CN104863382B - Roof boarding reinforcement means - Google Patents

Roof boarding reinforcement means Download PDF

Info

Publication number
CN104863382B
CN104863382B CN201510267894.5A CN201510267894A CN104863382B CN 104863382 B CN104863382 B CN 104863382B CN 201510267894 A CN201510267894 A CN 201510267894A CN 104863382 B CN104863382 B CN 104863382B
Authority
CN
China
Prior art keywords
stiffener
roof boarding
concrete
tensioning
pea gravel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510267894.5A
Other languages
Chinese (zh)
Other versions
CN104863382A (en
Inventor
朱奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rudong County Shengtai new rural development and Construction Co., Ltd
Original Assignee
叶长青
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 叶长青 filed Critical 叶长青
Priority to CN201510267894.5A priority Critical patent/CN104863382B/en
Publication of CN104863382A publication Critical patent/CN104863382A/en
Application granted granted Critical
Publication of CN104863382B publication Critical patent/CN104863382B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of roof boarding reinforcement means, is characterized in that construction procedure includes:(1) works above cleaning roofing concrete plate,(2) roofing concrete twist drill pilot hole,(3) channel-section steel support top roofing concrete plate is used,(4) roof boarding plate end office (EO) portion's concrete is cut,(5) reinforcement supporting-point position local roofing concrete plate is cut,(6) regulating bolt and regulating nut are installed successively at reinforcement supporting-point position,(7) the expansion pea gravel concreten for smashing reinforcement supporting portion is poured,(8) anchorage positioning is finished to pour and smashes expansion pea gravel concreten,(9) tensioning is carried out after expansion pea gravel concreten possesses some strength,(10) injecting treatment is carried out to pilot hole,Reinforcement is fastened with anchorage,(11) encapsulation process is carried out to reinforcement and anchorage handing-over position with building sealant,(12) brushing polyurethane coating film,(13) paving modified asphalt waterproof coiled material,(14) pour and smash expanded and vitrified small ball light mortar protective layer,(15) channel-section steel of support top roofing concrete plate is removed,(16) gunite concrete is implemented in roof boarding bottom.Mechanical property of the present invention is good, and constructing operation is safe and reliable.

