CN104863166B - 土质边坡滑坡塌方后的加固抢险施工方法 - Google Patents
土质边坡滑坡塌方后的加固抢险施工方法 Download PDFInfo
- Publication number
- CN104863166B CN104863166B CN201510251281.2A CN201510251281A CN104863166B CN 104863166 B CN104863166 B CN 104863166B CN 201510251281 A CN201510251281 A CN 201510251281A CN 104863166 B CN104863166 B CN 104863166B
- Authority
- CN
- China
- Prior art keywords
- landslide
- soil
- slope
- reinforcing
- construction method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
土质边坡滑坡塌方后的加固抢险施工方法,首先在土质边坡的滑坡塌方处插入钢筋;再在松软的泥土中打钻灌浆孔;之后,制备灌浆料,备用;接着将插入的钢筋用钢丝横向捆扎成为整体,或用电焊将插入的钢筋焊接成为整体;又在塌方的凹陷处填充植物纤维,整平;最后将制成的灌浆料用注浆机高压注入灌浆孔和填入植物纤维的地方,待其凝固,即形成对滑坡塌方后的土质边坡的固定整体。本发明无须铲除滑坡泥土,采用注浆技术将松软土质改变为紧固的类岩体,又将植物纤维与灌浆料形成稳定抗拉型混凝土整体。取材方便、施工机械化程度高、施工速度快捷、加固效果好。适用于山区公路、铁路、桥梁和建构筑物周围土质边坡滑坡塌方后的加固抢险。
Description
技术领域
本发明涉及建筑周边土壤的保护,进一步来说涉及公路、铁路或桥梁的周边土质边坡的保护,尤其涉及土质边坡滑坡塌方后的加固抢险施工。
背景技术
众所周知,公路、铁路、桥梁的周边乃至于山区坡地,土质边坡滑坡塌方现象极为常见,尤其在雨季更多。一旦出现滑坡塌方,不仅会阻塞交通,而且会危及人们的生命安全。为了减少由此产生的损失,滑坡塌方后需要及时抢险救灾。然而,由于边坡土质松软,滑坡塌方后抢险并非易事,抢险施工的成本也相当高昂。常用的抢险施工方法是将滑坡土石部分铲除之后填塞毛石、袋装土等加固边坡。这种临时性抢险不仅施工周期长、机械化程度低,而且材料运送难、施工成本高,抢险效果尚不理想。因此,土质边坡滑坡塌方后的加固抢险施工一直是一个技术难题。迄今为止,尚无更好的解决办法。
目前涉及滑坡抢险的专利申请件多与隧道有关,例如201110287612X号《隧道施工塌方安全通道装置》、ZL2011100837756号《隧道塌方空腔的回填修复方法》、ZL2010106204714号《一种变电站边坡滑坡塌方治理方法》、2014100471391号《潜孔钻跟管成孔回填砼稳定临空面处理塌方施工方法》、201410382380X号《一种隧道施工过程中断层破碎带塌方治理方法》等。以上专利技术虽然有其作用,但不能解决土质边坡滑坡塌方后的加固抢险施工难题。
发明内容
本发明旨在提供一种土质边坡滑坡塌方后的加固抢险施工方法,以解决土质边坡滑坡塌方后的加固抢险施工难题。
为达到发明目的,发明人提供的土质边坡滑坡塌方后的加固抢险施工方法,包括以下步骤:
第一步:在土质边坡的滑坡塌方处根据滑坡塌方的大小,按照固定土石方的需要插入钢筋;
第二步,在松软的泥土中根据需要固定的泥土面积大小打钻灌浆孔;
第三步,制备灌浆料,即采用快硬快干水泥加水混合,同时加入少量的水泥外加剂,充分搅拌、混合均匀,备用;
第四步,将插入的钢筋用钢丝横向捆扎成为整体,或用电焊将插入的钢筋焊接成为整体;
第五步,在塌方的凹陷处填充植物纤维,整平;
第六步,将制成的灌浆料用注浆机高压注入灌浆孔和填入植物纤维的地方,待其凝固,即可形成对滑坡塌方后的土质边坡的固定整体。
上述方法的第一步中,所述插入钢筋的密度通常为4根/1m2,其直径为16~22mm,长度为500~3000mm。
上述方法的第二步中,所述灌浆孔的打钻密度为9~12个/1m2,灌浆孔的直径为38~58mm,深度为500~3000mm。
上述方法的第三步中,所述灌浆料的原料质量配比为水泥∶水∶水泥外加剂为1∶0.5∶0.08。
上述方法的第四步中,所述钢丝为普通8#钢丝。
上述方法的第五步中,所述植物纤维包括木纤维、草纤维和竹纤维。
上述方法的第六步中,所述灌浆料的凝固时间为1~2小时。
发明人指出:本发明方法采取将植物纤维与灌浆料形成混凝土,是由于这种混凝土的抗拉力特强,因此具有很好的耐久性,而且由于灌浆料是在高压下灌注到有植物纤维的地方,注满所有空间,其中的植物纤维不与空气和水分接触,就难以腐化,形成密实的整体、增强混凝土的耐久性。
