CN104842460B - A kind of main building structure of concrete mixing plant and its installation method of Fast Installation - Google Patents

A kind of main building structure of concrete mixing plant and its installation method of Fast Installation Download PDF

Info

Publication number
CN104842460B
CN104842460B CN201410103368.0A CN201410103368A CN104842460B CN 104842460 B CN104842460 B CN 104842460B CN 201410103368 A CN201410103368 A CN 201410103368A CN 104842460 B CN104842460 B CN 104842460B
Authority
CN
China
Prior art keywords
layer platform
underframe
building structure
main building
mixing plant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410103368.0A
Other languages
Chinese (zh)
Other versions
CN104842460A (en
Inventor
邓拥军
刘国庆
孙华平
路则鹏
周智勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Leisa Heavy Construction Machinery Co Ltd
Original Assignee
Beiqi Foton Motor Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beiqi Foton Motor Co Ltd filed Critical Beiqi Foton Motor Co Ltd
Priority to CN201410103368.0A priority Critical patent/CN104842460B/en
Publication of CN104842460A publication Critical patent/CN104842460A/en
Application granted granted Critical
Publication of CN104842460B publication Critical patent/CN104842460B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28CPREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28C9/00General arrangement or layout of plant
    • B28C9/02General arrangement or layout of plant for producing mixtures of clay or cement with other materials

Abstract

The invention discloses the main building structure of concrete mixing plant and its installation method of a kind of Fast Installation.The main building structure of concrete mixing plant of the Fast Installation includes:Underframe;Stirring layer platform;Measuring layer platform;And column, which is in the way of being pivotally connected, the underframe, stirring layer platform and measuring layer platform are linked into an integrated entity, so as to column can switch between raised state and tilt state, in the raised state, the uprights vertical is in the underframe, stirring layer platform and measuring layer platform, in the tilt state, the column parallel to the underframe, stirring layer platform and measuring layer platform, or with the underframe, stirring layer platform and measuring layer platform into one less than 15 degree of angle.The main part of the main building structure of concrete mixing plant of the Fast Installation of the present invention is linked together by articulated manner such that it is able to is switched between raised state and tilt state, easily can be transported and install.