Description

Roof boarding reinforcement means
Technical field
The present invention relates to a kind of inadequate roof boarding of bearing capacity, more particularly to a kind of roof boarding reinforcement means.
Background technology
After defect or accessible roof increase load occurs in roof boarding quality, roof boarding bearing capacity can not reach requirement, In this case roof boarding will carry out pattern handling, and after process, roof boarding bending resistance shear resistance can be increased, but mesh Front prior art has two problems:One be it is difficult to by the intensive aspect of roof boarding and the organic formation entirety of original structure, two is roofing Plate easy seepage after processing.
Content of the invention
The technical problem to be solved is provided at a kind of reliable construction quality and the good roof boarding of water resistance Reason method, leakage problems after solving the problems, such as the intensive aspect of roof boarding and original structure integrated carrying and processing.
The principle of the invention is:The supporting-point of stiffener is set, and then a regulating bolt is applied by tightening at supporting-point, makes Which applies downwards external force in supporting-point to stiffener, and makes stiffener produce an external force upwards, and roof boarding is played Unloading Effect, makes roof boarding become eccentric compression member by flexural member, on the one hand makes former roof boarding and strengthen physical efficiency integrally to hold Power, on the other hand improves the bearing capacity of roof boarding.Multiple waterproof measure is taken to avoid seepage according further to reinforcement characteristics.
As 1/4 span position of plate end shearing is less, roof boarding stiffener supporting-point is arranged on from 1/4 span portion of plate end Position, roof boarding cut into up big and down small terrace with edge at stiffener supporting-point position, and top cross-section is the square of length 60mm, Bottom section is square of the length for 40mm, and terrace with edge middle setting regulating bolt, regulating bolt expose the setting of roofing plate part Screw thread, a diameter of 25mm of regulating bolt, it is embedded in the middle of the regulating bolt of roof boarding and seal ring is welded, sealing ring diameter 35mm, Sealing ring thickness is 3mm, and as outside moisture is radially penetrated into readily along regulating bolt, seal ring purpose is blocking water seepage road Footpath, terrace with edge bottom are poured and smash expansion pea gravel concreten, and expansion pea gravel concreten intensity is C35, and expansion pea gravel concreten is poured to smash and finished Produce microdilatancy afterwards, strengthen the compactness between newly-laid concrete and former roofing board concrete, Waterproof sand is clogged on terrace with edge top Slurry, waterproof mortar thickness are 15~20mm, and waterproof mortar is to avoid this position from becoming waterproof weakness ring as waterproof reinforced layer Section.Regulating bolt bottom couples regulating nut, and regulating nut is screwed in regulating bolt and coupled by screw thread, regulating nut bottom Welding steel cushion block, steel cushion block lower central arrange semi-circular recesses, and stiffener is welded to connect after being embedded in groove.Tensioning is grasped Regulating nut is rotated with spanner when making, regulating nut screws in regulating bolt screw thread upwards, drive steel cushion block and stiffener synchronization Rise.
Roof boarding plate end cuts into square hole in the range of nearside 150~200mm of body of wall, and roof boarding is drilled with oblique guiding Hole, is oriented to bore dia 2mm bigger than stiffener diameter, stiffener through the pilot hole of roof boarding enter after square hole with anchor Tool connection, square hole is poured smashes expansion pea gravel concreten, and expansion pea gravel concreten intensity is C35, and expansion pea gravel concreten is poured to be smash Microdilatancy is produced after finishing, and is strengthened the compactness between newly-laid concrete and former roofing board concrete, is expanded pea gravel concreten Top brushing polyurethane coating film, polyurethane coating film are to avoid this position from becoming waterproof weak link as waterproof reinforced layer.Poly- Modified asphalt waterproof coiled material is pasted on urethane film top, arranges expanded and vitrified small ball light mortar above modified asphalt waterproof coiled material Protective layer, protective layer adopt light material to mitigate roofing load.Roof boarding plate bottom arranges gunite concrete, and gunite concrete is thick Spend for 80~90mm.Stiffener and anchorage handing-over position carry out encapsulation process with building sealant, prevent this position from occurring Seepage.
Stiffener tensioning parameter is by identified below:
Stiffener adopts II level reinforcing bar, and control stress for prestressing value is 0.75 rebar standardses intensity, control stress for prestressing Value is 562.5MPa.If the former roof boarding concreting time is more than or equal to 3 years, its concrete shrinkage, creep visual For stablizing, the loss of prestress of stiffener can be omitted and be disregarded, and only need to consider by the loose part for causing of reinforcing bar, in construction When, reinforcing bar can be taken to surpass and to open 5% to make up, the stretching force of reinforcing bar is defined as 1.05 control stress for prestressing, i.e. 590.625MPa;Such as The fruit former roof boarding concreting time, for the sake of conservative, the stretching force of reinforcing bar was defined as 1.08 cable tensios control within 3 years Stress, i.e. 607.5MPa.
Stiffener tensioning vertical displacement δ value is calculated as the following formula,
L1For the oblique segment length of stiffener, L2For stiffener horizontal section length, σkFor the stretching force of stiffener, Es Elastic modelling quantity for reinforcing bar.
Construction procedure includes:
(1) works above cleaning roof boarding.