本发明的土质边坡滑坡塌方后的加固抢险施工方法具有以下优点:在土质边坡滑坡塌方后无须铲除滑坡泥土,采用注浆技术将松软的土质改变为紧固的类岩体,又在塌方空洞填入植物纤维,灌注灌浆料形成稳定的抗拉型混凝土,形成土质边坡的固定整体。本发明取材方便、施工机械化程度高、施工速度快捷、加固效果好。适用于山区公路、铁路、桥梁和建构筑物周围土质边坡滑坡塌方后的加固抢险。
具体实施方式
实施例在某个土质边坡的滑坡塌方10m3现场,首先按照密度为4根/1m2插入直径为20mm,长度为500~2000mm的钢筋20根;再在松软的泥土中打钻灌浆孔,打钻密度为10个/1m2,灌浆孔的直径为38~58mm,深度为300~2000mm。接着,采用快硬快干水泥加水混合,同时加入外加剂,充分搅拌、混合均匀,制备灌浆料备用;灌浆料的原料质量配比为水泥∶水∶水泥外加剂为1∶0.5∶0.08。此后,将插入的钢筋用普通8#钢丝横向捆扎成为整体;又在塌方的凹陷处填充木纤维、草纤维和竹纤维,整平;最后将制成的灌浆料用注浆机高压注入灌浆孔和填入植物纤维的地方,凝固2小时,即形成对滑坡塌方后的土质边坡的固定整体。
Claims (7)
1.一种土质边坡滑坡塌方后的加固抢险施工方法,其特征在于包括以下步骤:
第一步:在土质边坡的滑坡塌方处根据滑坡塌方的大小,按照固定土石方的需要插入钢筋;
第二步,在松软的泥土中根据需要固定的泥土面积大小打钻灌浆孔;
第三步,制备灌浆料,即采用快硬快干水泥加水混合,同时加入水泥外加剂,充分搅拌、混合均匀,备用;
第四步,将插入的钢筋用钢丝横向捆扎成为整体,或用电焊将插入的钢筋焊接成为整体;
第五步,在塌方的凹陷处填充植物纤维,整平;
第六步,将制成的灌浆料用注浆机高压注入灌浆孔和填入植物纤维的地方,待其凝固,即可形成对滑坡塌方后的土质边坡的固定整体。
2.如权利要求1所述的土质边坡滑坡塌方后的加固抢险施工方法,其特征在于第一步中,所述插入钢筋的密度通常为4 根/1m2,其直径为16~22mm,长度为500~3000mm。
3.如权利要求1所述的土质边坡滑坡塌方后的加固抢险施工方法,其特征在于第二步中,所述灌浆孔的打钻密度为9~12个/1m2,灌浆孔的直径为38~58mm,深度为500~3000mm。
4.如权利要求1所述的土质边坡滑坡塌方后的加固抢险施工方法,其特征在于第三步中,所述灌浆料的原料质量配比为水泥∶水∶水泥外加剂为1∶0.5∶0.08。
5.如权利要求1所述的土质边坡滑坡塌方后的加固抢险施工方法,其特征在于第四步中,所述钢丝为普通8#钢丝。
6.如权利要求1所述的土质边坡滑坡塌方后的加固抢险施工方法,其特征在于第五步中,所述植物纤维包括木纤维、草纤维和竹纤维。
7.如权利要求1所述的土质边坡滑坡塌方后的加固抢险施工方法,其特征在于第六步中,所述灌浆料的凝固时间为 1~2小时。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510251281.2A CN104863166B (zh) | 2015-05-18 | 2015-05-18 | 土质边坡滑坡塌方后的加固抢险施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510251281.2A CN104863166B (zh) | 2015-05-18 | 2015-05-18 | 土质边坡滑坡塌方后的加固抢险施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104863166A CN104863166A (zh) | 2015-08-26 |
CN104863166B true CN104863166B (zh) | 2017-03-15 |
Family
ID=53909302
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510251281.2A Expired - Fee Related CN104863166B (zh) | 2015-05-18 | 2015-05-18 | 土质边坡滑坡塌方后的加固抢险施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104863166B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107975050A (zh) * | 2017-12-08 | 2018-05-01 | 中水北方勘测设计研究有限责任公司 | 一种使堆渣体稳定的方法 |
