CN104847050B - Ceiling structure - Google Patents

Ceiling structure Download PDF

Info

Publication number
CN104847050B
CN104847050B CN201510283140.9A CN201510283140A CN104847050B CN 104847050 B CN104847050 B CN 104847050B CN 201510283140 A CN201510283140 A CN 201510283140A CN 104847050 B CN104847050 B CN 104847050B
Authority
CN
China
Prior art keywords
ceiling
furred ceiling
metope
connector
cantilever
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510283140.9A
Other languages
Chinese (zh)
Other versions
CN104847050A (en
Inventor
谭泳霖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU GUANGJIN DECORATION MATERIALS CO Ltd
Original Assignee
GUANGZHOU GUANGJIN DECORATION MATERIALS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU GUANGJIN DECORATION MATERIALS CO Ltd filed Critical GUANGZHOU GUANGJIN DECORATION MATERIALS CO Ltd
Priority to CN201510283140.9A priority Critical patent/CN104847050B/en
Publication of CN104847050A publication Critical patent/CN104847050A/en
Application granted granted Critical
Publication of CN104847050B publication Critical patent/CN104847050B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to a kind of ceiling structure, including:Cantilever, the first end of cantilever is installed on metope or roof, the second end are erected in metope elongation, and cantilever has the installation portion for installing ceiling, ceiling;First furred ceiling, the first furred ceiling be to be fixed on the furred ceiling of metope or be roof in itself;Wherein, ceiling is layed in installation portion the second furred ceiling of formation, gap is left between the first furred ceiling and the second furred ceiling, the two is separated from each other.Multilayer furred ceiling is installed, step-like sandwich construction is formed, easy to operate, labor intensity is low, can greatly improve decoration efficiency.