(2) roofing twist drill pilot hole.
(3) channel-section steel support top roof boarding is used.
(4) roof boarding plate end office (EO) portion's concrete is cut, cuts into square hole.
(5) stiffener supporting-point position local roof boarding is cut, and roof boarding digs into terrace with edge.
(6) regulating bolt and regulating nut are installed successively at stiffener supporting-point position, steel cushion block is welded on regulation Then stiffener is welded by nut with steel cushion block.
(7) the expansion pea gravel concreten for smashing stiffener supporting portion is poured, will expansion pea gravel concreten surface dabbing after 3 days After-pouring waterproof mortar.
(8) oblique for stiffener section is passed through pilot hole, stiffener end couples with anchorage, anchorage is interim with bracing members Positioning, anchorage positioning finishes to pour smashes expansion pea gravel concreten, and expansion pea gravel concreten pours the steel of the interim positioning of dismounting during smashing Support.
Tensioning is carried out after expansion pea gravel concreten possesses some strength after (9) 7 days.
Regulating bolt is tightened by spanner, applying tensioning is carried out to stiffener, tensioning is carried out in three times, first time tensioning Vertical displacement is stiffener tensioning vertical displacement for 1/3 δ, δ upwards to make stiffener, implements second tensioning after interval 1h, Second tensioning make stiffener upwards vertical displacement be 1/3 δ, after interval 1h implement third time tensioning, third time tensioning make plus Vertical displacement is 1/3 δ to strong reinforcing bar upwards.
(10) injecting treatment is carried out after tensioning is finished to pilot hole, closes the space between stiffener and pilot hole, use Stiffener is fastened by anchorage.
(11) encapsulation process is carried out to stiffener and anchorage handing-over position with building sealant.
(12) roof boarding plate end anchoring position expansion pea gravel concreten above brushing polyurethane coating film.
(13) polyurethane coating film brushing finishes rear paving modified asphalt waterproof coiled material.
(14) modified asphalt waterproof coiled material paving is poured after finishing and smashes expanded and vitrified small ball light mortar protective layer.
(15) channel-section steel of support top roof boarding is removed.
Gunite concrete is implemented in roof boarding bottom, and gunite concrete thickness is 80~90mm, and gunite concrete is applied at twice Work, first time construction of shotcrete thickness are 40~50mm, and second construction of shotcrete thickness is 40~50mm, in front and back The time interval of two-layer injection should not be less than the final setting time of concrete.
Gunite concrete presses following enforcement:
Pre-plugged jet thickness mark is answered on spraying operation face.Before gunite concrete, construction surface must be sprayed water wet Profit, it is to avoid construction surface absorbs excess moisture from gunite concrete.But, water spray can not be too many, it is impossible to leaves construction surface many Remaining moisture.Water spray is carried out using shower nozzle.Shower nozzle construction when try one's best vertical construction face, with construction surface keep distance should ensure that spray Penetrate concrete compaction.If shower nozzle from construction surface too close to, the concrete of injection can be washed the concrete for having sprayed open, if from Too remote, then the density of concrete is poor.Operating personnel should stand motionless, hold shower nozzle, make shower nozzle from top to bottom, from one side to Another side should not be once sprayed at one and reach whole thickness as the movement of fan-type, and gunite concrete should be made to be formed uniformly One layer.If it find that the concrete for ejecting is uneven, it is necessary to make shower nozzle leave construction surface immediately, mixed until ejected Solidifying soil is uniformly further continued for normally sprayed construction.In course of injection, if it find that concrete surface drying, loose, tenesmus, sliding Or during drawing crack phenomenon, should remove in time, spray again.
The present invention is less to the destruction of former room panel structure, and the prestressed equipment of enforcement is simply effective, and constructing operation is convenient, can To effectively improve the intensity after roof boarding is processed, and water resistance is good.
Description of the drawings
Fig. 1 is constructed for roofing board prestress stiffener supporting-point position, and Fig. 2 is anchored for roofing board prestress stiffener Position constructs.
Accompanying drawing mark:1st, regulating bolt, 2, regulating nut, 3, steel cushion block, 4, stiffener, 5, steel seal ring, 6, expansion Pea gravel concreten, 7, waterproof mortar, 8, anchorage, 9, building sealant, 10, polyurethane coating film, 11, modified asphalt waterproof coiled material, 12nd, expanded and vitrified small ball light mortar protective layer, 13, gunite concrete.
Specific embodiment
The present embodiment is described in detail below in conjunction with accompanying drawing.
Certain engineering roof boarding carries out building reconstruction after 3 years in final acceptance of construction, and roofing prepares to be transformed into ecologic planting roofing, plants Planting roofing has certain load to increase, and the bearing capacity of original roofing can not reach requirement, it is necessary to former roofing be reinforced, in addition It is also contemplated that the antiseep of roofing, roofing span of slab is 5.6m.
