unit is connected with the CPU main control unit through the SPI bus, and is used for storing the historical data of the smart energy meter. The EEPROM parameter storage unit is connected with the CPU main control unit through the I 2 C bus, and is used for storing important parameters of the smart energy meter.

CPU主控单元上通过I/O接口连接有法拉电容充放电单元,在外部220V交流供电断开的情况下,法拉电容充放电单元为CPU主控单元和GPRS网络处理单元供电,能够维持1~2分钟的电力供应,用于主控单元重要数据的存储。CPU主控单元通过I/O接口连接有硬件看门狗芯片,用于在CPU主控单元由于异常导致宕机时可以强行复位,恢复到正常的工作状态。The CPU main control unit is connected with a farad capacitor charging and discharging unit through the I/O interface. When the external 220V AC power supply is disconnected, the farad capacitor charging and discharging unit supplies power for the CPU main control unit and the GPRS network processing unit, and can maintain 1~ Power supply for 2 minutes is used for storage of important data of the main control unit. The CPU main control unit is connected with a hardware watchdog chip through the I/O interface, which is used to forcibly reset the CPU main control unit and return to the normal working state when the CPU main control unit is down due to an abnormality.

如图2所示,为本实用新型电源管理单元的电路图,电源管理单元包括78L05芯片、差模电感、集成电源芯片、整流桥。GPRS网络处理单元包括一块M590E-R2通信芯片、通过物理隔离的C707SIM卡座。As shown in Fig. 2, it is a circuit diagram of the power management unit of the present utility model. The power management unit includes a 78L05 chip, a differential mode inductor, an integrated power chip, and a rectifier bridge. The GPRS network processing unit includes a M590E-R2 communication chip and a C707 SIM card holder through physical isolation.

如图3所示,CPU主控单元还通过I/O接口连接SP706专用复位芯片。在所述的法拉电容充放电单元中,在外部AC-220V正常供电的情况下,自行充电,外部供电断开后,提供5V的直流给CPU主控单元和GPRS网络处理单元,持续时间为1~2分钟,此时间段用于CPU主控单元重要参数的保存以及数据停电转存。本实用新型CPU主控单元通过I/O接口分别与绿色LED状态灯和红色LED运行灯连接。As shown in Figure 3, the CPU main control unit is also connected to the SP706 dedicated reset chip through the I/O interface. In the charging and discharging unit of the farad capacitor, in the case of normal external AC-220V power supply, self-charging, after the external power supply is disconnected, 5V DC is provided to the CPU main control unit and GPRS network processing unit, and the duration is 1 ~2 minutes, this time period is used for saving important parameters of the CPU main control unit and transferring data after power failure. The CPU main control unit of the utility model is respectively connected with the green LED status light and the red LED running light through the I/O interface.

本实用新型的结构原理:Structural principle of the present utility model:

本实用新型的CPU主控单元是整个系统的核心,首先通过串行总线经过RS485数据采集单元采集最多四块智能电能表的电压、电流、功率、正向有功示值、剩余金额、剩余电量等实时数据,并在CPU主控单元中的72MHZARM7芯片中对收集的各指标数据进行统计、处理、告警及上传等工作。将指标及实时监测数据处理后,通过SPI总线写入存储空间为4M的AT45DB321Flash芯片中。最大可存储4块智能表连续31天的历史曲线数据以及62天的日冻结数据。CPU主控单元上行支持376.1主站通信规约,下行支持645智能表采集规约,可以同时采集智能表数据,并实现物理隔离。The CPU main control unit of the utility model is the core of the whole system. Firstly, the voltage, current, power, forward active value, remaining amount, and remaining power of up to four intelligent electric energy meters are collected through the serial bus through the RS485 data acquisition unit. Real-time data, and the 72MHZARM7 chip in the CPU main control unit performs statistics, processing, alarming and uploading of the collected indicator data. After the indicators and real-time monitoring data are processed, they are written into the AT45DB321Flash chip with a storage space of 4M through the SPI bus. It can store the historical curve data of 4 smart watches for 31 consecutive days and the daily frozen data of 62 days at most. The CPU main control unit supports the 376.1 master station communication protocol in the uplink, and supports the 645 smart meter collection protocol in the downlink, which can collect smart meter data at the same time and realize physical isolation.