CN109142672B (zh) * | 2018-07-17 | 2019-05-24 | 水利部交通运输部国家能源局南京水利科学研究院 | 一种用于防汛抢险演练的滑坡模拟试验方法 |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102080381A (zh) * | 2010-12-31 | 2011-06-01 | 佛山市顺德电力设计院有限公司 | 一种变电站边坡滑坡塌方治理方法 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP3214809B2 (ja) * | 1995-11-01 | 2001-10-02 | 東興建設株式会社 | 法面施工における下地処理工法 |
-
2015
- 2015-05-18 CN CN201510251281.2A patent/CN104863166B/zh not_active Expired - Fee Related
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102080381A (zh) * | 2010-12-31 | 2011-06-01 | 佛山市顺德电力设计院有限公司 | 一种变电站边坡滑坡塌方治理方法 |
Non-Patent Citations (3)
Title |
---|
"浅析某土质边坡滑坡特征及加固处理措施";李勇等;《中国水运》;20100504;第10卷(第2期);第123-127页 * |
"采用地表钻孔注浆治理公路隧道塌方地质灾害";何裕宝等;《探矿工程(岩土钻掘工程)》;20080901;第73-75页 * |
"高填方路基边坡的分析及治理";尚琳;《建材发展导向》;20140715;第63-64页 * |
Also Published As
Publication number | Publication date |
---|---|
CN104863166A (zh) | 2015-08-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104481560B (zh) | 巷道顶板含水层治理方法 | |
CN105201448B (zh) | 一种高压大流量涌水通道内阻水注浆封堵方法 | |
CN102493821B (zh) | 一种高应力巷道煤岩体的支护方法 | |
CN104746517B (zh) | 一种全长在承压水头以下的锚杆支护体系 | |
CN102864712B (zh) | 微扰动既有高速铁路路基变形病害整治方法及结构 | |
CN107060774B (zh) | 一种防隧道洞口围岩坍塌装置及施工方法 | |
CN106381840B (zh) | 一种高压动水状态下裂缝堵漏灌浆方法 | |
CN107165652A (zh) | 一种隧洞整体式塌陷后的施工方法 | |
CN102493822A (zh) | 一种通过富水断层影响带的隧道的帷幕注浆施工方法 | |
CN104453913A (zh) | 一种竖井工作面超前预注浆方法 | |
KR101907141B1 (ko) | 강관다단 그라우팅을 위한 실재용 조성물 및 이의 제조방법 | |
CN105525619B (zh) | 一种富水地层暗挖隧道咬合管幕 | |
CN104196014A (zh) | 一种植入圆钢的组合式嵌岩锚索抗滑桩及其施工方法 | |
CN105484269B (zh) | 爆破条件下基坑围护结构渗漏防治施工方法 | |
CN205576940U (zh) | 一种桩顶全连接的抗滑桩复合支挡结构 | |
CN206174963U (zh) | 过地裂缝破碎带的浅埋暗挖隧道支护结构 | |
CN109538216A (zh) | 穿越采空及塌陷区的隧道施工工艺 | |
CN102080381B (zh) | 一种变电站边坡滑坡塌方治理方法 | |
CN105350988B (zh) | 隧道基底加固方法 | |
CN106243307A (zh) | 一种矿用高分子加固材料、加注设备及加固方法 | |
CN105673025A (zh) | 一种地下工程黄土隧道控制地表沉降施工工艺 | |
CN106761814A (zh) | 一种管幕与竹筋注浆锚杆联合支护结构及方法 | |
CN104863166B (zh) | 土质边坡滑坡塌方后的加固抢险施工方法 | |
KR101197124B1 (ko) | 친환경 복합 사면 안정화공법 | |
CN103573280A (zh) | 一种多孔洞软泥入侵复合顶板巷道支护方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170315 Termination date: 20180518 |
|
CF01 | Termination of patent right due to non-payment of annual fee |