CN104863307A - Truss structure - Google Patents
Truss structure Download PDFInfo
- Publication number
- CN104863307A CN104863307A CN201510205829.XA CN201510205829A CN104863307A CN 104863307 A CN104863307 A CN 104863307A CN 201510205829 A CN201510205829 A CN 201510205829A CN 104863307 A CN104863307 A CN 104863307A
- Authority
- CN
- China
- Prior art keywords
- truss
- monolithic
- bar
- truss body
- stress
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510205829.XA CN104863307B (en) | 2015-04-28 | 2015-04-28 | Truss structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510205829.XA CN104863307B (en) | 2015-04-28 | 2015-04-28 | Truss structure |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104863307A true CN104863307A (en) | 2015-08-26 |
CN104863307B CN104863307B (en) | 2017-01-11 |
Family
ID=53909439
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510205829.XA Active CN104863307B (en) | 2015-04-28 | 2015-04-28 | Truss structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104863307B (en) |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1020583A1 (en) * | 1999-01-11 | 2000-07-19 | Marmorith Betonindustrie | Beam bottom, method for the production thereof and for the production of a beam therewith |
JP2004232229A (en) * | 2003-01-28 | 2004-08-19 | Nippon Kaiser Kk | Precast concrete slab |
CN101230681A (en) * | 2007-01-28 | 2008-07-30 | 邱则有 | Force-bearing type superposed component |
CN201347586Y (en) * | 2008-12-17 | 2009-11-18 | 广州市设计院 | Large-span prestressed cable-supported truss structure |
CN202023255U (en) * | 2011-03-18 | 2011-11-02 | 中国民航大学 | Steel-wood mixed truss string structure |
CN102747691A (en) * | 2012-08-02 | 2012-10-24 | 中铁二十三局集团有限公司 | Integral pushing erection method for truss girders |
CN104032833A (en) * | 2014-05-23 | 2014-09-10 | 苏州工业园区设计研究院股份有限公司 | External pre-stressing exerting structure of three-dimensional truss |
CN203890920U (en) * | 2014-06-17 | 2014-10-22 | 北京道从交通安全科技股份有限公司 | Trussed steel pope cable movable rail |
CN204163276U (en) * | 2014-11-17 | 2015-02-18 | 上海电力设计院有限公司 | The large span heat-net-pipeline steel truss of Shi Hanzhang |
-
2015
- 2015-04-28 CN CN201510205829.XA patent/CN104863307B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1020583A1 (en) * | 1999-01-11 | 2000-07-19 | Marmorith Betonindustrie | Beam bottom, method for the production thereof and for the production of a beam therewith |
JP2004232229A (en) * | 2003-01-28 | 2004-08-19 | Nippon Kaiser Kk | Precast concrete slab |
CN101230681A (en) * | 2007-01-28 | 2008-07-30 | 邱则有 | Force-bearing type superposed component |
CN201347586Y (en) * | 2008-12-17 | 2009-11-18 | 广州市设计院 | Large-span prestressed cable-supported truss structure |
CN202023255U (en) * | 2011-03-18 | 2011-11-02 | 中国民航大学 | Steel-wood mixed truss string structure |
CN102747691A (en) * | 2012-08-02 | 2012-10-24 | 中铁二十三局集团有限公司 | Integral pushing erection method for truss girders |
CN104032833A (en) * | 2014-05-23 | 2014-09-10 | 苏州工业园区设计研究院股份有限公司 | External pre-stressing exerting structure of three-dimensional truss |
CN203890920U (en) * | 2014-06-17 | 2014-10-22 | 北京道从交通安全科技股份有限公司 | Trussed steel pope cable movable rail |
CN204163276U (en) * | 2014-11-17 | 2015-02-18 | 上海电力设计院有限公司 | The large span heat-net-pipeline steel truss of Shi Hanzhang |
Also Published As
Publication number | Publication date |
---|---|
CN104863307B (en) | 2017-01-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103912073B (en) | A kind of built-in profile steel steel pipe concrete frame low yield point steel plate shear wall structure | |
KR20150126502A (en) | Structure And Construction Method of Steel Arch Bridge | |
CN102086677A (en) | Prefabricated reinforced concrete beam and connection joint of reinforced concrete column and beam | |
KR101673287B1 (en) | Methods of increasing the sectional resisting force for negative moment acting at the end part of beam in case of repair or remodeling | |
KR20100007300A (en) | A steel composite bridge having steel plates connected by using concrete cross beams and its constructing method | |
CN113445670A (en) | Prefabricated and assembled composite steel pipe concrete lattice column and construction method | |
CN104863307B (en) | Truss structure | |
CN204738451U (en) | Truss structure | |
KR100904880B1 (en) | The long span structure and this construction technique which synthesized an arch and a under tension | |
CN116044020A (en) | Construction structure for connecting square steel column with concrete beam | |
JP4449788B2 (en) | Hinge joint structure of RC structural member | |
US10006201B2 (en) | Structural support beam | |
CN212801948U (en) | High-strength stiff column-beam column connecting joint | |
KR101067723B1 (en) | Moment reinforcement of h-beam for steel frame construction | |
JP2016118013A (en) | Concrete structure | |
CN214219990U (en) | Connection node structure of confined concrete column combination beam | |
KR101550553B1 (en) | Methods of Manufacturing A Prestressed Girder Using Steel Rib Plate | |
KR100985495B1 (en) | Girder for bridge | |
CN109457866B (en) | Anti-sliding partially-wrapped composite beam and prefabricating method thereof | |
KR101118305B1 (en) | Composire bridge and hybrid tower for construction composite bridge | |
KR100985181B1 (en) | Gider using FRP unit | |
CN211647262U (en) | Reinforced structure of tower crane in core tube steel structure frame building | |
CN116717112B (en) | Construction ramp support auxiliary structure based on foundation pit crown beam | |
CN113944105B (en) | High-precision connection assembly method for split steel box girder of hybrid girder bridge | |
KR20140105914A (en) | Composite girder using cold formed channel as forms method of contructing the same |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C41 | Transfer of patent application or patent right or utility model | ||
CB03 | Change of inventor or designer information |
Inventor after: Cai Donghao Inventor before: Gong Suhua |
|
COR | Change of bibliographic data | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20161128 Address after: 523000 Guangdong Province, Dongguan city Changan Town Zhen'an road Shatou Road Applicant after: Dongguan Taifeng Steel Structure Co. Ltd. Address before: Jinjiang District Jinhua Road Chengdu City, Sichuan province 610000 section of No. 8 Building 1 11 unit 18 floor No. 1846 Applicant before: CHENGDU XUNDE TECHNOLOGY CO., LTD. |
|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20191223 Address after: The river town of Kau road 523000 in Guangdong province Dongguan city Po Thai Building No. 31 building A Room 403 Patentee after: Dongguan Ou Rui Construction Co., Ltd. Address before: 523000 Guangdong Province, Dongguan city Changan Town Zhen'an road Shatou Road Patentee before: Dongguan Taifeng Steel Structure Co. Ltd. |
|
TR01 | Transfer of patent right |