CPU主控单元根据采集到的智能表剩余金额、剩余电量,与电表内报警门限值比较,当达到报警门限值后,会向指定的用户发送报警短信,短信内容依次为编号、姓名、当前剩余金额及提示及时充值的信息,且在用户未充值的情况下,间隔24小时再发送2次。通过上述过程,能够及时有效的通知到用户剩余金额不足,大大的减少了小区人工催费所带来的人力浪费。The CPU main control unit compares the remaining amount and remaining power of the smart meter collected with the alarm threshold value in the meter. When the alarm threshold value is reached, it will send an alarm message to the designated user. The content of the message is serial number, name, The current remaining amount and prompts for timely recharge information, and if the user has not recharged, will be sent twice at intervals of 24 hours. Through the above process, the user can be notified in a timely and effective manner that the remaining amount is insufficient, which greatly reduces the waste of manpower caused by manual reminders in the community.

以上内容仅为说明本实用新型的技术思想,不能以此限定本实用新型的保护范围,凡是按照本实用新型提出的技术思想,在技术方案基础上所做的任何改动,均落入本实用新型权利要求书的保护范围之内。The above content is only to illustrate the technical idea of the utility model, and cannot limit the protection scope of the utility model. Any changes made on the basis of the technical solution according to the technical idea proposed by the utility model all fall into the scope of the utility model. within the scope of protection of the claims.

Claims (10)

1.一种用于居民费控表短信通知缴费的装置,其特征在于,包括壳体(1),以及设置于壳体(1)内的主控电路板,主控电路板上设置有CPU主控单元,以及均与CPU主控单元相交互的数据采集单元、无线通讯单元、存储单元以及电源管理单元,输出端转换为供CPU主控单元、数据采集单元、无线通讯单元以及存储单元的工作电压;壳体(1)的下端设置电源接口和数据接口,并安装有与无线通讯单元相连的天线,电源管理单元通过电源接口与费控表前端AC-220V电源相连,数据采集单元通过数据接口与费控表相连,壳体(1)的正面设置有运行状态显示面板(3);其中,1. A device for notifying payment by short message of the residential fee control meter, characterized in that it comprises a housing (1), and a main control circuit board arranged in the housing (1), the main control circuit board is provided with a CPU The main control unit, as well as the data acquisition unit, wireless communication unit, storage unit and power management unit that all interact with the CPU main control unit, and the output end is converted into power for the CPU main control unit, data acquisition unit, wireless communication unit and storage unit Working voltage; the lower end of the housing (1) is provided with a power interface and a data interface, and an antenna connected to the wireless communication unit is installed. The interface is connected to the fee control meter, and the front of the housing (1) is provided with a running status display panel (3); wherein, 数据采集单元用于采集至少一个费控表的费用及电量数据,并将采集到的数据发送给CPU主控单元;The data acquisition unit is used to collect the cost and electricity data of at least one cost control meter, and send the collected data to the CPU main control unit; CPU主控单元对数据采集单元采集的数据进行处理,将其转换为费用及电量信息,在电表剩余金额或剩余电量不足时,通过无线通讯单元通知终端用户;The CPU main control unit processes the data collected by the data acquisition unit, converts it into cost and power information, and notifies the end user through the wireless communication unit when the remaining amount of the meter or the remaining power is insufficient; 存储单元包括Flash数据存储单元和EEPROM参数存储单元,Flash数据存储单元用于存储电能表的历史数据,EEPROM参数存储单元用于存储电能表的参数。The storage unit includes a Flash data storage unit and an EEPROM parameter storage unit. The Flash data storage unit is used to store the historical data of the electric energy meter, and the EEPROM parameter storage unit is used to store the parameters of the electric energy meter. 2.根据权利要求1所述的用于居民费控表短信通知缴费的装置,其特征在于,所述数据采集单元采用有极性RS-485采集单元,用于采集四块电能表的数据;数据接口包括RS-485正极接口和RS-485负极接口。2. according to claim 1, the device for notifying payment of bills by short message of residential fee control meter is characterized in that, said data acquisition unit adopts a polar RS-485 acquisition unit for collecting the data of four electric energy meters; Data interface includes RS-485 positive interface and RS-485 negative interface. 3.根据权利要求1所述的用于居民费控表短信通知缴费的装置,其特征在于,所述CPU主控单元上连接有用于查询和设置通信参数、主站号码以及用户号码的红外维护单元,红外维护单元和无线通讯单元均通过串行总线与CPU主控单元相交互。3. the device for the short message notification payment of the residential fee control meter according to claim 1, characterized in that, the CPU main control unit is connected with an infrared maintenance system for querying and setting communication parameters, master station number and user number The unit, the infrared maintenance unit and the wireless communication unit all interact with the CPU main control unit through the serial bus. 4.根据权利要求3所述的用于居民费控表短信通知缴费的装置,其特征在于,所述红外维护单元包括38K红外发送调制电路以及红外发射和接收单元,红外发射和接收单元的发射和接收端设置于运行状态显示面板(3)上。4. The device according to claim 3 for notifying the fee payment of the residential fee control meter short message, wherein the infrared maintenance unit includes a 38K infrared transmission modulation circuit and an infrared emission and reception unit, and the emission of the infrared emission and reception unit and the receiving end are arranged on the running state display panel (3). 5.根据权利要求1所述的用于居民费控表短信通知缴费的装置,其特征在于,所述Flash数据存储单元通过SPI总线与CPU主控单元相交互,EEPROM参数存储单元通过I2C总线与CPU主控单元相交互。5. The device according to claim 1 for notifying the fee payment of the resident fee control meter short message, wherein the Flash data storage unit interacts with the CPU master control unit through the SPI bus, and the EEPROM parameter storage unit communicates with the CPU master control unit through the I 2 C The bus interacts with the CPU master control unit. 6.根据权利要求1所述的用于居民费控表短信通知缴费的装置,其特征在于,所述CPU主控单元通过I/O接口连接用于在CPU主控单元由于异常导致宕机时进行强行复位的看门狗复位单元;CPU主控单元和无线通讯单元均与用于在AC-220V电源断电时,向CPU主控单元和无线通讯单元放电,使CPU主控单元存储数据,无线通讯单元完成数据发送工作的法拉电容充放电单元。6. The device according to claim 1, wherein the short message notification payment device for the residential fee control meter is characterized in that, the CPU main control unit is connected through an I/O interface for when the CPU main control unit is down due to abnormality Watchdog reset unit for forced reset; both the CPU main control unit and the wireless communication unit are used to discharge the CPU main control unit and the wireless communication unit when the AC-220V power supply is cut off, so that the CPU main control unit stores data, The wireless communication unit completes the farad capacitor charging and discharging unit for data transmission. 7.根据权利要求1-6任意一项所述的用于居民费控表短信通知缴费的装置,其特征在于,所述无线通讯单元采用GPRS网络处理单元,天线为GPRS天线(6),壳体(1)的底部还设置有SIM卡槽(8);CPU主控单元采用型号为STM32F103的32位高速处理器。7. according to any one of claim 1-6, the device for notifying payment of residents' fee control meter short message, is characterized in that, the wireless communication unit adopts a GPRS network processing unit, and the antenna is a GPRS antenna (6), and the housing The bottom of the body (1) is also provided with a SIM card slot (8); the CPU main control unit adopts a 32-bit high-speed processor whose model is STM32F103. 8.根据权利要求1所述的用于居民费控表短信通知缴费的装置,其特征在于,所述壳体(1)分为上下扣合的两部分,通过至少四个螺栓(7)固定。8. The device for notification payment of residents' fee control meter according to claim 1, characterized in that, the housing (1) is divided into two parts that are fastened up and down, and are fixed by at least four bolts (7) . 9.根据权利要求1或8所述的用于居民费控表短信通知缴费的装置,其特征在于,所述壳体(1)背部上端设置用于悬挂整个装置的挂钩(2),通过挂钩(2)将整个装置安装与表箱中。9. According to claim 1 or 8, the device for notifying payment of residents' fee control meter by short message is characterized in that, the upper end of the back of the housing (1) is provided with a hook (2) for hanging the whole device, and through the hook (2) Install the whole device in the meter box. 10.根据权利要求1或8所述的用于居民费控表短信通知缴费的装置,其特征在于,所述壳体(1)中部相对设置有上卡槽(4)和下卡槽(5),上卡槽(4)和下卡槽(5)卡装在表箱的导轨(9)中,将整个装置安装于表箱内。10. The device according to claim 1 or 8, characterized in that, the middle part of the housing (1) is relatively provided with an upper card slot (4) and a lower card slot (5). ), the upper draw-in groove (4) and the lower draw-in groove (5) are clamped in the guide rail (9) of the meter case, and the whole device is installed in the meter case.
CN201521096611.7U 2015-12-24 2015-12-24 A device that is used for resident to take accuse table SMS notice collecting fee Expired - Fee Related CN205246729U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521096611.7U CN205246729U (en) 2015-12-24 2015-12-24 A device that is used for resident to take accuse table SMS notice collecting fee

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521096611.7U CN205246729U (en) 2015-12-24 2015-12-24 A device that is used for resident to take accuse table SMS notice collecting fee

Publications (1)

Publication Number Publication Date
CN205246729U true CN205246729U (en) 2016-05-18

Family

ID=55945806

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521096611.7U Expired - Fee Related CN205246729U (en) 2015-12-24 2015-12-24 A device that is used for resident to take accuse table SMS notice collecting fee

Country Status (1)

Country Link
CN (1) CN205246729U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105467181A (en) * 2015-12-24 2016-04-06 刘永祥 Device and method used for short-message payment notification of resident charge urging meter
CN107576833A (en) * 2017-10-18 2018-01-12 新开普电子股份有限公司 A kind of single-phase electronic energy meter mounting structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105467181A (en) * 2015-12-24 2016-04-06 刘永祥 Device and method used for short-message payment notification of resident charge urging meter
CN107576833A (en) * 2017-10-18 2018-01-12 新开普电子股份有限公司 A kind of single-phase electronic energy meter mounting structure

Similar Documents

Publication Publication Date Title
CN105467181A (en) Device and method used for short-message payment notification of resident charge urging meter
CN203038449U (en) Energy consumption data collector
CN103941312A (en) Remote rainfall monitoring system
CN108074387A (en) Kilowatt meter reading-out system
CN201054505Y (en) Data centralizer for optical voltage grid-parallel station
CN205091372U (en) Multiloop independently measures electric energy meter
CN104319898B (en) A kind of two-way interaction ordered electric inquiry system
CN205246729U (en) A device that is used for resident to take accuse table SMS notice collecting fee
CN201657009U (en) Intelligent identification and data acquisition system
CN102929244A (en) Community energy management system and method
CN202550680U (en) Electric energy collection and operation management system
CN206363128U (en) An Intelligent Prepaid Water Meter System
CN206117281U (en) Solar energy power supply apparatus
CN204833484U (en) Intelligent kilowatt -hour meter attachment device of collecting fee is reminded to SMS
CN203242151U (en) Ultra-low power consumption GPRS (general packet radio service) remote water meter device
CN203203613U (en) Energy consumption data collector
CN110531145A (en) A kind of intelligent lightening stroke counter having ad hoc network function
CN110568258A (en) A smart metering terminal
CN212749047U (en) Energy efficiency communication front-end processor based on cloud service platform
CN212012257U (en) Energy gateway with power grid detection and power load identification capabilities
CN210667148U (en) Energy management monitoring system multichannel data acquisition concentrator
CN209593102U (en) Small power station's active reactive control device based on Internet of Things chip wireless communication module
CN114629145A (en) Energy storage system and method with peak clipping and valley filling functions for communication base station
CN207518631U (en) The long-range power failure alarm device of power information acquisition system
CN201202462Y (en) Oil well operating condition monitoring apparatus

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160518