CN104878932B - Tinkertoy approach template construction engineering method - Google Patents

Tinkertoy approach template construction engineering method Download PDF

Info

Publication number
CN104878932B
CN104878932B CN201510317161.8A CN201510317161A CN104878932B CN 104878932 B CN104878932 B CN 104878932B CN 201510317161 A CN201510317161 A CN 201510317161A CN 104878932 B CN104878932 B CN 104878932B
Authority
CN
China
Prior art keywords
template
engineering method
construction engineering
tinkertoy
tinkertoy approach
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510317161.8A
Other languages
Chinese (zh)
Other versions
CN104878932A (en
Inventor
陈清胤
刘有良
彭杰
凌梓恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Li Zhaoqiang
Original Assignee
Kunshan Journey Construction Form And Shoring Application Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunshan Journey Construction Form And Shoring Application Technology Co Ltd filed Critical Kunshan Journey Construction Form And Shoring Application Technology Co Ltd
Priority to CN201510317161.8A priority Critical patent/CN104878932B/en
Publication of CN104878932A publication Critical patent/CN104878932A/en
Application granted granted Critical
Publication of CN104878932B publication Critical patent/CN104878932B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of Tinkertoy approach template construction engineering method, sample function is accurately turned over first with AutoCAD to carry out each template in template system to turn over sample, by the classification that block is realized from different materials, then using assembling each block in each template and block on the ground using simple connector by the way of playing with building blocks, the erection and reinforcing and support of template system are carried out again, have the advantages that construction is easy, construction precision is high, safety coefficient is high and quickness and high efficiency.

Description

Tinkertoy approach template construction engineering method
Technical field
The invention belongs to concreting technical field, the mould of more particularly to a kind of concrete structure complicated for moulding The construction method that plate is installed.
Background technology
At present, for the complicated concrete structure of moulding, the roofing of such as villa and building in the style of the ancients and the complicated rotation of moulding The conventional construction method of the formwork erection of the concrete structure of stair or special-shaped stair is:First according to drawing size fixed beam bottom, Completion supporting frame, then follow closely beam side plate again, further according to the absolute altitude of beam side plate, spreads the template in cast-in-place face.
There are following shortcomings in above-mentioned traditional construction method:By taking the roofing of villa as an example, the aerial accurate of sky is faced four Fixed beam bottom plate need fairly good woodwork and very flexible skill, it may appear that many cant beams, its fixation is not only needed Consider aerial height, also need position and gradient of consideration level etc., while plate splicing of many angles etc. is there is also, these Work is both needed to complete in the air, and difficulty of construction is big, and construction precision is poor, and safety coefficient is poor, special easily error.
The content of the invention
In order to solve the above-mentioned technical problem, the invention provides a kind of Tinkertoy approach template construction engineering method, building blocks of the invention Method template construction engineering method has the advantages that construction is easy, construction precision is high, safety coefficient is high and quickness and high efficiency.
The technical scheme that is used to solve its technical problem of the present invention is:
A kind of Tinkertoy approach template construction engineering method, is carried out in the steps below:
First, template turns over sample:Template is carried out using software and turns over sample, and each template in template system is carried out to turn over sample;
2nd, installation on ground:Using by the way of playing with building blocks by each block in each template and block using connector on ground Over-assemble is good.
The further technical scheme that is used to solve its technical problem of the present invention is:
Further say, software described in step one is AutoCAD.
Further say, the connector in step 2 is angle steel and screw.
Further say, described piece in step 2 is by selecting different materials to realize the classification of block.
Further say, the template system can be roofing template system.Furthermore, it is each described in step one Individual template includes girder template, secondary beam forms and column template.
Further say, the template system can be stair template system (spiral stairses or special-shaped stair).
When template system is roofing template system, following step is carried out after the completion of step 2:
3rd, lift:Connect integral by lifting the template that each is assembled, constitute template system;
4th, reinforce:The template system combined is reinforced;
5th, completion supporting frame.
Further say, the template system combined is reinforced by the way of simple rack is set up in step 4.
The beneficial effects of the invention are as follows:The present invention Tinkertoy approach template construction engineering method first with AutoCAD accurately Turn over sample function progress template and turn over sample, then the template of complicated concrete structure is assembled to come on the ground, then carried out again The erection and reinforcing and support of template system, with constructing, easy, construction precision height, safety coefficient height and quickness and high efficiency etc. are excellent Point.
Embodiment
Illustrate the embodiment of the present invention below by way of specific instantiation, those skilled in the art can be by this theory Content disclosed in bright book understands advantages of the present invention and effect easily.The present invention can also other different modes give reality Apply, i.e. do not depart from it is disclosed under the scope of, different modifications and change can be given.
Embodiment 1:A kind of Tinkertoy approach template construction engineering method, is carried out in the steps below:
First, template turns over sample:Template is carried out using AutoCAD softwares and turns over sample, and each template in template system is turned over Sample;
2nd, installation on ground:By realizing the classification of block from different materials, by each template by the way of playing with building blocks In each block assembled on the ground using simple connector (such as angle steel and screw) with block;
3rd, erection, connection and the reinforcing of template system are carried out and is supported.
Template system in the present embodiment can be roofing template system, spiral stairses template system, special-shaped stair template The template system of system or other complicated concrete structures.
Embodiment 2:A kind of Tinkertoy approach template construction engineering method of roofing template, is carried out in the steps below:
First, template turns over sample:Template is carried out using AutoCAD softwares and turns over sample, and each template in roofing template system is entered Row turns over sample;
2nd, installation on ground:By realizing the classification of block from different materials, by each template by the way of playing with building blocks In each block assembled on the ground using simple connector (such as angle steel and screw) with block;
3rd, lift:The girder template assembled, secondary beam forms and column template are connected integral by lifting, room is constituted Face die plate system;
4th, reinforce:The roofing template system combined is reinforced by the way of simple rack is set up;
5th, completion supporting frame.
Description above and embodiment are merely illustrative the principle and its effect of the present invention, are not to the present invention Limitation.Any creation fallen within the scope of the appended claims comes under the scope that the present invention is protected.

Claims (9)

1. a kind of Tinkertoy approach template construction engineering method, it is characterised in that:Carry out in the steps below:
First, template turns over sample:Template is carried out using software and turns over sample, and each template in template system is carried out to turn over sample;
2nd, installation on ground:Using each block in each template and block are utilized into connector group on the ground by the way of playing with building blocks Install.
2. Tinkertoy approach template construction engineering method as claimed in claim 1, it is characterised in that:Software is described in step one AutoCAD。
3. Tinkertoy approach template construction engineering method as claimed in claim 1, it is characterised in that:The connector in step 2 is angle Steel and screw.
4. Tinkertoy approach template construction engineering method as claimed in claim 1, it is characterised in that:Described piece in step 2 passes through selection Different materials realizes the classification of block.
5. Tinkertoy approach template construction engineering method as claimed in claim 1, it is characterised in that:The template system is roofing template body System.
6. Tinkertoy approach template construction engineering method as claimed in claim 5, it is characterised in that:Each template includes described in step one Girder template, secondary beam forms and column template.
7. the Tinkertoy approach template construction engineering method as described in claim 5 or 6, it is characterised in that:Carried out after the completion of step 2 following Step:
3rd, lift:Connect integral by lifting the template that each is assembled, constitute template system;
4th, reinforce:The template system combined is reinforced;
5th, completion supporting frame.
8. use Tinkertoy approach template construction engineering method as claimed in claim 7, it is characterised in that:It is simple using setting up in step 4 The mode of support is reinforced to the template system combined.
9. Tinkertoy approach template construction engineering method as claimed in claim 1, it is characterised in that:The template system is stair template body System.
CN201510317161.8A 2015-06-11 2015-06-11 Tinkertoy approach template construction engineering method Expired - Fee Related CN104878932B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510317161.8A CN104878932B (en) 2015-06-11 2015-06-11 Tinkertoy approach template construction engineering method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510317161.8A CN104878932B (en) 2015-06-11 2015-06-11 Tinkertoy approach template construction engineering method

Publications (2)

Publication Number Publication Date
CN104878932A CN104878932A (en) 2015-09-02
CN104878932B true CN104878932B (en) 2017-09-29

Family

ID=53946589

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510317161.8A Expired - Fee Related CN104878932B (en) 2015-06-11 2015-06-11 Tinkertoy approach template construction engineering method