In the present embodiment, roof boarding stiffener supporting-point is arranged on from plate end 1.6m position, and roof boarding is propped up in stiffener Hold a position and up big and down small terrace with edge is cut into, top cross-section is the square of length 60mm, it is 40mm that bottom section is length Square, terrace with edge middle setting regulating bolt 1, regulating bolt 1 expose roofing plate part arrange screw thread, 1 diameter of regulating bolt For 25mm, welding seal ring 5 in the middle of the regulating bolt 1 of roof boarding, 5 diameter 35mm of seal ring is embedded in, 5 thickness of seal ring is 3mm, terrace with edge bottom are poured and are smash expansion pea gravel concreten 6, and 6 intensity of expansion pea gravel concreten is C35, and waterproof mortar is clogged on terrace with edge top 7,7 thickness of waterproof mortar is 18mm.1 bottom of regulating bolt couples regulating nut 2, and regulating nut 2 screws in 1 screw thread of regulating bolt and enters Row connection, 2 bottom welding steel cushion block 3 of regulating nut, 3 lower central of steel cushion block arrange semi-circular recesses, and stiffener 4 is embedded in recessed It is welded to connect after groove.
Roof boarding plate end cuts into square hole in the range of nearside body of wall 180mm, and oblique pilot hole reserved by roof boarding, leads To bore dia 2mm bigger than 4 diameter of stiffener, stiffener 4 through the pilot hole of roof boarding enter after square hole with anchorage 8 Connection, square hole is poured smashes expansion pea gravel concreten 6, and 6 intensity of expansion pea gravel concreten is C35, expands 6 top of pea gravel concreten Brushing polyurethane coating film 10,10 top of polyurethane coating film paste modified asphalt waterproof coiled material 11, on modified asphalt waterproof coiled material 11 Face arranges expanded and vitrified small ball light mortar protective layer 12, and roof boarding plate bottom arranges gunite concrete 13, and gunite concrete 13 is thick Spend for 80mm, stiffener 4 and anchorage 8 join position and carry out encapsulation process with building sealant 9.
The stretching force of reinforcing bar is defined as 590.625MPa, and stiffener tensioning vertical displacement δ value is defined as 25.8mm.
Construction procedure includes:
(1) works above cleaning roof boarding.
(2) roofing twist drill pilot hole.
(3) channel-section steel support top roof boarding is used.
(4) roof boarding plate end office (EO) portion's concrete is cut, cuts into square hole.
(5) 4 supporting-point position local roof boarding of stiffener is cut, and roof boarding digs into terrace with edge.
(6) regulating bolt 1 and regulating nut 2 are installed successively at stiffener supporting-point position, steel cushion block 3 is welded on tune Then stiffener 4 is welded by section nut 2 with steel cushion block 3.
(7) pouring the expansion pea gravel concreten for smashing 4 supporting portion of stiffener will expansion 6 surface of pea gravel concreten after 6,3 days Dabbing after-pouring waterproof mortar 7.
(8) oblique for stiffener 4 section is passed through pilot hole, 4 end of stiffener couples with anchorage 8, and bracing members used by anchorage 8 Interim positioning, the positioning of anchorage 8 finishes to pour smashes expansion pea gravel concreten 6, and it is temporarily fixed that expansion pea gravel concreten 6 pours dismounting during smashing The bracing members of position.
Tensioning is carried out after expansion pea gravel concreten 6 possesses some strength after (9) 7 days.
Regulating bolt 1 is tightened by spanner, applying tensioning is carried out to stiffener 4, tensioning is carried out in three times, open for the first time Drawing makes stiffener 4, and vertical displacement is 8.6mm upwards, implements second tensioning after interval 1h, and second tensioning makes stiffener 4 Vertical displacement is 8.6mm upwards, implements third time tensioning after interval 1h, and third time tensioning makes the vertical displacement upwards of stiffener 4 For 8.6mm.
(10) injecting treatment is carried out after tensioning is finished to pilot hole, closes the space between stiffener 4 and pilot hole, use Stiffener 4 is fastened by anchorage 8.
(11) joining position with building sealant 9 to stiffener 4 and anchorage 8 carries out encapsulation process.
(12) roof boarding plate end anchoring position expansion pea gravel concreten 6 above brushing polyurethane coating film 10.
(13) brushing of polyurethane coating film 10 finishes rear paving modified asphalt waterproof coiled material 11.
(14) 11 paving of modified asphalt waterproof coiled material is poured after finishing and smashes expanded and vitrified small ball light mortar protective layer 12.
(15) channel-section steel of support top roof boarding is removed.
Gunite concrete is implemented in roof boarding bottom, and gunite concrete thickness is 80mm, and gunite concrete is constructed at twice, the Construction of shotcrete thickness is 40mm, and second construction of shotcrete thickness is 40mm, two-layer injection in front and back when Between be spaced should less than concrete final setting time.
Gunite concrete presses following enforcement:
Pre-plugged jet thickness mark is answered on spraying operation face.Before gunite concrete, construction surface must be sprayed water wet Profit, it is to avoid construction surface absorbs excess moisture from gunite concrete.But, water spray can not be too many, it is impossible to leaves construction surface many Remaining moisture.Water spray is carried out using shower nozzle.Shower nozzle construction when try one's best vertical construction face, with construction surface keep distance should ensure that spray Penetrate concrete compaction.If shower nozzle from construction surface too close to, the concrete of injection can be washed the concrete for having sprayed open, if from Too remote, then the density of concrete is poor.Operating personnel should stand motionless, hold shower nozzle, make shower nozzle from top to bottom, from one side to Another side should not be once sprayed at one and reach whole thickness as the movement of fan-type, and gunite concrete should be made to be formed uniformly One layer.If it find that the concrete for ejecting is uneven, it is necessary to make shower nozzle leave construction surface immediately, mixed until ejected Solidifying soil is uniformly further continued for normally sprayed construction.In course of injection, if it find that concrete surface drying, loose, tenesmus, sliding Or during drawing crack phenomenon, should remove in time, spray again.

Claims (3)

1. a kind of roof boarding reinforcement means, is characterized in that construction procedure includes:
(1) works above cleaning roof boarding;
(2) roofing twist drill pilot hole;
(3) channel-section steel support top roof boarding is used;
(4) roof boarding plate end office (EO) portion's concrete is cut, cuts into square hole;
(5) stiffener supporting-point position local roof boarding is cut, and roof boarding digs into terrace with edge;
(6) regulating bolt and regulating nut are installed successively at stiffener supporting-point position, steel cushion block are welded on regulating nut, Then stiffener is welded with steel cushion block;
(7) the expansion pea gravel concreten for smashing stiffener supporting portion is poured, will be poured after the dabbing of expansion pea gravel concreten surface after 3 days Building waterproofing mortar;
(8) oblique for stiffener section is passed through pilot hole, stiffener end couples with anchorage, anchorage bracing members are temporarily fixed Position, anchorage positioning finishes to pour smashes expansion pea gravel concreten, and expansion pea gravel concreten pours the steel of the interim positioning of dismounting during smashing and props up Support;
Tensioning is carried out after expansion pea gravel concreten possesses some strength after (9) 7 days;
Regulating bolt is tightened by spanner, applying tensioning is carried out to stiffener, tensioning is carried out in three times, first time tensioning make plus Strong reinforcing bar upwards vertical displacement be 1/3 δ, δ be stiffener tensioning vertical displacement, implement second tensioning after interval 1h, second Secondary tensioning makes stiffener, and vertical displacement is 1/3 δ upwards, implements third time tensioning after interval 1h, and third time tensioning makes reinforcement steel Vertical displacement is 1/3 δ to muscle upwards;
(10) injecting treatment is carried out after tensioning is finished to pilot hole, is closed the space between stiffener and pilot hole, is used anchorage Stiffener is fastened;
(11) encapsulation process is carried out to stiffener and anchorage handing-over position with building sealant;
(12) roof boarding plate end anchoring position expansion pea gravel concreten above brushing polyurethane coating film;
(13) polyurethane coating film brushing finishes rear paving modified asphalt waterproof coiled material;
(14) modified asphalt waterproof coiled material paving is poured after finishing and smashes expanded and vitrified small ball light mortar protective layer;
(15) channel-section steel of support top roof boarding is removed;
(16) gunite concrete is implemented in roof boarding bottom, and gunite concrete thickness is 80~90mm, and gunite concrete is applied at twice Work, first time construction of shotcrete thickness are 40~50mm, and second construction of shotcrete thickness is 40~50mm, in front and back The time interval of two-layer injection should not be less than the final setting time of concrete.
2. roof boarding reinforcement means according to claim 1, is characterized in that stiffener tensioning vertical displacement δ value as the following formula Calculated,
δ = 2 σ k E S L 1 2 + σ k L 1 L 2 E S
L1For the oblique segment length of stiffener, L2For stiffener horizontal section length, σkFor the stretching force of stiffener, ESFor reinforcing bar Elastic modelling quantity.
3. roof boarding reinforcement means according to claim 1, is characterized in that gunite concrete by following enforcement:Spraying operation Pre-plugged jet thickness mark is answered on face;Before gunite concrete, construction surface must be sprayed water moistening, it is to avoid construction surface is from spray Penetrate absorption excess moisture in concrete;But, water spray can not be too many, it is impossible to makes construction surface leave excessive moisture;Water spray is using spray Head is carried out;Shower nozzle construction when try one's best vertical construction face, with construction surface keep distance should ensure that gunite concrete is closely knit;Shower nozzle If from construction surface too close to, the concrete of injection can be washed the concrete for having sprayed open, if from too away from, concrete Density is poor;Operating personnel should found motionless, holding shower nozzle, make shower nozzle from top to bottom, as fan-type from one side to another side Mobile, should not once spray at one and whole thickness is reached, gunite concrete should be made to form uniform one layer;If it find that injection Concrete out is uneven, it is necessary to make shower nozzle leave construction surface immediately, until the concrete for ejecting just uniformly is further continued for Normal ground sprayed construction;In course of injection, if it find that when concrete surface drying, loose, tenesmus, sliding or drawing crack phenomenon, should Remove in time, spray again.
CN201510267894.5A 2013-10-19 2013-10-19 Roof boarding reinforcement means Active CN104863382B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510267894.5A CN104863382B (en) 2013-10-19 2013-10-19 Roof boarding reinforcement means

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201310510819.8A CN103526953B (en) 2013-10-19 2013-10-19 The roof panel processing method that bearing capacity is inadequate
CN201510267894.5A CN104863382B (en) 2013-10-19 2013-10-19 Roof boarding reinforcement means

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201310510819.8A Division CN103526953B (en) 2013-10-19 2013-10-19 The roof panel processing method that bearing capacity is inadequate

Publications (2)

Publication Number Publication Date
CN104863382A CN104863382A (en) 2015-08-26
CN104863382B true CN104863382B (en) 2017-03-08

Family

ID=49929273

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201310510819.8A Active CN103526953B (en) 2013-10-19 2013-10-19 The roof panel processing method that bearing capacity is inadequate
CN201510267894.5A Active CN104863382B (en) 2013-10-19 2013-10-19 Roof boarding reinforcement means

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201310510819.8A Active CN103526953B (en) 2013-10-19 2013-10-19 The roof panel processing method that bearing capacity is inadequate

Country Status (1)

Country Link
CN (2) CN103526953B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104481074B (en) * 2014-10-23 2017-06-30 中国二十冶集团有限公司 The construction method of heavy grade Sloping roof techonosphere antiskid
CN105133492B (en) * 2015-09-24 2017-05-10 中交第二航务工程局有限公司 Concrete bridge deck with channels at bottom
CN107327157B (en) * 2017-09-04 2023-12-15 安徽津达建材股份有限公司 Reinforced structure of concrete floor
CN108386001A (en) * 2018-03-09 2018-08-10 北京航空航天大学 A kind of structural strengthening technique based on puffing concrete
CN112942832B (en) * 2021-02-03 2022-07-29 湖南宝家云建筑工程管理有限公司 Building main body structure building method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3306182A1 (en) * 1983-02-23 1984-08-23 Johann 8351 Loham Wenninger Column foot
JP2012072604A (en) * 2010-09-29 2012-04-12 Nippon Steel Corp Reinforcing panel and reinforcing structure
CN202483089U (en) * 2012-03-17 2012-10-10 叶长青 Waterproof rigid roof
CN202530637U (en) * 2012-03-31 2012-11-14 叶长青 Inaccessible roof structure
CN102828623A (en) * 2012-08-30 2012-12-19 北京首钢建设集团有限公司 Construction method for maintaining and locally reinforcing reinforced concrete structure
CN202787690U (en) * 2012-08-24 2013-03-13 叶长青 Transverse connection construction of sandwich roof plate

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN86102326A (en) * 1986-04-23 1987-03-11 夏英湖 The storey-plus extension project in the old room of low layer, greening
CN2257561Y (en) * 1996-06-21 1997-07-09 韩生健 Thermal insulation energy saving, greening device for roofing
CN1431368A (en) * 2003-01-16 2003-07-23 林廷勇 Artificial lawn used for curing sandy, its producing method and operation method
CN2771365Y (en) * 2004-10-08 2006-04-12 邹新建 Plastic board with primary and secondary drainage passage and water storage for greening

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3306182A1 (en) * 1983-02-23 1984-08-23 Johann 8351 Loham Wenninger Column foot
JP2012072604A (en) * 2010-09-29 2012-04-12 Nippon Steel Corp Reinforcing panel and reinforcing structure
CN202483089U (en) * 2012-03-17 2012-10-10 叶长青 Waterproof rigid roof
CN202530637U (en) * 2012-03-31 2012-11-14 叶长青 Inaccessible roof structure
CN202787690U (en) * 2012-08-24 2013-03-13 叶长青 Transverse connection construction of sandwich roof plate
CN102828623A (en) * 2012-08-30 2012-12-19 北京首钢建设集团有限公司 Construction method for maintaining and locally reinforcing reinforced concrete structure

Also Published As

Publication number Publication date
CN103526953A (en) 2014-01-22
CN104863382A (en) 2015-08-26
CN103526953B (en) 2016-04-27

Similar Documents

Publication Publication Date Title
CN104863382B (en) Roof boarding reinforcement means
CN109339828B (en) Tunnel prestress inverted arch structure and construction method thereof
CH707301B1 (en) Method for creating prestressed concrete structures by means of profiles of a shape memory alloy and structure, produced by the process.
CN109457993A (en) A kind of concrete column restoring and fastening method
CN104847130B (en) A kind of ruggedized construction and its construction method of existing structure beam
CN105464396A (en) Reinforcing method for external wall of protective historical building
CN106801517A (en) A kind of schoolhouse surface consolidation of Prefabricated porous plate brick mixed structure strengthens method
CN109611102A (en) Construction of the flyover method is worn under a kind of cold excavation
CN103603676A (en) Scraper roadway supporting method
JP2016069971A (en) Construction method of retaining wall by mortar spraying
CN109281239B (en) Rib type abutment taper slope cutting method in road operation state
CN204875812U (en) Broken alternating layers formula composite rock matter side slope high pressure of soft or hard washes plants anchor and recharges and synthesize ecological protective structure
CN107916797B (en) Construction method for improving bearing performance of old building
CN109468943B (en) The anti-ejection system of vertical prestressed reinforcement and its construction method with function of seismic resistance
CN204782044U (en) Reinforced structure of existing structure roof beam
CN111042843A (en) Pre-anchoring method for underground excavated tunnel
CN113982033B (en) Method for repairing hydraulic retaining wall with inclination trend by using water in post-construction structure without damage to wall
CN106120817B (en) A kind of slope surface building concrete layer landslide-proofing construction technology
CN108755394A (en) A kind of method of presstressed reinforcing steel reinforcement bridge abnormity pier stud
CN114382509A (en) Section tunnel collapse construction method and support device
CN110453659B (en) Construction method for rock plug reservation construction key technology of diversion tunnel of weak surrounding rock
CN209067238U (en) A kind of tunnel prestressing force inverted arch structure
CN102535493A (en) Method for constructing inverted type foundation beam
CN102121248A (en) Method for reinforcing and fixing sloping surface of prestressed anchorage element
CN205531422U (en) Reinforced concrete frame girder construction is consolidated to prefabricated checkered plate steel truss

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201112

Address after: No.3, Tonghai Road, chuegang Town, Rudong County, Nantong City, Jiangsu Province, 226400

Patentee after: Rudong County Shengtai new rural development and Construction Co., Ltd

Address before: 325000 No. 4, Jinchuan Road, Tianhe street, Wenzhou economic and Technological Development Zone, Zhejiang, China