China
Prior art keywords
fdpso
octagonal
dock
construction
float
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510232282.2A
Other languages
Chinese (zh)
Other versions
CN104859788A (en
Inventor
马延德
谢彬
董庆辉
王世圣
谢文会
喻西崇
赵静
刘健
孙瑞雪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Offshore Oil Corp CNOOC
CNOOC Research Institute Co Ltd
Dalian Shipbuilding Industry Co Ltd
Original Assignee
China National Offshore Oil Corp CNOOC
CNOOC Research Institute Co Ltd
Dalian Shipbuilding Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Offshore Oil Corp CNOOC, CNOOC Research Institute Co Ltd, Dalian Shipbuilding Industry Co Ltd filed Critical China National Offshore Oil Corp CNOOC
Priority to CN201510232282.2A priority Critical patent/CN104859788B/en
Publication of CN104859788A publication Critical patent/CN104859788A/en
Application granted granted Critical
Publication of CN104859788B publication Critical patent/CN104859788B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to a kind of quick method of construction of octagonal FDPSO, it includes herein below:1) lower float of octagonal FDPSO and the construction in its inside function cabin are carried out on building berth or level land;2) Upper float of octagonal FDPSO at the same time, is divided into multiple mac functions on the surrounding lands of dock to be built respectively;3) after the completion of lower float construction, drag its lower water and integrally into dock, close dock gate and draw water to dock, make lower float pedestal in dock;4) by constructed multiple mac functions, by hanging apparatus, handling carries out modularization assembling to the top of lower float and closes up respectively;5) installation and the debugging efforts of work related devices are carried out in each mac function;6) opening dock gate makes water-filling in dock, and octagonal FDPSO integrally floats on marine under buoyant of sea water effect.The present invention shortens occupancy building berth, dock pacifically builds time of resource due to being carried out at the same time constructions by octagonal FDPSO points for upper and lower two parts, has reached quick construction purpose.