Country Status (1)

Country Link
CN (1) CN104878932B (en)

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7162844B2 (en) * 2003-01-09 2007-01-16 Chicago Bridge & Iron Company Use of partial precast panels for construction of concrete walls and shells
CN101864818B (en) * 2009-04-14 2012-02-08 武汉建工股份有限公司 Construction method of cast-in-situ oblique arc-suspended concrete shear wall
CN103132631B (en) * 2013-03-21 2015-07-01 甘肃快邦节能建筑有限公司 Double-layer fireproof heat-preservation mold plate type wall body
CN203462749U (en) * 2013-08-15 2014-03-05 李树斗 Modular aluminum-frame wood-plastic template
CN103995922B (en) * 2014-04-23 2017-01-25 哈尔滨飞机工业集团有限责任公司 Method for manufacturing TB720 material tubular beam stage die
CN104674989B (en) * 2015-03-02 2018-02-09 北京工业大学 The gently light wall assembled compound shear wall of steel occlusal pattern complex heat-preservation and the practice

Also Published As

Publication number Publication date
CN104878932A (en) 2015-09-02

Similar Documents

Publication Publication Date Title
CN102587661B (en) Method for constructing tall-section structural column of reinforced concrete frame
CN202706198U (en) Building structure
CN105401741B (en) A kind of basement roof strengthening construction device and its construction method
CN109235902A (en) Positive quadrangular pyramid bolt-ball net frame multi-point support high-altitude dissipates splicing method
RU2616306C1 (en) Method for construction of multistore buildings of three-dimensional blocks
CN104153495B (en) A kind of attachment structure of Multi-function light concrete curtain wall
CN108049666B (en) A kind of echelon installation method of super plane multilayer steel truss electronic workshop steel construction
CN105386517A (en) Prefabricated floating window board and mounting method thereof
CN103615063A (en) Construction method for pouring pitched roof concrete and steel bar structure used in method
CN104878932B (en) Tinkertoy approach template construction engineering method
CN102312563A (en) Method for connecting external scaffold with wall for large-span and ultra-story-height structures
CN112035915A (en) Design method of space three-dimensional curved surface template system for cable tower concrete structure
CN207110029U (en) A kind of assembled house
US10125457B1 (en) Method of paving abnormal-shaped grid decks
CN206346116U (en) A kind of skewback embedded anchor bar alignment system
CN207609011U (en) Assembled architecture agent structure
Chen et al. The step-by-step model technology considering nonlinear effect used for construction simulation analysis
CN207017634U (en) A kind of shaped steel frame wooden model
CN106592963A (en) Vertical scaffold connecting device capable of penetrating through floor slab and construction method
CN207846750U (en) Light steel concrete building block faced wall
CN205990586U (en) A kind of gardens foot bridge arc bridge arch construction assembling die
CN105405169A (en) Coordinate conversion method for pipe truss in different coordinate systems
CN105298118A (en) Formwork of cast-in-place concrete stair step
CN103669884A (en) Method for positioning, mounting and constructing purline of special-shaped roofs
CN217711127U (en) High-altitude large-cantilever arc-shaped steel structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Li Zhaoqiang

Inventor after: Chen Qingyin

Inventor after: Liu Youliang

Inventor after: Peng Jie

Inventor after: Ling Ziheng

Inventor before: Chen Qingyin

Inventor before: Liu Youliang

Inventor before: Peng Jie

Inventor before: Ling Ziheng

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201020

Address after: two hundred thousand and eighty On the north side of the intersection of inner ring elevated road and Tongxin Road in Hongkou District, Shanghai (adjacent to Shanghai Dobe sports loft international sports industrial park in the north, Shanghai Hongkou District mental health research center in the south, Shanghai Sanyang general branch committee in the west, and Shanghai Hongkou Football Field in the East) get off at Hongkou Football Field Station of Metro Line 3, and go west to No. 50, No. 18, Lane 649 In room one

Patentee after: Li Zhaoqiang

Address before: Suzhou City, Jiangsu province 215300 city town of Kunshan City Week Jiayu International Plaza Building 1, room 1620

Patentee before: KUNSHAN JOURNEY CONSTRUCTION FORMWORK APPLIED TECHNOLOGY Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170929

Termination date: 20210611