Description

A kind of main building structure of concrete mixing plant and its installation method of Fast Installation
Technical field
The present invention relates to technical field of engineering machinery, the concrete mixing plant main building knot of more particularly to a kind of Fast Installation Structure.
Background technology
In the prior art, the main building structure of concrete mixing plant mainly includes stirring layer column, measuring layer column, stirring Layer platform, measuring layer platform, stirring host, powder metering bucket, middle aggregate bin, level meter batch box and other equipment, it is above-mentioned Each component or part be absolute construction.
The part of this main building structure independence of prior art is more.A kind of pattern for playing with building blocks is belonging to during installation, from Under up in layer install.Platform is with bolts with column.When part is assembled together with part, overall sending out is not easy to Goods.So, it is scattered before the mounting, is also scattered during delivery transport.Although, after individual part can be assembled together Deliver again, but the relatively decentralized state of existing main building structure member can not be changed on the whole.
The problem that this main building structure is present is:As parts are more, look for material to spend the time long, assembling easily occur wrong By mistake, field installation time is longer, and installation cost is high.Another question is not assembled together during delivery, the handling of part It is cumbersome.This main building structure, in order to realize that some install facility, it has to stirring layer platform turns over, in its structure After installing column, then overturn back.Do so, needs larger vacant lot, also there is very big potential safety hazard.
For this reason, it may be necessary to there is a kind of main building structure, overcome or at least mitigate to a certain extent the above-mentioned of prior art and lack One or more in falling into.
The content of the invention
Concrete mixing plant is the combined unit for concentrated compactness concrete, also known as concrete prefabricated field.Due to it Mechanization, automaticity are higher, so productivity ratio is also very high, and can guarantee that the quality of concrete and save cement, are usually used in The engineerings such as concrete works amount is big, long in time limit, the large and medium-sized water conservancy that building site is concentrated, electric power, bridge.With urban construction etc. Development, is had an enormous advantage using the mixing plant tool of concentrated compactness, offer commerical ready-mixed concrete, thus is developed rapidly, and To promote Concrete Pumping Construction, realization is stirred, is conveyed, pouring mechanical integration of operation and create conditions.
Main building structure is the agent structure of concrete mixing plant, generally includes to stir layer platform, measuring layer platform, powder meter Batch box, middle aggregate bin and level meter batch box etc..
Stirring layer platform is the platform for installing stirring host.
Measuring layer platform is the platform for installing powder metering bucket, middle aggregate bin, level meter batch box etc..
Powder metering bucket is for measuring powder(Such as cement, breeze, flyash)Sealing container, it is possible to temporarily store Powder, which is installed on measuring layer platform.
Middle aggregate bin is used for the sandstone aggregate that temporarily storage is come up by the conveying of oblique belt feeder, and which is installed on measuring layer platform On.
Level meter batch box is the sealing container for measuring water, liquid additive etc., it is possible to temporarily store water and liquid Additive, which is installed on measuring layer platform.
It is an object of the invention to provide a kind of main building structure of concrete mixing plant of Fast Installation is overcoming or at least subtract One or more in the drawbacks described above of light prior art.
For achieving the above object, the present invention provides a kind of main building structure of concrete mixing plant of Fast Installation, described quick The main building structure of concrete mixing plant of installation includes:
Underframe;
Stirring layer platform;
Measuring layer platform;And
Column, the underframe, stirring layer platform and measuring layer platform are linked into an integrated entity in the way of being pivotally connected by which, So as to column can be cut between raised state and tilt state relative to the underframe, stirring layer platform and measuring layer platform Change,
In the raised state, the uprights vertical in the underframe, stirring layer platform and measuring layer platform,
In the tilt state, the column parallel to the underframe, stirring layer platform and measuring layer platform, or with it is described Underframe, stirring layer platform and measuring layer platform are into an angle less than 15 degree.
Preferably, the lower end of the column is pivotally connected with the underframe;The upper end of the column is flat with the measuring layer Platform is pivotally connected;The middle part of the column is pivotally connected with the stirring layer platform.
Preferably, the quantity of the column is four.
Preferably, in raised state, four root post projection in the horizontal plane is in rectangle or foursquare four On individual summit.
The two root posts of side and being pivotally connected highly for underframe are preferably located at, are stood higher than two positioned at opposite side Post is pivotally connected height with underframe.
The two root posts of the side and being pivotally connected highly for measuring layer platform are preferably located at, higher than positioned at described The two root posts of opposite side are pivotally connected height with measuring layer platform.
It is preferably located at the two root posts of the side and being pivotally connected highly, higher than the upper table of the underframe for underframe Face.
It is preferably located at the two root posts of the opposite side and being pivotally connected highly, less than the meter for measuring layer platform The lower surface of amount layer platform.
Be preferably located at the two root posts of the side and underframe the upper surface for being pivotally connected height and the underframe it Between distance, be pivotally connected height and the measuring layer platform equal to two root posts and the measuring layer platform of the opposite side The distance between lower surface.
The distance between two root posts of the side are preferably located at more than the stirring layer platform and/or the meter Amount size of the layer platform on the range direction.
The present invention also provides a kind of installation method of the main building structure of concrete mixing plant of Fast Installation, and methods described includes Following step:Under tilt state, by the main building structure of concrete mixing plant whole Transporting of Fast Installation as above to peace Holding position;The main building structure of concrete mixing plant of described Fast Installation is sling to raised state from the tilt state;With And the main building structure of concrete mixing plant of described Fast Installation is fastenedly connected, it is allowed to keep the raised state.
The main part of the main building structure of concrete mixing plant of the Fast Installation of the present invention is connected to one by articulated manner Rise such that it is able to switch between raised state and tilt state, easily can transport and install.
Description of the drawings
Fig. 1 is that the installment state of the main building structure of concrete mixing plant of Fast Installation according to an embodiment of the invention is faced Schematic diagram.
Fig. 2 is the installment state schematic side view of the main building structure of concrete mixing plant of Fast Installation shown in Fig. 1.
Fig. 3 is the installment state schematic top plan view of the main building structure of concrete mixing plant of Fast Installation shown in Fig. 1.
Fig. 4 is schematic diagram of the main building structure of concrete mixing plant of Fast Installation shown in Fig. 1 when in tilt state.
Fig. 5 is the main building structure of concrete mixing plant of Fast Installation shown in Fig. 1 in the schematic diagram during erecting.
Reference:
1 Underframe 8 Stirring host
2 Bearing pin 9 Powder metering bucket
3 First column 10 Middle aggregate bin
4 Second column 11 Level meter batch box
5 3rd column 12 Measuring layer platform
6 4th column 13 Support
7 Stirring layer platform
Specific embodiment
To make purpose, technical scheme and the advantage of present invention enforcement clearer, below in conjunction with the embodiment of the present invention Accompanying drawing, the technical scheme in the embodiment of the present invention is further described in more detail.In the accompanying drawings, identical from start to finish or class As label represent same or similar element or the element with same or like function.Described embodiment is the present invention A part of embodiment, rather than the embodiment of whole.It is exemplary below with reference to the embodiment of Description of Drawings, it is intended to use It is of the invention in explaining, and be not considered as limiting the invention.Based on the embodiment in the present invention, ordinary skill people The every other embodiment obtained under the premise of creative work is not made by member, belongs to the scope of protection of the invention.Under Face combines accompanying drawing and embodiments of the invention is described in detail.
In describing the invention, it is to be understood that term " " center ", " longitudinal direction ", " horizontal ", "front", "rear", The orientation or position relationship of the instruction such as "left", "right", " vertical ", " level ", " top ", " bottom " " interior ", " outward " is based on accompanying drawing institute The orientation for showing or position relationship, are for only for ease of the description present invention and simplify description, rather than indicate or imply the dress of indication Put or element with specific orientation, with specific azimuth configuration and operation, therefore it is not intended that must be protected to the present invention The restriction of scope.
Included according to the main building structure of concrete mixing plant of the Fast Installation of a broad embodiment of the invention:Underframe;Stirring Layer platform;Measuring layer platform;And column.The column in the way of being pivotally connected, by the underframe, stirring layer platform and meter Amount layer platform links into an integrated entity.Column can relative to the underframe, stirring layer platform and measuring layer platform in raised state and Switch between tilt state.That is, whole main building structure of concrete mixing plant can raised state and tilt state it Between switch.
In the raised state(Referring to Fig. 1), the uprights vertical is flat in the underframe, stirring layer platform and measuring layer Platform.In the tilt state(Referring to Fig. 4), the column parallel to the underframe, stirring layer platform and measuring layer platform, or with The underframe, stirring layer platform and measuring layer platform are into an angle less than 15 degree.
The main part of the main building structure of concrete mixing plant of above-mentioned Fast Installation is linked together by articulated manner, So as to switch between raised state and tilt state, easily can transport and install.
Fig. 1 is that the installment state of the main building structure of concrete mixing plant of Fast Installation according to an embodiment of the invention is faced Schematic diagram.Fig. 2 is the installment state schematic side view of the main building structure of concrete mixing plant of Fast Installation shown in Fig. 1.Fig. 3 is figure The installment state schematic top plan view of the main building structure of concrete mixing plant of Fast Installation shown in 1.
The main building structure of concrete mixing plant of the Fast Installation shown in Fig. 1 to Fig. 3 includes underframe 1;Stirring layer platform 7;Meter Amount layer platform 12;And four root posts:First column 3, the second column 4, the 3rd column 5 and the 4th column 6.The column is with pivot Turn the mode of connection, the underframe 1, stirring layer platform 7 and measuring layer platform 12 are linked into an integrated entity.
In the height direction, stir layer platform 7 to be arranged between underframe 1 and measuring layer platform 12.Stirring layer platform 7 is to use In the platform for installing stirring host 8.Advantageously, stirring host 8 is mounted on stirring layer platform 7 in advance, as stirring layer platform 7 is transported Defeated and installation.As such, it is possible to greatly reduce the time needed for in-site installation.Certainly, stirring host 8 also can as needed in peace Installed at dress scene.
Measuring layer platform 12 is located at the top of main building structure of concrete mixing plant, is for installing powder metering bucket 9, centre The platform of aggregate bin 10 and level meter batch box 11 etc..Advantageously, powder metering bucket 9, middle aggregate bin 10 and level meter batch box One or more pre- in 11 is mounted on measuring layer platform 12, with the transport of measuring layer platform 12 with install.As such, it is possible to big The big time reduced needed for in-site installation.Certainly, in powder metering bucket 9, middle aggregate bin 10 and level meter batch box 11 Or more also can be installed in erecting bed as needed.Powder metering bucket 9 is for measuring powder(Such as cement, ore deposit Powder, flyash)Sealing container, it is possible to temporarily store powder.It is defeated by oblique belt feeder that middle aggregate bin 10 is used for temporarily storage The sandstone aggregate sent up.Level meter batch box 11 is the sealing container for measuring water, liquid additive etc., it is possible to temporarily deposited Water storage and liquid additive.
Further it will be understood that underframe 1;The shape and construction of stirring layer platform 7 and measuring layer platform 12 is not limited to figure The embodiment shown, and can be to be arranged as required to.For example, underframe can be simple welding type frame structure, or may be used also To carry reinforcement structure as needed.
First column 3, the second column 4, the 3rd column 5 and the 4th column 6 are at its lower end by bearing pin 2 and 1 pivot of underframe Turn connection;It is pivotally connected with stirring layer platform 7 by bearing pin 2 in center;By bearing pin 2 and measuring layer platform 12 at top It is pivotally connected.It is understood that the axis of the bearing pin is parallel to each other, the pivot axis being pivotally connected described in other words It is parallel to each other.So, the first column 3, the second column 4, the 3rd column 5 and the 4th column 6 can relative to the underframe, Stirring layer platform and measuring layer platform switch between raised state and tilt state.That is, whole concrete mixing plant Main building structure can switch between raised state and tilt state.
In the raised state shown in Fig. 1, column vertically extends, flat perpendicular to the underframe, stirring layer platform and measuring layer Platform.At this point it is possible to further column and the underframe, stirring layer platform and measuring layer platform are fixed(For example, by weldering Connect or be threadedly coupled), whole main building structure of concrete mixing plant is maintained at into raised state.
In the tilt state shown in Fig. 4, column is parallel to the underframe, stirring layer platform and measuring layer platform.At this In bright, " parallel " refers to general parallel orientation, i.e. both angles are within the scope of 5 degree.It is understood that as needed, Tilt state, column and the underframe, stirring layer platform and measuring layer platform can be arranged to some larger angle, and such as 6 Degree, 10 degree etc., it is advantageous to the angle is less than or less than 15 degree.
Advantageously, in raised state, the projection in the horizontal plane of four root posts is in rectangle or foursquare four On summit.
Referring to Fig. 1, positioned at the two root posts in left side(First column 3 and the second column 4)Height is pivotally connected with underframe 1 Degree, higher than the two root posts positioned at right side(3rd column 5 and the 4th column 6)With being pivotally connected highly for underframe.This is conducive to Under tilt state form certain gap to accommodate corresponding component between underframe 1 and measuring layer platform 12, or avoid doing Relate to.
Also for gap is formed, positioned at the two root posts in the left side(First column 3 and the second column 4)With metering Layer platform 12 be pivotally connected height, higher than positioned at right side side two root posts(3rd column 5 and the 4th column 6)With measuring layer Platform 12 be pivotally connected height.This is pivotally connected height and is combined together with the difference in height that is pivotally connected mentioned in the preceding paragraph, So that the space of a generally cuboid is formed between underframe 1 and measuring layer platform 12, this is big by two differences in height On body it is identical and realize.Two differences in height are substantially the same to be meaned:Connect with the pivot of underframe positioned at the two root posts in left side Height is connect the distance between with the upper surface of the underframe, essentially equal to the pivot of the two root posts on right side and measuring layer platform Connection height is the distance between with the lower surface of the measuring layer platform.
Advantageously, as shown in figure 1, positioned at the two root posts in left side and being pivotally connected highly, higher than the bottom for underframe The upper surface of frame.Positioned at the two root posts on right side and being pivotally connected highly, less than the measuring layer platform for measuring layer platform Lower surface.This be conducive to avoiding column topple over erect during with underframe and/or the measuring layer intervening platform.
Referring to Fig. 2, linked together by supporting 13 between first column 3 and the second column 4 in left side, it is whole so as to improve The intensity of individual structure.It is understood that support 13 is not provided with where position is higher than stirring layer platform 7, so as to avoid Interfere with the possibility of stirring layer platform 7 when toppling over.
Preferably, the distance between the first column 3 and the second column 4 are more than the stirring layer platform and/or the meter Amount size of the layer platform on the range direction.This be conducive to avoiding column topple over erect during with stirring layer platform And/or the measuring layer intervening platform.
The present invention is assembled together between column and platform by way of bearing pin connection from the beginning of pillar construction is changed. Powder metering bucket, middle aggregate bin, level meter batch box are arranged on measuring layer platform;Stirring host is arranged on stirring layer platform On.Whole main building structure is assembled together entirely.During delivery, column is kept flat with platform, parallel to the ground.During installation, around one Two columns of common axis of rotation rotation are installed in a rotating manner to erect and(Pilot process is referring to Fig. 5), and due to known Kinematic reasons, the platform of previous level remains in that level, meanwhile, propped up by column high come the installation site needed for reaching Degree.When this main building structure is delivered, overall to deliver, integral hoisting can improve installation rate, and installation process is very convenient.
According to one embodiment of the invention, the installation method of the main building structure of concrete mixing plant comprises the steps: Under tilt state, by the main building structure of concrete mixing plant whole Transporting of Fast Installation as above to installation site;By institute The main building structure of concrete mixing plant of the Fast Installation stated is sling to raised state from the tilt state;And to described fast The main building structure of concrete mixing plant that speed is installed is fastenedly connected, and is allowed to keep the raised state, i.e., so that the first column 3rd, the second column 4, the 3rd column 5 and the 4th column 6 are no longer able to relative to underframe 1, stirring layer platform 7 and measuring layer platform 12 Pivot.The concrete mode being fastenedly connected to main building structure of concrete mixing plant can be taken as needed so that mode. In one embodiment, associated components are welded to connect.In another embodiment, will be threadedly coupled between associated components or Riveting.In a further embodiment, support bar is set between associated components.It is understood that various companies can also be adopted Connect the combination of mode to be fastenedly connected.Advantageously, in transport, stirring host 8, powder metering bucket 9, middle aggregate bin The device such as 10 and level meter batch box 11 is already installed on the main building structure of concrete mixing plant.
The main building structure of concrete mixing plant of the present invention includes a underframe.Underframe is used to connect four root posts, allows four Column is respectively on the position of four points of rectangle.Column is connected with the bearing pin that is connected by of underframe, and column can be the bottom of parallel to Frame is rotated with the spaced winding bearing pin perpendicular to underframe position.Column can fall, during this fell, drive two platforms and Stirring host on platform gradually smoothly reduces height together with hopper, until column is laid flat completely.In the process, pass through The optimization of physical dimension, each part will not be interfered.When installing this main building structure, then the flow process contrary with the process of falling can In the case of not interfering, it is quickly installed.The characteristics of main building structure, in addition to meeting and installing quickly, also meet Overall structure disposably integrally can be lifted under the state of falling, and main building structure integrally can be transported by a transport vehicle It is defeated, it is not necessary in addition the position of each part is adjusted.Additionally, the characteristics of in terms of this main building structure also has layout.Full While foot entirety Fast Installation, the powder metering bucket and level meter batch box installed on measuring layer is placed in the two of middle aggregate bin Side, has enough spaces to allow personnel to pass through between powder metering bucket and middle aggregate bin, level meter batch box and middle aggregate bin it Between also leave the space that personnel pass through.
It is last it is to be noted that:Above example only to illustrate technical scheme, rather than a limitation.To the greatest extent Pipe has been described in detail to the present invention with reference to the foregoing embodiments, it will be understood by those within the art that:Which is still Technical scheme described in foregoing embodiments can be modified, or equivalent is carried out to which part technical characteristic and replace Change;And these modifications or replacement, do not make the essence of appropriate technical solution depart from the essence of various embodiments of the present invention technical scheme God and scope.

Claims (10)

1. a kind of main building structure of concrete mixing plant of Fast Installation, it is characterised in that include:
Underframe(1);
Stirring layer platform(7);
Measuring layer platform(12);And
Column, its in the way of being pivotally connected, by the underframe(1), stirring layer platform(7)With measuring layer platform(12)Connect into Integrally, so as to column can be relative to the underframe(1), stirring layer platform(7)With measuring layer platform(12)In raised state and Switch between tilt state,
In the raised state, the uprights vertical is in the underframe(1), stirring layer platform(7)With measuring layer platform(12),
In the tilt state, the column is parallel to the underframe(1), stirring layer platform(7)With measuring layer platform(12), or With the underframe(1), stirring layer platform(7)With measuring layer platform(12)Into an angle less than 15 degree.
2. the main building structure of concrete mixing plant of Fast Installation as claimed in claim 1, it is characterised in that under the column End and the underframe(1)It is pivotally connected;The upper end of the column is pivotally connected with the measuring layer platform;The middle part of the column With the stirring layer platform(7)It is pivotally connected.
3. the main building structure of concrete mixing plant of Fast Installation as claimed in claim 1, it is characterised in that the number of the column Measure as four.
4. the main building structure of concrete mixing plant of Fast Installation as claimed in claim 3, it is characterised in that in raised state, Four root post projection in the horizontal plane is on rectangle or foursquare four summits.
5. the main building structure of concrete mixing plant of Fast Installation as claimed in claim 4, it is characterised in that positioned at the two of side Root post is pivotally connected height with underframe, higher than being pivotally connected highly for the two root posts and underframe positioned at opposite side.
6. the main building structure of concrete mixing plant of Fast Installation as claimed in claim 5, it is characterised in that positioned at the side Two root posts and measuring layer platform(12)Be pivotally connected height, higher than positioned at the opposite side two root posts and measuring layer Platform(12)Be pivotally connected height.
7. the main building structure of concrete mixing plant of Fast Installation as claimed in claim 6, it is characterised in that positioned at the side Two root posts and underframe be pivotally connected height, higher than the upper surface of the underframe.
8. the main building structure of concrete mixing plant of Fast Installation as claimed in claim 7, it is characterised in that positioned at described another The two root posts of side and measuring layer platform(12)Be pivotally connected height, less than the measuring layer platform(12)Lower surface.
9. the main building structure of concrete mixing plant of Fast Installation as claimed in claim 8, it is characterised in that positioned at the side Two root posts and underframe be pivotally connected the distance between height and upper surface of the underframe, equal to the two of the opposite side Root post and measuring layer platform(12)Be pivotally connected height and the measuring layer platform(12)The distance between lower surface.
10. a kind of installation method of the main building structure of concrete mixing plant of Fast Installation, it is characterised in that comprise the steps:
Under tilt state, by the main building structure of concrete mixing plant of Fast Installation as claimed in any one of claims 1-9 wherein Whole Transporting is to installation site;
The main building structure of concrete mixing plant of described Fast Installation is sling to raised state from the tilt state;And
The main building structure of concrete mixing plant of described Fast Installation is fastenedly connected, is allowed to keep the raised state.
CN201410103368.0A 2014-03-19 2014-03-19 A kind of main building structure of concrete mixing plant and its installation method of Fast Installation Active CN104842460B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410103368.0A CN104842460B (en) 2014-03-19 2014-03-19 A kind of main building structure of concrete mixing plant and its installation method of Fast Installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410103368.0A CN104842460B (en) 2014-03-19 2014-03-19 A kind of main building structure of concrete mixing plant and its installation method of Fast Installation

Publications (2)

Publication Number Publication Date
CN104842460A CN104842460A (en) 2015-08-19
CN104842460B true CN104842460B (en) 2017-04-05

Family

ID=53842632

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410103368.0A Active CN104842460B (en) 2014-03-19 2014-03-19 A kind of main building structure of concrete mixing plant and its installation method of Fast Installation

Country Status (1)

Country Link
CN (1) CN104842460B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110253762A (en) * 2019-06-03 2019-09-20 长沙爱达环保科技有限公司 A kind of integrated form concrete mixing plant main building

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL7604126A (en) * 1976-04-20 1977-10-24 Mulder Maschf B V Large scale concrete mixing system - has frame in two hinging parts forming vehicle or mixing unit
JP2008302646A (en) * 2007-06-11 2008-12-18 Shimizu Corp Concrete manufacturing and supply plant
CN201342733Y (en) * 2008-12-05 2009-11-11 四川现代建设机电集团有限公司 Packaged mixing plant
CN201633136U (en) * 2010-03-17 2010-11-17 中铁轨道系统集团有限公司 Concrete mixing main building
CN101979771A (en) * 2010-11-09 2011-02-23 无锡锡通工程机械有限公司 Tower whole movement lifting device
CN102528935A (en) * 2012-02-06 2012-07-04 三一重工股份有限公司 Fast mounting mixing station main building and mixing station with same
CN202498641U (en) * 2012-03-26 2012-10-24 阜新市和美工程机械有限公司 Folding movable-type concrete mixing station
CN202666761U (en) * 2012-07-16 2013-01-16 郝志付 Foldable asphalt mixing equipment
CN103465380A (en) * 2013-09-04 2013-12-25 三一汽车制造有限公司 Mortar stirring station

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL7604126A (en) * 1976-04-20 1977-10-24 Mulder Maschf B V Large scale concrete mixing system - has frame in two hinging parts forming vehicle or mixing unit
JP2008302646A (en) * 2007-06-11 2008-12-18 Shimizu Corp Concrete manufacturing and supply plant
CN201342733Y (en) * 2008-12-05 2009-11-11 四川现代建设机电集团有限公司 Packaged mixing plant
CN201633136U (en) * 2010-03-17 2010-11-17 中铁轨道系统集团有限公司 Concrete mixing main building
CN101979771A (en) * 2010-11-09 2011-02-23 无锡锡通工程机械有限公司 Tower whole movement lifting device
CN102528935A (en) * 2012-02-06 2012-07-04 三一重工股份有限公司 Fast mounting mixing station main building and mixing station with same
CN202498641U (en) * 2012-03-26 2012-10-24 阜新市和美工程机械有限公司 Folding movable-type concrete mixing station
CN202666761U (en) * 2012-07-16 2013-01-16 郝志付 Foldable asphalt mixing equipment
CN103465380A (en) * 2013-09-04 2013-12-25 三一汽车制造有限公司 Mortar stirring station

Also Published As

Publication number Publication date
CN104842460A (en) 2015-08-19

Similar Documents

Publication Publication Date Title
CA2953504C (en) System and method for delivery of oilfield materials
US11141882B2 (en) Concrete batching plant having reduced cycle time and reduced installation and dismantling time
KR101208629B1 (en) Portable batcher plant
CN109397547A (en) Integrated folded foundation-free concrete mixing station
CN109760212A (en) Integrated folded foundation-free vehicle-mounted mobile mixing plant
CN111852552A (en) Filling slurry preparation system and preparation method thereof
CN104842460B (en) A kind of main building structure of concrete mixing plant and its installation method of Fast Installation
CN103899091A (en) Long-distance gentle slope concrete conveying device
CN203856209U (en) Long distance gentle slope concrete conveying device
CN202753283U (en) Movable concrete mixing device
CN203403420U (en) Concrete vertical conveying pouring system
JP2008302646A (en) Concrete manufacturing and supply plant
CN205471315U (en) Autoloading system of grit material for concrete
CN105821883A (en) Rotary type concrete feed divider for round-section vertical shaft
CN206765100U (en) Sunk type concrete mixing plant
CN205416035U (en) Remove grit feed proportioning system at stirring station
CN204566381U (en) Bavin electricity mixing forced action type stirs and drags pump machine
CN209538194U (en) Sliding slot equipment
CN208930492U (en) Integrated folded foundation-free vehicle-mounted mobile mixing plant
CN109403674B (en) Assembled prefabrication factory for bridge construction and construction method thereof
CN210100374U (en) Concrete feeding device of mixing plant
CN113183326A (en) Construction method for refilling silo of mixing station under complex geological condition
CN102409856B (en) Method and device suitable for concrete transportation on complex terrain
CN206307286U (en) A kind of new additives machine
CN109987381B (en) Close-range three-dimensional concrete transportation system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200928

Address after: No.202 Xuanfu street, Xuanhua District, Zhangjiakou, Hebei Province

Patentee after: Hebei Leisa Heavy Construction Machinery Co., Ltd

Address before: 102206 Changping District City, Shahe, Sha Yang Road, Beijing

Patentee before: BEIQI FOTON MOTOR Co.,Ltd.