Description

Ceiling structure
Technical field
The invention belongs to the field of fitting up, and in particular to a kind of ceiling structure.
Background technology
Ceiling is installed on roof, the roof space can be beautified, using multilayer ceiling structure, it is possible to use level Visual effect make floor space structure more attractive.But, traditional installation furred ceiling method is the default position according to keel Put, position the position of expandable nail, expandable nail is squeezed on roof, suspension rod is hung on into roof, hook is linked up with suspension rod bottom provided with hook Keel are hung, typically fixing a keel needs multiple hooks, and roof needs to head into many expandable nails, and workman faces upward head operation very not Convenient, multiple ends or middle part for tangling keel are, it is necessary to which manual adjustment keel level, then installs smallpox on keel again Plate.When installing multi-level step-like furred ceiling, framework is generally set up in advance, then by ceiling using nail joint, splicing etc. Mode is fixed on the surface of framework as decoration, and this installation method complexity is cumbersome, and needs to carry out complicated positioning, leveling Operation, it is desirable to have the installer of experience specialty installs, and labor intensity is big and takes considerable time, once install, by difficulty To adjust and dismantle, it is unfavorable for the maintenance in later stage and other equipment is installed.
The content of the invention
Based on this, the present invention discloses a kind of ceiling structure, installs multilayer furred ceiling, forms step-like sandwich construction, Easy to operate, labor intensity is low, can greatly improve decoration efficiency.
A kind of ceiling structure, including:Cantilever, the first end of cantilever is installed on metope or roof, the second end are erected in metope Elongation, cantilever has the installation portion for installing ceiling, ceiling;First furred ceiling, the first furred ceiling is to be fixed on wall The furred ceiling in face or for roof in itself;Wherein, ceiling is layed in installation portion the second furred ceiling of formation, the first smallpox Gap is left between furred ceiling and the second furred ceiling, the two is separated from each other.
In one of the embodiments, the cantilever includes keel and connector, and the connector includes connecting portion and held Support portion, the connecting portion is fixed on metope or roof, the supporting part are docked with one end of the keel, and the keel are erected in Metope.
In one of the embodiments, the supporting part is erected in metope, and the end of the keel and the supporting part are logical Cross the concaveconvex structure being mutually matched mutually nested.
In one of the embodiments, the connector includes height connector and width connector, the height connection The connecting portion is arranged at the top of part, and the bottom of the height connector is docked with the width connector from the near-end of metope, institute State width connector has the supporting part from the distal end of metope.
In one of the embodiments, first furred ceiling above and below second furred ceiling with staggering to form multilayer Furred ceiling structure.
In one of the embodiments, left between first furred ceiling and second furred ceiling between level Furred ceiling is divided into polylith region by gap, first furred ceiling, second furred ceiling, the horizontal clearance.
In one of the embodiments, the cantilever is installed on metope or roof by support beam, and the support beam is fixed In metope or roof and provided with transverse slipway, what one end that the cantilever approaches metope was slided is located on the transverse slipway.
In one of the embodiments, the support beam is additionally provided with the first buckle hanging unit, and first buckle hanging unit is located at described Above transverse slipway, first furred ceiling is provided with the second buckle hanging unit, and first buckle hanging unit buckles second buckle hanging unit, The first furred ceiling carry is in the support beam.
In one of the embodiments, riser is also included, the riser is erected in the cantilever, and the riser is located at institute State between the first furred ceiling and second furred ceiling.
In one of the embodiments, illuminating part mounting groove is provided between the riser and the second end of the cantilever.
The advantage or principle to such scheme are illustrated below:
1st, the first end of cantilever is installed on metope or roof, the second end are erected in metope elongation, is level or near horizontal State, cantilever has the installation portion for installing ceiling, and ceiling is layed in installation portion the second furred ceiling of formation, the first ceiling suspension hook Push up the furred ceiling to be fixed on metope or be roof in itself;Wherein, stayed between the first furred ceiling and the second furred ceiling Have gap, the two be separated from each other, single second furred ceiling is installed by cantilever support, can be with the first furred ceiling collocation group Into multilayer suspended ceiling structure up and down, the first furred ceiling and the second furred ceiling can also draw in house ceiling space in the horizontal direction It is divided into multiple regions, mixes into different effects.
2nd, cantilever includes keel and connector, and connector includes connecting portion and supporting part, and connecting portion is fixed on metope or room Top, supporting part are docked with one end of keel, and keel are erected in metope, and connector is separate part, connector with keel It is installed on after metope, as long as keel can be installed with the structure that connector is docked provided with cooperating, different dragons can be installed Bone, versatility is more preferable.
3rd, supporting part is erected in metope, and the end of keel is mutually nested by the concaveconvex structure being mutually matched with supporting part, Keel are connected with connector by the way of nested, can repeatedly be dismantled, be maintained easily and change.
4th, connector includes height connector and width connector, and connecting portion is arranged at the top of height connector, and height is connected Near-end of the bottom of part with width connector from metope is docked, and width connector has supporting part from the distal end of metope, during installation Same level highly squeezes into expandable nail, and positioning is easy, afterwards by the height connector of different length come the height of adjustment keel Position, it is easy to operate without in multiple altitude location expandable nails, and to be made strip cost relatively low for keel, keel, highly connect Fitting, width connector is formed integrally can greatly increase collection space, is not easy to production and transport.
5th, cantilever is installed on metope or roof by support beam, and support beam is fixed on metope or roof and provided with laterally sliding Road, what one end that cantilever approaches metope was slided is located on transverse slipway, can be adjusted during installation with sliding gib on cantilever level face Position, flexibly, conveniently.
6th, support beam is additionally provided with the first buckle hanging unit, and the first buckle hanging unit is located above transverse slipway, and the first furred ceiling is provided with Second buckle hanging unit, the first buckle hanging unit buckles the second buckle hanging unit, and the first furred ceiling carry is in support beam, the first furred ceiling and Two furred ceilings are supported by same support beam, it is only necessary to which support beam is installed on into metope, are set up afterwards and by carry, slip Mode installed, remove from and the operation of expandable nail repeatedly squeezed into metope, operation facility.
7th, riser is also included, riser is erected in cantilever, and riser is located between the first furred ceiling and the second furred ceiling, Riser is used to decorate between the first furred ceiling and the second furred ceiling, and riser is directly mounted at cantilever, compared to it is traditional Riser is coverd with wooden frame outer surface, simple to operate.
8th, illuminating part mounting groove is provided between riser and the second end of cantilever, illuminating part can be installed with illuminating part mounting groove, Now riser is luminescent screen.
Brief description of the drawings
Fig. 1 is the structure chart of ceiling structure of the embodiment of the present invention;
The enlarged drawing that Fig. 2 is A in this Fig. 1;
Fig. 3 is the structure chart of support beam in the embodiment of the present invention;
Fig. 4 is the side view of support beam in the embodiment of the present invention;
Fig. 5 is the structure chart of height connector in the embodiment of the present invention;
Fig. 6 is the side view of height connector in the embodiment of the present invention;
Fig. 7 is the structure chart of width connector in the embodiment of the present invention;
Fig. 8 is the scheme of installation of ceiling structure of the embodiment of the present invention.
Description of reference numerals:
100th, support beam, the 110, first buckle hanging unit, 120, transverse slipway, 200, height connector, 210, connecting portion, 220, First mounting part, 300, width connector, the 310, second mounting part, 320, supporting part, 400, keel, 500, ceiling, 600, Metope, 700, riser.
Embodiment
The present invention is described in further detail with reference to embodiment and accompanying drawing, but embodiments of the present invention are not limited to This.
Ceiling structure, including:Cantilever, ceiling 500, the first furred ceiling, support beam 100.
Support beam 100 is fixed on metope 600 or roof, and support beam 100 is provided with the buckle hanging unit 110 of transverse slipway 120 and first, First buckle hanging unit 110 is located at the top of transverse slipway 120, and the first furred ceiling includes the first keel 400 and the first ceiling 500, First keel 400 are provided with the second buckle hanging unit, and the first buckle hanging unit 110 buckles the second buckle hanging unit, and (the first buckle hanging unit 110 can also be water Flat or near horizontal slideway, the first buckle hanging unit 110 and the second buckle hanging unit slide mounting), the first ceiling 500 is installed on the first dragon Bone 400.(or the first furred ceiling be roof in itself.)
Cantilever includes keel 400 and connector, and connector includes height connector 200 and width connector 300.
Connecting portion 210, the transverse slipway located at support beam 100 that connecting portion 210 is slided are arranged at the top of height connector 200 On 120;The bottom of height connector 200 is provided with the first mounting part 220, width connector 300 from metope 600 near-end provided with the Two mounting parts 310, the first mounting part 220 and the second mutually mounting, distal end of the width connector 300 from metope 600 of mounting part 310 There is a supporting part 320, the end of the one end of keel 400 and supporting part 320 mutually nested, the supporting part by the concaveconvex structure being mutually matched 320 are embedded in the groove of keel 400, and keel 400 are erected in metope 600.
Keel 400 are provided with installation portion, and ceiling 500 is layed in installation portion the second furred ceiling of formation, the first furred ceiling Left between the second furred ceiling gap, the two be separated from each other, stagger shape above and below the first furred ceiling and the second furred ceiling Into multilayer furred ceiling structure.
Can also be.Horizontal clearance, the first furred ceiling, second are left between first furred ceiling and the second furred ceiling Furred ceiling is divided into polylith region by furred ceiling, horizontal clearance.
Also include riser 700, riser 700 is erected in cantilever, and riser 700 is located at the first furred ceiling and the second ceiling suspension hook Between top.Illuminating part mounting groove is provided between riser 700 and the second end of cantilever, illuminating part mounting groove can be sent out with mounted lamp etc. Light part, now riser 700 is light barrier.
Each technical characteristic of embodiment described above can be combined arbitrarily, to make description succinct, not to above-mentioned reality Apply all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, the scope of this specification record is all considered to be.
Embodiment described above only expresses the several embodiments of the present invention, and it describes more specific and detailed, but simultaneously Can not therefore it be construed as limiting the scope of the patent.It should be pointed out that coming for one of ordinary skill in the art Say, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the protection of the present invention Scope.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (7)

1. a kind of ceiling structure, it is characterised in that including:
Cantilever, the first end of cantilever is installed on metope or roof, the second end are erected in metope elongation, and cantilever has for installing smallpox The installation portion of plate, the cantilever includes keel and connector, and the connector includes connecting portion and supporting part, and the connecting portion is consolidated Docked due to metope or roof, the supporting part with one end of the keel, the keel are erected in metope, the connector bag Height connector and width connector are included, the top of the height connector has under the connecting portion, the height connector Portion is docked with the width connector from the near-end of metope, and the width connector has the supporting part from the distal end of metope, high The bottom for spending connector is provided with the first mounting part, and width connector is provided with the second mounting part, the first mounting part from the near-end of metope Mutually mounted with the second mounting part;
Ceiling;
First furred ceiling, the first furred ceiling be to be fixed on the furred ceiling of metope or be roof in itself;Wherein, smallpox Plate is layed in installation portion the second furred ceiling of formation, and gap, the two phase are left between the first furred ceiling and the second furred ceiling Mutually separation;
Riser, the riser is erected in the cantilever, and the riser is located at first furred ceiling and second ceiling suspension hook Between top.
2. ceiling structure according to claim 1, it is characterised in that the supporting part is erected in metope, the keel End is mutually nested by the concaveconvex structure being mutually matched with the supporting part.
3. ceiling structure according to claim 1, it is characterised in that first furred ceiling and second ceiling suspension hook Stagger to form multilayer furred ceiling structure above and below top.
4. ceiling structure according to claim 1, it is characterised in that first furred ceiling and second ceiling suspension hook Horizontal clearance is left between top, first furred ceiling, second furred ceiling, the horizontal clearance draw furred ceiling It is divided into polylith region.
5. according to any described ceiling structure of Claims 1-4, it is characterised in that the cantilever is installed on by support beam Metope or roof, the support beam are fixed on metope or roof and provided with transverse slipway, and what the first end of the cantilever was slided sets In on the transverse slipway.
6. ceiling structure according to claim 5, it is characterised in that the support beam is additionally provided with the first buckle hanging unit, described First buckle hanging unit is located above the transverse slipway, and first furred ceiling is provided with the second buckle hanging unit, first buckle hanging unit Second buckle hanging unit is buckled, the first furred ceiling carry is in the support beam.
7. ceiling structure according to claim 1, it is characterised in that set between the riser and the second end of the cantilever There is illuminating part mounting groove.
CN201510283140.9A 2015-05-28 2015-05-28 Ceiling structure Expired - Fee Related CN104847050B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510283140.9A CN104847050B (en) 2015-05-28 2015-05-28 Ceiling structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510283140.9A CN104847050B (en) 2015-05-28 2015-05-28 Ceiling structure

Publications (2)

Publication Number Publication Date
CN104847050A CN104847050A (en) 2015-08-19
CN104847050B true CN104847050B (en) 2017-10-24

Family

ID=53846997

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510283140.9A Expired - Fee Related CN104847050B (en) 2015-05-28 2015-05-28 Ceiling structure

Country Status (1)

Country Link
CN (1) CN104847050B (en)

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7634881B2 (en) * 2005-10-31 2009-12-22 Usg Interiors, Inc. Cross panel
KR100852778B1 (en) * 2007-07-31 2008-08-19 정광수 Structure for fixing the ceiling plate
CN203769172U (en) * 2013-11-28 2014-08-13 北新建材(上海)有限公司 Hanger
CN203742052U (en) * 2013-12-24 2014-07-30 广州市广京装饰材料有限公司 Ceiling and keel assembling structure
CN203795688U (en) * 2014-03-31 2014-08-27 广州市广京装饰材料有限公司 Keel connecting and assembling structure
CN203856119U (en) * 2014-05-29 2014-10-01 北新建材(上海)有限公司 External corner cladding keel of clamp-type main keel
CN204023865U (en) * 2014-06-17 2014-12-17 北新集团建材股份有限公司 A kind of longitudinal furred ceiling fastener
CN203977672U (en) * 2014-07-29 2014-12-03 上海圣峰建材科技有限公司 A kind of roof suspended ceiling integrated member
CN204781540U (en) * 2015-05-28 2015-11-18 广州市广京装饰材料有限公司 It flower structure

Also Published As

Publication number Publication date
CN104847050A (en) 2015-08-19

Similar Documents

Publication Publication Date Title
CN202227644U (en) Three-dimensional adjustable hanging piece device for decoration wallboard
CN104847048A (en) Ceiling keel structure and mounting method thereof
CN105178495B (en) A kind of suspended ceiling keel system and its construction method
CN104878868B (en) Ceiling keel structure and installation method
CN204781540U (en) It flower structure
CN104088391A (en) Hanging piece used for low-rise high-integration suspended ceiling
CN204940658U (en) Ceiling keel structure and connector
CN104847050B (en) Ceiling structure
CN204781552U (en) It flower structure
CN203947655U (en) A kind of hanging piece for low floor height Integral ceiling
CN205088824U (en) A system is erect to decoration of decorative board and uses thereof with novel structure
CN204781542U (en) Smallpox keel structure
CN101775866B (en) Suspended ceiling
CN204738434U (en) Double ceiling fossil fragments system
CN103953897A (en) Combined decorative lamp trough section
CN204438015U (en) Combined ornament lamp channel section
CN204100159U (en) Combined ornament lamp channel section
CN111576712B (en) Ceiling board mounting structure and ceiling board paving method with same
CN204114767U (en) A kind of panel light with multiple mounting modes
CN104847049B (en) Ceiling structure
CN113775109A (en) Airport assembly type ceiling system and construction method thereof
CN202544208U (en) Fixing structure for indoor suspended ceiling
CN104847047B (en) A kind of double ceiling grid system
CN205877657U (en) Adjustable installing support
CN104563358A (en) Parallel keel ceiling

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171024

CF01 Termination of patent right due to non-payment of annual fee