CN104878951A - 埋入式可控卸荷器 - Google Patents

埋入式可控卸荷器 Download PDF

Info

Publication number
CN104878951A
CN104878951A CN201510314719.7A CN201510314719A CN104878951A CN 104878951 A CN104878951 A CN 104878951A CN 201510314719 A CN201510314719 A CN 201510314719A CN 104878951 A CN104878951 A CN 104878951A
Authority
CN
China
Prior art keywords
nut
unloader
thrust bearing
lead screw
embedded type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510314719.7A
Other languages
English (en)
Other versions
CN104878951B (zh
Inventor
刘晶
金峰
王国鸿
杨军龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Nuclear Force Building Special Technology Co Ltd
Original Assignee
Zhejiang Nuclear Force Building Special Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Nuclear Force Building Special Technology Co Ltd filed Critical Zhejiang Nuclear Force Building Special Technology Co Ltd
Priority to CN201510314719.7A priority Critical patent/CN104878951B/zh
Publication of CN104878951A publication Critical patent/CN104878951A/zh
Application granted granted Critical
Publication of CN104878951B publication Critical patent/CN104878951B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明公开了埋入式可控卸荷器,包括一个底板,所述的底板中心设置有一个空心管,所述的空心管中插入有一个螺丝杆,所述的螺丝杆上套设有推力轴承和第一螺母,所述的推力轴承抵靠所述的空心管,所述的第一螺母旋压所述的推力轴承,所述的螺丝杆的上端设置顶板;其优点在于:1)通过扭力扳手扳动第一螺母,查询扭力与顶力之间关系表,可以通过扭力得到需要的顶力;2)一旦得到需要的顶力,移除扭力扳手后第一螺母产生自锁,不会产生顶力衰减;3)放入墙内不影响墙体封堵。

Description

埋入式可控卸荷器
技术领域
本发明涉及一种可调并能埋入被支撑物体的托架,具体是埋入式可控卸荷器。
背景技术
2012年以来,宁波地区发生了数起砖混房屋倒塌事件,究其原因,房屋建造质量差是一方面因素,但用户在使用当中对墙体随意拆改是房屋倒塌的主要原因,为此宁波地区率先在全国开展了住宅房屋安全监测工作,发现了一批拆改严重的房屋,为确保房屋安全使用,必须对已拆改的墙体进行恢复处理。
房屋建造完成后,墙体重量通过砖、砂浆垂直向下传递,当下部墙体局部拆改成洞口后,上部墙体传递下来的重量在洞口位置被分解至洞口两侧墙体;如果只是简单封堵洞口,不对分解的重量进行归位,则加固就起不到作用;因此需要在封堵洞口前用顶升设备置换被分解的上部墙体重量;以前一般是使用液压千斤顶在洞口上下表面实施顶升,墙体封堵完成后拆除千斤顶,但洞口内的千斤顶会影响墙体封堵,过早拆除又无法解决垂直传递问题,因此无法达到理想的墙体修复效果。
发明内容
本发明针对现有技术不足,提供一种能够垂直传递上下墙体重量,并提供长期保持稳定的可调顶力、且不影响墙体修复的埋入式可控卸荷器。
埋入式可控卸荷器包括一个底板,所述的底板中心设置有一个空心管,所述的空心管中套有一个螺丝杆,所述的螺丝杆上套设有推力轴承和第一螺母,所述的推力轴承抵靠所述的空心管,所述的第一螺母旋压所述的推力轴承,所述的螺丝杆的上端设置顶板。
所述的螺丝杆上套设有第二螺母,所述的第二螺母焊接在所述的顶板上。
所述的螺丝杆焊接在所述的顶板上。
本发明与现有技术相比,具有如下有益效果:1)通过扭力扳手扳动第一螺母,查询扭力与顶力之间关系表,可以通过扭力得到需要的顶力; 2)一旦得到需要的顶力,移除扭力扳手后第一螺母产生自锁,不会产生顶力衰减;3)放入墙内不影响墙体封堵。
附图说明
图1为本发明实施例的结构示意图。
具体实施方式
下面结合附图与具体实施方式对本发明作进一步详细描述:参见图1所示,
埋入式可控卸荷器包括一个底板1,底板中心设置有一个空心管2,空心管内插入一根螺丝杆3,用于调节高度,螺丝杆上套设有推力轴承4和第一螺母5,推力轴承抵靠在空心管的上端面,第一螺母旋压推力轴承,螺丝杆的上端套设有第二螺母7,第二螺母焊接在顶板6上,通过第一螺母旋转,螺丝杆在这里可也可上升或下降,这样也可以产生顶力。
这种埋入式可控卸荷器推入洞口后,手工扭动第一螺母,由于推力轴承的存在,比较容易手动旋转升高,找到合适的位置后,再用扭力扳手扭动第一螺母产生顶力,如果顶板发生转动,则用扳手卡住第二螺母即可固定;达到要求顶力后,拿开扭力扳手,封堵洞口,将这种埋入式可控卸荷器浇注在洞口内;这样墙体受力恢复到了原始状态。
螺丝杆也可以焊接在顶板上,这样支撑强度更大;顶力也可通过在螺丝杆、空心管上设置的应变片方式读取;底板和顶板可为方形、圆形或其它多种型式;空心管可为圆形、方形或其他多种型式;这种埋入式可控卸荷器除用于墙体封堵外,还可以为其他加固物体提供可控的反顶力。

Claims (3)

1.埋入式可控卸荷器,其特征在于:包括一个底板(1),所述的底板中心设置有一个空心管(2),所述的空心管中套有一个螺丝杆(3),所述的螺丝杆上套设有推力轴承(4)和第一螺母(5),所述的推力轴承抵靠所述的空心管,所述的第一螺母旋压所述的推力轴承,所述的螺丝杆的上端设置顶板(6)。
2.如权利要求1所述的埋入式可控卸荷器,其特征在于:所述的螺丝杆上套设有第二螺母(7),所述的第二螺母焊接在所述的顶板上。
3.如权利要求1所述的埋入式可控卸荷器,其特征在于:所述的螺丝杆焊接在所述的顶板上。
CN201510314719.7A 2015-06-10 2015-06-10 埋入式可控卸荷器 Active CN104878951B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510314719.7A CN104878951B (zh) 2015-06-10 2015-06-10 埋入式可控卸荷器

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510314719.7A CN104878951B (zh) 2015-06-10 2015-06-10 埋入式可控卸荷器

Publications (2)

Publication Number Publication Date
CN104878951A true CN104878951A (zh) 2015-09-02
CN104878951B CN104878951B (zh) 2017-03-29

Family

ID=53946608

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510314719.7A Active CN104878951B (zh) 2015-06-10 2015-06-10 埋入式可控卸荷器

Country Status (1)

Country Link
CN (1) CN104878951B (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108265996A (zh) * 2017-12-28 2018-07-10 浙江核力建筑特种技术有限公司 一种砌体结构破墙开洞预顶恢复施工工法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2730997Y (zh) * 2004-07-12 2005-10-05 耿红军 可调管支撑
GB2443181A (en) * 2006-10-27 2008-04-30 Christopher Nicholls Screwed support jack
US20110277412A1 (en) * 2010-05-14 2011-11-17 Wikaru, L.L.C. Wall repair apparatus, system, and method
CN202347866U (zh) * 2011-12-02 2012-07-25 中国三冶集团有限公司第三建筑工程公司 手动螺旋升降器
CN102644386A (zh) * 2012-04-28 2012-08-22 上海建工集团股份有限公司 钢结构临时支撑卸载控制方法
CN204738554U (zh) * 2015-06-10 2015-11-04 浙江核力建筑特种技术有限公司 埋入式可控卸荷器

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2730997Y (zh) * 2004-07-12 2005-10-05 耿红军 可调管支撑
GB2443181A (en) * 2006-10-27 2008-04-30 Christopher Nicholls Screwed support jack
US20110277412A1 (en) * 2010-05-14 2011-11-17 Wikaru, L.L.C. Wall repair apparatus, system, and method
CN202347866U (zh) * 2011-12-02 2012-07-25 中国三冶集团有限公司第三建筑工程公司 手动螺旋升降器
CN102644386A (zh) * 2012-04-28 2012-08-22 上海建工集团股份有限公司 钢结构临时支撑卸载控制方法
CN204738554U (zh) * 2015-06-10 2015-11-04 浙江核力建筑特种技术有限公司 埋入式可控卸荷器

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108265996A (zh) * 2017-12-28 2018-07-10 浙江核力建筑特种技术有限公司 一种砌体结构破墙开洞预顶恢复施工工法
CN108265996B (zh) * 2017-12-28 2020-08-04 浙江核力建筑特种技术有限公司 一种砌体结构破墙开洞预顶恢复施工工法

Also Published As

Publication number Publication date
CN104878951B (zh) 2017-03-29

Similar Documents

Publication Publication Date Title
JP2011117205A (ja) 間隔調節可能な支持具
CN108149693A (zh) 一种采矿用坑基支护结构
CN207685835U (zh) 一种采矿用坑基支护结构
CN105178626B (zh) 轻型多功能支承装置的顶紧力计算方法
CN104878951A (zh) 埋入式可控卸荷器
CN204738554U (zh) 埋入式可控卸荷器
CN202612981U (zh) 一种机床床身与地基连接固定机构
CN201512949U (zh) 混凝土设备基础的倒锥形预留孔成型装置
US20080236061A1 (en) Floor slab support system
CN204823988U (zh) 一种剪式千斤顶
CN205437695U (zh) 一种滚轮体上快速压入销轴的装置
CN204454285U (zh) 一种塔式起重机的稳固基座
CN205438332U (zh) 一种用于滚轮体上压入销轴的夹具
CN102840276A (zh) 防盗ut线夹
CN204343647U (zh) 一种型钢悬挑脚手架用支撑架
CN202867703U (zh) 防盗ut线夹
CN203287245U (zh) 一种适用于桩基水平和竖向组合加载的装置
CN210684324U (zh) 毛卷辊的升降装置
CN207727982U (zh) 一种建筑墙转角构造柱施工模板
CN201704797U (zh) 用于高强度螺栓斜锲负载的装置
CN214662575U (zh) 一种大型水工构筑物穿墙防堵套管
CN204386173U (zh) 一种混凝土墙柱模板垂直度校正器
CN205578911U (zh) 地面管线的简易支撑架
CN216839391U (zh) 一种带有辅助转向结构的管桩
CN205157313U (zh) 墙板拉接件的抗拔检验专用夹具及设备

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant