CN104836330A CN201510178572.3A CN201510178572A CN104836330A CN 104836330 A CN104836330 A CN 104836330A CN 201510178572 A CN201510178572 A CN 201510178572A CN 104836330 A CN104836330 A CN 104836330A
Authority
CN
China
Prior art keywords
bus
voltage
phase
inlet wire
preset value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510178572.3A
Other languages
Chinese (zh)
Other versions
CN104836330B (en
Inventor
陈晓彬
孙玉彤
王树浩
胡云花
张筱骞
陈连军
黄祖伟
李暖群
邢林华
刘耿彬
付美贤
孙志清
朱颖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHUHAI ELECTRIC POWER DESIGN INSTITUTE CO LTD
Jieyang Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
ZHUHAI ELECTRIC POWER DESIGN INSTITUTE CO LTD
Jieyang Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHUHAI ELECTRIC POWER DESIGN INSTITUTE CO LTD, Jieyang Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical ZHUHAI ELECTRIC POWER DESIGN INSTITUTE CO LTD
Priority to CN201510178572.3A priority Critical patent/CN104836330B/en
Publication of CN104836330A publication Critical patent/CN104836330A/en
Application granted granted Critical
Publication of CN104836330B publication Critical patent/CN104836330B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Provided are a method for quickly detecting bus PT three-phase disconnection of an automatic switching device of a standby power supply and a method for preventing maloperation of bus PT three-phase disconnection of the automatic switching device of the standby power supply. The method for quickly detecting bus PT three-phase disconnection of the automatic switching device of the standby power supply comprises following steps: when an operating inlet wire breaker is closed, if the positive-sequence voltage of the three phases of the bus PT are all lower than a bus no-voltage preset value and operating inlet wire current is higher than a certain current preset value, determining the occurrence of bus PT three-phase disconnection after performing setting and time delaying; if the positive-sequence voltage of the three phases of the bus PT are all lower than the bus no-voltage preset value and operating inlet wire PT voltage is higher than a line in-voltage preset value, determining the occurrence of bus PT three-phase disconnection; if a change ratio of the bus PT three-phase voltage is over a certain value lower than that of the operating inlet wire PT voltage, a voltage change ratio is equal to voltage effective value/voltage rated value%, and if the operating inlet wire PT voltage is higher than in-voltage preset value, determining the occurrence of bus PT three-phase disconnection. The method for quickly detecting bus PT three-phase disconnection of the automatic switching device of the standby power supply may timely discriminate bus fault about voltage lost and a bus PT three-phase disconnection fault.

Description

Backup auto-activating device bus PT three-phase broken string method for quick and faulty action preventing method
Technical field
The present invention relates to a kind of backup auto-activating device bus PT three-phase wire break detection method, also disclose a kind of backup auto-activating device bus PT three-phase broken string faulty action preventing method.
Background technology
Along with the up-to-dateness of our people's productive life improves day by day, people are also being doubled to the demand of electric power and degree of dependence, also more strict to the requirement of the quality of power supply, stride forward in the every field also continuous target to automation, unattended operation, Long-distance Control, uninterrupted power supply for distribution.The supply of electric power of China mainly still relies on national grid to power; electric power breach is also in continuous increase; especially serious in peak times of power consumption short of electricity phenomenon; a lot of large enterprise is all from having power plant or being equipped with generator for this reason, therefore various power supply mutual switching, ensure that the uninterrupted power supply of power supply has become the pith of protection and control loop in Modern power distribution engineering with the high reliability of power supply.
Backup auto-activating device and automatic throw-in equipment of emergency power supply, be when working power or working equipment because of exception, fault or unexpected be disconnected after, can automatically and rapidly stand-by power supply or stand-by equipment are devoted oneself to work the device that restores electricity, it is used widely in modern electric power system.
PT and voltage transformer, be used to measure the high-tension special transformer of electrical network, after high voltage can be converted to lower voltage by scale, be connected on the device such as instrument, instrument and carry out gathering or measuring, no matter voltage transformer original edge voltage is how many volts, and secondary voltage is generally all defined as 57.7 volts or 100 volts.Bus PT, is namely connected with electrical network primary equipment power bus-bar, for gathering three voltage transformers of three-phase bus voltage.Bus PT three-phase breaks, and disconnection problem appears in three voltage transformers be namely connected respectively with three-phase bus, causes it can not go out the state of bus by correct response.Bus PT voltage, namely via the busbar voltage data of voltage measuring transformer.
The criterion of the bus PT three-phase broken string that existing backup auto-activating device adopts is as follows:
1) bus positive sequence voltage be less than 30V and work inlet wire have electric current, judge that bus PT three-phase breaks;
2) bus negative sequence voltage is greater than 8V, judges bus PT single-phase or two-phase broken string.
Meet above condition arbitrarily, time delay 10 seconds report bus PT disconnection signals, after disconnection fault disappears, time delay 1.25 seconds backup auto-activating devices return pre-fault status.Meanwhile, link when backup auto-activating device provides bus PT three-phase broken string contact accesslocking prepared auto restart loop option.
Owing to judging in the criterion whether bus PT three-phase breaks, one of them condition is that requirement work inlet wire has electric current, and when work of transformer substation inlet wire actual load electric current is too small as caused work inlet wire load current too small owing to there being small power supply to generate electricity by way of merging two or more grid systems in standing, do not reach inlet wire and have definite value in current condition, backup auto-activating device by can not judge this abnormal be that the fault of bus loss of pressure or bus PT three-phase break the wrong report of the bus loss of pressure caused, backup auto-activating device can start immediately, cause backup auto-activating device misoperation, need to introduce other criterion for this reason.
Summary of the invention
First technical problem to be solved by this invention is to provide a kind of backup auto-activating device bus PT three-phase wire break detection method, to make backup auto-activating device also can differentiate bus loss of pressure fault and bus PT three-phase disconnection fault in time when the inlet wire current that works is too small.
Second technical problem to be solved by this invention is to provide a kind of backup auto-activating device bus PT three-phase broken string faulty action preventing method, to make backup auto-activating device also can differentiate bus loss of pressure fault and bus PT three-phase disconnection fault in time when the inlet wire current that works is too small, take corresponding measure in time, thus avoid the harmful effect that backup auto-activating device misoperation causes.
The present invention solves its first technical problem by following technical solution: a kind of backup auto-activating device bus PT three-phase broken string method for quick, is characterized in that, comprise the steps:
1) PT by being connected with bus obtains bus three-phase voltage, is obtained the voltage of the arbitrary phase of work inlet wire by the PT be connected with work inlet wire, and obtains the electric current of work inlet wire by the CT be connected with work inlet wire, and work lead-in circuit breaker is when co-bit;
2) make the following judgment:
2.1) if bus PT three-phase positive sequence voltage is all less than bus no-voltage preset value, and work inlet wire current is greater than certain electric current preset value, after time delay of adjusting, judges that bus PT three-phase breaks;
2.2) if bus PT three-phase positive sequence voltage is all less than bus no-voltage preset value, and work inlet wire PT voltage is greater than circuit pressure preset value, judges that bus PT three-phase breaks;
2.3) if bus PT three-phase voltage rate of change is less than more than work inlet wire PT voltage change ratio certain value, described voltage change ratio=voltage effective value/voltage rating %, meanwhile, work inlet wire PT voltage is greater than circuit pressure preset value, judges that bus PT three-phase breaks.
Criterion 2.2) for steady-state process, criterion 2.3) in " if bus PT three-phase voltage rate of change is less than more than work inlet wire PT voltage change ratio certain value ", for transient process, criterion 2.3) in " work inlet wire PT voltage is greater than circuit pressure preset value " judge that whether busbar voltage abnormal for ensureing when the inlet wire PT voltage that works is normal, prevent because bus PT is different from circuit PT characteristic, secondary load is different, cause its measure error different, when power system voltage reduces fast, the erroneous judgement situation of bus PT three-phase voltage and the inconsistent appearance of work inlet wire PT voltage change ratio error may be caused.
Along with new forms of energy are as the continuous expansion of the promotion and application scale of photovoltaic generation, wind power generation, the load that the generation of electricity by new energy power-supply system of electric power system access causes original power generating source system to be carried there occurs change, the load current of the work inlet wire that backup auto-activating device detects may be very little, even can exceed its detection range.The appearance of these phenomenons may make some intelligent apparatus criterion as original in circuit distance protection equipment lose efficacy, and makes them cannot correctly judge the actual working state of bus-bar system, may cause erroneous judgement problem.As when the inlet wire load current that works is too small, when bus PT occurs that three-phase breaks, backup auto-activating device cannot make accurate judgment, there will be backup auto-activating device misoperation phenomenon, this may cause the accident of no-voltage of entire station to occur, by increasing criterion of the present invention, these intelligent apparatus can be made to find timely, and bus PT three-phase breaks the wrong report problem of the bus loss of pressure caused, take measures in time, as locking backup auto-activating device, avoid harmful effect.
Described step 2.2) and 2.3) in judge that bus PT three-phase broken string is as without delay operation.
Step 2) in also make the following judgment:
2.4) if bus PT three-phase voltage rate of change is identical with work inlet wire PT voltage change ratio, and be all less than certain preset value a or be all greater than certain preset value b, a<b, then judge electric power system fault;
And/or
2.5) if work inlet wire PT voltage is less than circuit pressure preset value, namely do not meet and have voltage conditions, and line voltage distribution rate of change is less than certain preset value c, but bus three-phase PT voltage is all greater than bus compression set value, namely bus has pressure, and bus PT three-phase voltage rate of change is all greater than certain preset value d, c<d, then judge that circuit PT breaks.
The present invention solves its second technical problem by following technical solution: a kind of backup auto-activating device bus PT three-phase broken string faulty action preventing method, is characterized in that, comprise the steps:
S1) PT by being connected with bus obtains bus three-phase voltage, is obtained the voltage of the arbitrary phase of work inlet wire by the PT be connected with work inlet wire, and obtains the electric current of work inlet wire by the CT be connected with work inlet wire, and work lead-in circuit breaker is when co-bit;
S2) make the following judgment:
(1) if bus PT three-phase positive sequence voltage is all less than bus no-voltage preset value, and work inlet wire current is greater than certain electric current preset value, after time delay of adjusting, judges that bus PT three-phase breaks;
(2) if bus PT three-phase positive sequence voltage is all less than bus no-voltage preset value, and work inlet wire PT voltage is greater than circuit pressure preset value, judges that bus PT three-phase breaks, locking backup auto-activating device after time delay of adjusting;
(3) if bus PT three-phase voltage rate of change is less than more than work inlet wire PT voltage change ratio certain value, described voltage change ratio=voltage effective value/voltage rating %, simultaneously, work inlet wire PT voltage is greater than circuit pressure preset value, judge that bus PT three-phase breaks, locking backup auto-activating device after time delay of adjusting.
Judge that bus PT three-phase broken string is as without delay operation in described step (2) and (3).
Relative to prior art, the present invention has following beneficial effect: 1) the invention solves new energy grid-connected power, after some current supply circuit load current diminishes, load current cannot be utilized to judge the bus PT problem whether three-phase breaks, achieve when not increasing external cabling, change by means of only software just effectively can judge PT broken string situation, effectively solves the impact that new energy grid-connected power brings;