Description

A kind of quick method of construction of octagonal FDPSO
Technical field
The present invention relates to a kind of quick method of construction of octagonal FDPSO, belong to field of ocean engineering.
Background technology
In order to meet the economy of ocean marginal oil field and practicality requirement, be developed a kind of collection drilling well, Oil recovery, production, oil storage and outer defeated octagonal FDPSO (the floating drilling, production, storage being integrated And offloading unit, floating type well drilling, production storage handler) Multifunctional marine design library part editor and reuse.As Figure 1 and Figure 4, should Device is designed as size and eight larger ribs of conducting oneself with dignity in order to meet the requirement of stability, by the lower float 1 of octagonal FDPSO Rod structure, the inside of eight prisms are provided with multiple functional cabins 11 by partition plate.Meanwhile in order to meet the drilling of oil and storage Etc. demand, the deck of the Upper float 2 for the octagonal FDPSO being wholely set with lower float 1 is divided into multiple intensive arrangements Mac function, be configured with corresponding working equipment 22 in each mac function.
Since octagonal FDPSO volumes are larger, the construction of the device can only use in dock after construction at present Floating launching, dynamic launching or build rear dragging on level land and move to partly latent and refute the three kinds of sides of construction that launch a ship after being built on building berth Formula.But these three mode of construction are there are certain defect, when using being built in dock, due to cutting for octagonal FDPSO Face and height dimension is excessive, function module arrangement is intensive, hence in so that the construction period in dock extends;When using in building berth During upper construction, since the principal dimensions and body of octagonal FDPSO is from great, the bearing capacity and size of conventional launching platform cannot expire Its lower water demand of foot, therefore large-scale redevelopment need to be carried out to building berth, but which not only adds shipbuilding cost, but also exist Some potential safety problems so that construction period becomes longer;When using being built on level land, although dock and ship will not be taken Taiwan investment source, but since octagonal FDPSO principal dimensions and body are from great, phase more demanding to harbour foundation bearing is built on level land Reply partly latent barge etc. is built resource allocation request and also can accordingly be improved, and then adds the cost of shipbuilding.
The content of the invention
In view of the above-mentioned problems, the object of the present invention is to provide one kind can reduce dock, building berth pacifically resource occupation when Between and be greatly lowered the quick method of construction of the octagonal FDPSO of construction cost.
To achieve the above object, the present invention takes following technical scheme:A kind of quick method of construction of octagonal FDPSO, It includes herein below:
1) lower float of octagonal FDPSO and the construction in its inside function cabin are carried out on building berth or level land;
2) while step 1) is carried out, by the Upper float of octagonal FDPSO point on the surrounding lands of dock Built respectively for multiple mac functions;
3) after the completion of the lower float of octagonal FDPSO is built, drag its lower water and integrally into dock, close depressed place Door simultaneously draws water dock, makes the lower float pedestal of octagonal FDPSO in dock;
4) constructed multiple mac functions are distinguished into handling to the lower float of octagonal FDPSO by hanging apparatus Top carries out modularization assembling and closes up, and it is formed the Upper float of a complete octagonal FDPSO;
5) installation and the debugging efforts of work related devices are carried out in each mac function;
6) opening dock gate makes water-filling in dock, octagonal FDPSO integrally floated under buoyant of sea water effect it is marine, and then The lower water conservancy project for completing octagonal FDPSO is made.
Building the building berth of the lower float of the octagonal FDPSO or level land need to meet the octagonal FDPSO's The size and weight demands of lower float.
The hanging apparatus used need to meet the size and weight demands of mac function.
The hanging apparatus is hung using large-sized gantry or marine crane barge hanging apparatus.
Due to taking above technical scheme, it has the following advantages the present invention:1st, the present invention is since octagonal FDPSO being divided Construction is carried out at the same time for upper and lower two parts, therefore shortens and takes the time that building berth, dock pacifically build resource, not significantly Under the premise of increasing construction cost, quick construction purpose is reached.2nd, the present invention by Upper float due to being divided into multiple mac functions Built, and each mac function is carried out at the top of lower float by modularization assembling by hanging apparatus and is closed up, effectively Operation side has been subjected to plane expansion, so as to shorten construction period, has reduced construction cost.
Brief description of the drawings
Fig. 1 is the overall structure diagram of existing octagonal FDPSO;
Fig. 2 is the construction flow chart of octagonal FDPSO of the present invention;
Fig. 3 is the Upper float Section A-A structure diagram of octagonal FDPSO of the present invention;
Fig. 4 is the lower float section B-B structure diagram of octagonal FDPSO of the present invention.
Embodiment
The present invention is described in detail below with reference to the accompanying drawings and embodiments.
As shown in Figure 2 and Figure 3, the method for the present invention comprises the following steps:
1) lower float 1 of octagonal FDPSO and the construction in its inside function cabin 11 are carried out on building berth or level land 3.
2) while step 1) is carried out, by the Upper float 2 of octagonal FDPSO on the surrounding lands of dock 4 It is divided into multiple mac functions 21 to be built respectively.
3) after the completion of the lower float 1 of octagonal FDPSO is built, drag its lower water and integrally into dock 6, close Dock gate 5 simultaneously draws water dock 6, makes 1 pedestal of lower float of octagonal FDPSO in dock 6.
4) constructed multiple mac functions 21 are distinguished into handling by hanging apparatus and carries out mould to the top of lower float 1 Blockization is assembled and closed up, and it is formed the Upper float 2 (as shown in Figure 3) of a complete octagonal FDPSO.
5) installation and the debugging efforts of work related devices are carried out in each mac function 21.
6) opening dock gate 5 makes water-filling in dock 6, octagonal FDPSO integrally floated under buoyant of sea water effect it is marine, into And the lower water conservancy project for completing octagonal FDPSO is made.
In above-described embodiment, building the building berth of lower float 1 or level land 3 need to meet that the size of lower float 1 and weight will Ask.
In above-described embodiment, the hanging apparatus used need to meet the size and weight demands of mac function 21.
In above-described embodiment, hanging apparatus can be hung using large-sized gantry or marine crane barge hanging apparatus.
The various embodiments described above are merely to illustrate the present invention, wherein the structure of each component, connection mode etc. are all can be Change, every equivalents carried out on the basis of technical solution of the present invention and improvement, should not exclude the present invention's Outside protection domain.

Claims (4)

1. a kind of quick method of construction of octagonal FDPSO, it includes herein below:
1) lower float of octagonal FDPSO and the construction in its inside function cabin are carried out on building berth;
2) while step 1) is carried out, the Upper float of octagonal FDPSO is divided on the surrounding lands of dock more A mac function is built respectively;
3) after the completion of the lower float of octagonal FDPSO is built, drag its lower water and integrally into dock, close dock gate simultaneously Draw water to dock, make the lower float pedestal of octagonal FDPSO in dock;
4) constructed multiple mac functions are distinguished to the top of lower float of the handling to octagonal FDPSO by hanging apparatus Carry out modularization assembling and close up, it is formed the Upper float of a complete octagonal FDPSO;
5) installation and the debugging efforts of work related devices are carried out in each mac function;
6) opening dock gate makes water-filling in dock, and octagonal FDPSO integrally floats on marine under buoyant of sea water effect, and then completes The lower water conservancy project of octagonal FDPSO is made.
A kind of 2. quick method of construction of octagonal FDPSO as claimed in claim 1, it is characterised in that:Build the illiciumverum The building berth of the lower float of shape FDPSO or level land need to meet the size and weight of the lower float of the octagonal FDPSO It is required that.
A kind of 3. quick method of construction of octagonal FDPSO as claimed in claim 1, it is characterised in that:Hung described in using Assembling device need to meet the size and weight demands of mac function.
A kind of 4. quick method of construction of octagonal FDPSO as described in claim 1 or 2 or 3, it is characterised in that:It is described to hang Assembling device is hung using large-sized gantry or marine crane barge hanging apparatus.
CN201510232282.2A 2015-05-08 2015-05-08 A kind of quick method of construction of octagonal FDPSO Active CN104859788B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510232282.2A CN104859788B (en) 2015-05-08 2015-05-08 A kind of quick method of construction of octagonal FDPSO

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510232282.2A CN104859788B (en) 2015-05-08 2015-05-08 A kind of quick method of construction of octagonal FDPSO

Publications (2)

Publication Number Publication Date
CN104859788A CN104859788A (en) 2015-08-26
CN104859788B true CN104859788B (en) 2018-05-04

Family

ID=53906069

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510232282.2A Active CN104859788B (en) 2015-05-08 2015-05-08 A kind of quick method of construction of octagonal FDPSO

Country Status (1)

Country Link
CN (1) CN104859788B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107187545B (en) * 2017-05-22 2019-11-05 南通中远海运船务工程有限公司 The installation method of gas compression Module functionality unit
CN107264721A (en) * 2017-05-22 2017-10-20 南通中远船务工程有限公司 The installation method of gas compression module

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102145734A (en) * 2010-02-10 2011-08-10 烟台来福士海洋工程有限公司 Method for integrally folding semi-submersible drilling platform
CN202743445U (en) * 2012-06-07 2013-02-20 中国海洋石油总公司 Floating type production platform with both drilling and oil storage functions
CN103921905A (en) * 2014-04-17 2014-07-16 大连理工大学 Semi-submersible module for combining into large-scale floating body on the water and assembling method thereof

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102190065B (en) * 2010-03-10 2013-07-17 烟台来福士海洋工程有限公司 Construction method for ocean platform
KR101695879B1 (en) * 2010-09-29 2017-01-23 대우조선해양 주식회사 Method for installing the topside of floating marine plant
CN102849180B (en) * 2012-09-18 2014-12-31 渤海装备辽河重工有限公司 Launching process of jack-up offshore drilling platform by airbag
CN103171743B (en) * 2012-10-15 2015-10-28 大连理工大学 Dock eight shuttle table type Floating Production oil storage systems

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102145734A (en) * 2010-02-10 2011-08-10 烟台来福士海洋工程有限公司 Method for integrally folding semi-submersible drilling platform
CN202743445U (en) * 2012-06-07 2013-02-20 中国海洋石油总公司 Floating type production platform with both drilling and oil storage functions
CN103921905A (en) * 2014-04-17 2014-07-16 大连理工大学 Semi-submersible module for combining into large-scale floating body on the water and assembling method thereof

Also Published As

Publication number Publication date
CN104859788A (en) 2015-08-26

Similar Documents

Publication Publication Date Title
WO2017173934A1 (en) Self-elevating submersible underwater working platform and usage thereof
CN204527563U (en) Middle deep water semi-submersible drilling platform
CN104859788B (en) A kind of quick method of construction of octagonal FDPSO
CN103452086A (en) Mat-assisted driving movable platform
CN104743058B (en) The method of tension leg platform (TLP) upper chunk floating support mounting
CN105480380B (en) Tension leg platform (TLP) upper module and the closure workmanship of lower float structure
CN109866887A (en) The oblique self-stabilization type semi-submerged platform of column outside a kind of band
CN107917702B (en) Ocean hydrology visualizer for ocean wind power planning
CN206187290U (en) Marine monitoring platform
CN104354831A (en) Installation process for tail roller of three-purpose working ship
CN103738480B (en) Skid-mounted type offshore platform module
CN110186645B (en) Test device for testing load of buoy region of deepwater anti-bench drilling marine riser
CN205150152U (en) Be suitable for rotatory buoy tender that hangs of coastal energy -concerving and environment -protective type 10t in guangdong
CN207773398U (en) The oblique self-stabilization type semi-submerged platform of column outside a kind of band
CN107399412A (en) MOPU method of construction
CN110696984A (en) Floating offshore gas station platform and stabilizing method thereof
CN104802950A (en) Self-elevating type underwater floater tension leg platform and establishing method thereof
CN206987757U (en) A kind of deep water blowout emergency offsets installation system under water
CN204623785U (en) A kind of jack up underwater buoyant body tension leg platform
CN204871497U (en) River course is with ship of decontaminating
CN203977394U (en) Ocean platform can float
CN211472381U (en) Novel easy-to-install and easy-to-remove surge eliminating and wave dissipating device on sea
KR102117387B1 (en) Arrangement scheme of living quarter in semi-submersible drilling rig
CN202644508U (en) Wellhead platform supported by cylinder combined tubular pile
CN206914575U (en) A kind of ton overflow oil recovering ship

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 100010 Beijing, Chaoyangmen, North Street, No. 25, No.

Applicant after: China Offshore Oil Group Co., Ltd.

Applicant after: CNOOC research institute limited liability company

Applicant after: Dalian Shipping Heavy Industry Group Co., Ltd.

Address before: 100010 Beijing, Chaoyangmen, North Street, No. 25, No.

Applicant before: China National Offshore Oil Corporation

Applicant before: CNOOC Research Institute

Applicant before: Dalian Shipping Heavy Industry Group Co., Ltd.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant