CN104875148B
CN104875148B CN201510278925.7A CN201510278925A CN104875148B CN 104875148 B CN104875148 B CN 104875148B CN 201510278925 A CN201510278925 A CN 201510278925A CN 104875148 B CN104875148 B CN 104875148B
Authority
CN
China
Prior art keywords
led lamp
installation frame
large led
lamp installation
head part
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510278925.7A
Other languages
Chinese (zh)
Other versions
CN104875148A (en
Inventor
叶青健
刘世泉
李海波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan Pratic CNC Science and Technology Co Ltd
Original Assignee
Foshan Pratic CNC Science and Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foshan Pratic CNC Science and Technology Co Ltd filed Critical Foshan Pratic CNC Science and Technology Co Ltd
Priority to CN201510278925.7A priority Critical patent/CN104875148B/en
Publication of CN104875148A publication Critical patent/CN104875148A/en
Application granted granted Critical
Publication of CN104875148B publication Critical patent/CN104875148B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25BTOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING OR HOLDING
    • B25B11/00Work holders not covered by any preceding group in the subclass, e.g. magnetic work holders, vacuum work holders
    • B25B11/02Assembly jigs

Abstract

The present invention relates to frock clamp field, particularly relating to the frock clamp of a kind of large LED lamp installation frame, fixture is made up of with being arranged on the cross spacing block of plate upper surface, longitudinal spacing block, the most quickly head part, the quickest head part and active grab one piece of base plate;Large LED lamp installation frame is placed and plate upper surface, and large LED lamp installation frame is close to the upper surface of base plate by active grab;The most quickly head part and cross spacing block one work and limit the movement that large LED lamp installation frame is horizontal;The most quickly head part and longitudinal spacing block one work and limit the movement that large LED lamp installation frame is longitudinal;The present invention is according to said structure, propose a kind of novel frock clamp, the installation frame of the special clamping of frock clamp a kind of large LED lamp, location structure is set according to the concrete structure of framework, take full advantage of the special construction of workpiece itself to carry out clamping and fix so that the clamping of workpiece is more stable.

Description

A kind of frock clamp of large LED lamp installation frame
Technical field
The present invention relates to frock clamp field, particularly relate to the frock clamp of a kind of large LED lamp installation frame.
Background technology
Along with the extensive application of LED, the mounting means of LED gets more and more, and wherein utilizes a kind of grid frame The mode that frame carries out installing is the most universal.
Described framework is a kind of large-scale LED installation frame, and vertical and horizontal are provided with orthogonal staggered Beam, frame surface is formed the engraved structure of multiple similar Tian-shaped;When large-scale LED installation frame is to LED When lamp is installed, girder construction is by lamp tube cover in mounting groove, and light passes from engraved structure, so that While LED stably installs, do not interfere with again penetrating of light.
Because this large LED lamp installation frame size is bigger, it is an entirety, and needs at numerical control machine The position being processed on bed is a lot, and the most tiny processing request precision is the highest, once these errors Bigger than normal may result in described large LED lamp installing frame cannot normal mounting;The most described large LED lamp is installed The machining tool of framework and frock clamp select and use just to be particularly important.
Summary of the invention
It is an object of the invention to propose a kind of simple in construction, easy to operate, clamping precision is high, fills specially Press from both sides the frock clamp of a kind of large LED lamp installation frame.
For reaching this purpose, the present invention by the following technical solutions:
A kind of frock clamp of large LED lamp installation frame, described large LED lamp installation frame is rectangle frame, The internal longeron arranged of described installation frame intersects with a plurality of beam vertical so that described large LED lamp Installation frame is uniformly provided with multiple engraved structure, and described engraved structure is about about described longeron four also Symmetry, the two ends of described longeron also are provided with engraved structure;
Described frock clamp by one piece of base plate and be arranged on the cross spacing block of plate upper surface, longitudinal spacing block, The most quickly head part, the most quickly head part and active grab are constituted, and described large LED lamp installation frame is placed In described plate upper surface, described cross spacing block passes from the engraved structure of described longeron side, and its The side of a side and described longeron be affixed;The described longitudinal spacing block hollow out knot from described longeron two ends Pass on structure, and fit with engraved structure herein in its a side;Described active grab, described laterally fast Speed head part and the most quickly head part pass from the engraved structure of described longeron both sides;
Described crossbeam is pushed down in one end of described active grab, and described large LED lamp installation frame is close to institute State the upper surface of base plate;The side of described longeron is laterally withstood in one end of described the most quickly head part, by described Longeron is tightly affixed on the side of described cross spacing block;One end of the quick head part of described longitudinal direction is withstood described large-scale The inner side of the frame of LED installation frame one end.
Further illustrating, described cross spacing block is that one piece of side can be with described large LED lamp installation frame The metal derby of the side laminating of longeron, is located at the side of described base plate longitudinal central axis line.
Further illustrating, described longitudinal spacing block is that side can be pasted with the side of described longeron two ends engraved structure The metal derby closed, and be parallel to lathe X-axis and be fixed on the two ends of described base plate longitudinal central axis line.
Further illustrating, described cross spacing block is at least two pieces.
Illustrating further, the quick head part of described longitudinal direction is identical, by one with described the most quickly ejecting mechanism Be arranged on described base plate upper bed-plate and horizontal through described base push rod and be nested in push rod one end provide bullet The elastic component composition of power.
Illustrate further, the quick head part of described longitudinal direction at least two, parallel be fixed on described base plate with The opposite side that described longitudinal spacing block is corresponding, and described push rod is parallel to Y direction, end is just scheduled on institute State on the side of large LED lamp installation frame internal structure.
Illustrate further, described the most quickly head part at least two, described cross spacing block and described horizontal stroke It is respectively arranged on described longeron to quick head part and is placed on the both sides of the position on described base plate, and described push rod is put down Row is in X-direction, and end is just scheduled on the side of described large LED lamp installation frame internal structure.
Illustrating further, described active grab is arranged on described base plate upper bed-plate and the hinged described end by one The seat jig arm of upper end and be connected between jig arm and base provide the elastic component of elastic force to form, described jig arm One end is pressed on the internal correspondence position of described large LED lamp installation frame on bending crossbeam.
The present invention is according to said structure, it is proposed that a kind of novel frock clamp, and described frock clamp fills specially Press from both sides the installation frame of a kind of large LED lamp, according to the concrete structure Design Orientation structure of framework, make full use of The special construction of workpiece itself carries out clamping to be fixed so that the clamping of workpiece is more stable.
Accompanying drawing explanation
Fig. 1 is schematic diagram during large LED lamp installation frame described in one embodiment of the present of invention clamping;
Schematic top plan view when Fig. 2 is large LED lamp installation frame described in one embodiment of the present of invention clamping.
Wherein: longeron 100, crossbeam 200, forniciform crossbeam 210, base plate 300, cross spacing block 110, Longitudinal spacing block 120, the most quickly head part 130, the most quickly head part 140, active grab 150, large-scale LED installation frame 400.
Detailed description of the invention
Further illustrate technical scheme below in conjunction with the accompanying drawings and by detailed description of the invention.
As shown in Figure 1-2, the frock clamp of a kind of large LED lamp installation frame 400, described large LED Lamp installation frame 400 is rectangle frame, the internal longeron 100 arranged of described installation frame and three crossbeams 200 intersect vertically so that described large LED lamp installation frame 400 is uniformly provided with multiple engraved structure, and institute Stating engraved structure the most symmetrical about described longeron about 100 respectively distribution four, the two ends of described longeron 100 are also It is provided with engraved structure;
Cross spacing block 110 that described frock clamp by one piece of base plate 300 and is arranged on base plate 300 upper surface, Longitudinal spacing block 120, the most quickly head part 130, the most quickly head part 140 and active grab 150 are constituted, Described large LED lamp installation frame 400 is positioned over described base plate 300 upper surface, described cross spacing block 110 Pass from the engraved structure of described longeron 100 side, and the side of its a side and described longeron 100 Face is affixed;Described longitudinal spacing block 120 passes from the engraved structure at described longeron 100 two ends, and its One side and the laminating of engraved structure herein;Described active grab 150, described laterally quickly head part 130 and vertical Pass from the engraved structure of described longeron 100 both sides to quick head part 140;
Described crossbeam 200 is pushed down in one end of described active grab 150, by described large LED lamp installation frame 400 upper surfaces being close to described base plate 300;One end of described the most quickly head part 130 is laterally withstood described The side of longeron 100, is tightly affixed on the side of described cross spacing block 110 by described longeron 100;Described The inner side of the frame of described large LED lamp installation frame 400 one end is withstood in one end of the quickest head part 140.
Described frock clamp is according to the special construction of large LED lamp installation frame 400 and process requirements, fully Utilizing described engraved structure, crossbeam 200 and longeron 100, on described base plate 300, specific position arranges difference Fixed structure, first with described active grab 150 rapidly by described large LED lamp installation frame 400 It is close to described base plate 300 upper surface;From horizontal and vertical, workpiece is being carried out clamping respectively, thus realizing The stable clamping of described large LED lamp installation frame 400, meanwhile, because described frock clamp is mostly Withstand on side surface of workpiece, both do not interfered with the processing of workpiece, also make described large LED lamp installation frame 400 Clamping and unloading process convenient.
Described cross spacing block 110 is that one piece of side can be with the longeron of described large LED lamp installation frame 400 The metal derby of the side laminating of 100, is located at the side of described base plate 300 longitudinal central axis line.Described cross spacing The first side laminating with described longeron 100 in the side of block 110, limits its movement along X-direction, then profit It is fixed in described longeron 100 another side with the most quickly head part 130, it is achieved thereby that described large-scale The LED installation frame 400 clamping in lathe X-direction, employing fixed structure and top clip respective outer side edges Mode makes the clamping fixation procedure of whole lathe X-direction more quick and precisely.
Described longitudinal spacing block 120 can be with the side laminating of described longeron 100 two ends engraved structure for side Metal derby, and be parallel to lathe X-axis and be fixed on the two ends of described base plate 300 longitudinal central axis line.Because it is described The inside of large LED lamp installation frame 400, described longeron 100 two ends are provided with engraved structure, described frock Fixture makes full use of the engraved structure at this, by the quick head part of described longitudinal direction 140 and described longitudinal spacing block 120 join more quickly and easily by quicker and accurate to the clamping of described large LED lamp installation frame 400 and dismounting Really.
Described cross spacing block 110 at least two pieces.Because 2 determine straight line, hence with two pieces The while of cross spacing block 110, fit in the same side with described longeron 100, thus just secures described large-scale The located lateral of LED installation frame 400.
The quick head part of described longitudinal direction 140 is identical with described the most quickly head part 130 mechanism, is arranged on by one Described base plate 300 upper bed-plate and horizontal through described base push rod and be nested in push rod one end provide elastic force Elastic component composition.
The quick head part of described longitudinal direction 140 and the most quickly head part 130 vertical and horizontal respectively are arranged, fixed respectively In the side of the horizontal frame of the longitudinal one end of described large LED lamp installation frame 400, and described longeron 100 Side, thus described large LED lamp installation frame 400 is longitudinally fitted with described longitudinal spacing block 120, Laterally fit with described cross spacing block 110, and then be fixed.
The quick head part of described longitudinal direction 140 at least two, parallel being fixed on described base plate 300 is indulged with described To the opposite side of limited block 120 correspondence, and described push rod is parallel to Y direction, and end is just scheduled on described On the side of large LED lamp installation frame 400 internal structure.
Described laterally quickly head part 130 at least two, described cross spacing block 110 and described the most quickly Head part 130 is respectively arranged on described longeron 100 and is placed on the both sides of the position on described base plate 300, and described Push rod is parallel to X-direction, and end is just scheduled on described large LED lamp installation frame 400 internal structure On side.Described the most quickly head part 130 head part quick with described longitudinal direction 140 structure is the same so that described The production and assembly of frock clamp are convenient, but the two installation site is installed according to described large LED lamp respectively The construction features of framework 400 sets, so that the clamping of described large LED lamp installation frame 400 is more Stable;The vertical and horizontal location mode of described large LED lamp installation frame 400, is all to use a patch Close and a jack unit coordinates, this installation way fast and easy, again because there being the laminating of multiple limited block Correction, thus ensure that the clamping precision of described large LED lamp installation frame 400.More excellent such as Fig. 2 institute Showing, described base plate 300 is additionally provided with a described horizontal stroke at the corner of described large LED lamp installation frame 400 To quick head part 130, thus strengthen the clamping to workpiece further.
Concrete, described active grab 150 is arranged on described base plate 300 upper bed-plate and hinged described by one The jig arm of base upper end and be connected between jig arm and base provide the elastic component of elastic force to form, described jig arm One end be pressed in forniciform crossbeam 210 on the internal correspondence position of described large LED lamp installation frame 400 On.Described large LED lamp installation frame 400 is placed on described base plate 300 upper surface, the end of described jig arm It is internal that portion stretches into described large LED lamp installation frame 400, is pressed on the longitudinal connection structure of inside, thus It is attached to described base plate 300 upper surface;The end of described jig arm under the effect of described elastic component by described Large LED lamp installation frame 400 is pressed on the upper surface of described base plate 300, this installation way ratio spiral shell The connectors such as nail are more quick and convenient;Described jig arm end is to be pressed in inside the installation frames such as described large LED Distinctive attachment structure on, and this attachment structure need not processing, described frock clamp is abundant The construction features of workpiece self and the feature of Working position is utilized to carry out clamping so that described frock clamp is to many The clamping of number large LED lamp installation frame 400 had not both interfered with workpiece processing on lathe, made work yet The clamping of part is more stable, accurately, convenient.
The know-why of the present invention is described above in association with specific embodiment.These describe and are intended merely to explain this The principle of invention, and limiting the scope of the invention can not be construed to by any way.Based on herein Explaining, those skilled in the art need not pay performing creative labour can associate other tool of the present invention Body embodiment, within these modes fall within protection scope of the present invention.

Claims (8)

1. the frock clamp of a large LED lamp installation frame, it is characterised in that described large LED lamp is pacified The frame that frames up is rectangle frame, and the internal longeron arranged of described installation frame intersects with a plurality of beam vertical, makes Obtain described large LED lamp installation frame and be uniformly provided with multiple engraved structure, and described engraved structure is about described Longeron is symmetrical, and the two ends of described longeron also are provided with engraved structure;
Described frock clamp by one piece of base plate and be arranged on the cross spacing block of plate upper surface, longitudinal spacing block, The most quickly head part, the most quickly head part and active grab are constituted, and described large LED lamp installation frame is placed In described plate upper surface, described cross spacing block passes from the engraved structure of described longeron side, and its The side of a side and described longeron be affixed;The described longitudinal spacing block hollow out knot from described longeron two ends Pass on structure, and fit with engraved structure herein in its a side;Described active grab, described laterally fast Speed head part and the most quickly head part pass from the engraved structure of described longeron both sides;
Described crossbeam is pushed down in one end of described active grab, and described large LED lamp installation frame is close to institute State the upper surface of base plate;The side of described longeron is laterally withstood in one end of described the most quickly head part, by described Longeron is close to the side of described cross spacing block;Described large LED is withstood in one end of the quick head part of described longitudinal direction The inner side of the frame of lamp installation frame one end.
The frock clamp of a kind of large LED lamp installation frame the most according to claim 1, its feature exists In, described cross spacing block is that one piece of side can be pasted with the side of the longeron of described large LED lamp installation frame The metal derby closed, is located at the side of described base plate longitudinal central axis line.
The frock clamp of a kind of large LED lamp installation frame the most according to claim 1, its feature exists In, described longitudinal spacing block is the metal derby can fitted with the side of described longeron two ends engraved structure in side, And be parallel to lathe X-axis and be fixed on the two ends of described base plate longitudinal central axis line.
The frock clamp of a kind of large LED lamp installation frame the most according to claim 2, its feature exists In, described cross spacing block is at least two pieces.
The frock clamp of a kind of large LED lamp installation frame the most according to claim 1, its feature exists In, the quick head part of described longitudinal direction is identical with described the most quickly ejecting mechanism, is arranged on described base plate by one Upper bed-plate and horizontal through described base push rod and be nested in push rod one end provide elastic force elastic component group Become.
The frock clamp of a kind of large LED lamp installation frame the most according to claim 5, its feature exists In, the quick head part of described longitudinal direction at least two, parallel it is fixed on described base plate and described longitudinal spacing block Corresponding opposite side, and described push rod is parallel to Y direction, end is just scheduled on described large LED lamp peace Frame up on the side of frame internal structure.
The frock clamp of a kind of large LED lamp installation frame the most according to claim 5, its feature exists In, described the most quickly head part at least two, described cross spacing block and described the most quickly head part are respectively It is located at described longeron and is placed on the both sides of the position on described base plate, and described push rod is parallel to X-direction, End is just scheduled on the side of described large LED lamp installation frame internal structure.
The frock clamp of a kind of large LED lamp installation frame the most according to claim 1, its feature exists In, described active grab by a jig arm being arranged on described base plate upper bed-plate and hinged described base upper end with And it being connected between jig arm and base provide the elastic component of elastic force to form, one end of described jig arm is pressed in described On forniciform crossbeam on the internal correspondence position of large LED lamp installation frame.
CN201510278925.7A 2015-05-27 2015-05-27 A kind of frock clamp of large LED lamp installation frame Active CN104875148B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510278925.7A CN104875148B (en) 2015-05-27 2015-05-27 A kind of frock clamp of large LED lamp installation frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510278925.7A CN104875148B (en) 2015-05-27 2015-05-27 A kind of frock clamp of large LED lamp installation frame

Publications (2)

Publication Number Publication Date
CN104875148A CN104875148A (en) 2015-09-02
CN104875148B true CN104875148B (en) 2016-08-24

Family

ID=53942953

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510278925.7A Active CN104875148B (en) 2015-05-27 2015-05-27 A kind of frock clamp of large LED lamp installation frame

Country Status (1)

Country Link
CN (1) CN104875148B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102005028794B3 (en) * 2005-06-16 2006-09-21 J. Schmalz Gmbh Workpiece fixing device for machining has one single positioning apparatus, which can be coupled to all clamping beams
CN202412098U (en) * 2011-12-13 2012-09-05 深圳市奥拓电子股份有限公司 LED (light-emitting diode) display unit cabinet assembly fixture
CN203390803U (en) * 2013-06-21 2014-01-15 深圳市奥拓电子股份有限公司 Assembly clamp for LED (Light-Emitting Diode) display unit box
CN204339376U (en) * 2014-12-03 2015-05-20 佛山市普拉迪数控科技有限公司 A kind of special fixture for clamping frame workpiece

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102005028794B3 (en) * 2005-06-16 2006-09-21 J. Schmalz Gmbh Workpiece fixing device for machining has one single positioning apparatus, which can be coupled to all clamping beams
CN202412098U (en) * 2011-12-13 2012-09-05 深圳市奥拓电子股份有限公司 LED (light-emitting diode) display unit cabinet assembly fixture
CN203390803U (en) * 2013-06-21 2014-01-15 深圳市奥拓电子股份有限公司 Assembly clamp for LED (Light-Emitting Diode) display unit box
CN204339376U (en) * 2014-12-03 2015-05-20 佛山市普拉迪数控科技有限公司 A kind of special fixture for clamping frame workpiece

Also Published As

Publication number Publication date
CN104875148A (en) 2015-09-02

Similar Documents

Publication Publication Date Title
CN204381737U (en) A kind of jig for body in white trial-production repair welding
CN102626841B (en) Automatic welding fixture of subway train obverse-reverse side roofs
CN202716050U (en) Machine body siding folding flexible positioning device
CN203579043U (en) Switching type fixture platform applied to welding line
CN106624890B (en) A kind of clamping tool for machine work
CN203636247U (en) Splicing and welding tooling for components in middle of excavator frame
CN104907892B (en) A kind of numerical control machining center of large LED lamp installation frame
CN103659081B (en) A kind of suitching type jig platform be applied on welding line
CN203356924U (en) Welding fixture
CN104875148B (en) A kind of frock clamp of large LED lamp installation frame
CN104668873A (en) Processing die for reinforcement cage
CN102357756A (en) Welding fixture for auxiliary frame assembly of automobile
CN204621437U (en) Adopt fixture by the fixed structure of longitudinal wall plate peculiar to vessel and flat-bulb steel positioning welding
CN204819232U (en) Synchronous clamping device of different cross -sections spare part
CN204339657U (en) The assembled frock of suspension arm of lorry-mounted crane
CN105234609A (en) Welding support device for automobile sheet metal part
CN205414809U (en) Multipurpose makes up welding jig fast
CN210188756U (en) Quick clamping and positioning device for circular electrode
CN206535658U (en) A kind of electric precipitator positive plate fast calibrating device
CN104668871A (en) Bogie welding and clamping device and clamping method
CN204657802U (en) A kind of underframe of coach frame welding fixture
CN205363297U (en) Anchor clamps switch unit
CN205111290U (en) Can realize keysets of quick centering
CN205166277U (en) Frock is assembled to wind -powered electricity generation roof beam
CN206010517U (en) The multi-position pneumatic fixture of PLC controls

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: Block 1 and block 3, No. 9, Lexin Avenue, Leping Town, Sanshui District, Foshan City, Guangdong Province

Patentee after: Guangdong Pradi Technology Co., Ltd

Address before: 528137 No. 70, C District, Sanshui Central Industrial Park, Guangdong, Foshan

Patentee before: FOSHAN PRATIC CNC SCIENCE & TECHNOLOGY Co.,Ltd.