2) the inventive method can find bus PT three-phase disconnection fault fast without time delay, and no matter be not activated all can quick lock backup auto-activating device for backup auto-activating device, improves the reliability of power system operation;
3) the inventive method adopts bus PT voltage and circuit PT voltage, bus PT voltage change ratio and circuit PT voltage change ratio to combine judgement and detects bus PT disconnection fault, do not need to add hardware device, the setting that only need complete software can realize above-mentioned functions, has the advantage of small investment instant effect;
4) namely can adaptive voltage criterion after backup auto-activating device once being adjusted, need not select to exit prepared auto restart function, improve the utilization rate of prepared auto restart, guarantee power grid security.
Accompanying drawing explanation
Fig. 1 is the main wiring diagram of network system.
Embodiment
Below in conjunction with accompanying drawing, the present invention is described in further detail:
As shown in Figure 1, threephase potential transformer is connected with bus, and the A phase of single-phase potential transformer and a circuit (only draw a circuit in figure, in fact can have many circuits) is connected, and this circuit is namely as the work inlet wire of bus.Backup auto-activating device has line voltage distribution incoming end and locked loop, is respectively used to access above-mentioned voltage transformer and locking backup auto-activating device.
For the electric power system of 110kV, 220kV electric pressure, the criterion of backup auto-activating device bus PT wire break detection method is as follows:
1) bus PT three-phase positive sequence voltage be less than 30V and work inlet wire have electric current, for judge bus PT three-phase broken string (existing criterion);
2) bus negative sequence voltage is greater than 8V, for judging bus PT single-phase or two-phase PT broken string (existing criterion);
Meet above condition time delay arbitrarily 10 seconds report bus PT disconnection faults, after disconnection fault disappears, time delay 1.25 seconds backup auto-activating devices return pre-fault status.
3) lead-in circuit breaker is worked when co-bit, bus three-phase voltage is obtained by the PT be connected with bus, the voltage of the arbitrary phase of circuit is obtained by the PT be connected with circuit, if bus PT three-phase positive sequence voltage is all less than bus no-voltage preset value, and circuit PT voltage is greater than circuit voltage preset value, then can judge that bus PT three-phase breaks without the need to time delay, locking backup auto-activating device after time delay of adjusting, prevents prepared auto restart misoperation in its simplest form.Bus PT recovers normal logic and requires same as the prior art remaining unchanged.
4) lead-in circuit breaker is worked when co-bit, bus three-phase voltage is obtained by the PT be connected with bus, the voltage of the arbitrary phase of circuit is obtained by the PT be connected with circuit, if bus PT three-phase voltage rate of change is less than more than work inlet wire PT voltage change ratio certain value, namely the difference of inlet wire PT voltage change ratio and bus PT three-phase voltage rate of change of working is more than or equal to certain value, described voltage change ratio=voltage effective value/voltage rating %, simultaneously, circuit PT voltage is greater than circuit voltage preset value, then can judge that bus PT three-phase breaks without the need to time delay, locking backup auto-activating device after time delay of adjusting, prevent prepared auto restart misoperation in its simplest form.Bus PT recovers normal logic and requires same as the prior art remaining unchanged.
The present invention goes back easily extensible and goes out following determining step:
Work lead-in circuit breaker is when co-bit, bus three-phase voltage is obtained by the PT be connected with bus, the voltage of the arbitrary phase of circuit is obtained by the PT be connected with circuit, if bus PT three-phase voltage rate of change is identical with work inlet wire PT voltage change ratio, described voltage change ratio=voltage effective value/voltage rating %, and be all less than certain preset value a or be all greater than certain preset value b, a<b, then judge the system failure.
Lead-in circuit breaker is when co-bit, bus three-phase voltage is obtained by the PT be connected with bus, obtained the voltage of the arbitrary phase of circuit by the PT be connected with circuit, if working line PT voltage is less than circuit compression set value, does not namely meet and have voltage conditions, and line voltage distribution rate of change is less than certain preset value c, but bus three-phase PT voltage is all greater than bus compression set value, and namely bus has pressure, and bus PT three-phase voltage rate of change is all greater than certain preset value d, c<d, then judge that circuit PT breaks.
Work lead-in circuit breaker is when co-bit, and when judged result is that bus PT is with no pressure, backup auto-activating device charges and in operating criterion, relevant bus has pressure and decompression criterion that employing work inlet wire PT voltage all can be selected to replace, and namely adopts single-phase voltage to determine whether pressure or low pressure.

Claims (5)

1. a backup auto-activating device bus PT three-phase broken string method for quick, is characterized in that, comprise the steps:
1) PT by being connected with bus obtains bus three-phase voltage, is obtained the voltage of the arbitrary phase of work inlet wire by the PT be connected with work inlet wire, and obtains the electric current of work inlet wire by the CT be connected with work inlet wire, and work lead-in circuit breaker is when co-bit;
2) make the following judgment:
2.1) if bus PT three-phase positive sequence voltage is all less than bus no-voltage preset value, and work inlet wire current is greater than certain electric current preset value, after time delay of adjusting, judges that bus PT three-phase breaks;
2.2) if bus PT three-phase positive sequence voltage is all less than bus no-voltage preset value, and work inlet wire PT voltage is greater than circuit pressure preset value, judges that bus PT three-phase breaks;
2.3) if bus PT three-phase voltage rate of change is less than more than work inlet wire PT voltage change ratio certain value, described voltage change ratio=voltage effective value/voltage rating %, meanwhile, work inlet wire PT voltage is greater than circuit pressure preset value, judges that bus PT three-phase breaks.
2. backup auto-activating device bus PT three-phase according to claim 1 broken string method for quick, is characterized in that, described step 2.2) and 2.3) in judge that bus PT three-phase breaks as without delay operation.
3. backup auto-activating device bus PT three-phase according to claim 2 broken string method for quick, is characterized in that, step 2) in also make the following judgment:
2.4) if bus PT three-phase voltage rate of change is identical with work inlet wire PT voltage change ratio, and be all less than certain preset value a or be all greater than certain preset value b, a<b, then judge electric power system fault;
And/or
2.5) if work inlet wire PT voltage is less than circuit pressure preset value, namely do not meet and have voltage conditions, and line voltage distribution rate of change is less than certain preset value c, but bus three-phase PT voltage is all greater than bus compression set value, namely bus has pressure, and bus PT three-phase voltage rate of change is all greater than certain preset value d, c<d, then judge that circuit PT breaks.
4. a backup auto-activating device bus PT three-phase broken string faulty action preventing method, is characterized in that, comprise the steps:
S1) PT by being connected with bus obtains bus three-phase voltage, is obtained the voltage of the arbitrary phase of work inlet wire by the PT be connected with work inlet wire, and obtains the electric current of work inlet wire by the CT be connected with work inlet wire, and work lead-in circuit breaker is when co-bit;
S2) make the following judgment:
(1) if bus PT three-phase positive sequence voltage is all less than bus no-voltage preset value, and work inlet wire current is greater than certain electric current preset value, after time delay of adjusting, judges that bus PT three-phase breaks;
(2) if bus PT three-phase positive sequence voltage is all less than bus no-voltage preset value, and work inlet wire PT voltage is greater than circuit pressure preset value, judges that bus PT three-phase breaks, locking backup auto-activating device after time delay of adjusting;
(3) if bus PT three-phase voltage rate of change is less than more than work inlet wire PT voltage change ratio certain value, described voltage change ratio=voltage effective value/voltage rating %, simultaneously, work inlet wire PT voltage is greater than circuit pressure preset value, judge that bus PT three-phase breaks, locking backup auto-activating device after time delay of adjusting.
5. backup auto-activating device bus PT three-phase broken string faulty action preventing method according to claim 4, is characterized in that,
Judge that bus PT three-phase broken string is as without delay operation in described step (2) and (3).
CN201510178572.3A 2015-04-16 2015-04-16 Backup auto-activating device bus PT three-phases broken string quick determination method and faulty action preventing method Active CN104836330B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510178572.3A CN104836330B (en) 2015-04-16 2015-04-16 Backup auto-activating device bus PT three-phases broken string quick determination method and faulty action preventing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510178572.3A CN104836330B (en) 2015-04-16 2015-04-16 Backup auto-activating device bus PT three-phases broken string quick determination method and faulty action preventing method

Publications (2)

Publication Number Publication Date
CN104836330A true CN104836330A (en) 2015-08-12
CN104836330B CN104836330B (en) 2017-11-07

Family

ID=53814024

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510178572.3A Active CN104836330B (en) 2015-04-16 2015-04-16 Backup auto-activating device bus PT three-phases broken string quick determination method and faulty action preventing method

Country Status (1)

Country Link
CN (1) CN104836330B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105119256A (en) * 2015-10-10 2015-12-02 江苏省电力公司苏州供电公司 Method for preventing power grid distance protection misoperation under condition of voltage loss after start
CN105244858A (en) * 2015-10-10 2016-01-13 江苏省电力公司苏州供电公司 Method for preventing misoperation caused by voltage loss after starting distance protection of power grid
CN105244857A (en) * 2015-10-10 2016-01-13 江苏省电力公司苏州供电公司 Method for preventing power grid distance protection maloperation caused by voltage-losing after start-up
CN105244856A (en) * 2015-09-29 2016-01-13 国家电网公司 Method for preventing distance protection misoperation caused by PT line breakage
CN105891680A (en) * 2016-06-16 2016-08-24 国网山东省电力公司滨州供电公司 10kV distribution line multiphase disconnection fault determination method based on three-phase voltage and current
CN106291219A (en) * 2016-10-10 2017-01-04 国网四川省电力公司技能培训中心 Single-phase earthing/PT disconnection fault automatic discrimination alarm device and method
CN116482581A (en) * 2023-06-20 2023-07-25 广东电网有限责任公司佛山供电局 Transformer substation voltage transformer opening triangle voltage secondary circuit tester
CN117526815A (en) * 2024-01-04 2024-02-06 天津飞旋科技股份有限公司 Power-down protection method and device for magnetic levitation motor and magnetic levitation system

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006094599A (en) * 2004-09-22 2006-04-06 Kyoritsu Keiki Co Ltd Apparatus and method for switching power supply
CN101581751A (en) * 2009-06-11 2009-11-18 牛晓丽 Locating method of voltage transformer disconnection
CN102890222A (en) * 2012-10-17 2013-01-23 南京国电南自美卓控制系统有限公司 Method for judging breaking of PT (potential transformer) in fast switch

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006094599A (en) * 2004-09-22 2006-04-06 Kyoritsu Keiki Co Ltd Apparatus and method for switching power supply
CN101581751A (en) * 2009-06-11 2009-11-18 牛晓丽 Locating method of voltage transformer disconnection
CN102890222A (en) * 2012-10-17 2013-01-23 南京国电南自美卓控制系统有限公司 Method for judging breaking of PT (potential transformer) in fast switch

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105244856A (en) * 2015-09-29 2016-01-13 国家电网公司 Method for preventing distance protection misoperation caused by PT line breakage
CN105244856B (en) * 2015-09-29 2018-01-16 国家电网公司 A kind of method for preventing PT broken strings from causing distance protection malfunction
CN105119256B (en) * 2015-10-10 2017-12-19 江苏省电力公司苏州供电公司 Prevent power network distance protection first start after decompression malfunction method
CN105244857A (en) * 2015-10-10 2016-01-13 江苏省电力公司苏州供电公司 Method for preventing power grid distance protection maloperation caused by voltage-losing after start-up
CN105119256A (en) * 2015-10-10 2015-12-02 江苏省电力公司苏州供电公司 Method for preventing power grid distance protection misoperation under condition of voltage loss after start
CN105244857B (en) * 2015-10-10 2017-12-19 江苏省电力公司苏州供电公司 Prevent power network distance protection first start after decompression malfunction method
CN105244858A (en) * 2015-10-10 2016-01-13 江苏省电力公司苏州供电公司 Method for preventing misoperation caused by voltage loss after starting distance protection of power grid
CN105244858B (en) * 2015-10-10 2018-06-26 江苏省电力公司苏州供电公司 Prevent power grid distance protection first start after decompression malfunction method
CN105891680A (en) * 2016-06-16 2016-08-24 国网山东省电力公司滨州供电公司 10kV distribution line multiphase disconnection fault determination method based on three-phase voltage and current
CN105891680B (en) * 2016-06-16 2019-04-16 国网山东省电力公司滨州供电公司 10kV distribution line multiphase disconnection fault determination method based on three-phase voltage current
CN106291219A (en) * 2016-10-10 2017-01-04 国网四川省电力公司技能培训中心 Single-phase earthing/PT disconnection fault automatic discrimination alarm device and method
CN116482581A (en) * 2023-06-20 2023-07-25 广东电网有限责任公司佛山供电局 Transformer substation voltage transformer opening triangle voltage secondary circuit tester
CN116482581B (en) * 2023-06-20 2023-11-14 广东电网有限责任公司佛山供电局 Transformer substation voltage transformer opening triangle voltage secondary circuit tester
CN117526815A (en) * 2024-01-04 2024-02-06 天津飞旋科技股份有限公司 Power-down protection method and device for magnetic levitation motor and magnetic levitation system
CN117526815B (en) * 2024-01-04 2024-04-02 天津飞旋科技股份有限公司 Power-down protection method and device for magnetic levitation motor and magnetic levitation system

Also Published As

Publication number Publication date
CN104836330B (en) 2017-11-07

Similar Documents

Publication Publication Date Title
CN104836330B (en) Backup auto-activating device bus PT three-phases broken string quick determination method and faulty action preventing method
CN102684175B (en) A kind of implementation method of micro-capacitance sensor protection
Choudhary et al. A review on microgrid protection
Dang et al. An adaptive protection method for the inverter dominated microgrid
CN103001195A (en) Relay protection method capable of quickly removing dead zone fault of transformer
CN104901284A (en) Detection method and false tripping preventive method of three-phase PT broken line of distance protector
CN104753045A (en) Distributed photovoltaic grid-connection safeguard system
Khademlahashy et al. A review on protection issues in micro-grids embedded with distribution generations
CN112421615A (en) Power distribution station self-healing control method and system based on intelligent breaker action
CN109167338B (en) Generator-transformer unit protection control method and device for nuclear power unit
Ogden et al. Impacts of distributed generation on low-voltage distribution network protection
CN105514948A (en) Backup automatic switching (BZT) apparatus breaker breakdown detection method and BZT apparatus
CN103346534B (en) The relay protecting method that failure in transformer dead zone excises fast
CN102694419B (en) Measurement and control integration management system
CN104882904A (en) Novel photovoltaic power station passive anti-islanding protection method
CN103618290A (en) Transformer dead-zone fault relay protection method based on short-time open protection and sealed TAs
CN104009453B (en) A kind of fault detection method for micro-capacitance sensor off-grid operation situation
Delfanti et al. Coordination of interface protection systems for DG applications in MV distribution networks
Kim et al. Active TCC based protection coordination scheme for networked distribution system
CN109103848B (en) System and method for starting failure protection of injection type ground protection of generator
CN202663192U (en) Detection and control integrated user boundary switch
Amarnath et al. Prevention of power blackout and power theft using IED
US20130188285A1 (en) Method of operating integrated circuit breaker module for solar power system
CN103683200A (en) Relay protection method for dead-zone faults of voltage transformers on basis of starting at switching positions and sealed current transformers TA
CN213879272U (en) Single-phase grounding protection optimization device of photovoltaic access thermal power plant station system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant